STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 ....

25
STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER Til Statens Vegvesen Document type Rapport Date November, 2015

Transcript of STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 ....

Page 1: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER

Til

Statens Vegvesen

Document type

Rapport

Date

November, 2015

Page 2: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

STATENS VEGVESEN

E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER

1100019854-331-001_0_Rapport_E6 Søfoldtunnelene.docx

Rambøll Hannemanns Allé 53 DK-2300 København S T +45 5161 1000 F +45 5161 1001 www.ramboll.dk

Revisjon 0 Date 2015-29-11 Lavet av PELI ALKN Kontrollert av UTN Godkjent av UTN Beskrivelse Geofysiske undersøkelser for SVV, i forbindelse med

hengebru over Leirfjorden i Søfold Ref 1100019854-331-001_0_Rapport_E6 Søfoldtunnelene.docx

Page 3: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

INDHOLD

1. INDLEDNING 1 2. MÅLEMETODE OG DATAINDSAMLING 2 2.2 Resistivitetsmålinger (CVES) 2 2.3 Indusert Polarisasjon (IP) 3 2.4 Innmåling av koordinater 4 2.5 Evaluering av datakvalitet i felten 4 2.5.1 Resistivitetsmålinger 4 2.6 Beskrivelse av linjene 5 3. DATAPROCESSERING 6 3.1 Prosessering av GPS-data 6 3.2 Prosessering av CVES 6 3.3 Prosessering av IP 7 4. RESULTATER OG TOLKNING 8 4.1 Profil 1 8 4.2 Profil 2 9 4.3 Profil 3 9 5. REFERANCER 10 BILAG

Appendix 1 Processerede Profiler

Appendix 2 Måledata (tabeller)

Page 4: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

1

1. INDLEDNING

Statens vegvesen er i gang med planlegning av fjordkrysning over Leirfjorden i Søfold kommune. I den forbindelse har man anmodet Rambøll Danmark om at gjøre resistivitetsmålinger (CVES), samt indusert polarisasjon (IP) langs utvalgte linjer. Formålet med undersøkelsene er at skaffe informasjon om grunnforholdene på nordsida av Leirfjorden for landfeste for brua. Målingene utføres for at kartlegge mektigheten av løsmasser, dyp til fjelloverflate og svakhetssoner i det aktuelle område. Feltarbeidet er utført den 1. november til den 4. november 2015 under utfordrende vær- og terrengforhold og omfattede i alt 3 undersøkelsesprofiler på i alt 1200m. Rapporten beskriver prosjektets baggrund, datainnsamling, prosessering og de tolkede resultater. Resultatene fra resistivitetsmålingene vises som 2D resistivitetsprofiler. Resistivitets- og polarisasjonsmålingene er primært brukt til at få en større kunnskap til strukturgeologien i området. Soner som er tolket til å være sprekkesoner eller svakhetssoner er lagt inn i profilene, og er vist som figurer. Plasseringen av sonene er i tillegg angitt i tabellform med koordinat langs måleprofilet og UTM-koordinat. I tillegg er der også tolket fallretning på sonene.

Figur 1-1 Oversiktskart av planlagte linjer

Page 5: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

2

2. MÅLEMETODE OG DATAINDSAMLING

2.1 Måleoppstilling Ved denne undersøkelsen ble det benyttet fire kabler med 5 meters elektrodeavstand og gradient elektrodekonfigurasjon. Dybderekkevidden med 5 meters elektrodeavstand er ca. 70 meter. Oppløsningen, og dermed nøyaktigheten, er størst i den øvre halvdelen av pseudoseksjonen. Måleprocessen styres av ABEM Terrameter LS. Ved undersøkelsen ble der foretatt målinger av 2D resistivitet og indusert polarisasjon. IP måles samtidig med resistivitetsmålingerne og fører til noet utvidet måletid. Dette er av mindre betydning i forhold til viktigheten av også å måle IP. Ved å kombinere de to metoder kan risiko for feiltolkninger reduseres. IP data (Indusert polaritet) giver et mål på jordens oppladdelighet (Chargeability mV/V). IP data kan være behjelpelig med at skjelne forskjellige soner av lavresistive anomalier fra hinannen. Profilenes beliggenhet er innmålt med GPS, se appendix 1.1.

2.2 Resistivitetsmålinger (CVES) Resistivitetsmålingene utførtes som CVES (Continuous Vertical Electrical Sounding) med en roll-along teknikk, hvor der anvendes multilederkabler med 5 meters innbyrdes avstand mellom elektroder/jordspyd. På multilederkablerne er der forbundet ca. 40 centimeter lange stålelektroder, der var sett ned i jorden, de steder hvor der er fjell i dagen blev plader påsat direkte på bjergsiden. For at disse påsaatte plader ikke flyttede sig under oppmålingen blev Johnson Revert pulver blandet opp med vand (additiv til boremudder), hvilket danner en elektrisk ledende klister. Tabell 2-1 giver en oversikt over parameterindstillinger av Terrameter LS. Data har innsamlet som full waveform data som giver en mer avansert analyse og prosessering, (Figur 2-1). Metoden resulterer i en 2D resistivitetsprofil langs den oppmålte linje. Resistivitet er et materiales evne til at lede elektrisk strøm og man kan blant andet skjelne mellom materialer med lav resistivitet såsom vannmettet jord, materialer med middelshøy resistivitet som umettet sand/grus og materialer med høy resistivitet som meget tør grovkornet jord/sand eller krystallinsk grunnfjell.

