TCUSD New K-5 Construction

PROJECT UPDATENOVEMBER 4, 2015

1

Page 2: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

TCUSD New K-5 Construction

• PROJECT PROCESS• CONCEPTUAL COST ESTIMATE• DESIGN UPDATE• BUILDING STRUCTURE & EXTERIOR FINISH

OPTIONS• INTERIOR/EXTERIOR FINISHES

2

Page 3: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

The Preconstruction Process

Page 4: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

The Preconstruction Process

Page 5: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

The Preconstruction Process

Page 6: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

The Preconstruction Process

Page 7: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

D

ETA

ILLESS

TIME

The Preconstruction Process

MORE ESTIMATE

DESIGN

Programming

Schematic Design

Design Development

ConstructionDocuments Permitting

Page 8: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

MORE

D

ETA

ILLESS

ESTIMATE

DESIGN

Programming

Schematic Design

Design Development

ConstructionDocuments Permitting

TIME

Programming Estimate

SD Estimate

DD Estimate

CD Estimate

Permitted Documents

Design slows to react to milestone estimate

The Preconstruction Process

Page 9: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

D

ETA

ILLESS

TIME

The Preconstruction Process

MORE ESTIMATE

DESIGN

Programming

Schematic Design

Design Development

ConstructionDocuments Permitting

Page 10: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

The Preconstruction Process

Page 11: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

The Preconstruction Process

Page 12: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

The Preconstruction Process

Page 13: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

The Preconstruction Process

Page 14: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

The Preconstruction Process

Page 15: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

+

The Preconstruction Process

GMP #1Demolition and

Abatement

GMP #2Sitework and

Building

Page 16: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

Design Update• Emc2 prepared Design Development Drawings

o CORE updating Estimateo Emc2 reviewed design & systems with District Staff

• CORE presenting Abatement and Demolition GMPo Work to take place November / December

• Construction Drawings Planned to be Completed around end of November

• Construction GMP in January• Construction to start February with Completion

December 2016

16

Page 17: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

o Circulation• Parking Alternates, Reuse Existing Paving

(under new paving)o Utilities

• Reviewing Existing Water Sourceo Grades / Drainage

• Surface Flow / Stepped Buildings

17

Page 18: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

o Current Building Area = 62,880o 36 Classroom Spaces

• 24 Typical Classrooms (Classroom Wings)

• 4 Typical Classrooms at Building Center

• 4 NLI classrooms + 1 HLI Classroom

• 1 Music Room (at Platform)• 2 Special Needs Rooms

o 6 Future Classrooms Planned for at end of classroom wings

18

Page 19: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

Enlarged Core & MPR

19

Page 20: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

Typical Classroom Wing

20

Page 21: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

o Materials & Finishes• Wood Framed Building Structure• Masonry Veneer with Prefinished Metal Wall Panels• Single Ply Roofing• Aluminum Windows• Hollow Metal (Steel Doors and Frames)

21

Page 22: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

22

Page 23: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

o New Buildings integrating with Jr. High & High School Buildings (Unity of District)• Materials• Colors• Design Features

Continuity in Design

23

Page 24: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

Structure & Exterior Options

• Base Bid: Wood Studs with EIFS $14,524,024

Exterior Skin Analysis• Option 1: Wood Studs with masonry + $270,000

veneer to 9 feet & metalpanels above

• Option 2: Wood studs with Fiber ($53,000)Cement Board Siding

Structural Framing Analysis• Option 1a: Concrete Masonry Unit (CMU) + $945,000

Painted exterior walls, metal studinterior walls, wood roof structure

• Option 1b: Concrete Masonry Units (CMU) at + $255,000interior corridor walls (furring onnon-corridor sides)

• Option 2: Concrete Masonry Units (CMU) + $1,705,000Painted exterior walls, metal studinterior walls, wood roof at center,steel roof structure at wings

24

Page 25: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

Base Bid- EIFS

25

Page 26: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

Exterior Finish Option 1-Masonry Veneer & Metal

Panels

Masonry Veneer

Metal Panels

26

Page 27: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

Structural Framing Option – Painted CMU

27

Page 28: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

Interior Floor Finishes

28

Page 29: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

Interior Floor Finishes

29

Page 30: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

Interior Floor Finishes

30

Page 31: TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4, 2015 1.

Interior Floor Finishes

31