1Amulsar – Path to ProductionNovember 2016 – Photo Journal
Lydianinternational.co.uk | TSX:LYD
![Page 2: Lydian Construction Update](https://reader036.fdocuments.net/reader036/viewer/2022062316/5873a8f41a28aba3548b57d5/html5/thumbnails/2.jpg)
2
Topsoil Removal at the Camp Platform.
![Page 3: Lydian Construction Update](https://reader036.fdocuments.net/reader036/viewer/2022062316/5873a8f41a28aba3548b57d5/html5/thumbnails/3.jpg)
3
Excavation for the Temporary Construction Office / Contractor Laydown Area Platform
![Page 4: Lydian Construction Update](https://reader036.fdocuments.net/reader036/viewer/2022062316/5873a8f41a28aba3548b57d5/html5/thumbnails/4.jpg)
4
Initial Upgrades to RD-5 from Gndevaz to Site 14
![Page 5: Lydian Construction Update](https://reader036.fdocuments.net/reader036/viewer/2022062316/5873a8f41a28aba3548b57d5/html5/thumbnails/5.jpg)
5
Sediment Control Near the Temporary Construction Offices Platform, at the Base of the HLF
Sediment Control on the Extended Side of the Temporary Construction Offices Platform
![Page 6: Lydian Construction Update](https://reader036.fdocuments.net/reader036/viewer/2022062316/5873a8f41a28aba3548b57d5/html5/thumbnails/6.jpg)
6
Widening of RD-5
![Page 7: Lydian Construction Update](https://reader036.fdocuments.net/reader036/viewer/2022062316/5873a8f41a28aba3548b57d5/html5/thumbnails/7.jpg)
7
Ripping and Removal of Materials as Part of Access Road Construction
![Page 8: Lydian Construction Update](https://reader036.fdocuments.net/reader036/viewer/2022062316/5873a8f41a28aba3548b57d5/html5/thumbnails/8.jpg)
8
RD-5 Widening
![Page 9: Lydian Construction Update](https://reader036.fdocuments.net/reader036/viewer/2022062316/5873a8f41a28aba3548b57d5/html5/thumbnails/9.jpg)
9
Slope Cutting and Material Removal
![Page 10: Lydian Construction Update](https://reader036.fdocuments.net/reader036/viewer/2022062316/5873a8f41a28aba3548b57d5/html5/thumbnails/10.jpg)
10
Re-Routed Powerline Near the HLF
![Page 11: Lydian Construction Update](https://reader036.fdocuments.net/reader036/viewer/2022062316/5873a8f41a28aba3548b57d5/html5/thumbnails/11.jpg)
Lydianinternational.co.uk | TSX:LYD