Tabell 2-1 Innstillinger av Terrameter LS

Parameter Innstilling Kommentar T on 1 s Acq delay 0.5 s

Acq time 0.5 s T off 1 s Protokol:

Grad_12ch_v3_1

Antal stacks min/max

3/5

Min/Max current 20/500 (mA) Antall IP Vinduer 14

Page 6: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

3

Tabell 2-2 Innstillinger av Terrameter LS

Vinduer Time[ms] 14 vinduer

Acc.Time [ms] 14 vinduer

IP Delay Time (ms) 10 10 1 20 30 2 20 50 3 20 70 4 40 110 5 60 170 6 70 240 7 90 330 8 110 440 9 150 590 10 190 780 11 220 1000 12 280 1280 13 330 1610 14 400 2010 15 - - 16 - - 17 - -

2.3 Indusert Polarisasjon (IP)

IP står for indusert polarisasjon. IP metoden er en tilføyelse til den meget anvendte CVES metode. Hvor man i tradisjonell CVES måler på mostanden mens der sendes strøm gjennom jorden bruker man i IP metoden at måle på potensialet hen over et elektrodepar efter at man har slukket for strømmen.

Dette svarer populært sagt til at måle på jorden som en kapasitor. Denne ”kapasitans” kan beskrives med fire såkalte Cole-Cole parametere. Disse 4 parametere beskriver et eksponentielt henfall, ρ, m0, τ, C.

m0 også kaldt chargeability – denne måles tradisjonelt i millivolt pr. volt [mv/V] og beskriver hvor meget elektrisk potensiale jorden kan ”holde på”. Leir vil have høyere verdier end sand, saltvand vil som oftest have lavere verdier end ferskvand. Tilstedeværelsen av metaller og ioner vil forhøye denne verdi.

De tre andre parametere bliver beskrevet i det omfang de bliver benyttet i tolkningen.

Det viser seg at spenningen øker brått til en viss verdi når strømmen slås på, for deretter å øke langsomt med tiden. Når strømmen slås av faller spenningen umiddelbart til en viss verdi for deretter å avta langsomt mot null. Spenningen som måles etter at strømmen er slått av skyldes IP-effekten. Årsaken til denne IP-effekten kan kort forklares med at det i strømtiden bygger seg opp en polarisasjonsspenning mellom ledende mineraler og den omliggende bergart med innhold av porevæske. Oppbygging av denne spenningen i strømtiden forløper likedan som den avtar etter at strømmen er slått av. Normalt foregår målingen av IP-spenningen i tiden hvor strømmen er slått av. Hvoretter at man da måler i et bestemt tidsrom etter strømmen er slått av. Lund Universitet har da kommet med en ny og forbedret metode, hvormed man kan optimere målingen av IP effekten. Denne metode går i sin enkelthet du på at man både måler IP effekten under den positive ombygning av spenning og etterfølgende ved den negative spenning som vist i nedenstående Figur 2-1(Røde linje).

Page 7: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

4

Figur 2-1: Screenshot av full Waveform måling I Terrameter LS, den røde linje indikerer IP effekten

2.4 Innmåling av koordinater

Det benyttede koordinatsystem er ETRS89, UTM 33N. Alle linjer er målt inn mens kablene lå i terrenget. Der er lavet en GPS måling ved hver stasjon for geoelektrikken (hver 10m). Innmålingen er utført med efterprosessert GravNav™ Software. Hvert GPS punkt er foretaket som en midling over 15 punkter med en generall unøyaktighet på 0.03m -0.5m. Koordinatene er etterfølgende korrigerende med data fra en basestasjon ved Kirona, Sverige (stasjonsnummer, KIRO). Den etterproceserede vertikale nøjagtighed er beregnet og ses i vedlagte tabel i appendix 2.

2.5 Evaluering av datakvalitet i felten

2.5.1 Resistivitetsmålinger Kvaliteten av de innsamlede data evalueres kontinuerlig i felten. Først utføres en test av overgangsmotstanden for hver enkelt elektrode. Hvis en elektrode har dårlig kontakt, bliver denne forbedret. Under målingene bliver der hele tiden kontrollert at strømstyrken holder sig over et på forhånd definert nivå. Såfremt data virker urimelige bliver det varslet og noterte i Terrameter loggen. Ut over dette viser Terrameter LS en pseudosektion av data i realtid. Det giver en løpende oversikt over resistivitetsforholdene langs profilet.

Page 8: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

5

Figur 2-2: Pseudosektion av profil 1

Data blev løpende sendt til kontoret, hvor der blev utført en innledende prosessering og kontroll av kvalitet.

2.6 Beskrivelse av linjene Grundet kraftig topografi foregikk arbeidet i felten langsomt. Under de fire dages feltarbeid i området, gikk den første dag med at få utstyret oppstillet. Heretter tog det ca. en dag pr profil. Linje 3 blev grundet terrenget kortere, da dette ikke var mulig at komme passere den ekstremt steile fjellside der befant sig i dette område av linjeføringene. Tråds det hårde terreng, blev der lavet 1100 meters fornuftige RES/IP målinger.

Figur 2-3: Utfordringer i felt grundet terreng

Page 9: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

6

3. DATAPROCESSERING

3.1 Prosessering av GPS-data De horisontale posisjoner er av god kvalitet i åpne områder, mens de tettbevoksede områder har været nødvendig at justere målepunkter inn, så de ligger mere på linje. Dette kan man tillate sig, da CVES-kablets lengde og elektrodeavstanden setter visse begrensninger på geometrien. Ved innjustering av målepunkter er der tatt høyde for den ofte betydelige helning av terrenget ved at lave avstands beregningerne i tre dimensjoner. De vertikale posisjoner er av god kvalitet i de åpne områder, dvs. hvor treer, huse eller fjel ikke har skjermet for satellitmottagelsen. Dessverre er en stor del av de målte høyder av lav kvalitet. For at rette opp på dette, er der flere steder brukt data direkte fra en digital terrengmodell for området. Denne terrengmodell passer godt sammen med de GPS-målte høyder de steder, hvor der har været god dekning og den ventes derfor også at være troverdig i områdene med dårlig dekning. Den endelige høydemodel er et resultat fra en kombinasjon av GPS-data og den digitale terrengmodell.

