Sjzl20094800-ZXG10 IBSC (V6.20.10) Performance Counter Reference

1657
ZXG10 BSS Base Station Subsystem Performance Counter Reference Version 6.20.10 ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, P. R. China 518057 Tel: (86) 755 26771900 800-9830-9830 Fax: (86) 755 26772236 URL: http://support.zte.com.cn E-mail: [email protected]

description

perf

Transcript of Sjzl20094800-ZXG10 IBSC (V6.20.10) Performance Counter Reference

  • ZXG10 BSSBase Station Subsystem

    Performance Counter Reference

    Version 6.20.10

    ZTE CORPORATIONZTE Plaza, Keji Road South,Hi-Tech Industrial Park,Nanshan District, Shenzhen,P. R. China518057Tel: (86) 755 26771900 800-9830-9830Fax: (86) 755 26772236URL: http://support.zte.com.cnE-mail: [email protected]

  • LEGAL INFORMATION

    Copyright 2006 ZTE CORPORATION.

    The contents of this document are protected by copyright laws and international treaties. Any reproduction or distribution ofthis document or any portion of this document, in any form by any means, without the prior written consent of ZTE CORPO-RATION is prohibited. Additionally, the contents of this document are protected by contractual confidentiality obligations.

    All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE CORPORATIONor of their respective owners.

    This document is provided as is, and all express, implied, or statutory warranties, representations or conditions are dis-claimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose, title or non-in-fringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the use of or reliance on theinformation contained herein.

    ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications covering the subjectmatter of this document. Except as expressly provided in any written license between ZTE CORPORATION and its licensee,the user of this document shall not acquire any license to the subject matter herein.

    ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.

    Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire related information.

    The ultimate right to interpret this product resides in ZTE CORPORATION.

    Revision History

    Revison No. Revision Date Revision Reason

    R1.0 20090805 First edition

    Shi Kai

    Serial Number: sjzl20094800

  • Content

    About This Manual.............................................. i

    PS Basic Measurement (BSC) ............................1Overview....................................................................... 1

    C900030001 Number of bytes received from data link ......... 1

    C900030002 Number of bytes sent to data link ................. 1

    PS Basic Measurement (Cell).............................3Overview......................................................................10

