STEG Renewable Energies »

33
Benaïssa AYADI, Director-General STEG ER December 2010 Tunisian Solar Plan STEG Renewable Energy Economic Forum Japan - World arab The 2nd JAEF 2010

Transcript of STEG Renewable Energies »

Page 1: STEG Renewable Energies »

Benaïssa AYADI, Director-General STEG ER

December 2010

Tunisian Solar Plan

STEG Renewable Energy

Economic Forum Japan - World arab

The 2nd

JAEF

2010

Page 2: STEG Renewable Energies »

Energy Conservation Data in Tunisia

The 2nd

JAEF

2010

Page 3: STEG Renewable Energies »

I36% I30%

I17%I 10%I7%

Industry Transport

ResidentialTertiaryAgriculture

Sectorial distribution of final consumption

The 2nd

JAEF

2010

Page 4: STEG Renewable Energies »

0

10

20

30

40

50

60

70

80

90

100

2003 2010 2020 2030

Renewable Energies

20%

Energy Efficiency

80%

Mtoe

Energy Saving Potential by 2030

The 2nd

JAEF

2010

Page 5: STEG Renewable Energies »

- setting up the institutional framework : The creation of ANME in 1985 - setting up the legal framework : Law of August 2nd 2004 amended by the Law of February 9th 2009- setting up financial initiatives: The Creation of National Fund for Energy Conservation in December 2005-Setting action programs -1st programme 2005-2008-2nd programme 2008-2011-3rd programme: Presidential Programme 2009-2014- 4rd programme: Tunisian Solar Plan 2009-2016

The implementation of energy conservation policy in Tunisia

The 2nd

JAEF

2010

Page 6: STEG Renewable Energies »

Evolution of the legal framework for electricity production in Tunisia

1962Creation of STEG

Self-producers (conventional production)

Law of03-04-1962n° 62-8

1996 IPPLaw of01-04-1996n° 96-27

Decree of20-06-1996n° 96-1125

2004 Law of02-08-2004n° 2004-72

2002 CogenerationLaw of24-07-1990n° 90-62

Decree of03-12-2002

n° 2002-3232

Energy concervation

2009 Law of09-02-2009n° 2009-7

Amendment of the law on energyconcervation(Self-production by RenewablesEnergies)

The 2nd

JAEF

2010

Page 7: STEG Renewable Energies »

Electricity producers in Tunisia:

STEG: Société Tunisienne de l’Electricité et du Gaz - Production, Transmissionand Distribution

Cogenerator: In accordance with the decree of 3 febr 2002 and law of of 9 feb2009.

IPP: Granted by governmental AO (Sell only for STEG)

Self-producers: Big Power Consuming Facilities (BPCF) can produce – from RE-their own requirements in Energy and sell to STEG up to 30% of their production(Law of 9 Feb. 2009)

Export: Energy production in Tunisia intended for export (law In progress )

Evolution of the legal framework for electricity production in Tunisia

The 2nd

JAEF

2010

Page 8: STEG Renewable Energies »

Mtoe Evolution of primary energy consumption :

Mtoe

Programme results (2005-2008)

8,4

8,8

9.1

7,77,9

8,0

7,00

7,50

8,00

8,50

9,00

9,50

2004 2005 2006 2007 2008 2009

Evolution de la consommation énergétique

Consommation base 2004 Consommation d'énergie primaire

Mtep

1,112,3% )

(8%) 0.7

0.18

(2%)

Without Energy Conservation programme

With Energy conservation programme

Evolution of primary energy consumption :

The 2nd

JAEF

2010

Page 9: STEG Renewable Energies »

0,25

0,30

0,35

0,40

0,451000 dt /toe

0,323

0,416

0,352

0,391

Evolution of energy intensity1990-2005 : Annual reduction for energy intensity : 1%

2005-2007 : Annual reduction for energy intensity : 2.8%

2008-2011 : Annual reduction for energy intensity : 3%

0,286

0,309

Energy intensity evolution

0,314

2008

The 2nd

JAEF

2010

Page 10: STEG Renewable Energies »

8%

,

10, 6

,

8, 6

7,20

7,70

8,20

8,70

9,20

9,70

10,20

10,70

2004 2009 2011

1,112,3%

Reducing Consumption

20%

Mtoe .I Evolution of primary energy consumption: 2007-2005نتائج برنامج :

Programme targets (2008-2011)

Without Energy Conservation programme

With Energy Conservation programme

Reduction of primary energy consumption by 20% in 2011

The 2nd

JAEF

2010

Page 11: STEG Renewable Energies »

The Presidential Programme 2009-2014

Towards environment-friendly, energy-saving and innovative economywith high technological content.