3.2 Prosessering av CVES Ved alle resistivitetsmålinger måles en tilsynelatende resistivitet. Denne representerer et veid middel av alle resistiviteter som er innenfor målingens influensvolum. For å finne den specifikke resistivitet i ulike deler av undergrunnen inverteres data. De innsamlede resistivitets og IP-data prosesseres i Software pakken Aarhus Workbench utviklet på Aarhus Universitet, derudover har vi også benyttet Res2DInv, der bedre kan håndtere store resistivitetsforskelle, hvor WorkBench har en større inntrengningsdybe. De to typer for software bliver da forsøgt samtolket for et mere troværdigt billede af undergrundens struktur. Det ble gjort forsøk med forskjellig inversjonsmetoder samt forskjellige filtre. Rådatafilene innleses sammen med en posisjonerings fil fra innmålingen, samt med en fil inneholdende de inn målte høyde-data. Ved prosesseringen gjennomgås pseudoseksjonerne og eventuelle dårlige resistivitets data fjernes, og inngår derved ikke i den videre tolkning av profilet.

Page 10: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

7

Figur 3-1: Screendump fra processerings vindue i Aarhus WorkBench

3.3 Prosessering av IP

Prosseringen af IP foregik i Workbench, her blev der lavet fire såkalte Cole-Cole parametere. Disse 4 parametere beskriver et eksponentielt henfall, ρ, m0, τ, C.

Foruten den førnevnte m0, er der også prosessert følgende parametere; ρ – denne måles i ohmmeter [Ωm] og er den spesifikke elektriske mostand av jorden, dette er den samme parameter man måler på i alminnelige CVES målinger.

τ – måles i sekunder [s] og beskriver hvor lenge jorden holder på det elektriske potensiale. Der findes teoretiske studier der tyder på at denne parameter har sammenheng med den hydrauliske konduktivitet hvor høye verdier vil forventes at tyde på lavere hydraulisk kapasitet. Dette er fortsatt på et forskningsmæssigt plan.

C – som er en enhetslast tal der beskriver formen av det eksponentielle henfall. Denne parameter kan i nogen tilfelle likesom de øvrige parametere brukes til at følge et geologisk lags utbredelse.

Page 11: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

8

4. RESULTATER OG TOLKNING

Geoelektrikkne er god til at indikere hvor der er svakhetssoner, da der ofte ses en relativ høy motstand i grunnfjell og lavere mostander i svakhetssoner alt efter hva sonerne er fylt med. Følgende motstands inndelinger er generelt blevet benyttet til at beskrive den strukturelle sammensetning i den enkelte profiler: Resistivitetsverdiern høyere enn ca. 10000 Ohmm indikere stabilt fjell, soner med resistiviteter under 3000 Ohmm indikere svagt fjell. Gennomgående for de tre profiler er at der i de øverste 10 meter findes en løsmasse enhet /1/. Ud fra den forventede geologi er der lavet en forsiktig tolkning av de enkelte soner langs med profilerne /2//3/. Profiler og tolkninger er vist i appendix 1.1 til 1.3.

4.1 Profil 1 Dette profil er presenteret i Appendix 1.1 og har orienteringen V-Ø. Profil 1 kan oppdeles i to intervaller med varierende geologi; Den første intervall går fra 0-240 MLP, og det andet sone ligger fra 240-400 MLP. I den vestlige del av profilet til 240 MLP ses flere resistivitets kontraster. Generelt ligger resistivitetene i intervallet mellom 1000 – 10000 Ohmm, dog kan det ses at der er to lavresistivitets soner samt en enkelt høy resistivitetssone. Det andet intervall er karakterisert ved at have generelt høye resistiviteter indikert ved den røde til lilla farve (10000 – 30000 Ohmm). Resistivitetene i dette område å indikere at der her er tale om godt fjell. Det blev påvist to områder med lav resistivitet som er tolket som sone 1 og 2. Disse soner er tolket som sandsynlige svakhetssoner. Sone 2 utgjør en sone på omkring 25 m meter i horisontal utbredelse, denne er karakterisert som værende steil. Resistivitetene i denne sone er ligger under 500 Ohmm. Der er en klar IP-effekt på opp til 80mV/V i sonen. Denne effekt kan enten betyde at den lavresistive sone er grunnet en gangbergart eller at der inntreffer IP-effekter ved overgangen mellom to forskjellige bergarter. Det forventes mest sannsynligst at effekten inntreffer grunnet overgangen fra en kalspatmarmor til glimmerskifer. /3/ Sone 1 er en smal sone som ligger helt mod vest i profilet fra 0-20 MLP. Denne sone har likesom den foregående sone en resistivitet som ligger under 500 Ohmm. Denne sone har også en IP-effekt på opp til over 60mV/V og forventes å være på grunn av overgangen mellom kalkspatmarmor og glimmerskifer.

Page 12: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

9

4.2 Profil 2 Dette profil er presenteret i Appendix 1.2 og har orienteringen V-Ø. Måledata fra profil 2 var av noe dårligere datakvalitet enn de øvrige, det er dog mulig at man kan følge samme trend som fra der foregående profil. Det ses igjen der i den østlige del av profilet finnes de høyeste resistiviteter (10000 – 30000 Ohmm). I den vestlige ende av profilet kan en mindre svakhetssone findes fra 100 – 130 MLP, denne korrelerer godt med den tidligere tolkede sone 2 fra profil 1. Sonen har en likesom foregående svakhetssoner en resistivitet på under 500 Ohmm. Ved svakhetssonen kan en mindre IP effekt identifiseres. Dette kunne igjen skyldes overgangen mellom forskjellige bergarter (Kalkspatmarmor og glimmerskifer) som kan gi resitivitetsanomalier.

4.3 Profil 3 Dette profil er presentert i appendix 1.3 og har orienteringen V-Ø. Profil 3 er karakterisert som værende mindre homogen end de to tidligere profiler. Det er indikert to soner. Profilet avgrenses i den østlige ende av et steilt fjell side og er da kun 300 meter i utbredelse. Sone 1 er en smal sone i de øverste 40 m, dernest økes bredden av sonen til det dobbelte i horisontal utbredelse (80 -105 MLP). Sone 2 er går fra 175 -205 MLP, denne korrelerer godt med de tidligere tolkede soner fra profil 1 og 2. Begge soner har resistiviteter på under 500 Ohmm. Begge soner har moderate IP-effekter som kan tolkes som overganger mellom forskjellige bergarter (Kalkspatmarmor og glimmerskifer).

