SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images...

37
SUPERVISING EXPERTS AND TECHNICAL ENGINEERING CONSULTANTS

Transcript of SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images...

Page 1: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

SUPERVISING EXPERTS AND TECHNICALENGINEERING CONSULTANTS

Page 2: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

WE UNDERSTANDTHE LANGUAGE OF WAVES

Page 3: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

1 // MARINE HYDRODYNAMICS

2 // HARBOR AND MARINE STRUCTURES

3 // COASTAL AND WATERFRONT STRUCTURES

4 // FEASIBILITY STUDIES AND MASTER PLANNING

5 // PROFILE

Page 4: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

1 //

Page 5: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

5B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

CARRYING OUT (CO), SUPPLY OF SPECIFICATIONS, SUPERVISIONAND CONTROL ON SITE DURING EXECUTION, ASSESSMENT ANDANALYSIS OF NUMERICAL AND EXPERIMENTAL RESULTS OF

• TOPOGRAPHICSURVEYS(CO)• BATHYMETRICSURVEYS(CO)• GEOTECHNICALINVESTIGATIONS• HYDROGRAPHICDATACOLLECTION• UNDERWATERINVESTIGATIONOFEXISTINGSTRUCTURES

PHYSICAL INVESTIGATIONS

Carrying out topographic and bathymetric surveys (Holiday Beach Marina - 2009 )

Underwater Investigation of existing marine structures (Diving at Dar el Mreisse Fishing Harbor Entrance - 2009)

Supply of Specs, supervision, assessment and analysis of geo-technical investigations (Extension of Quay wall N7 at Tripoli Commerc. Harbor OEPT - 2009)

Page 6: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

6B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

CARRYING OUT OF HYDRODYNAMIC CALCULATIONS ANDMATHEMATICAL MODELING (PARTNERSHIP) FOR HARBORSAND COASTAL ZONES

• WAVESANDCURRENTSCALCULATIONS• NUMERICALMODELINGOFWAVESANDCURRENTS,HARBORS

AGITATION,COASTALCHANGES,SEDIMENTSTUDY(INPARTNERSHIPWITHFOREIGNCOMPANIES,…)

• ANALYSISOFNUMERICALANDEXPERIMENTALRESULTS.• RELATIONSANDPARTNERSHIPSSETUPWITHFOREIGNENGINEER-

INGFIRMSANDCONSULTANTS.

HYDRODYNAMIC CALCULATION AND WAVES MODELING

Waves calculations in collaboration with French Experts (Saraya Aqaba - Jordan 2006 / 2007)

Waves and Hydrodynamic calculations (Umm Suqeim I – II & Jumeriah Fishing Harbor (UAE) – Arab Express - 2004 / 2005 / 2006)

Supply of Specs, supervision, assessment and analysis of geo-technical investigations (Extension of Quay wall N7 at Tripoli Commerc. Harbor OEPT - 2009)

Page 7: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

2 //

Page 8: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

8B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

DESIGN, SUPPLY OF EXECUTION DRAWINGS, TENDER DOCUMENTS, BOQ, AND TECHNICAL SPECIFICATIONS, SUPERVISION AND CONTROL ON SITE DURING EXECUTION OF VARIOUS TYPES OF BREAKWATERS

Following the case study, an assessment and analysis of experimental results related to physical modeling can be achieved in collaboration with specialized Laboratories.

• RUBBLEMOUNDBREAKWATERS• PILEDJETTIES• VERTICAL(COMPOSITE/CAISSON)BREAKWATERS• WAVESATTENUATORS• GROYNES,SEAWALLSANDVARIOUSCOASTALPROTECTIONS

BREAKWATER WORKS

Rubble Mound breakwater(Rehab of Main Breakwater at Tyr FishingHarbor - GDLMT - 2009-2010-2011-2012)

Breakwaters with rocky armor layer (KFOURY METALS Co. – Selaata – 2009)

Breakwaters with concrete armor layer(Dar el Mreisse Fish. Harbor entrance -2009)

Page 9: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

9B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

DESIGN, SUPPLY OF EXECUTION DRAWINGS, TENDER DOCUMENTS, BOQ, AND TECHNICAL SPECIFICATIONS, SUPERVISION AND CONTROL ON SITE DURING EXECUTION OF LAND RECLAMATION AND HARBORS PLATFORMS WORKS :

• LANDRECLAMATIONOFLARGEAREAS.• CONCRETEWORKSRELATEDTOHARBORSPLATFORMS(SLABSON

GRADE,BITUMINOUSCOATING,…)

LAND RECLAMATION AND HARBORS PLATFORMS WORKS

Land reclamation works(KFOURY METALS Co. - Selaata - 2009)

