Temperature Rise Peak temp. profile Strength required to stop curing 7day curing typical for GPC...
-
Upload
brenda-ryan -
Category
Documents
-
view
215 -
download
0
description
Intelli-Rock System Simple to use by foreman once conversion curve established
Transcript of Temperature Rise Peak temp. profile Strength required to stop curing 7day curing typical for GPC...
Temperature Rise Peak temp. profile Strength required to stop curing 7day curing typical for GPC concrete is reduced to 1-3days Strength required to support load 4day form retention typical for GPC concrete is reduced to