Improving energy efficiency indicator to reach 275 kg oil equivalent per 1000 dinars of

GDP at constant prices, in 2014, compared to 305 kg currently.

Increasing five-fold the percentage of renewable energies use in the total energy

consumption, from 0,8% currently to 4,3% in 2014, and producing 550 megawatts of this

type of energy (including cogeneration).

From paragraph 11 of the Presidential Program 2009-2014

The 2nd

JAEF

2010

Page 12: STEG Renewable Energies »

Tunisian solar plan

The 2nd

JAEF

2010

Page 13: STEG Renewable Energies »

The Tunisian Solar Plan (TSP) aims at implementing the 2009-2014

presidential programme and the will of the Tunisian State to promote

concrete actions in the fields of energy efficiency and renewable

energies. Besides, it confirms Tunisia's ambition to become an

international platform for production and industrial and energy export

including the solar energy.

Tunisian Solar Plan

The 2nd

JAEF

2010

Page 14: STEG Renewable Energies »

OVERALL PRESENTATION : The Tunisian Solar Plan in divided into 5 chapters,

related to specific fields of energy activities, and encompasses 40 projects.

IMPLEMENTATION PERIOD : 2010- 2016.

PROGRAMME TOTAL COST: The estimated total cost of the TSP is about 4100

MTND which is the equivalent of 2300 M€. The funding is detailed as follow:

260 MTND, (145 M€) : by the National Fund for Energy Conservation (FNME)

1000 MTND, (560 M€) : by the public sector (925 MTND by STEG)

2750 MTND, (1530 M€) : by private funds

115 MTND, ( 65 M€) by international cooperation.

PLAN CONSISTENCY AND TOTAL COST

TUNISIAN SOLAR PLAN

The 2nd

JAEF

2010

Page 15: STEG Renewable Energies »

TargetsTUNISIAN SOLAR PLAN

Renewable Installed Power:

The 2nd

JAEF

2010

Page 16: STEG Renewable Energies »

Distribution by type of Renewables Energies :

MW

TargetsTUNISIAN SOLAR PLAN

Wind solar OthersThe

2nd JA

EF 2010

Page 17: STEG Renewable Energies »

IMPACT

ENERGY IMPACT : Fall in demand about 24% in 2016

ENVIRONNEMENTAL IMPACT : The estimated amount of avoided CO2 is

about 2 000 000 tons per year, thus generating CDM (Clean Development

Mechanism) revenues of around 400 MD (200 M€) over 10 years (based on

10 € per ton).

TUNISIAN SOLAR PLAN

The 2nd

JAEF

2010

Page 18: STEG Renewable Energies »

THE OPERATORS : The proponents of the 40 projects are as follows :

Public sector : 5 projects, of which 3 STEG projects ;

private sector : 29 projects ;

5 projects related to the studies and the plan implementation :

financed by international cooperation ;

Establishment of « STEG Renewable Energies ».

THE OPERATORSTUNISIAN SOLAR PLAN

The 2nd

JAEF

2010

Page 19: STEG Renewable Energies »

TUNISIAN SOLAR PLAN PROJECTS

I. Solar Energy Projects

II. Wind Energy Projects

III. Energy Efficiency Projects

IV. Other Projects

V. Study and Implementation of the PlanThe 2nd

JAEF

2010

Page 20: STEG Renewable Energies »

Solar water heating by solar thermal energy:

Project n°1 : Residential and individual Household PROSOL

Project n°2 : Residential Collective PROSOL.

Project n°3 : Tertiary (services) and industrial PROSOL.

Project n°4 : Solar powering of municipal indoors swimming pools.