Land reclamation works(Commercial Harbor of Tripoli OEPT - 2009)

Concrete platforms works(Fishing Harbor of Chekka GDLMT – 2008)

Concrete platforms works(Fishing Harbor of Amchit GDLMT – 2008)

Page 10: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

10B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

DESIGN, SUPPLY OF EXECUTION DRAWINGS, TENDER DOCUMENTS, BOQ, AND TECHNICAL SPECIFICATIONS, SUPERVISION AND CONTROL ON SITE DURING EXECUTION OF QUAY WALLS

• PRE-CASTCONCRETEQUAYWALLS• PILED(PILES/SHEETPILES)QUAYWALLS• UNDERWATERCONCRETEQUAYWALLS• DOLPHINS• MOORINGANDFENDERACCESSORIES

QUAY WALL WORKS

Pre-cast concrete blocks for quay wall(Chekka Fishing Harbor GDLMT - 2008)

Underwater concrete blocks for quay wall(KFOURY METALS Co. – Selaata – 2009)

Quaywalls (L : Amchit Harbor - 2008) / R : Tripoli OEPT – Extension of QY @-8.75m - 2010)

Quay wall design

A

B

C

D

E

F

0X

Y

Mz

Z

Page 11: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

11B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

DESIGN, SUPPLY OF EXECUTION DRAWINGS, TENDER DOCUMENTS, BOQ, AND TECHNICAL SPECIFICATIONS, SUPERVISION AND CONTROL ON SITE DURING EXECUTION OF MISCELLANEOUS CIVIL ENGINEERING WORKS RELATEDTO HARBORS

• WATERFEEDINGSYSTEMFORVESSELS.• DRAINAGE,ELECTRICAL,SANITARY,WATERSUPPLYSYSTEMS,

FENDERS,BOLLARDS,…ANDOTHERACCESSORIESFORHARBORS.

CIVIL ENGINEERING WORKS RELATED TO HARBORS

Drainage System(Tripoli Commercial Harbor - OEPT - 2009)

Winch System(Naqoura Fishing Harbor - GDLMT - 2009)

Water feeding system for Vessels(Tripoli Commercial Harbor - OEPT - 2009)

Electrical and water Supply systems(KFOURY METALS Co. Selaata – 2009)

Page 12: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

12B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

DESIGN, SUPPLY OF EXECUTION DRAWINGS, TENDER DOCUMENTS, BOQ, AND TECHNICAL SPECIFICATIONS, SUPERVISION AND CONTROL ON SITE DURING EXECUTION OF MISCELLANEOUS SEA LINES AND OUTFALLS

• FUELANDGAZSEALINES.• WATERTREATMENTOUTFALLS.

SEALINES

Sealine Design(Design and MS)

Water Treatment Outfalls at Lebanon(Technical and Design Assistance for Lebanese Engineers - 2004 - … - 2009)

Fuel oil sealine(Design of Fuel Oil sealine – FALCON – Tripoli)

Page 13: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

3 //

Page 14: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

14B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

DESIGN, SUPPLY OF EXECUTION DRAWINGS, TENDER DOCUMENTS, BOQ, AND TECHNICAL SPECIFICATIONS, SUPERVISION AND CONTROL ON SITE DURING EXECUTION OF MISCELLANEOUS COASTAL AND WATERFRONT STRUCTURES

COASTAL PROTECTIONS

Coastal protection (Rocky armor layer)(KFOURY METALS Co. Selaata – 2009)

Coastal protection (Reinforced Concrete) at Berbara (Lebanon) (GDLMT - 2010)

Coastal protection (Rocky armor layer) at Ghazieh (Lebanon) (GDLMT – 2009 / 2010)

Page 15: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

4 //

Page 16: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

16B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

• PRE FEASIBILITY STUDY• FEASIBILITY STUDY• PROJECT EVALUATION• CONCEPTUAL DESIGN• MASTER PLANNING• DETAILED DESIGN• TENDER DOCUMENTS• SUPERVISION OF WORKS

• COMMERCIALHARBORS

• FISHINGHARBORS

• MILITARYHARBORS

• MARINAS

• COASTALRECREATIONALAREAS

• WATERFRONTSTRUCTURES

OVERALL MASTER PLANS

(Umm Suqeim I – II &Jumeriah Fishing Harbor (UAE) – Arab Express - 2004 / 2005 / 2006)

TYR Fishing Harbor (GDLMT - 2009 -…-2012) Tropical Beach Marina (Lebanon – 2007)

Page 17: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

5 //

Page 18: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

18B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

| LATEST EXECUTED PROJECTS

TYR Fishing Harbor (design and Supervisin Works)(Client : General Directorate of Land and Maritime Transportation – Ministry of Public Works | 2009-2010-2011-2012)