    C900040001 Number of GPRS DL TBF establishment

    success on PACCH .................................................10

    C900040002 Number of GPRS DL TBF release due to

    N3105 overflow.....................................................12

    C900040003 Number of GPRS DL TBF release due to

    other reasons........................................................13

    C900040004 Number of GPRS DL TBF forcing release by

    control plane.........................................................14

    C900040005 Number of GPRS DL TBF release due to

    instance suspension...............................................15

    C900040006 Number of GPRS DL TBF release due to

    inner abnormal......................................................15

    C900040007 Number of GPRS DL signaling TBF

    establishment .......................................................16

    C900040008 Number of GPRS DL data TBF

    establishment .......................................................16

    C900040009 Number of EGPRS DL TBF establishment

    success on PACCH .................................................16

    C900040010 Number of EGPRS DL TBF release due to

    N3105 overflow.....................................................18

    C900040011 Number of EGPRS DL TBF release due to

    other reasons........................................................19

    C900040012 Number of EGPRS DL TBF forcing release by

    control plane.........................................................20

  • C900040013 Number of EGPRS DL TBF release due to

    instance suspension...............................................21

    C900040014 Number of EGPRS DL TBF release due to

    inner abnormal......................................................21

    C900040015 Number of EGPRS DL signaling TBF

    establishment .......................................................22

    C900040016 Number of EGPRS DL data TBF

    establishment .......................................................22

    C900040017 Average number of GPRS DL TBF

    simultaneous establishment ...................................23

    C900040018 Average number of EGPRS DL TBF

    simultaneous establishment ...................................23

    C900040019 Number of GPRS UL data TBF establishment

    success on PACCH .................................................23

    C900040020 Number of GPRS UL TBF release due to

    N3101 overflow.....................................................24

    C900040021 Number of GPRS UL TBF release due to

    N3103 overflow.....................................................25

    C900040022 Number of GPRS UL TBF forcing release by

    control plane.........................................................25

    C900040023 Number of GPRS UL TBF release due to

    instance suspension...............................................26

    C900040024 Number of GPRS UL TBF release due to inner

    abnormal..............................................................26

    C900040025 Number of GPRS UL signaling TBF

    establishment .......................................................27

    C900040026 Number of GPRS UL data TBF

    establishment .......................................................29

    C900040027 Number of EGPRS UL TBF establishment

    success on PACCH .................................................30

    C900040028 Number of EGPRS UL TBF release due to

    N3101 overflow.....................................................31

    C900040029 Number of EGPRS UL TBF release due to

    N3103 overflow.....................................................31

    C900040030 Number of EGPRS UL TBF forcing release by

    control plane.........................................................32

    C900040031 Number of EGPRS UL TBF release due to

    instance suspension...............................................32

    C900040032 Number of EGPRS UL TBF release due to

    inner abnormal......................................................32

  • C900040033 Number of EGPRS UL signaling TBF

    establishment .......................................................33

    C900040034 Number of EGPRS UL data TBF

    establishment .......................................................33

    C900040035 Average number of GPRS UL TBF

    simultaneous establishment ...................................34

    C900040036 Average number of EGPRS UL TBF

    simultaneous establishment ...................................34

    C900040037 Number of GPRS UL signaling TBF release

    due to N3101 overflow ...........................................34

    C900040038 Number of GPRS UL signaling TBF release

    due to N3103 overflow ...........................................35

    C900040039 Number of GPRS UL signaling TBF forcing

    release by control plane .........................................35

    C900040040 Number of GPRS UL signaling TBF release

    due to instance suspension .....................................36

    C900040041 Number of GPRS UL signaling TBF release

    due to inner abnormal............................................36

    C900040042 Number of EGPRS UL signaling TBF release

    due to N3101 overflow ...........................................37

    C900040043 Number of EGPRS UL signaling TBF release

    due to N3103 overflow ...........................................37

    C900040044 Number of EGPRS UL signaling TBF forcing

    release by control plane .........................................38

    C900040045 Number of EGPRS UL signaling TBF release

    due to instance suspension .....................................38

    C900040046 Number of EGPRS UL signaling TBF release

    due to inner abnormal............................................38

    C900040047 Number of EGPRS DL LLC frames ..................39

    C900040048 Number of discarded EGPRS DL LLC frames

    due to buffer overflow ............................................39

    C900040049 Number of discarded EGPRS DL LLC frames

    due to life time expiration.......................................40

    C900040050 Number of discarded EGPRS DL LLC frames

    due to other reasons .............................................41

    C900040051 Number of DL signaling LLC frames ...............41

    C900040052 Number of discarded EGPRS DL signaling

    LLC frames due to buffer overflow............................42

    C900040053 Number of discarded EGPRS DL signaling

    LLC frames due to life time expiration.......................43

  • C900040054 Number of discarded EGPRS DL signaling

    LLC frames due to other reasons .............................43

    C900040055 Number of data blocks transmitted according

    to given Abis bandwidth .........................................44

    C900040056 Bytes of effective upper layer protocol data

    sent on DL PDCH ..................................................44

    C900040057 Bytes of effective upper layer protocol data

    received on UL PDCH ............................................45

    C900040058 Bytes of LLC frame on GPRS UL data TBF

    ...........................................................................46

    C900040059 Duration of GPRS UL data TBF ......................46

    C900040060 Bytes of LLC frame on GPRS DL data TBF

    ...........................................................................47

    C900040061 Duration of GPRS DL data TBF ......................48

    C900040062 Number of effective data blocks received on

    GPRS UL TBF ........................................................48

    C900040063 Number of NACK blocks received on GPRS

    UL TBF ................................................................49

    C900040064 Number of effective data blocks sent on

    GPRS DL TBF .......................................................50

    C900040065 Number of NACK blocks sent on GPRS DL

    TBF ....................................................................50

    C900040066 Bytes of LLC frame on EGPRS UL data TBF

    ...........................................................................51

    C900040067 Duration of EGPRS UL data TBF ....................52

    C900040068 Bytes of LLC frame on EGPRS DL data TBF

    ...........................................................................53

    C900040069 Duration of EGPRS DL data TBF ....................53

    C900040070 Number of effective data blocks received on

    EGPRS UL TBF.......................................................54

    C900040071 Number of NACK blocks received on EGPRS

    UL TBF ................................................................55

    C900040072 Number of effective data blocks sent on

    EGPRS DL TBF ......................................................55

    C900040073 Number of NACK blocks sent on EGPRS DL

    TBF ....................................................................56

    C900040074 Number of GPRS DL LLC frames....................57

    C900040075 Number of discarded GPRS DL LLC frames

    due to buffer overflow ............................................58

  • C900040076 Number of discarded GPRS DL LLC frames

    due to life time expiration.......................................58

    C900040077 Number of discarded GPRS DL LLC frames

    due to other reasons..............................................59

    C900040078 Number of DL dummy control blocks on

    PACCH .................................................................60

    C900040079 Number of UL dummy control blocks on

    PACCH .................................................................60