Page 13: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

10

5. REFERANCER

/1/ Jan Steinar Rønning et al., Resistivity mapping as a tool for identification and characterisation of weakness zones in crystalline bedrock: definition and testing of an interpretational model, Bull Eng Geol Environ DOI 10.1007/s10064-013-0555-7

/2/ http://geo.ngu.no/kart/losmasse/ /3/ http://geo.ngu.no/kart/berggrunn/

Page 14: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

1-1

APPENDIX 1 PROCESSEREDE PROFILER

Page 15: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

Rev. :

Dato:

Af:

Kontrol:

Sag:

Appendix 1.1

Hannemanns Allé 53Dk 2300 København S

Statens vegvesen Søfold

0

04-12-2015

PELI

ALKN

1100019854

Godkendt: ALKN

2D Resistivitetsmodell

Strukturell Tolkningsprol

Stabilt Fjell Stabilt Fjell Stabilt FjellHøy ResistivitetssoneGodt Fjell

Svak

hets

sone

Ust

abilt

Fje

llSvak

hets

sone

Ust

abilt

Fje

llTerreng

Base Model

Svakhetssone

IP - Modell

Svakhetssone 1 Svakhetssone 2

MLP

Klassikasjon av soner

Resistivitetpå soner(Ohmm)

0 - 20 170 - 195

<500 <500

Stejl Stejl

PROFIL 1

Page 16: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

Hannemanns Allé 53Dk 2300 København S

Statens vegvesen Søfold

2D Resistivitetsmodel

Strukturell Tolkningsprol

SvakhetssoneUstabilt FjellStabilt Fjell Stabilt Fjell

Høy ResistivitetssoneGodt Fjell

Høy

Res

istiv

itets

sone

God

t Fje

ll

Terreng

Base Model

Svakhetssone

Appendix 1.2Rev. :

Dato:

Af:

Kontrol:

Sag:

0

04-12-2015

PELI

ALKN

1100019854

Godkendt: ALKN

Svakhetssone 1

MLP

Klassikasjon av soner

Resistivitetpå soner(Ohmm)

100 - 130

<500

Stejl

PROFIL 2

IP - Modell

Page 17: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

Hannemanns Allé 53Dk 2300 København S

Statens vegvesen Søfold

Appendix 1.3

Terreng

Base Model

Svakhetssone

Svakhetssone 1 Svakhetssone 2

MLP

Klassikasjon av soner

Resistivitetpå soner(Ohmm)

80 -105 175 - 205

<500 <500

Stejl Stejl

Rev. :

Dato:

Af:

Kontrol:

Sag:

0

04-12-2015

PELI

ALKN

1100019854

Godkendt: ALKN

2D Resistivitetsmodel

Strukturell Tolkningsprol

Høy

Res

istiv

itets

sone

God

t Fje

ll

Høy ResistivitetssoneGodt FjellStabilt FjellStabilt Fjell

SvakhetssoneUstabilt Fjell

SvakhetssoneUstabilt Fjell

Page 18: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

E6 Søfoldtunnelene Resistivitet og IP målinger

1100019854

2-1

APPENDIX 2 MÅLEDATA (TABELLER)