DORA Fishing Harbor (Design and Supevision)(Client : General Directorate of Land and Maritime Transportation – Ministry of Public Works | 2012-2013-2014-…)

Page 19: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

19B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

| LATEST EXECUTED PROJECTS

Amchit Fishing Harbor (Design and Supervsion)(Client : General Directorate of Land and Maritime Transportation – Ministry of Public Works | 2012-2013-2014-…)

River bank protection of Naher el Kebir river at Aarida (Design and Supervision)(Client : General Directorate of Land and Maritime Transportation – Ministry of Public Works | 2012-2013)

Page 20: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

20B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

| LATEST EXECUTED PROJECTS

Dalieh Fishing Harbor (Design and Supervision)(Client : General Directorate of Land and Maritime Transportation – Ministry of Public Works | 2012-2013-2014-…)

SAYFCO Marina (LEBANON)(Client : SYAFCO) - 2014

Neemeh Marina (LEBANON)(Client : Hiba Real estate) - 2014

Tripoli Marina (LEBANON)(Client : JCC / SOTEG) - 2014

Page 21: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

21B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

FIELDOFACTIVITY

• Harbor engineering,• Coastal engineering, • Coastal Management,• Sedimentology,• Feasibility studies,• Maritime hydraulics,• StructuresAnalysisandScientificComputation,• Software engineering for marine works,• Tender Documents,

DETAILS

1 / ACTIVITY

• COASTALENGINEERING1. Design and supervision of coastal protections (Groyne, near shore

breakwaters…).

• COASTALMANAGEMENT1. Coasts overall studies.

• SEDIMENTOLOGY1. Design and supervision of dredging works, computation of

sediments volumes…

• FEASIBILITYSTUDIES1. Feasibility studies for harbors and similar projects.

• FLUVIALANDMARITIMEHYDRAULICS1. Computation of waves and currents parameters (Heights, period,

length, celerity, direction,…).

• STRUCTURESANALYSISANDSCIENTIFICCOMPUTATION1. Structural computations related to civil engineering works…

• SOFTWAREENGINEERING1. Waves calculations and marine structures design.2. Civil structures computations and drawings.

• TENDERDOCUMENTS1. Preparation of Tender Documents (Contractual Documents,

technical specs, BOQ,…).

• HARBORENGINEERING1. Design and supervision of Harbors – Commercial, Fishing,

Marinas, Military, Industrial,… (Overall mass plans, details , Gravity quay walls with precast concrete blocks, quays on piles, composite quay walls,…breakwaters with rocky and/or special concrete blocks protection, submerged breakwaters, reclaimedareas, Ports accessories – water and electrical supply…).

Page 22: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

22B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

2 / TECHNICAL EXPERIENCE

A / HARBORS AND COASTAL ENGINEERING PROJECTS

1 / FISHING HARBORS

SINCE 2000, MANY MARINE DESIGNS HAVE BEEN CARRIED OUT BY SEATEC OFFICE, TRANSFORMED LATER INTO SEATEC SARL.HEREIN,LISTEDSOMEOFTHESEPROJECTS:

• AARIDAFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Bathymetric survey of site. (2010)2. Master Plan Design. (2010)3. Bathymetric survey of Nahr-el-Kebir and design for river

dredging. (2011).4. Design and Supervision of River Bank protection with sloped

rocky protection, R.C. platforms and dredging 5. of river entrance (2012-2013)6. Designofanewfishingharbouratthevicinityoftheriver

(Breakwaters, quay walls, platforms,…). (2012)

• TRIPOLIFISHINGHARBOUR(LEBANON-CLIENT:GDLMT)1. Overall Master Plan. (2011)

• HIRANFISHINGHARBOUR(LEBANON-CLIENT:GDLMT)1. Overall Master Plan. (2011)

• GROYNEANDQUAYWALLATTHESOUTHERNSANDYBEACHATTRIPOLI(LEBANON-CLIENT:GDLMT)1. Design of a Groyne (with rocky protections) and a quay wall at

3.00m with precast concrete blocks. (2006)

• KALAMOUNWATERFRONTPROJECT(LEBANON-CLIENT:GDLMT/MUNICIPALITY)1. Design of coastal protection for reclaimed area, and rehabilitation

of the existing Breakwater (with rocky protections), Design of recreational and sportive facilities on existing platforms…(2006-2007-2008-2009)

• CHEIKHZENNADFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Bathymetric survey of site. (2000)

• RAMKINEISLANDATTRIPOLI(LEBANON-CLIENT:GDLMT)1. - Design of Lighthouse rehabilitation, and service quay. (2008)

Page 23: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

23B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

1 / FISHING HARBORS• KALAMOUNFISHINGHARBOR(LEBANON-CLIENT:GDLMT)

