SLOPEIntegrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas
Final Review Meeting 1 Feb 17
FINAL REVIEW MEETING
FONDAZIONE GRAPHITECHBRUSSELS, 1° FEBRUARY 2017
THEME: Integrated processing and Control Systems forSustainable Production in Farms and ForestsDuration: 36 MonthsPartners: 10Coordinating institution: Fondazione GraphiTech
Final Review Meeting 1 Feb 17
Welcome
Final Review Meeting 1 Feb 17
Agenda - Morning • Introduction• WP9 Financial and administrative management (GraphiTech)
• Use of resource analysis, Q&A• WP1 Definition of Requirements and System analysis (MHG)
• Overview of achievements and results, Q&A• WP2 Forest Information collection and analysis (Coastway)
• Overview of achievements and results, Q&A• WP3 Integration of novel intelligent harvesting systems operating in
mountain areas (Greifenberg, Compolab, Itene, CNR)• Detailed overview of T.3.3, T.3.4, T.3.5, T.3.6, Q&A
• WP4 Multi-sensor model-based quality control of mountain forest production (CNR, Boku, Treemeetrics)• Detailed overview of T.4.3, T.4.4, T.4.5, T.4.6, Q&A
Final Review Meeting 1 Feb 17
Agenda - Afternoon • WP5 Forest information system development (MHG, Treemeetrics,
Boku)• Detailed overview of T.5.2, T.5.3, T.5.4, T.5.5, Q&A
• WP6 System Integration (GraphiTech, MHG)• Detailed overview of T.6.2, T.6.3, T.6.4, Q&A
• WP7 piloting the SLOPE demonstrator (Boku, CNR)• Detailed overview of T.5.2, T.5.3, T.5.4, T.5.5, Q&A
• WP8 Openness with other activities, dissemination and exploitation of results (ITENE, MHG, CNR and All)• Detailed overview of T.8.1, T.8.2, T.8.3, T.8.4, Q&A
• Closure• PO and Reviewer internal meeting• Closing remarks
Final Review 1/Feb/2017
Project ObjectivesImprove, harmonize and optimize the wood
processing chain from the forest to the market
• Integrated processing: all actors interact together providing and sharing information to create a forest data model
• Integrated control systems: real-time quality assessment and tracking• Sustainable forest production: transport optimization, response to
market demands• Mountain areas: specific focus on high slope area where operations
are difficult
Final Review 1/Feb/2017
The typical scenario
Selection Cutting and debranching
Harvesting and logging Transport Sawmill
processing Selling
Problems• Right areas/trees selection: demand/quality/optimization• Operational areas selection in the forest: harvesting, processing, stocking• Slope: optimize carriage system placement• Transport: path optimization among sawmills, reduce loading and unloading
times• Logs quality: maximize final product value• Other actors involved
Final Review 1/Feb/2017
The SLOPE scenarioForest Survey (RS, UAV, TLS)
Digital Forest Model Creation
Harvest plan and
simulation
Trees Marking
(RFID)Trees Felling Extraction
Trees proces
sing
Piling stocking
transportSelling
The ConsortiumItaly• Fondazione Graphitech: Interactive GEO Visualization, integration and coordination• CNR-Ivalsa: Novel harvesting machines sensing techniques and pilots• Compolab: Mechanical Engineering, prototype design and construction• FlyBy: Digital imaging, remote sensing, optical sensor data processing• Greifenberg: Cable crane carriage and other forest mechanization systems
Ireland• Treemetrics: Terrestrial Laser Scanning, 3D reconstruction and operational planning• Coastway: UAV forest data acquisition and analysis
Finland• MHG: FIS development, optimization, purchasing & invoicing, integration, exploitation
Austria• BOKU: Sensing techniques, harvesting planning, road and logistic evaluation, pilots
Spain• ITENE: woods traceability, logistic models, dissemination
Final Review 1/Feb/2017
Final Review Meeting 1 Feb 17
Project Overview• Deliverables submitted
• Draft: D.7.06 Reports and manuals for off-the-job training• Milestones achieved• Machines development has been completed
• Tecno, Chockers, Rope Launcher Easer, iTruck, Processor Head, Mobile devices• Software integration completed• 2 pilots tests performed• Good dissemination
• Fairs• Conferences• Workshops
• Final Conference• Exploitation booster service
• Key exploitable results• Business model canvas
Final Review Meeting 1 Feb 17
Meeting objectivesEstablish:1. The degree of fulfilment of the whole project for the second period,
including deliverables and milestones2. The continued relevance of the objectives3. The resources planned and utilized in relation to the achieved progress4. The beneficiaries’ contributions and integration within the project5. The expected potential impact in scientific, technological, economic,
competition and social terms, and plans for the use and dissemination of foreground
Final Review Meeting 1 Feb 17
Thanks