Page 19: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

Profil 1

Elektroder afstandEasting Northing Height

0 531492.629 7495505 152.446

10 531498.594 7495511 153.586

20 531509.296 7495512 153.366

30 531518.113 7495513 151.973

40 531528.474 7495511 150.423

50 531537.155 7495514 149.933

60 531546.67 7495517 150.257

70 531555.461 7495518 149.98

80 531564.336 7495523 148.678

90 531574.263 7495527 147.69

100 531582.557 7495527 146.142

110 531591.346 7495527 143.761

120 531600.545 7495527 138.252

130 531610.544 7495526 135.064

140 531619.048 7495528 132.221

150 531628.976 7495531 128.57

160 531636.916 7495535 126.31

170 531644.889 7495541 123.333

180 531652.758 7495545 120.159

190 531662.412 7495546 118.563

200 531672.934 7495544 116.324

210 531681.308 7495547 112.211

220 531689.61 7495549 112.125

230 531699.168 7495552 112.194

240 531708.224 7495549 110.216

250 531716.799 7495550 112.377

260 531726.631 7495549 106.137

270 531734.089 7495549 101.727

280 531741.751 7495550 107.549

290 531750.358 7495550 114.073

300 531757.203 7495552 120.73

310 531767.101 7495554 122.334

320 531776.27 7495558 121.562

330 531785.225 7495560 119.92

340 531795.278 7495562 119.231

350 531803.72 7495565 114.803

360 531812.112 7495571 113.399

370 531821.301 7495572 111.537

380 531831.286 7495573 112.544

390 531834.054 7495569 108.069

400 531844.836 7495571 109.333

Page 20: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

Profil 2

Elektroder afstandEasting Northing Height

0 531570.89 7495431 106.51

10 531579.615 7495433 109.986

20 531591.579 7495434 108.709

30 531599.086 7495435 104.6

40 531608.843 7495435 103.133

50 531618.525 7495438 102.48

60 531626.76 7495444 100.996

70 531636.497 7495447 97.128

80 531646.105 7495444 93.437

90 531655.87 7495446 91.384

100 531662.366 7495450 88.702

110 531672.371 7495454 87.539

120 531681.392 7495456 89.135

130 531689.393 7495459 91.929

140 531700.744 7495458 93.263

150 531708.989 7495464 94.227

160 531714.677 7495469 98.71

170 531721.47 7495476 99.935

180 531732.715 7495478 97.9

190 531738.125 7495472 90.789

200 531743.748 7495471 84.151

210 531752.092 7495473 86.104

220 531759.943 7495472 75.296

230 531763.281 7495475 78.281

240 531768.771 7495477 85.794

250 531776.545 7495479 86.905

260 531783.813 7495482 89.723

270 531793.004 7495486 92.299

280 531801.026 7495487 92.167

290 531810.489 7495490 91.467

300 531819.731 7495491 90.001

310 531827.76 7495492 92.299

320 531837.378 7495490 94.761

330 531844.45 7495492 97.48

340 531853.588 7495493 101.535

350 531861.947 7495496 104.562

360 531869.228 7495499 109.569

370 531878.532 7495503 113.635

380 531889.367 7495505 114.353

390 531898.28 7495505 114.649

400 531905.564 7495507 114.895

Page 21: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

Profil 3

Elektroder afstandEasting Northing Height

0 531511.965 7495341 62.07

10 531521.5 7495340 63.303

20 531531.6 7495340 63.939

30 531540.217 7495342 61.53

40 531550.124 7495345 56.953

50 531558.955 7495349 60.224

60 531566.983 7495354 61.571

70 531576.672 7495356 59.293

80 531584.361 7495361 60.13

90 531594.835 7495362 60.507

100 531603.429 7495364 63.699

110 531612.281 7495369 62.499

120 531621.914 7495371 60.943

130 531631.059 7495371 58.591

140 531641.738 7495374 56.395

150 531650.459 7495376 55.345

160 531659.635 7495379 57.49

170 531669.635 7495381 55.472

180 531678.768 7495383 52.964

190 531686.674 7495389 56.635

200 531695.116 7495392 54.45

210 531704.726 7495392 58.761

220 531713.755 7495394 56.931

230 531722.401 7495398 56.645

240 531731.323 7495403 54.876

250 531740.114 7495405 57.651

260 531748.947 7495409 55.253

270 531758.438 7495411 51.092

280 531762.929 7495412 44.71

290 531769.074 7495410 41.131

300 531775.192 7495413 39.813

Page 22: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

Time Latitude Longitude Pos.Quality Source Type MeasID Description01/11/2015 13:21 67.57396 15.74474 3 User -1 Created a new station at -20;0;001/11/2015 13:21 67.5739 15.74476 3 Instrument -1 Measuring Started. (976 data points requested.)01/11/2015 13:22 67.57395 15.74472 3 Instrument -1 Electrode test FAIL (OK:49 Bad:2 Fail:10)01/11/2015 13:32 67.57387 15.7448 3 Instrument -1 Measuring Started. (976 data points requested.)01/11/2015 13:32 67.57387 15.74482 3 Instrument -1 Electrode test FAIL (OK:49 Bad:2 Fail:10)01/11/2015 13:32 67.57386 15.74483 3 Instrument -1 Measuring Started. (976 data points requested.)01/11/2015 13:33 67.57389 15.74479 3 Instrument -1 Electrode test FAIL (OK:49 Bad:1 Fail:11)01/11/2015 13:33 67.57375 15.74493 3 Instrument -1 Measuring Started. (976 data points requested.)01/11/2015 13:34 67.57376 15.74494 3 Instrument -1 Electrode test OK (OK:49 Bad:1 Fail:11)01/11/2015 13:34 67.57385 15.74492 3 Instrument 1 Measuring Stopped (463 data points remaining).01/11/2015 13:34 67.57385 15.74492 3 Instrument 1 Measuring Started. (463 data points requested.)01/11/2015 13:34 67.57384 15.7449 3 Instrument 1 Electrode test OK (OK:49 Bad:1 Fail:11)01/11/2015 13:50 67.57409 15.74468 3 Instrument 66 Measuring done01/11/2015 13:59 67.57378 15.74397 3 User 66 Created a new station at 0;0;0

01/11/2015 13:59 67.57376 15.74399 3 Instrument 66 Measuring Started. (622 data points requested.)01/11/2015 14:00 67.57378 15.74401 3 Instrument 66 Electrode test FAIL (OK:59 Bad:1 Fail:1)01/11/2015 14:02 67.57375 15.744 3 Instrument 66 Measuring Started. (622 data points requested.)01/11/2015 14:02 67.57374 15.74399 3 Instrument 66 Electrode test OK (OK:59 Bad:1 Fail:1)01/11/2015 14:20 67.57385 15.74403 3 Instrument 140 Measuring done01/11/2015 14:28 67.57371 15.74196 3 User 140 Created a new station at 20;0;0

01/11/2015 14:28 67.57371 15.74198 3 Instrument 140 Measuring Started. (565 data points requested.)01/11/2015 14:29 67.57368 15.74191 3 Instrument 140 Electrode test FAIL (OK:46 Bad:0 Fail:10)01/11/2015 14:31 67.5737 15.74196 3 Instrument 140 Measuring Started. (565 data points requested.)01/11/2015 14:31 67.5737 15.74194 3 Instrument 140 Electrode test OK (OK:46 Bad:0 Fail:10)01/11/2015 14:38 67.5737 15.74187 3 Instrument 168 Measuring done01/11/2015 17:50 0 0 1 Instrument 168 Started01/11/2015 18:28 0 0 1 Instrument 168 Started01/11/2015 18:31 0 0 1 Instrument 168 Start dhcp service01/11/2015 18:34 0 0 1 Instrument 168 Started01/11/2015 18:34 0 0 1 Instrument 168 Start dhcp service

no. Neg Res 0Electrode spacing X:5 Y: Z:1no. Datapoints 1178focus position Z (min) 2.66focus position Z (max) 75.479