1. Design for Basin dredging and Breakwater extension. (2008)2. Design for Basin dredging. (2008-2010).

• BATROUNFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Design for Basin dredging. (Drawings) (2007-2008). Works

executed in (2008)2. Design of Rehabilitation Works for platforms and internal basin

dredging (2008)3. Supervision of execution Works. (2008)

• MARINESCHOOLATBATROUN(LEBANON-CLIENT:GDLMT)1. Design for Land reclamation and coastal protection of Marine

school at Batroun (Decree). (2007)

• BERBARAFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Preliminary Design of Existing Breakwater Rehabilitation, Quay

wall extension, retaining walls...(2006)2. Design for Basin dredging. (2007). Works executed in (2008)3. Design of Existing concrete Breakwater Rehabilitation, Quay wall

extension, Waves attenuator, retaining 4. walls...(2008-2009) and Supervision of execution Works. (2010)5. Design and Supervision of installation of 48 Accropodes Blocks

16m3. (2010)6. DesignofWWTP,fishermenrooms,RC.Platforms,…(2014)

• HERYFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Master Plan design. (2009)

• CHEKKAFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Design of Precast Concrete Quay walls, rocks protection, land

reclamation,basindredging,fishermenrooms...asapartofthefirstphaserehabilitationworksoftheexistingPort.(2006-2007)(Phase 1)

2. Supervision of Execution Works (Phase 1). (2008)3. Design of Precast Concrete Quay walls, rocks protection, land

reclamation,basindredging,fishermenrooms…asapartofthesecond phase rehabilitation works of the existing Port. (2008-2009) (Phase 2)

4. Supervision of Execution Works (Phase 2). (2010-2011)5. Design and Supervision of Entrance Dredging. (2012)6. Design of Accropodes Protection for the Port entrance. (2012)

Page 24: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

24B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

1 / FISHING HARBORS• AMCHITFISHINGHARBOR(LEBANON-CLIENT:GDLMT)

1. DesignofQuaywalls,platforms,fishermenroom.(2006-2007)and Supervision of Execution Works. (2008)

2. Design of rehabilitation works for main breakwater (with Accropodes blocks and new RC crown wall, a new underwater concrete quay wall, lighting and water supply, inner basin dredging,…). (2012)

3. Supervision of execution Works (2012-2013-2014)

• JOUNIEHFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Design and Supervision of Basin dredging. (2008). Works

executed in (2008)

• DBAYEFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Bathymetric surveys of basin. (2003)2. Design of Basin Dredging. (2009)

• DORAFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Design for Basin dredging. (2007)2. Design and Supervision of Works of Basin dredging.

(2008-2010-2012)3. Design of Main breakwater extension. (2010).4. Design and Supervision of complete rehabilitation works (1200m

of new quay walls and piers, rocky protection at entrance, new Fishermenrooms,newfishmarket,newfishermensyndicateheadquarter, lighting and water supply, slipways, reclaimed areas, RC seawall and platforms,…). (2012-2013-2014)

• BYBLOSFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Bathymetric surveys. (2003).2. Design of Extension and rehabilitation works - low crested

breakwater : Accropodes armor layer, crown wall, lighting and water supply, basin dredging, rehabilitation of damaged historical sea wall (2010 -11-12)

3. Design of submerged breakwater variant. (2014)

• HALATEFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Design of Master Plan (2010-2011)

Page 25: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

25B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

1 / FISHING HARBORS• DARELMREISSEFISHINGHARBOR(LEBANON-CLIENT:GDLMT)

1. Design of Main entrance Protection using Accropodes Blocks. (2008-2009)

2. Supervision of Execution Works. (2009).3. Overall Mass plan of the new port ( with vertical concrete

breakwater and Accropodes blocks) (2012).

• HANTOUCHFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Design of provisory protection using Accropodes concrete blocks

with basin dredging. (2008-2009)2. Design and Master Plan of harbor (2008-2009-2010)

• MANARAFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. -Complete Design of Fishing port (Breakwater, Quaywalls,

platforms,fishermenrooms,…).(2014)

• OUZAIFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. BOQ and method statements for steel and precast concrete cut

walks. (2006)2. Design of Basin Dredging. (2009-2010) and Supervision of

Dredging Works (2010)

• SAIDAFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Design of works related to the basin dredging. Fishermen rooms

and waste water system rehabilitation, facilities for tourists…(2004-2006). Works executed in (2006)

• SARAFANDFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Bathymetric surveys. (2003)2. Design of Basin Dredging. (2009)3. Design and Supervision of basin dredging (2010)

• DALIEHFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Design for new cranes foundations and slipway rehabilitation

works. (2008). Works executed in (2008)2. Design of Boats parking Structure and Harbor rehabilitation

works. (2009-2010).3. Design and Supervision of new harbor (new main breakwater

with Accropodes armoring, quay walls, slipway, Fishermen rooms, Fishermen syndicate building, lighting and water supply, basin dredging, slipway...). (2011-2012-2013-2014)

Page 26: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

26B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

1 / FISHING HARBORS• TYRFISHINGHARBOR(LEBANON-CLIENT:GDLMT)

1. Design of quay walls, Cut walks, … - BTUTP - (2006-2007). 2. Design of Basin Dredging and opening of existing conducts

(2008). 3. Design of rehabilitation works related to damaged concrete

breakwater head (2008-2009)4. Design and Supervision of execution works related to the

complete rehabilitation of the port : New precastconcrete quay walls (L=260m), RC platforms, piers, basin dredging, existing breakwater rehabilitation with precast concrete Accropodes blocks armoring and new RC crown wall,…(2010-2011-2012

• UMMSUQEIM1FISHINGHARBOR(UAE-CLIENT:NAKHEEL–CLIENT:MEI)1. Design of marine infrastructure (Two variants with stones

armoring and precast concrete Accropodes blocks and a third variant based on caissons solution). (2004)

• UMMSUQEIM2FISHINGHARBOR(UAE-CLIENT:NAKHEEL–CLIENT:MEI)1. Design of marine infrastructure (Two variants with stones

armoring and precast concrete Accropodes blocks and a third variant based on caissons solution). (2004-2005)

• JUMEIRAHFISHINGHARBOR(UAE-CLIENT:NAKHEEL–CLIENT:MEI)1. Design of marine infrastructure (Two variants with stones

armoring and precast concrete Accropodes blocks and a third variant based on caissons solution). (2004-2005)

• NAQOURAFISHINGHARBOR(LEBANON-CLIENT:GDLMT)1. Design of Basin Dredging. (2008). Works executed in (2009)2. Design of 5T Boat winch - (2008). Works executed in (2009)3. Overall Master Plan. (2011)4. FullDesignoffishingharbor(MainBreakwaterwithAccropodes

armor, Quay walls, RC platforms, Basin dredging, Fishermen rooms,…) (2014)

Page 27: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

27B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

2 / COMMERCIAL HARBORS• TRIPOLICOMMERCIALHARBOR(LEBANON–CLIENT:OEPT

1. Design of Land reclamation areas using demolition of Naher El Bared Buildings (2008) and Supervision of works (2008-2009)

2. Design and Supervision of Works of Water supply system for ships at the Port : GRP pipes installation, trenching, digital water meters, pumps, data transfer by radar to OEPT headquarter (2009-2010)

3. Design of a breasting dolphin for the Pilot tug (2009) and Supervision of Works.

4. Design and Works supervision of quay wall N7 extension (@-8.75m) for 10000 DWT vessels – Concrete blocks , capping beams, land reclamation, RC platforms, 100T bollards and fender installation and Supervision of works (2009-2010)

5. Design of a passenger quay wall (@-8.00m) (2009)6. Design and Supervision of Dredging works and debris removal

along quay walls. (2010-2011)7. Design of breasting dolphins for 5000 DWT ships and basin

dredging. (2010)8. Design and Supervision of 2 breasting dolphins (piles). (2010)9. Design of passenger terminal adjacent to main breakwater (Quay

wall @-10.00m). (2011)

• KFOURYMETALSCO.HARBOR(SELAATA/LEBANON–CLIENT:KFOURYMETALSCO.)1. Design of an unsheltered quay wall @ -10.00m (L=50.00m) and

7.00m (L=200m)(Underwater Concrete Blocks, underwater blasting and dredging, R.C. platforms…(2006-2007-2008-2009).

2. Supervision of Execution Works. (2008–2009-2010 - 2011 2012-2013)

• JOUNIEHCRUISEPORT(LEBANON–CLIENT:GDLMT)1. Conceptual Design of a cruise port . (2012-2013-2014)

• BASINOFZOUKPOWERSTATION(LEBANON–CLIENT:EDL)1. Bathymetric survey of site and design of basin dredging.