    C900040080 Number of DL RLC blocks on PACCH

    (excluding dummy block) .......................................61

    C900040081 Number of DL RLC pending blocks in CS1 on

    PDTCH .................................................................62

    C900040082 Number of DL RLC pending blocks in CS2 on

    PDTCH .................................................................62

    C900040083 Number of DL RLC pending blocks in CS3 on

    PDTCH .................................................................63

    C900040084 Number of DL RLC pending blocks in CS4 on

    PDTCH .................................................................64

    C900040085 Number of DL RLC NACK blocks in CS1 on

    PDTCH .................................................................64

    C900040086 Number of DL RLC NACK blocks in CS2 on

    PDTCH .................................................................65

    C900040087 Number of DL RLC NACK blocks in CS3 on

    PDTCH .................................................................66

    C900040088 Number of DL RLC NACK blocks in CS4 on

    PDTCH .................................................................66

    C900040089 Number of DL RLC new blocks in CS1 on

    PDTCH .................................................................67

    C900040090 Number of DL RLC new blocks in CS2 on

    PDTCH .................................................................68

    C900040091 Number of DL RLC new blocks in CS3 on

    PDTCH .................................................................68

    C900040092 Number of DL RLC new blocks in CS4 on

    PDTCH .................................................................69

    C900040093 Number of UL RLC blocks excluding dummy

    blocks on PACCH ...................................................70

    C900040094 Number of UL RLC pending blocks in CS1 on

    PDTCH .................................................................70

    C900040095 Number of UL RLC pending blocks in CS2 on

    PDTCH .................................................................71

  • C900040096 Number of UL RLC pending blocks in CS3 on

    PDTCH .................................................................72

    C900040097 Number of UL RLC pending blocks in CS4 on

    PDTCH .................................................................72

    C900040098 Number of UL RLC NACK blocks in CS1 on

    PDTCH .................................................................73

    C900040099 Number of UL RLC NACK blocks in CS2 on

    PDTCH .................................................................74

    C900040100 Number of UL RLC NACK blocks in CS3 on

    PDTCH .................................................................74

    C900040101 Number of UL RLC NACK blocks in CS4 on

    PDTCH .................................................................75

    C900040102 Number of UL RLC new blocks in CS1 on

    PDTCH .................................................................76

    C900040103 Number of UL RLC new blocks in CS2 on

    PDTCH .................................................................76

    C900040104 Number of UL RLC new blocks in CS3 on

    PDTCH .................................................................77

    C900040105 Number of UL RLC new blocks in CS4 on

    PDTCH .................................................................78

    C900040106 Number of UL data blocks received on

    PDTCH .................................................................78

    C900040107 Number of DL data blocks sent on

    PDTCH .................................................................79

    C900040108 Number of GPRS DL TBF establishment

    requests ..............................................................79

    C900040109 Number of GPRS DL TBF establishment

    failure due to database allocation failure ...................79

    C900040110 Number of GPRS DL TBF resource

    reallocation requests due to UL TBF establishment

    ...........................................................................81

    C900040111 Number of GPRS DL TBF resource

    reallocation failure due to UL TBF establishment

    ...........................................................................81

    C900040112 Number of GPRS DL TBF resource

    reallocation requests due to LLC transmission............82

    C900040113 Number of GPRS DL TBF resource

    reallocation failure due to LLC transmission ..............83

    C900040114 Number of EGPRS DL TBF establishment

    requests ..............................................................84

  • C900040115 Number of EGPRS DL TBF establishment

    failure due to database allocation failure ...................84

    C900040116 Number of EGPRS DL TBF resource

    reallocation requests due to UL TBF establishment

    ...........................................................................85

    C900040117 Number of EGPRS DL TBF resource

    reallocation failure due to UL TBF establishment

    ...........................................................................86

    C900040118 Number of EGPRS DL TBF resource

    reallocation requests due to LLC transmission............87

    C900040119 Number of EGPRS DL TBF resource

    reallocation failure due to LLC transmission ..............88

    C900040120 Number of GPRS UL TBF establishment

    requests ..............................................................88

    C900040121 Number of GPRS UL TBF establishment

    failure due to database allocation failure ...................89

    C900040122 Number of GPRS UL TBF resource reallocation

    requests due to DL TBF establishment ......................90

    C900040123 Number of GPRS UL TBF resource

    reallocation failure due to DL TBF establishment .........91

    C900040124 Number of GPRS UL TBF resource

    reallocation requests due to LLC transmission............92

    C900040125 Number of GPRS UL TBF resource

    reallocation failure due to LLC transmission...............92

    C900040126 Number of GPRS UL TBF resource

    reallocation requests for resource request.................93

    C900040127 Number of GPRS UL TBF resource

    reallocation failure due to database allocation failure

    for resource request...............................................94

    C900040128 Number of EGPRS UL TBF establishment

    requests...............................................................95

    C900040129 Number of EGPRS UL TBF establishment

    failure due to database allocation failure ...................95

    C900040130 Number of EGPRS UL TBF resource

    reallocation requests due to DL TBF

    establishment .......................................................96

    C900040131 Number of EGPRS UL TBF resource

    reallocation failure due to DL TBF establishment .........97

    C900040132 Number of EGPRS UL TBF resource

    reallocation requests due to LLC transmission............98

  • C900040133 Number of EGPRS UL TBF resource

    reallocation failure due to LLC transmission...............98

    C900040134 Number of EGPRS UL TBF resource

    reallocation requests for resource request.................99

    C900040135 Number of EGPRS UL TBF resource

    reallocation failure due to database allocation

    failure ................................................................ 100

    C900040136 Number of available PDCH.......................... 101

    C900040137 Number of forcing conversation dynamic

    from PDCH to TCH by BSC .................................... 101

    C900040138 Number of PDCH used by TBF in each

    cell .................................................................... 101

    C900040139 Maximum number of used PDCH ................. 102

    C900040140 Average number of used PDCH ................... 102

    C900040141 Number of GPRS DL TBF establishment

    requests before T3192 expiration........................... 102

    C900040142 Number of GPRS DL TBF establishment

    using existing DL TBF resource .............................. 103

    C900040143 Number of GPRS DL TBF establishment

    requests on PACCH .............................................. 104

    C900040144 Number of GPRS DL TBF establishment

    requests on CCCH/PCCCH..................................... 105

    C900040145 Number of EGPRS DL TBF establishment

    requests before T3192 expiration........................... 106

    C900040146 Number of EGPRS DL TBF establishment

    using existing DL TBF resource .............................. 107

    C900040147 Number of EGPRS DL TBF establishment

    requests on PACCH .............................................. 108

    C900040148 Number of EGPRS DL TBF establishment

    requests on CCCH/PCCCH..................................... 109

    C900040149 Number of GPRS DL signaling TBF release

    due to N3105 overflow ......................................... 110

    C900040150 Number of GPRS DL signaling TBF release

    due to other reasons............................................ 111

    C900040151 Number of GPRS DL signaling TBF forcing

    release by control plane ....................................... 111

    C900040152 Number of GPRS DL signaling TBF release

    due to instance suspension ................................... 112

    C900040153 Number of GPRS DL signaling TBF release

    due to inner abnormal.......................................... 113

  • C900040154 Number of EGPRS DL signaling TBF release

    due to N3105 overflow ......................................... 113

    C900040155 Number of EGPRS DL signaling TBF release