Page 23: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

MeasID Description03/11/2015 11:56 67.57321 15.74574 3 User -1 Created a new station at -20;0;003/11/2015 11:56 67.5732 15.74568 3 Instrument -1 Measuring Started. (976 data points requested.)03/11/2015 11:57 67.57317 15.74572 3 Instrument -1 Electrode test FAIL (OK:49 Bad:3 Fail:9)03/11/2015 12:05 67.57322 15.74561 3 Instrument -1 Measuring Started. (976 data points requested.)03/11/2015 12:06 67.5732 15.74555 3 Instrument -1 Electrode test FAIL (OK:49 Bad:2 Fail:10)03/11/2015 12:08 67.57317 15.74566 3 Instrument -1 Measuring Started. (976 data points requested.)03/11/2015 12:08 67.57317 15.74566 3 Instrument -1 Electrode test OK (OK:49 Bad:2 Fail:10)03/11/2015 12:10 67.5732 15.74554 3 Receiver 6 NEGATIVE RESISTIVITY Tx :3-1 4-21 204mA Rx 3:3-21 4-5 dV=-1.495V ( -2.614V 631.0mV 656.9mV -2.078V)03/11/2015 12:10 67.57321 15.74564 3 Receiver 7 NEGATIVE RESISTIVITY Tx :3-1 4-21 203mA Rx 3:3-21 4-5 dV=-1.381V ( -1.904V 890.8mV 890.6mV -1.840V)03/11/2015 12:12 67.57318 15.74571 3 Receiver 12 NEGATIVE RESISTIVITY Tx :3-5 4-5 239mA Rx12:3-21 4-3 dV=-12.10V ( -11.55V 12.46V 12.58V -11.79V)03/11/2015 12:13 67.5732 15.74564 3 Receiver 14 NEGATIVE RESISTIVITY Tx :3-7 4-7 91.1mA Rx 8:4-3 4-5 dV=-6.206V ( -4.406V 6.955V 7.094V -6.371V)03/11/2015 12:14 67.57318 15.74559 3 Receiver 16 NEGATIVE RESISTIVITY Tx :3-9 4-9 96.1mA Rx 4:4-3 4-5 dV=-8.520V ( -10.19V 7.355V 7.432V -9.104V)03/11/2015 12:27 67.57316 15.74557 3 Receiver 19 NEGATIVE RESISTIVITYTx :3-1 4-11 172mARx10:3-21 4-5 dV=-2.522V ( 3.255V -1.904V -1.907V 3.023V)03/11/2015 12:27 67.57314 15.74557 3 Receiver 20 NEGATIVE RESISTIVITYTx :3-1 4-11 173mARx10:3-21 4-5 dV=-2.332V ( -2.249V 2.419V 2.443V -2.216V)03/11/2015 12:29 67.57313 15.7457 3 Receiver 25 NEGATIVE RESISTIVITYTx :3-11 4-11 134mARx 7:4-3 4-5 dV=-16.53V ( -16.65V 16.42V 16.46V -16.59V)03/11/2015 12:30 67.57314 15.74563 3 Receiver 28 NEGATIVE RESISTIVITYTx :3-13 4-13 48.1mARx 3:4-3 4-5 dV=-6.781V ( -6.927V 6.690V 6.698V -6.808V)03/11/2015 12:30 67.57314 15.74556 3 Receiver 30 NEGATIVE RESISTIVITYTx :3-15 4-15 113mARx 6:4-3 4-5 dV=-2.727V ( -2.863V 2.578V 2.601V -2.868V)03/11/2015 12:31 67.57313 15.74569 3 Receiver 32 NEGATIVE RESISTIVITYTx :3-17 4-17 164mARx 2:4-3 4-5 dV=-1.024V ( -1.041V 963.6mV 986.7mV -1.105V)03/11/2015 12:32 67.57312 15.74556 3 Receiver 34 NEGATIVE RESISTIVITYTx :3-19 4-19 118mARx 5:4-3 4-5 dV=-3.252V ( -3.308V 3.197V 3.186V -3.317V)03/11/2015 12:33 67.57312 15.7456 3 Receiver 36 NEGATIVE RESISTIVITYTx :2-5 4-5 172mARx 6:3-13 3-17 dV=-642.8mV ( 18.08V 5.052V 4.850V -5.603V)03/11/2015 12:33 67.57313 15.74564 3 Receiver 38 NEGATIVE RESISTIVITYTx :2-9 4-9 80.3mARx12:3-21 4-5 dV=-541.2mV ( -685.8mV 433.6mV 432.4mV -612.9mV)03/11/2015 12:34 67.57315 15.7456 3 Receiver 40 NEGATIVE RESISTIVITYTx :2-13 4-13 136mARx10:3-21 4-5 dV=-1.116V ( -1.196V 1.032V 1.038V -1.199V)03/11/2015 12:34 67.57315 15.74561 3 Receiver 42 NEGATIVE RESISTIVITYTx :2-17 4-17 119mARx 7:3-21 4-5 dV=-711.7mV ( -794.1mV 645.1mV 648.9mV -758.5mV)

03/11/2015 12:35 67.57315 15.74566 3 Receiver 46 NEGATIVE RESISTIVITYTx :3-1 3-11 139mARx 1:3-2 3-3 dV=-2.107V ( -2.104V 2.448V 2.448V -1.428V)Rx 2:3-4 3-5 dV=-1.056V ( -1.445V 407.2mV 296.3mV -2.075V)

03/11/2015 12:36 67.57315 15.74568 3 Receiver 47 NEGATIVE RESISTIVITYTx :3-11 3-21 136mARx 1:3-12 3-13 dV=-19.24V ( -19.54V 19.06V 19.13V -19.24V)Rx 4:3-19 3-20 dV=-16.05V ( -15.82V 16.48V 16.49V -15.42V)