(2009-2013)

• DEMCOSTEELPORT(LEBANON–CLIENT:DEMCOSTEEL)1. Design of a new port with a main quay wall. (2012)

• BASINOFJIEHPOWERSTATION(LEBANON–CLIENT:EDL):1. Bathymetric survey of site and design and Supervision of basin

dredging. (2009-2010-2011-2012)

Page 28: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

28B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

2 / COMMERCIAL HARBORS• MIXEDUSEFACILITY(QATAR)

1. Technical Consultancy, BOQ pricing and method statement for contractor. (2007)

• GUARBECQUEQUAY(FRANCE)1. Preliminary Design drawings of a pile supported quay wall with

French Consultant. (2005)

• JICHYQUAYWALL(CONGO)1. Design of pile/sheetpile quaywall @-13.00m (L=450m) for 40 000

DWT ships. (2014-2015)

Page 29: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

29B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

3 / MILITARY HARBORS• LEBANESENAVYMARINEBASE(TRIPOLI/LEBANON-CLIENT:LAF)

1. Supervision of Dredging works and debris removal from basin. (2011)

• LEBANESENAVYMARINEBASE(AMCHIT/LEBANON-CLIENT:LAF)1. Preliminary Design of a marine base (Breakwaters, quay walls, RC crown

wall, platforms, slipway…). (2013)

• ISFMARINEBASE(DBAYE/LEBANON-CLIENT:ISF)1. Preliminary Design of a marine base (Breakwaters, quay walls,…). (2007). 2. Final Design of the marine base (Breakwaters, quay walls, RC crown wall

and platforms, slipway…). (2012)

• SHARJAHCOASTGUARDBASE(UAE)1. Technical Consultancy, BOQ pricing and method statement for

contractor. (2005)

• BAYACOASTGUARDBASE(UAE)1. Technical Consultancy, BOQ pricing and method statement for

contractor. (2005)

Page 30: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

30B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

4 / MARINAS• TRIPOLIMARINA(LEBANON)

1. Design of marina (Breakwaters, RC crown walls and platforms, quay walls, pontoons, slipway…). (2014)

• ASSEILYMARINA(AMCHIT-LEBANON)1. Design of marina (Breakwaters, RC crown walls and platforms,

quay walls, pontoons, slipway…). (2012-2013)

• KASSARMARINA(AMCHIT-LEBANON)1. Design of marina (Breakwaters, RC crown walls and platforms,

quay walls, pontoons, slipway…). (2011)

• BYBLOSSUDVILLAGE(BYBLOS-LEBANON)1. Designoffloatingbreakwater(2008-2009-2010-2011-2012)and

works supervision. (2011)

• BASSILMARINAHALATE(HALATE-LEBANON)1. Design of marina and Decree preparation (Breakwater, quays,

pontoons …).(2013-2014)

• HALATESURMERMARINA(HALATE-LEBANON)1. Preliminary design of main breakwater rehabilitation and

pontoons. (2010)

• FLORIDABEACHHERY(HERY-LEBANON)1. Design of basin dredging. (2009-2010).2. Design and Supervision of sand dredging works in and outside the

marina. (2011-2012)

• HERYMARINA(HERY-LEBANON)1. Design of marina and Decree preparation (Breakwater, quays,

pontoons …). (2014)

• BONITABAYBATROUN(BATROUN-LEBANON)1. -Preliminary design of a pontoon supported on piles. (2008).

• BERBARAHIDEAWAYMARINA(BERBARA-LEBANON)1. Technical consultancy, BOQ Pricing and method statement for

contractor. (2006).2. Design of additional protection of the existing vertical breakwater

using Accropodes blocks. (2013).

Page 31: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

31B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

4 / MARINAS• HATMARINA(HALATE-LEBANON)

1. Design of marina and Decree preparation (Breakwater, quays, land reclamation…). (2014)

• TROPICALBEACHATZOUKMOSBEH(ZOUKMOSBEH-LEBANON)1. Preliminary design of detached breakwater with touristic facilities

(Restaurant, bungalows on piles,…). (2008)

• HOLIDAYBEACHMARINA(DBAYEH-LEBANON)1. Design of basin dredging. (2010)

• CITYMARINA(NEWJDEIDEH-LEBANON)1. Design of marina (Breakwater, quays, pontoons …)

and Decree preparation. (2014)

• GHAYSSMARINA(NEEMEH-LEBANON)1. Design of marina (Breakwater, quays, pontoons, slipway…)

and Decree preparation. (2011-2012)

• NEEMEHMARINA(NEEMEH-LEBANON)1. Design of marina (Breakwater, quays, pontoons, slipway…)

and Decree preparation. (2014)

• JERDIMARINAATJIEH(JERDI-LEBANON)1. Conceptual design of Marina. (2008)

• SAFRAMARINA(SAFRA-LEBANON)1. Design of marina (Breakwater, quays, pontoons, slipway…). (2010-

2011-2012)

• DOUMETMARINA(NAHRIBRAHIM-LEBANON)1. Design of marina (Concrete breakwater). (2010-2011-2012)

• DOUMETMARINA(NAHRIBRAHIM-LEBANON)1. Design of marina (Concrete breakwater). (2010-2011-2012)