    due to other reasons............................................ 114

    C900040156 Number of EGPRS DL signaling TBF forcing

    release by control plane ....................................... 115

    C900040157 Number of EGPRS DL signaling TBF release

    due to instance suspension ................................... 116

    C900040158 Number of EGPRS DL signaling TBF release

    due to inner abnormal.......................................... 117

    C900040159 Number of GPRS UL TBF establishments in

    release state....................................................... 117

    C900040160 Number of GPRS UL TBF establishment with

    existing UL resource ............................................ 119

    C900040161 Number of GPRS UL TBF establishment

    requests on PACCH .............................................. 119

    C900040162 Number of EGPRS UL data TBF

    establishments on PACCH ..................................... 120

    C900040163 Number of EGPRS UL TBF establishments in

    release state....................................................... 120

    C900040164 Number of EGPRS UL TBF establishment

    with existing UL resource...................................... 121

    C900040165 Number of EGPRS UL TBF establishment

    requests on PACCH .............................................. 122

    C900040166 Number of EGPRS UL TBF establishment

    requests on CCCH/PCCCH..................................... 123

    C900040167 Number of dynamic PDCH preemption for

    CS service .......................................................... 124

    C900040168 Number of GPRS UL TBF establishment

    requests on CCCH/PCCCH..................................... 124

    C900040169 Number of GPRS DL TBF establishment

    requests on PACCH .............................................. 125

    C900040170 Number of EGPRS DL TBF establishment

    requests on PACCH .............................................. 125

    C900040171 Number of GPRS UL TBF establishment

    requests on PACCH .............................................. 126

    C900040172 Number of DL RLC pending blocks in MCS1

    on PDTCH........................................................... 126

    C900040173 Number of DL RLC pending blocks in MCS2

    on PDTCH........................................................... 127

  • C900040174 Number of DL RLC pending blocks in MCS3

    on PDTCH........................................................... 128

    C900040175 Number of DL RLC pending blocks in MCS4

    on PDTCH........................................................... 128

    C900040176 Number of DL RLC pending blocks in MCS5

    on PDTCH........................................................... 129

    C900040177 Number of DL RLC pending blocks in MCS6

    on PDTCH........................................................... 130

    C900040178 Number of DL RLC pending blocks in MCS7

    on PDTCH........................................................... 130

    C900040179 Number of DL RLC pending blocks in MCS8

    on PDTCH........................................................... 131

    C900040180 Number of DL RLC pending blocks in MCS9

    on PDTCH........................................................... 132

    C900040181 Number of DL RLC NACK blocks in MCS1 on

    PDTCH ............................................................... 132

    C900040182 Number of DL RLC NACK blocks in MCS2 on

    PDTCH ............................................................... 133

    C900040183 Number of DL RLC NACK blocks in MCS3 on

    PDTCH ............................................................... 134

    C900040184 Number of DL RLC NACK blocks in MCS4 on

    PDTCH ............................................................... 134

    C900040185 Number of DL RLC NACK blocks in MCS5 on

    PDTCH ............................................................... 135

    C900040186 Number of DL RLC NACK blocks in MCS6 on

    PDTCH ............................................................... 136

    C900040187 Number of DL RLC NACK blocks in MCS7 on

    PDTCH ............................................................... 136

    C900040188 Number of DL RLC NACK blocks in MCS8 on

    PDTCH ............................................................... 137

    C900040189 Number of DL RLC NACK blocks in MCS9 on

    PDTCH ............................................................... 138

    C900040190 Number of DL RLC new blocks in MCS1 on

    PDTCH ............................................................... 138

    C900040191 Number of DL RLC new blocks in MCS2 on

    PDTCH ............................................................... 139

    C900040192 Number of DL RLC new blocks in MCS3 on

    PDTCH ............................................................... 140

    C900040193 Number of DL RLC new blocks in MCS4 on

    PDTCH ............................................................... 140

  • C900040194 Number of DL RLC new blocks in MCS5 on

    PDTCH ............................................................... 141

    C900040195 Number of DL RLC new blocks in MCS6 on

    PDTCH ............................................................... 142

    C900040196 Number of DL RLC new blocks in MCS7 on

    PDTCH ............................................................... 142

    C900040197 Number of DL RLC new blocks in MCS8 on

    PDTCH ............................................................... 143

    C900040198 Number of DL RLC new blocks in MCS9 on

    PDTCH ............................................................... 144

    C900040199 Number of UL RLC pending blocks in MCS1

    on PDTCH........................................................... 144

    C900040200 Number of UL RLC pending blocks in MCS2

    on PDTCH........................................................... 145

    C900040201 Number of UL RLC pending blocks in MCS3

    on PDTCH........................................................... 146

    C900040202 Number of UL RLC pending blocks in MCS4

    on PDTCH........................................................... 146

    C900040203 Number of UL RLC pending blocks in MCS5

    on PDTCH........................................................... 147

    C900040204 Number of UL RLC pending blocks in MCS6

    on PDTCH........................................................... 148

    C900040205 Number of UL RLC pending blocks in MCS7

    on PDTCH........................................................... 148

    C900040206 Number of UL RLC pending blocks in MCS8

    on PDTCH........................................................... 149

    C900040207 Number of UL RLC pending blocks in MCS9

    on PDTCH........................................................... 150

    C900040208 Number of UL RLC NACK blocks in MCS1 on

    PDTCH ............................................................... 150

    C900040209 Number of UL RLC NACK blocks in MCS2 on

    PDTCH ............................................................... 151

    C900040210 Number of UL RLC NACK blocks in MCS3 on

    PDTCH ............................................................... 152

    C900040211 Number of UL RLC NACK blocks in MCS4 on

    PDTCH ............................................................... 152

    C900040212 Number of UL RLC NACK blocks in MCS5 on

    PDTCH ............................................................... 153

    C900040213 Number of UL RLC NACK blocks in MCS6 on

    PDTCH ............................................................... 154

  • C900040214 Number of UL RLC NACK blocks in MCS7 on

    PDTCH ............................................................... 154

    C900040215 Number of UL RLC NACK blocks in MCS8 on

    PDTCH ............................................................... 155

    C900040216 Number of UL RLC NACK blocks in MCS9 on

    PDTCH ............................................................... 156

    C900040217 Number of UL RLC new blocks in MCS1 on

    PDTCH ............................................................... 156

    C900040218 Number of UL RLC new blocks in MCS2 on

    PDTCH ............................................................... 157

    C900040219 Number of UL RLC new blocks in MCS3 on

    PDTCH ............................................................... 158

    C900040220 Number of UL RLC new blocks in MCS4 on

    PDTCH ............................................................... 158

    C900040221 Number of UL RLC new blocks in MCS5 on

    PDTCH ............................................................... 159

    C900040222 Number of UL RLC new blocks in MCS6 on

    PDTCH ............................................................... 160

    C900040223 Number of UL RLC new blocks in MCS7 on

    PDTCH ............................................................... 160

    C900040224 Number of UL RLC new blocks in MCS8 on

    PDTCH ............................................................... 161

    C900040225 Number of UL RLC new blocks in MCS9 on

    PDTCH ............................................................... 162

    CPU Load Measurement.................................163Overview.................................................................... 163

    C900050001 Average load of the processor..................... 163

    C900050002 Peak value of the processor load ................. 163

    CS Basic Measurement ..................................165Overview.................................................................... 172