TUNISIAN SOLAR PLAN PROJECTSI. SOLAR

I.1. THERMAL PROSOL

The 2nd

JAEF

2010

Page 21: STEG Renewable Energies »

Solar cooling :

Project n°5 : Execution of 10 pilot projects of application of solar cooling

technologies in agro-food industry (conditioning , storage….).

Project n°6 : Execution of 1 pilot project of application of solar drying

technologies in the agro-food industry.

Solar drying :

TUNISIAN SOLAR PLAN PROJECTS

I. SOLARI.1. THERMAL PROSOL [continued]

The 2nd

JAEF

2010

Page 22: STEG Renewable Energies »

Decentralised production :

Project n°7 : Installation of 15 MW of solar panels (6000 individuals households and

1000 public and private buildings).

Project n°8 : Equipment of 200 agriculture farms with water pumping photovoltaic

systems for irrigation purposes.

Project n°9 : Electrification of 1 000 households and of 100 farms and small-scale rural

projects by solar and wind energies.

Project n°10 : Installation of photovoltaic systems for street lighting of a total power of

0.5 MW.

Project n°11 : Installation of 100 photovoltaic systems connected to the network in

petrol stations.

TUNISIAN SOLAR PLAN PROJECTS

I. SOLARI.2. POWER PROSOL

The 2nd

JAEF

2010

Page 23: STEG Renewable Energies »

Centralised production :

Project n°12 : Construction of a Concentrated Solar Power (CSP) plant of 25 MWcapacity, integrated to Combine Cycle of 150 MW capacity (by STEG).

Project n°13 : Construction of a CSP plants of 75 MW capacity whose production istotally or partly intended for exportation.

Project n°14 : Construction of a Solar/Gas combine CSP plant in El Borma (bySITEP).

Project n°15 : Photovoltaic plants of 10 MW capacity (by STEG).

Project n°16 : Photovoltaic plants of 10 MW capacity (by private sector).

Manufacture of photovoltaic panels

Project n°17 : Construction of a plant for the manufacture of photovoltaic panels ofa 14 MW minimum production capacity.

TUNISIAN SOLAR PLAN PROJECTS

I. SOLARI.2. POWER PROSOL

The 2nd

JAEF

2010

Page 24: STEG Renewable Energies »

Project n°18 : Electricity self-production (60 MW) based on wind energy for

the supply of Big Power Consuming Facilities (EGCE).

Project n°19 : Electricity production (120 MW+69 MW) based on wind energy

(by STEG).

Project n°20 :

Electricity production (100 MW) based on wind energy, whose production is

totally or partly intended for exportation (by the private sector).

Wind Energy :

TUNISIAN SOLAR PLAN PROJECTS

II. WIND ENERGY

The 2nd

JAEF

2010

Page 25: STEG Renewable Energies »

Project n°21 : Replacement of 400 000 over 10-year old refrigerators by energy efficient

refrigerators of Classes 1 and 2.

Project n°22 : Construction of positive energy buildings.

Project n°23 : Thermal insulation of housing terraces.

Project n°24 : Dissemination of low consumption lamps (LCL) in households.

Project n°25 : Energy efficiency in the industrial sector.

Project n°26 : Training in economical energy consumption behaviour.

Project n°27 : Setting up corporate car fleet monitoring systems of public enterprises.

Energy Efficiency :

TUNISIAN PLAN SOLAR PROJECTS

III. ENERGY EFFICIENCY

The 2nd

JAEF

2010

Page 26: STEG Renewable Energies »

Project n°32 : ”soleil de Nefta” / “Nefta sun project”: Renewable Energies for the oasis of,Nefta.

Project n°33 :”Zarzis-Jerba Eco village” project.

Project n°34 : Energy optimisation of the reclamation project of the Train Station of Sousse.

Other projects :

TUNISIAN PLAN SOLAR PROJECTS

Project n°28 : Electricity production (14,5 MW) based on optimisation of poultry waste.

Project n°29: Electricity production (10 MW) based on optimisation of landfill gases.

Project n°30 : Electricity self-production (1 MW) based on optimisation of organic wastes.

Biomass :

Electrical interconnection :

Project n°31 : ELMED project, Electrical Interconnection between Tunisia and Italy via a 400 kVdirect current submarine cable.

