Tokyo, Japan 21-June-2015 Sustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015

Transcript of Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable...

Page 1: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

Tokyo, Japan 21-June-2015

Sustainable Development of Energy and Electricity Policy In Cambodia

IEEJ:August 2015

Page 2: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

I. Cambodia Background

II. Current energy policy and measures of Cambodia

III. Cambodian Energy demand and supply

IV. Outlook Energy Demand and supply projection

V. Main issue of Energy policy

VI. Main Purpose and on going work

2

Content

Page 3: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

I. Cambodian Background

3

Page 4: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

4

•Land Area: 181 035 sq.km

• Located at Southeast Asiabordered with Lao MDR in the north, Thailand in the west and Vietnam in the east and south.

• Two seasons: Dry season (Jan-May) and Raining Season(June-Nov)

• Population(est. 2014 ): 15.45Million. (growth rate: 1.63%)

• Total GDP: 11.66 MUSDAnd GDP/capita: 830 USD (NIS 2010)

Geography and Demography

Page 5: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

5

63% are Working Age 53% are Labour Force

80% of Population live at Rural area

Page 6: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

6

City and Urban household

Page 7: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

7

Rural Household

Page 8: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

8

Page 9: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

9

Page 10: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

10

Passenger Transportation

Page 11: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

11

Freight Transportation

Page 12: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

12

II. Current energy policy and

measures of Cambodia

Page 13: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

13

Current energy policy and measure

- To ensure a reliable and secured electricity supply at reasonable prices, which facilitates the investments in Cambodia and developments of the national economy.

- In year 2020: 100% of villages has electrical supply by different kind of electricity source.

- In year 2030: 70% of household has connect to the grid.

- Reduce electrical tariff +Measure: - Seek the fund to support project of power system extension.

Page 14: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

III. Cambodian Energy demand and supply

14

Page 15: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

15

Electricity Coverage Area

Demand: in NG ≈ 780 MW

Country ≈ 850 MW Supply in NG ≈ 1500 MW

Page 16: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

Note: the hydro power can generate only 50% of their capacity during dry season

Available Generation Capacity in 2015

16

- 200 400 600 800

1,000 1,200 1,400 1,600 1,800 2,000

2009 2010 2011 2012 2013 2014 2015 Import Via Distribution line 29 39 49 78 81 81 81 Import Via High Voltage 180 200 215 250 270 320 320 Coal 7 7 7 7 108 228 363 Hydro 11 11 11 223 512 927 927 Fuel Oil 246 229 230 227 227 218 218

MW

Year

In 2015, the source out of EDC’s grid is 54.90

MW

Page 17: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

Available Generation Capacity in 2015

Note: the hydro power can generate only 50% of their capacity during dry season

Year Unit 2009 2010 2011 2012 2013 2014 2015

Import Via Distribution MW 29 39 49 78 81 81 81

Import Via High Voltage MW 180 200 215 250 270 320 320

Coal MW 7 7 7 7 108 228 363

Hydro MW 11 11 11 223 512 927 927

Fuel MW 246 229 230 227 227 218 218

In 2015, the source out of EDC’s grid is 54.90

MW

Page 18: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

Peak Demand in National Grid from 2005 - 2015

18

133 165 232

278 274 334

407

508

625

784

897

40 50 70 83 94 99 116 143 168 177

448

0

100

200

300

400

500

600

700

800

900

1000

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 May 2015

MW

Year

Peak Demand Off Peak Demand

Page 19: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

0 500

1000 1500 2000 2500 3000 3500 4000 4500 5000

2008 2009 2010 2011 2012 2013 2014

Thermal Wood

HYDRO COAL DO HFO IMPORT

Generation by Type in EDC Systems GWhSystem

Year System

Energy Generation by Type in EDC Systems

19

Year Unit 2008 2009 2010 2011 2012 2013 2014

Energy Generation GWh 1,625 1,818 2,242 2,564 3,319 3,689 4,509

Growth Rate % 18% 12% 23% 14% 29% 11% 22%

12% 23%

14%

29% 11%

22%

18%

Page 20: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

Energy Consumption and Customer

20

Note: Other is include Distributor (REE)

13% 24%

14%

31% 8%

Type Unit 2009 2010 2011 2012 2013 2014

Energy Sale GWh. (%)

1,641.56 (13.06%)

2,059.41 (25.45%)

2,353.50 (14.28%)

3,091.11 (31.34%)

3,352 (8.44%)

4,081.21 (21.75%)

Customer Number Conn. (%)

340,396 (7.89%)

375,997 (10.46%)

418,066 (11.19%)

460,984 (10.27%)

502,859 (9.11%)

541,141 (7.59%)

22%

Page 21: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

IV. Outlook of Energy demandand supply projection

21

Page 22: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

Actual Power Transmission and Plan

22

.

.

Kirirom I 12 MW

Kirirom III 18 MW

Stung Chhay Areng 108 MW

Stung Tatay 246 MW

LRSC LS 66 MW x 2

LRSC UP 103 MW x 2

Stung Atay 100 MW

Stung Atay 20 MW

Kamchay 193.2 MW

Stung Pursat I 20 MW

Stung Meteuk III 175 MW

Stung Battambang II 36 MW

Stung I Battambang 24 MW

Stung Siem Reap 2 MW

Stung Sen 5 MW

Stung Chinit 5 MW

Lower Sesan III 375 MW

Prek Liang I 55 MW

Prek Liang II 44 MW

Lower Srepok 235 MW

Prek Rwei I 5 MW

Prek Rwei II 5 MW

O Phlai IV 7 MW

Upper Prekter 15 MW

O Phlai II 4 MW

O Phlai III 5 MW

Sambor 2600 MW

Stung Treng 980 MW

Lower Sesan 900 MW

Lower Se San II 400MW

Upper Sesan IV 350 MW

Prek Por II 17 MW

Prek Por II 8 MW

Under study

Hydro 400 MW

Hydro 193 MW

Hydro 30 MW

Coal: 1st: 500 MW 2nd: 500 MW Import

200 MW

Import 100 MW

Fuel oil 200 MW

Hydro 800 MW

Page 23: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

Rural Electrification Developing Map

23

Page 24: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

Outlook Of Supply and Peak Demand 2014-20

24

Outlook Of Supply and Peak Demand

-

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2014 2015 2016 2017 2018 2019 2020

Available power supply peak demand

MW

Year

Page 25: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

Energy Generation by Type 2014-20

25

2014 2015 2016 2017 2018 2019 2020 Others 15 15 15 15 15 15 15 HFO 250 0 0 0 0 0 0 Import 1079 963 824 414 330 280 250 Coal 640 835 1635 1669 1753 2367 3130 Hydro 1978 2605 2605 3599 4199 4299 4299

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000 GWh

Year

Page 26: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

V. Main Issue of Energy Policy

26

Page 27: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

27

Main Issue of Energy Policy • Energy is the essential input for socio-economic

development of a country. Nearly every aspects ofdevelopment – from reducing poverty and raisingliving standards to improving health care, andindustrial and agriculture productivity – requirereliable access to modern energy sources.

• Main energy issues:– Import dependency– Lateness or suspension of some power plant

constructions.– Seek the fund to support project of power system

extension.

Page 28: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

VI. Purpose and ongoing work

28

Page 29: Sustainable Development of Energy and Electricity …eneken.ieej.or.jp/data/6231.pdfSustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 I. Cambodia

Purpose and ongoing work

The main purpose of this training program are: •To get and exchange some knowledge from Japan and other trainee countries on energy policy •To analyze the current energy situation and estimate future energy needs •To assess the indigenous energy resource potential and explore possibilities for energy resource development