    C900060001 Number of MTC access attempts ................. 172

    C900060002 Number of MTC access success ................... 173

    C900060003 Number of SDCCH seizure attempts for

    assignment......................................................... 174

    C900060004 Number of SDCCH seizure success for

    assignment......................................................... 175

    C900060005 Number of SDCCH seizure failure for

    assignment......................................................... 176

    C900060006 Number of SDCCH seizure attempts for

    handover............................................................ 177

  • C900060007 Number of SDCCH seizure failure for

    handover............................................................ 179

    C900060008 Number of SDCCH allocation success for

    assignment......................................................... 180

    C900060009 Number of SDCCH allocation failure for

    assignment......................................................... 181

    C900060010 Number of signaling TCH/F seizure attempts

    for assignment .................................................... 182

    C900060011 Number of signaling TCH/F seizure failure

    for assignment .................................................... 183

    C900060012 Number of signaling TCH/F seizure attempts

    for handover ....................................................... 184

    C900060013 Number of signaling TCH/F seizure failure

    for handover ....................................................... 186

    C900060014 Number of signaling TCH/F allocation

    success for assignment ........................................ 187

    C900060015 Number of signaling TCH/F allocation failure

    for assignment .................................................... 188

    C900060016 Number of signaling TCH/F allocation failure

    for handover ....................................................... 189

    C900060017 Number of signaling TCH/F assignment

    success for assignment ........................................ 190

    C900060018 Number of signaling TCH/F assignment

    failure for assignment .......................................... 191

    C900060019 Number of voice TCH/F seizure

    attempts ............................................................ 192

    C900060020 Number of voice TCH/F seizure failure ......... 193

    C900060021 Number of voice TCH/F seizure attempts for

    handover............................................................ 194

    C900060022 Number of voice TCH/F seizure failure for

    handover............................................................ 197

    C900060023 Number of TCH/F allocation success for

    assignment (speech version1) ............................... 198

    C900060024 Number of TCH/F allocation failure for

    assignment (speech version1) ............................... 199

    C900060025 Number of TCH/F allocation success for

    assignment (speech version2) ............................... 200

    C900060026 Number of TCH/F allocation success for

    assignment (speech version3) ............................... 201

  • C900060027 Number of TCH/F allocation failure for

    assignment (speech version3) ............................... 203

    C900060028 Number of voice TCH/F assignment

    success .............................................................. 204

    C900060029 Number of voice TCH/F assignment failure

    for assignment .................................................... 205

    C900060030 Number of data TCH/F seizure attempts for

    assignment......................................................... 206

    C900060031 Number of data TCH/F seizure failure for

    assignment......................................................... 208

    C900060032 Number of data TCH/F seizure attempts for

    handover............................................................ 208

    C900060033 Number of data TCH/F seizure failure for

    handover............................................................ 211

    C900060034 Number of data TCH/F allocation success for

    assignment......................................................... 212

    C900060035 Number of data TCH/F allocation failure for

    assignment......................................................... 213

    C900060036 Number of data TCH/F assignment

    success .............................................................. 214

    C900060037 Number of data TCH/F assignment

    failure ................................................................ 215

    C900060038 Number of signaling TCH/H seizure attempts

    for assignment .................................................... 216

    C900060039 Number of signaling TCH/H seizure failure

    for assignment .................................................... 217

    C900060040 Number of signaling TCH/H seizure attempts

    for handover ....................................................... 218

    C900060041 Number of signaling TCH/H seizure failure

    for handover ....................................................... 220

    C900060042 Number of voice TCH/H seizure attempts for

    assignment......................................................... 221

    C900060043 Number of voice TCH/H seizure failure for

    assignment......................................................... 223

    C900060044 Number of voice TCH/H seizure attempts for

    handover............................................................ 224

    C900060045 Number of voice TCH/H seizure failure for

    handover............................................................ 226

    C900060046 Number of data TCH/H seizure attempts for

    assignment......................................................... 227

  • C900060047 Number of data TCH/H seizure failure for

    assignment......................................................... 229

    C900060048 Number of data TCH/H seizure attempts for

    handover............................................................ 230

    C900060049 Number of data TCH/H seizure failure for

    handover............................................................ 232

    C900060050 Number of SAPI3 link establishment

    requests on SDCCH (MO-SM) ................................ 233

    C900060051 Number of SAPI3 link establishment

    requests on SDCCH (MT-SM)................................. 235

    C900060052 Number of SDCCH drops due to handover

    failure ................................................................ 236

    C900060053 Number of SDCCH drops............................ 238

    C900060054 Number of TCH/F drops ............................. 238

    C900060055 Number of TCH/H drops............................. 239

    C900060056 Average number of idle TCH/F with

    interference band 1 ............................................. 239

    C900060057 Average number of idle TCH/F with

    interference band 2 ............................................. 240

    C900060058 Average number of idle TCH/F with

    interference band 3 ............................................. 240

    C900060059 Average number of idle TCH/F with

    interference band 4 ............................................. 240

    C900060060 Average number of idle TCH/F with

    interference band 5 ............................................. 241

    C900060061 Average number of idle TCH/H with

    interference band 1 ............................................. 241

    C900060062 Average number of idle TCH/H with

    interference band 2 ............................................. 241

    C900060063 Average number of idle TCH/H with

    interference band 3 ............................................. 242

    C900060064 Average number of idle TCH/H with

    interference band 4 ............................................. 242

    C900060065 Average number of idle TCH/H with

    interference band 5 ............................................. 242

    C900060066 Number of samples with UL RQ = 0............. 243

    C900060067 Number of samples with UL RQ = 1............. 243

    C900060068 Number of samples with UL RQ = 2............. 243

    C900060069 Number of samples with UL RQ = 3............. 244

    C900060070 Number of samples with UL RQ = 4............. 244

  • C900060071 Number of samples with UL RQ = 5............. 244

    C900060072 Number of samples with UL RQ = 6............. 245

    C900060073 Number of samples with UL RQ = 7............. 245