03/11/2015 12:37 67.57312 15.74575 3 Receiver 50 NEGATIVE RESISTIVITYTx :3-2 3-12 239mARx 1:3-3 3-4 dV=-5.980V ( -5.978V 5.928V 6.040V -5.973V)Rx 5:3-4 3-5 dV=-130.7V ( -126.5V 133.1V 134.3V -128.8V)03/11/2015 12:38 67.57318 15.74561 3 Receiver 57 NEGATIVE RESISTIVITYTx :2-15 3-5 135mARx10:3-2 3-3 dV=-52.39V ( 53.93V -50.71V -50.84V 54.09V)03/11/2015 12:39 67.57319 15.7456 3 Receiver 60 NEGATIVE RESISTIVITYTx :2-16 3-6 165mARx 9:3-2 3-3 dV=-13.33V ( -14.32V 12.89V 12.82V -13.30V)03/11/2015 12:40 67.57318 15.74565 3 Receiver 62 NEGATIVE RESISTIVITYTx :2-17 3-7 172mARx 9:3-2 3-3 dV=-11.78V ( -11.75V 11.96V 11.96V -11.44V)03/11/2015 12:40 67.57317 15.74564 3 Receiver 63 NEGATIVE RESISTIVITYTx :3-7 3-17 239mARx 3:3-12 3-13 dV=-8.794V ( -8.865V 8.743V 8.778V -8.792V)03/11/2015 12:41 67.57318 15.74563 3 Receiver 65 NEGATIVE RESISTIVITYTx :2-18 3-8 119mARx 6:3-2 3-3 dV=-5.012V ( 5.174V -4.804V -4.795V 5.274V)03/11/2015 12:41 67.57322 15.74557 3 Receiver 66 NEGATIVE RESISTIVITYTx :3-8 3-18 156mARx 4:3-12 3-13 dV=-8.813V ( -8.795V 8.795V 8.846V -8.814V)03/11/2015 12:42 67.57321 15.74558 3 Receiver 68 NEGATIVE RESISTIVITYTx :2-19 3-9 85.0mARx 5:3-2 3-3 dV=-3.361V ( -3.108V 3.648V 3.708V -2.979V)03/11/2015 12:42 67.5732 15.74557 3 Receiver 69 NEGATIVE RESISTIVITYTx :3-9 3-19 106mARx 3:3-12 3-13 dV=-8.108V ( -7.165V 6.848V 9.661V -8.756V)03/11/2015 12:43 67.57325 15.74552 3 Receiver 71 NEGATIVE RESISTIVITYTx :2-20 3-10 139mARx 5:3-2 3-3 dV=-3.538V ( -3.188V 3.933V 3.945V -3.085V)

03/11/2015 12:43 67.57325 15.74552 3 Transmitter 72

Transmitter stopped due to unexpected high power loss. Probable causes: A sudden drop in resistance or a highly inductive load. Try to reduce the maximum current.Tx :3-

10 3-20Estimated load: 1.6379kOCurrent:239mAStatus code:TX status 0x0040Too high power loss

03/11/2015 12:43 67.57323 15.74555 3 Transmitter 73

Transmitter stopped due to unexpected high power loss. Probable causes: A sudden drop in resistance or a highly inductive load. Try to reduce the maximum current.Tx :3-

10 3-20Estimated load: 1.9710kOCurrent:239mAStatus code:TX status 0x0040Too high power loss 03/11/2015 12:44 67.57321 15.74559 3 Instrument 73 Measuring done03/11/2015 12:47 67.57321 15.74564 3 User 73 Created a new station at 0;0;003/11/2015 12:47 67.57322 15.74563 3 Instrument 73 Measuring Started. (599 data points requested.)03/11/2015 12:48 67.57318 15.74561 3 Instrument 73 Electrode test FAIL (OK:59 Bad:1 Fail:0)03/11/2015 12:49 67.5732 15.74563 3 Instrument 73 Measuring Started. (599 data points requested.)03/11/2015 12:49 67.57322 15.74561 3 Instrument 73 Electrode test OK (OK:59 Bad:1 Fail:0)03/11/2015 12:49 67.57324 15.74548 3 Receiver 75 NEGATIVE RESISTIVITYTx :1-1 4-13 97.9mARx 1:2-5 2-13 dV=-398.8mV ( -13.78mV 850.9mV 842.2mV 111.9mV)03/11/2015 12:50 67.57322 15.74553 3 Receiver 77 NEGATIVE RESISTIVITYTx :1-5 4-17 207mARx 1:2-1 2-9 dV=-13.60V ( -18.32V 10.89V 10.68V -14.52V)03/11/2015 12:50 67.57324 15.74545 3 Receiver 78 NEGATIVE RESISTIVITYTx :1-7 4-19 144mARx 1:2-3 2-11 dV=-172.3mV ( -253.0mV 102.3mV 99.04mV -235.1mV)03/11/2015 12:51 67.57323 15.7455 3 Receiver 80 NEGATIVE RESISTIVITYTx :1-3 4-3 102mARx 3:2-7 2-13 dV=-979.2mV ( -573.1mV 1.380V 1.375V -588.1mV)

03/11/2015 12:51 67.57326 15.7456 3 Receiver 81

NEGATIVE RESISTIVITYTx :1-5 4-5 239mARx 1:2-3 2-9 dV=-15.75V ( -21.29V 14.59V 14.02V -13.12V)Rx 2:2-3 1-17 dV=-954.1mV ( -832.9mV 1.172V 1.145V -666.2mV)Rx 3:2-5 3-

5 dV=-733.8mV ( 115.6mV 1.340V 1.388V -322.9mV)Rx12:3-1 2-15 dV=-16.43V ( -16.23V 16.37V 16.35V -16.76V)

03/11/2015 12:52 67.57325 15.74548 3 Receiver 82

NEGATIVE RESISTIVITYTx :1-7 4-7 183mARx 1:2-5 2-11 dV=-423.8mV ( -182.9mV 681.6mV 676.8mV -153.9mV)Rx 4:2-17 3-3 dV=-35.37mV ( 19.01mV 90.98mV 98.14mV

28.64mV)03/11/2015 13:04 67.57321 15.74564 3 Receiver 134 NEGATIVE RESISTIVITYTx :2-12 3-2 127mARx 5:2-19 2-20 dV=-92.07V ( -94.13V 92.66V 93.02V -88.49V)03/11/2015 13:05 67.57321 15.74558 3 Receiver 136 NEGATIVE RESISTIVITYTx :2-13 3-3 40.0mARx 4:2-19 2-20 dV=-6.173V ( -6.392V 5.964V 5.986V -6.351V)

