Task 1.1 – users and system requirements (by itene)
Slope presentation wp8
Mhg company presentation
T.2.1 – remote sensing and multispectral analysis (by fly)
Slope wp9, task 9.1, project reporting by Graphitech
Coastway technical presentation5
Presentazione Slope by boku
T.2.5 – road and logistic planning (by itene)
Slope task 4.1 by treemetrics
Task 3.1 intelligent tree marking (by cnr)
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
WP7: System Integration and Task 7.1 – Definition of evaluation methodology
Slope graphitech introduction
Wp6 presentation by graphitech
SLOPE intro we have a new project!
Evaluation of near infrared (NIR) spectroscopy as a tool for determination of log/biomass quality index in mountain forests (by CNR)
Slope company presentation
Task 7.4 – Training on the job (by CNR)
Task 5.2 – Platform for near real time control of operations (by TRE)
Task 3.5 intelligent transport truck (by itene)