    C900060074 Number of samples with DL RQ = 0............. 245

    C900060075 Number of samples with DL RQ = 1............. 246

    C900060076 Number of samples with DL RQ = 2............. 246

    C900060077 Number of samples with DL RQ = 3............. 246

    C900060078 Number of samples with DL RQ = 4............. 247

    C900060079 Number of samples with DL RQ = 5............. 247

    C900060080 Number of samples with DL RQ = 6............. 247

    C900060081 Number of samples with DL RQ = 7............. 248

    C900060082 Number of TCH/F handover attempts due to

    UL strength ........................................................ 248

    C900060083 Number of TCH/F handover attempts due to

    DL strength ........................................................ 249

    C900060084 Number of TCH/F handover attempts due to

    UL quality........................................................... 249

    C900060085 Number of TCH/F handover attempts due to

    DL quality........................................................... 250

    C900060086 Number of TCH/F handover attempts due to

    UL interference ................................................... 250

    C900060087 Number of TCH/F handover attempts due to

    DL interference ................................................... 251

    C900060088 Number of TCH/F handover attempts due to

    good C/I............................................................. 252

    C900060089 Number of TCH/F handover attempts due to

    bad C/I .............................................................. 252

    C900060090 Number of TCH/F handover attempts due to

    PBGT ................................................................. 253

    C900060091 Number of TCH/F handover attempts due to

    large TA ............................................................. 254

    C900060092 Number of TCH/F handover attempts due to

    other reasons...................................................... 254

    C900060093 Number of BSC-controlled inter-cell outgoing

    handover............................................................ 255

    C900060094 Number of BSC-controlled inter-cell outgoing

    handover success ................................................ 256

    C900060095 Number of MSC-controlled outgoing

    handover............................................................ 257

  • C900060096 Number of MSC-controlled outgoing

    handover success ................................................ 257

    C900060097 Number of BSC-controlled inter-cell

    incoming handover .............................................. 258

    C900060098 Number of BSC-controlled inter-cell

    incoming handover success................................... 259

    C900060099 Number of MSC-controlled incoming

    handover............................................................ 259

    C900060100 Number of MSC-controlled incoming

    handover due to forced release ............................. 260

    C900060101 Number of MSC-controlled incoming

    handover due to queue ........................................ 261

    C900060102 Number of MSC-controlled incoming

    handover success ................................................ 261

    C900060103 Number of incoming handover

    from undefined layer (GSM900) to current

    layer(GSM1800) .................................................. 262

    C900060104 Number of incoming handover success

    from undefined layer(GSM900) to current layer

    (GSM1800)......................................................... 263

    C900060105 Number of incoming handover from

    undefined layer (GSM1800) to current layer

    (GSM900)........................................................... 263

    C900060106 Number of incoming handover success

    from undefined layer(GSM1800) to current

    layer(GSM900).................................................... 264

    C900060107 Number of incoming handover from the

    same layer GSM900 to GSM1800........................... 265

    C900060108 Number of incoming handover success from

    the same layer GSM900 to GSM1800 ..................... 266

    C900060109 Number of incoming handover from GSM900

    to GSM1800 from the upper layer .......................... 266

    C900060110 Number of incoming handover success from

    GSM900 to GSM1800 in the upper layer ................. 267

    C900060111 Number of incoming handover from GSM900

    to GSM1800 in the lower layer .............................. 268

    C900060112 Number of incoming handover success from

    GSM900 to GSM1800 in the lower layer .................. 268

    C900060113 Number of incoming handover from

    GSM1800 to GSM900 from the same layer .............. 269

  • C900060114 Number of incoming handover success from

    GSM1800 to GSM900 from the same layer .............. 270

    C900060115 Number of incoming handover from

    GSM1800 to GSM900 from the upper layer ............. 271

    C900060116 Number of incoming handover success from

    GSM1800 to GSM900 from the upper layer ............. 271

    C900060117 Number of incoming handover from

    GSM1800 to GSM900 from the lower layer .............. 272

    C900060118 Number of incoming handover success from

    GSM1800 to GSM900 from the lower layer .............. 273

    C900060119 Number of Intra-cell handover .................... 273

    C900060120 Number of Intra-cell handover success ......... 274

    C900060121 Maximum number of busy TCH/H................ 275

    C900060122 Average number of available SDCCH............ 276

    C900060123 Average number of unavailable SDCCH......... 276

    C900060124 SDCCH busy time ..................................... 277

    C900060125 Average number of available radio

    channel .............................................................. 278

    C900060126 Average number of unavailable radio

    channel .............................................................. 279

    C900060127 TCH/H busy time ...................................... 279

    C900060128 Maximum number of busy TCH/F ................ 280

    C900060129 TCH/F busy time....................................... 281

    C900060130 Number of healthy TRXs ............................ 282

    C900060131 Number of CM service requests of MOC......... 283

    C900060132 Number of SAPI3 link establishment success

    on SDCCH (MT-SM) ............................................. 283

    C900060133 Number of available defined SDCCH ............ 285

    C900060134 Number of available defined TCH/F.............. 285

    C900060135 Number of signaling TCH/H assignment

    failure ................................................................ 286

    C900060136 Number of MOC access attempts................. 287

    C900060137 Number of wireless access due to paging

    responses........................................................... 287

    C900060138 Number of TCH/F allocation failure due

    to BTS connection failure for assignment (speech

    version1)............................................................ 288

    C900060139 Number of TCH/F allocation failure due

    to BIU connection failure for assignment (speech

    version1)............................................................ 289

  • C900060140 Number of TCH/F allocation failure due to

    TCU connection failure for assignment (speech

    version1)............................................................ 290

    C900060141 Number of TCH/F allocation failure due to

    channel activation failure for assignment (speech

    version2)............................................................ 291

    C900060142 Number of TCH/F allocation failure due

    to BTS connection failure for assignment (speech

    version2)............................................................ 292

    C900060143 Number of TCH/F allocation failure due

    to BIU connection failure for assignment (speech

    version2)............................................................ 292

    C900060144 Number of TCH/F allocation failure due to

    TCU connection failure for assignment (speech

    version2)............................................................ 293

    C900060145 Number of TCH/F allocation failure due

    to BTS connection failure for assignment (speech

    version3)............................................................ 294

    C900060146 Number of TCH/F allocation failure due