• GRACEKHOURYPROJECT(TABARJA-LEBANON)1. Design of coastal rocky protection. (2011)

• SAYFCOMARINA(ZOUK-LEBANON)1. Design of marina (Breakwaters, RC crown walls and platforms,

quay walls, pontoons, slipway…). (2014)

Page 32: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

32B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

4 / MARINAS• RESTHOUSETYR(TYR-LEBANON)

1. Design of Basin dredging. (2010-2013)• NAJMATABUDHABI–ALREEMISLAND-(UAE)

1. Technical consultancy, BOQ pricing and method statement for contractor. (2006-2007)

• QATARQUAYWALLS(QATAR)1. Technical consultancy, Preliminary Design of a quay wall variant

(Precast Concrete Blocks @-6.00m) with BOQ for Contractor. (2006)

• C11ISLAND–(DUBAI/UAE–CLIENT:ACIENGINEERING)1. Conceptual Design of marine infrastructure of the C11 Island

(Includingmarinasconcept,floatingandpilessupportedpontoons, concrete quay walls,...(2008-2009)

• SARAYAAQABA(AQABA-JORDAN)1. Design of diaphragm walls, submerged breakwaters, marine

protection for lagoon banks, beach stability, geotextile, sediment transportation, pontoons, piling and sheet piling… in collaboration with french consultant Jacques Renou. (2006-2007-2008-2009-2010-2011)

• ALMARJANARTIFICIALISLAND(UAE)1. Technical consultancy, BOQ pricing and method statement for

contractor . (2005)

• ALSEEFANDBANIASROADSMARINAPILING(UAE)1. Technical consultancy, BOQ pricing and method statement for

contractor. (2005)

• MARINAALFAJER–JUMEIRAH-(UAE)1. Technical consultancy, BOQ pricing and method statement for

contractor. (2006)

Page 33: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

33B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

5 / COASTAL PROTECTION• COASTALPROTECTIONOFPLOTN126-127ATBEDDAWI(LEBANON

CLIENT:SOLVOCHEM)1. Design of a rocky coastal protection / L=270m. (2013)

• GROYNEANDQUAYWALLATTHESOUTHERNSANDYBEACHAT(TRIPOLI/LEBANON-CLIENT:GDLMT)1. Design of a Groyne (with rocky protections) and a quay wall

@-3.00m with precast concrete blocks. (2006)

• COASTALPROTECTIONOFELMINACORNICHE(TRIPOLI/LEBANON-CLIENT:GDLMT/SOTEG)1. Design of a rocky coastal protection / L=300m. (2014)

• SEAWALLFORLEPECHERESTAURANTATAQUAMARINA(MAAMELTEIN/LEBANON-CLIENT:AQUAMARINA)1. Design of a RC seawall for the protection of Le Peche Restautant

(2013)

• COASTALPROTECTIONOFDBAYEHHIGHWAY(LEBANONCLIENT:GDLMT/SOTEG)1. Conceptual Design of a highway coastal protection /

L=300m. (2014)

• MARINEPROTECTIONOFTHERECLAIMEDLANDFORTHEWASTETREATMENTCENTERATTRIPOLI(LEBANON)1. Review of the armoring stones concept and design (L=900m).

(2004-2005)

• MARINEPROTECTIONOFTHERECLAIMEDLANDFORTHEWASTEDISCHARGEATTRIPOLI(LEBANON)1. General Guidance for the Contractor in charge of executing the

coastal protection (Rocky slopes, land reclamation and Retaining wall). (2006)

• PROTECTIONOFSOUTHERNSANDYBEACHAT(TRIPOLI/LEBANONCLIENT:GDLMT)1. Design of a stones seawall as coastal protection / L=260m. (2006)

Page 34: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

34B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

5 / COASTAL PROTECTION• COASTALPROTECTIONFORAISHTI(ANTELIAS/LEBANON-CLIENT:

AISHTI)1. Design and Decree preparation for rocky coastal protection.

(2012-2013)

• MARINEPROTECTIONFORINDUSTRIALZONEATGHAZIEH(LEBANON-CLIENT:GDLMT)1. Design of a rocky coastal protection for industrial buildings with

land reclamation. (2006–2007–2008–2009)2. Supervision of Execution Works. (2010)

• COASTALPROTECTIONFORTHETYRLIGHTHOUSE(LEBANON-CLIENT:GDLMT)1. Design of a rocky underwater reef protection for tyr lighthouse.

(2013)

• WATERTAXIALONGLEBANESECOAST(LEBANON-CLIENT:LEBANESEMARITIMECOMPANY)1. Conceptual Design. (2011

• COASTALANDFLUVIALPROTECTIONOFPARCELN32NAHERIBRAHIM(LEBANON)1. Coastal and Fluvial protection of parcel N32 at Naher Ibrahim.