Page 24: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

03/11/2015 13:05 67.57313 15.74576 3 Transmitter 138 Transmitter setup fail.Tx :2-4 2-14Estimated load: 23.026kOCurrent:26.5mAStatus code:TX status 0x0020Not regulating 03/11/2015 13:06 67.57311 15.74574 3 Receiver 139 NEGATIVE RESISTIVITYTx :2-14 3-4 20.2mARx 4:2-19 2-20 dV=-1.233V ( 1.096V -1.368V -1.371V 1.095V)03/11/2015 13:07 67.57312 15.74579 3 Receiver 141 NEGATIVE RESISTIVITYTx :2-15 3-5 106mARx 3:2-19 2-20 dV=-1.529V ( 1.417V -1.645V -1.651V 1.405V)03/11/2015 13:08 67.57309 15.74573 3 Receiver 148 NEGATIVE RESISTIVITYTx :2-18 3-8 87.1mARx 5:2-20 3-1 dV=-354.8mV ( -274.9mV 417.0mV 405.7mV -321.7mV)03/11/2015 13:09 67.57318 15.74566 3 Receiver 151 NEGATIVE RESISTIVITYTx :2-19 3-9 85.7mARx 1:3-1 2-20 dV=-2.580V ( -2.529V 2.634V 2.610V -2.549V)

03/11/2015 13:10 67.57319 15.74559 3 Transmitter 153

Transmitter stopped due to unexpected high power loss. Probable causes: A sudden drop in resistance or a highly inductive load. Try to reduce the maximum current.Tx :2-

10 2-20Estimated load: 1.8031kOCurrent:239mAStatus code:TX status 0x0040Too high power loss 03/11/2015 13:10 67.57322 15.74567 3 Instrument 155 Measuring done03/11/2015 13:24 67.57298 15.74376 3 User 155 Created a new station at 20;0;003/11/2015 13:24 67.57298 15.74385 3 Instrument 155 Measuring Started. (565 data points requested.)03/11/2015 13:24 67.57301 15.74372 3 Instrument 155 Electrode test FAIL (OK:46 Bad:0 Fail:10)03/11/2015 13:26 67.57305 15.74361 3 Instrument 155 Measuring Started. (565 data points requested.)03/11/2015 13:26 67.57306 15.7436 3 Instrument 155 Electrode test OK (OK:46 Bad:0 Fail:10)03/11/2015 13:32 67.57304 15.74368 3 Instrument 183 Measuring done03/11/2015 16:07 0 0 1 Instrument 183 Started03/11/2015 16:07 0 0 1 Instrument 183 Start dhcp service03/11/2015 18:25 0 0 1 Instrument 183 Started03/11/2015 18:25 0 0 1 Instrument 183 Start dhcp service03/11/2015 18:48 0 0 1 Instrument 183 Started03/11/2015 18:48 0 0 1 Instrument 183 Start dhcp service

no. Neg Res 40Electrode spacing X:5 Y: Z:1no. Datapoints 1266focus position Z (min) 2.66focus position Z (max) 75.479

Page 25: STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG … Document type Rapport Date November, 2015 . STATENS VEGVESEN E6 SØFOLDTUNNELENE RESISTIVITET OG IP MÅLINGER 1100019854-331-001_0_Rapport_E6

Time Latitude Longitude Pos.Quality Source Type MeasID Description04/11/2015 13:16 67.57255 15.74434 3 User -1 Created a new station at -20;0;004/11/2015 13:17 67.57255 15.7444 3 Instrument -1 Measuring Started. (976 data points requested.)04/11/2015 13:17 67.57255 15.74445 3 Instrument -1 Electrode test FAIL (OK:49 Bad:0 Fail:12)04/11/2015 13:20 67.5725 15.74442 3 Instrument -1 Measuring Started. (976 data points requested.)04/11/2015 13:20 67.5725 15.74444 3 Instrument -1 Electrode test FAIL (OK:49 Bad:0 Fail:12)04/11/2015 13:21 67.57249 15.74448 3 Instrument -1 Measuring Started. (976 data points requested.)04/11/2015 13:21 67.57249 15.74449 3 Instrument -1 Electrode test OK (OK:49 Bad:0 Fail:12)

04/11/2015 13:22 67.57248 15.74446 3 Receiver 5

NEGATIVE RESISTIVITYTx :3-1 4-21 169mARx 9:3-21 4-

5 dV=-8.960mV ( -1.629V -1.297V -1.266V -970.1mV)04/11/2015 13:37 67.57252 15.74444 3 Instrument 67 Measuring done04/11/2015 13:39 67.57247 15.74445 3 User 67 Created a new station at 0;0;004/11/2015 13:39 67.57254 15.74446 3 Instrument 67 Measuring Started. (592 data points requested.)04/11/2015 13:39 67.57254 15.74445 3 Instrument 67 Electrode test FAIL (OK:1 Bad:0 Fail:0)04/11/2015 13:39 67.57253 15.74442 3 Instrument 67 Measuring Started. (592 data points requested.)04/11/2015 13:40 67.57255 15.74433 3 Instrument 67 Electrode test FAIL (OK:44 Bad:1 Fail:11)04/11/2015 13:41 67.57253 15.74428 3 Instrument 67 Measuring Started. (592 data points requested.)04/11/2015 13:41 67.57252 15.74428 3 Instrument 67 Electrode test OK (OK:44 Bad:1 Fail:11)04/11/2015 13:47 67.57249 15.74438 3 Instrument 93 Measuring done04/11/2015 17:36 0 0 1 Instrument 93 Started04/11/2015 17:36 0 0 1 Instrument 93 Start dhcp service

no. Neg Res 1Electrode spacing X:5 Y: Z:1no. Datapoints 641focus position Z (min) 2.66focus position Z (max) 55.49