    to BIU connection failure for assignment (speech

    version3)............................................................ 295

    C900060147 Number of TCH/F allocation failure due to

    TCU connection failure for assignment (speech

    version3)............................................................ 296

    C900060148 Number of TCH/F allocation failure due

    to BTS connection failure for assignment (speech

    version3)............................................................ 296

    C900060149 Number of data TCH/F allocation failure due

    to BIU connection failure for assignment................. 297

    C900060150 Number of data TCH/F allocation failure due

    to TCU connection failure for assignment ................ 298

    C900060151 Number of voice TCH/H drops due to

    handover failure .................................................. 299

    C900060152 Number of Abis interface paging command

    messages ........................................................... 300

    C900060153 Number of Abis CS paging messages ........... 301

    C900060154 Number of Abis PS paging messages ........... 302

    C900060155 Number of available defined TCH/H ............. 302

  • C900060156 Number of TCH/F allocation failure due

    to channel activation failure for handover(speech

    version1)............................................................ 303

    C900060157 Number of TCH/F allocation failure due

    to BTS connection failure for handover (speech

    version1)............................................................ 304

    C900060158 Number of TCH/F allocation failure due

    to BIU connection failure for handover (speech

    version1)............................................................ 305

    C900060159 Number of TCH/F allocation failure due

    to TCU connection failure for handover (speech

    version1)............................................................ 306

    C900060160 Number of TCH/F allocation failure due

    to channel activation failure for handover(speech

    version2)............................................................ 307

    C900060161 Number of TCH/F allocation failure due

    to BTS connection failure for handover (speech

    version2)............................................................ 308

    C900060162 Number of TCH/F allocation failure due

    to BIU connection failure for handover (speech

    version2)............................................................ 309

    C900060163 Number of TCH/F allocation failure due

    to TCU connection failure for handover (speech

    version2)............................................................ 310

    C900060164 Number of TCH/F allocation failure due to

    channel activation failure for handover (speech

    version3)............................................................ 311

    C900060165 Number of TCH/F allocation failure due

    to BTS connection failure for handover (speech

    version3)............................................................ 313

    C900060166 Number of TCH/F allocation failure due

    to BIU connection failure for handover (speech

    version3)............................................................ 314

    C900060167 Number of TCH/F allocation failure due

    to TCU connection failure for handover (speech

    version3)............................................................ 315

    C900060168 Number of Voice TCH/F handover

    success .............................................................. 316

    C900060169 Number of data TCH/F allocation failure due

    to channel activation failure for handover................ 318

  • C900060170 Number of TCH/F allocation failure due to

    BTS connection failure for handover ....................... 319

    C900060171 Number of TCH/F allocation failure due to

    BIU connection failure for handover ....................... 320

    C900060172 Number of TCH/F allocation failure due to

    TCU connection failure for handover ....................... 321

    C900060173 Number of data TCH/F handover

    success .............................................................. 322

    C900060174 Number of signaling TCH/H allocation failure

    for assignment .................................................... 324

    C900060175 Number of TCH/H allocation failure due to

    channel activation failure for assignment (speech

    version1)............................................................ 325

    C900060176 Number of TCH/H allocation failure due

    to BTS connection failure for assignment (speech

    version1)............................................................ 326

    C900060177 Number of TCH/H allocation failure due

    to BIU connection failure for assignment (speech

    version1)............................................................ 327

    C900060178 Number of TCH/H allocation failure due

    to TCU connection failure for assignment (speech

    version1)............................................................ 328

    C900060179 Number of TCH/H allocation failure due to

    channel activation failure for handover (speech

    version1)............................................................ 328

    C900060180 Number of TCH/H allocation failure due

    to BTS connection failure for handover (speech

    version1)............................................................ 330

    C900060181 Number of TCH/H allocation failure due

    to BIU connection failure for handover (speech

    version1)............................................................ 331

    C900060182 Number of TCH/H allocation failure due

    to TCU connection failure for handover (speech

    version1)............................................................ 332

    C900060183 Number of TCH/H allocation failure due to

    channel activation failure for assignment (speech

    version2)............................................................ 333

    C900060184 Number of TCH/H allocation failure due

    to BTS connection failure for assignment (speech

    version2)............................................................ 333

  • C900060185 Number of TCH/H allocation failure due

    to BIU connection failure for assignment (speech

    version2)............................................................ 334

    C900060186 Number of TCH/H allocation failure due

    to TCU connection failure for assignment (speech

    version2)............................................................ 335

    C900060187 Number of TCH/H allocation failure due to

    channel activation failure for handover (speech

    version2)............................................................ 336

    C900060188 Number of TCH/H allocation failure due

    to BTS connection failure for handover (speech

    version2)............................................................ 337

    C900060189 Number of TCH/H allocation failure due

    to BIU connection failure for handover (speech

    version2)............................................................ 338

    C900060190 Number of TCH/H allocation failure due

    to TCU connection failure for handover (speech

    version2)............................................................ 339

    C900060191 Number of TCH/H allocation failure due to

    channel activation failure for assignment (speech

    version3)............................................................ 340

    C900060192 Number of TCH/H allocation failure due

    to BTS connection failure for assignment (speech

    version3)............................................................ 341

    C900060193 Number of TCH/H allocation failure due

    to BIU connection failure for assignment (speech

    version3)............................................................ 342

    C900060194 Number of TCH/H allocation failure due

    to TCU connection failure for assignment (speech

    version3)............................................................ 343

    C900060195 Number of TCH/H allocation failure due to

    channel activation failure for handover (speech

    version3)............................................................ 344

    C900060196 Number of TCH/H allocation failure due

    to BTS connection failure for handover (speech

    version3)............................................................ 345

    C900060197 Number of TCH/H allocation failure due

    to BIU connection failure for handover (speech