(2012)

• COASTALPROTECTIONOFTALALERSLANPLOTATKHALDEH(LEBANON/CLIENT:MRTALALERSLAN)1. Design of a rocky coastal protection for Talal Erslan Plot. (2012)

• MARINEPROTECTIONFORTHEGHAZIEHCOAST(GHAZIEH/LEBANON-CLIENT:GDLMT)1. Design of coastal protection - stones armoring - (L=500m). (2003

- 2004)

Page 35: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

35B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

6 / SEALINE• SEALINE(GAZ)ATSYRIA(CLIENT:MARCONTRACTING)

1. Design review and stability calculation note (2010)• UNIVERSALGAZSEALINE(FUEL)(LEBANON–AMCHIT/CLIENT:

UNIVERSALGAZ)1. Bathymetric survey, relocation of buoys and Sealine. (2013)

• MARINEPROTECTIONFORTHEOUTFALLSEALINEFORTHEWATERTREATMENTSTATIONATBYBLOS(LEBANON/CLIENT:BUTEC)1. Design of the sealine marine protection (L=450m).

(2006-2007-2008)

• WATERFRONTCITYSEAOUTFALL(DBAYEH-LEBANON/CLIENT:MAJIDALFUTTAYMPROPERTIES/JOSEPHKHOURY)1. Design of HDPE sea outfall (L=1000m) and a WWTP plant

(Diffusion modelling – Maritime protection – Tender Docs…(2012-2013)

• MEDCOSEALINEATDORA(LEBANON/CLIENT:GEORGESCHAMMASSALCO.)1. Design of a sealine for MEDCO. (2008 – 2009)2. Decree preparation (2014)

• HDPESEAOUTFALLATTRIPOLI(LEBANON/CLIENT:OEPT)1. Assitance of OEPT port for the installation of the Outfall at the

vicinity of the harbor. (2008-2009)

• SEALINE(FUEL)ATTRIPOLI(CLIENT:FALCONCO.)1. Design and decree preparation. (2009)

• MARINEPROTECTIONFORTHEHDPEOUTFALLFORTHEWATERTREATMENTSTATIONATCKEKKA(LEBANON/CLIENT:BUTEC)1. Design of the sealine marine protection (L=600m). (2003-2004)

• SEALINE(FUEL)ATSELAATA(CLIENT:IAPCO)1. Design and decree preparation. (2013)

• MARINEPROTECTIONFORTHEHDPEOUTFALLFORTHEWATERTREATMENTSTATIONATBATROUN(LEBANON/CLIENT:BUTEC)1. Design of the sealine marine protection (L=450m).

(2006-2007-2008)

Page 36: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

36B E C A U S E W A T E R C O V E R S 7 0 % O F T H E G L O B E

A / HARBORS AND COASTAL ENGINEERING PROJECTS

6 / SEALINE 7 / COASTAL MANAGEMENT• UNIGAZSEALINEATBORJHAMMOUD(LEBANON/CLIENT:UNIGAZ

SAL)1. Decree preparation for Unigaz sal. (2012)

• TUNISIANCOAST(TUNISIA)1. Drawings for the Tunisian coast management studies in

collaboration with french Consultant.(2004-2005).

GDLMT: General Directorate of Land and Marine Transportation / Lebanese Ministry of

Public Works and Transportation

OEPT: Office d’Exploitation du Port de Tripoli

• CORALSEALINEATBORJHAMMOUD(LEBANON/CLIENT:CORALOILCOMPANY)1. Decree preparation for Coral sal. (2010-2011)2. Bathymetric survey and Relocation of mooring buoys. (2014)3. Tanks surveying. (2014)

• TOTALSALSEALINEATBAUCHRIYEH(LEBANON/CLIENT:TOTALLIBAN)1. Bathymetric survey and Decree preparation for Total sal. (2010-

2011-2014).

• TYRSEAOUTFALL(LEBANON/CLIENT:RESEARCHCONSORZIOSTABILEJVRESEARCHSPA/DANASHCO)1. Design (Bathymetric survey, hydraulic and maritime design,

marine protection… (2014-2015).

Page 37: SUPERVISING EXPERTS AND TECHNICAL ENGINEERING …seatec-sarl.com › bundles › frontweb › images › Seatec-Profile.pdf · 5 // profile. 1 // because water covers 70 of the globe

AddressBeayniCenter,1stfloor,MainStreet,Byblos,Lebanon.

Phone (+961) 9 55 00 22 | Fax : (+961) 9 55 00 44

Mobile (+961) 70 55 00 22 | (+961) 3 29 10 30

[email protected] | www.seatec-sarl.com