IV. OTHER PROJECTS

The 2nd

JAEF

2010

Page 27: STEG Renewable Energies »

Project n°35 : Centre International Centre International de Formation supérieure desÉnergies Renouvelables et efficacité énergétique et laboratoire International desTechnologies de l’Énergie Solaire (International Centre for Advanced Training inRenewable Energies and Energy Efficiency & International Laboratory of Solar Energytechnologies).

Project n°36 : Pilot photovoltaic plant in Borj-Cedria.

Project n°37 : Establishment of “STEG Renewable Energies”.

Project n°38 : Strategic Study of the Energy Mix for power production in Tunisia for thetime frame 2030.

Project n°39 : Strategic study on production of electricity based on solar and windenergy.

Project n°40 : Setting up a Management Unit of the Tunisian Solar Plan (PST).

Studies and implementation of the Plan :

TUNISIAN SOLAR PLAN PROJECTSV. STUDY AND IMPLEMENTAION OF THE PLAN

The 2nd

JAEF

2010

Page 28: STEG Renewable Energies »

TUNISIAN SOLAR PLAN

ISCC POWER PLANT PROJECT IN EL BORMA : PROJECT 14

It is what the site of El Borma?

• It is an isolated site, situated in Sahara in the southwest of the country and far from the national network.

• It is the site which contains diverse oil well exploited by the Italo-Tunisian Company of Oil Operation (SITEP).

• needs of electricity for oil and gas installations of the (SITEP) are satisfied by 3 gas turbine of 14 MW unit power of which became antiquated and energy intensive; from where the decision of the SITEP to renew it.

The 2nd

JAEF

2010

Page 29: STEG Renewable Energies »

TUNISIAN SOLAR PLAN

ISCC POWER PLANT PROJECT IN EL BORMA : PROJECT 14Objectives and Project componentsOn the occasion of the renewal of the power plant, the SITEP aims at various objectives which are the following:• Optimize the consumption of natural gas for electricity production by the installation of equipments with high performance where from the choice of the construction of a power plant with 40 MW combined cycle CC (1st constituent of the project).

- Evolution of the performance : from 20 % to 35 %.- Cost of this constituent : 140 Million Tunisian Dinras.- Starting date : in December, 2013.

• Join within the framework of the PST which plans the integration of a power plant CSP to the power plant CC, where from the ISCC project.

The 2nd

JAEF

2010

Page 30: STEG Renewable Energies »

TUNISIAN SOLAR PLAN

ISCC POWER PLANT PROJECT IN EL BORMA : PROJECT 14

Supply of the CSP by Japan

•A letter of intention carrying supply by the NEDO (New Energy and Industrial Development Organization) to the MIT (Ministry of Industry and the Technology) of a thermo-solar power plant was signed on 23/07/2010 by the Tunisian part represented by the MIT and STEG ER and the Japanese part represented by the NIDO; fulfilling so agreements of cooperation Tuniso - Japanese.

• This power plant will be integrated into the CC power plant of El Borma

The 2nd

JAEF

2010

Page 31: STEG Renewable Energies »

TUNISIAN SOLAR PLAN

ISCC POWER PLANT PROJECT IN EL BORMA : PROJECT 14The thermo-solar power station• It is about the building of a tower thermo-solar generator steam. This steam generator will be integrated into the power station combined cycle and will give him with the steam to produce 5 MW electrical.

• Cost of this constituent : 25-30 Million Tunisian Dinars Starting date : December, 2013

Example of a tower CSP Plant

The 2nd

JAEF

2010

Page 32: STEG Renewable Energies »

TUNISIAN SOLAR PLAN

Second phase of cooperation Tuniso- Japanese

After the success of the project of El Borma, Japan will finance the construction of a tower Concentrated Solar Power (CSP) plant of 25MW capacity integrated to a combined cycle plant of 150MW capacity in the south of Tunisia.

The 2nd

JAEF

2010

Page 33: STEG Renewable Energies »

TUNISIAN SOLAR PLAN

Thanks for your attention

www.plansolairetunisien.tn

The 2nd

JAEF

2010