    version3)............................................................ 346

  • C900060198 Number of TCH/H allocation failure due

    to TCU connection failure for handover (speech

    version3)............................................................ 347

    C900060199 Number of Voice TCH/H assignment

    success .............................................................. 348

    C900060200 Number of Voice TCH/H assignment

    failure ................................................................ 349

    C900060201 Number of Voice TCH/H handover

    success .............................................................. 350

    C900060202 Number of data TCH/H allocation failure due

    to channel activation failure for assignment............. 352

    C900060203 Number of data TCH/H allocation failure due

    to BTS connection failure for assignment ................ 353

    C900060204 Number of data TCH/H allocation failure due

    to BIU connection failure for assignment................. 354

    C900060205 Number of data TCH/H allocation failure due

    to TCU connection failure for assignment ................ 355

    C900060206 Number of data TCH/H allocation failure due

    to channel activation failure for handover................ 356

    C900060207 Number of data TCH/H allocation failure due

    to BTS connection failure for handover ................... 357

    C900060208 Number of data TCH/H allocation failure due

    to BIU connection failure for handover.................... 358

    C900060209 Number of data TCH/H allocation failure due

    to TCU connection failure for handover ................... 359

    C900060210 Number of data TCH/H assignment

    success .............................................................. 360

    C900060211 Number of data TCH/H assignment

    failure ................................................................ 361

    C900060212 Number of data TCH/H handover

    success .............................................................. 361

    C900060213 Number of BSC-controlled incoming

    handover due to forced release ............................. 363

    C900060214 Number of BSC-controlled incoming

    handover due to queues ....................................... 364

    C900060215 Number of BSC-controlled incoming

    handover due to forced handover .......................... 365

    C900060216 Number of MSC-controlled incoming

    handover due to forced handover .......................... 366

    C900060217 Number of unavailable defined TCH/H.......... 367

  • C900060218 Number of unavailable defined TCH/F .......... 367

    C900060219 Number of signaling TCH/F drops due to

    handover failure .................................................. 368

    C900060220 Number of voice TCH/F drops due to

    handover failure .................................................. 370

    C900060221 Number of data TCH/F drops due to

    handover failure .................................................. 372

    C900060222 Number of signaling TCH/H drops due to

    handover failure .................................................. 374

    C900060223 Number of data TCH/H drops due to

    handover failure .................................................. 376

    C900060224 Number of TCH/H handover attempts due to

    UL strength ........................................................ 378

    C900060225 Number of TCH/H handover attempts due to

    DL strength ........................................................ 379

    C900060226 Number of TCH/H handover attempts due to

    UL quality........................................................... 379

    C900060227 Number of TCH/H handover attempts due to

    DL quality........................................................... 380

    C900060228 Number of TCH/H handover attempts due to

    UL interference ................................................... 380

    C900060229 Number of TCH/H handover attempts due to

    DL interference ................................................... 381

    C900060230 Number of TCH/H handover attempts due to

    good C/I............................................................. 382

    C900060231 Number of TCH/H handover attempts due to

    bad C/I .............................................................. 382

    C900060232 Number of TCH/H handover attempts due to

    PBGT ................................................................. 383

    C900060233 Number of TCH/H handover attempts due to

    large TA ............................................................. 384

    C900060234 Number of TCH/H handover attempts due to

    other reasons...................................................... 384

    C900060235 Number of signaling TCH/H assignment

    success .............................................................. 385

    C900060236 Number of MOC access success .................. 386

    C900060237 Number of dual band outgoing

    handover............................................................ 386

    C900060238 Number of dual band outgoing handover

    success .............................................................. 387

  • C900060239 Number of dual band incoming

    handover............................................................ 388

    C900060240 Number of dual band incoming handover

    success .............................................................. 389

    C900060241 Number of SDCCH assignment

    attempts ............................................................ 389

    C900060242 Number of SDCCH assignments

    success .............................................................. 390

    C900060243 Number of SDCCH assignment failure .......... 391

    C900060244 Number of voice TCH/F drops due to radio

    link failure .......................................................... 392

    C900060245 Number of voice TCH/H drops due to radio

    link failure .......................................................... 393

    Configuration Management Information Basic

    Measurement..........................................395Overview.................................................................... 395

    C900090001 Cell frequency band .................................. 395

    C900090002 Number of TRX......................................... 396

    C900090003 Number of TCH......................................... 396

    C900090004 Number of SDCCH .................................... 396

    C900090005 Radio capacity (call loss 1) ......................... 396

    C900090006 Radio capacity (call loss 2) ......................... 397

    C900090007 Radio capacity (based on TRX).................... 397

    C900090008 Number of static PDTCH............................. 397

    C900090009 Number of dynamic PDTCH ........................ 397

    Downlink Data TBF Measurement..................399Overview.................................................................... 400

    C901000001 Number of GPRS DL TBF resumption in delay

    state.................................................................. 400

    C901000005 Number of GPRS DL TBF establishment

    failure on PACCH due to time out ........................... 401

    C901000006 Number of GPRS DL TBF establishment

    failure on PACCH due to other reasons ................... 402

    C901000009 Number of GPRS DL TBF establishment

    failure on CCCH/PCCCH due to time out.................. 402

    C901000010 Number of GPRS DL TBF establishment

    failure on CCCH/PCCCH due to other reasons .......... 404

    C901000011 Number of GPRS DL TBF establishment

    execution on CCCH/PCCCH ................................... 404

  • C901000012 Number of GPRS DL TBF establishment

    execution failure on CCCH/PCCCH due to polling

    failed ................................................................. 406

    C901000013 Number of GPRS DL TBF establishment

    execution success on CCCH/PCCCH due to polling

    succeeded .......................................................... 407

    C901000014 Number of GPRS DL TBF establishment

    success on CCCH/PCCCH ...................................... 409

    C901000015 Number of GPRS DL TBF normal

    release............................................................... 411

    C901000023 Number of EGPRS DL TBF resumption in

    delay state ......................................................... 412

    C901000027 Number of EGPRS DL TBF establishment

    failure on PACCH due to time out ........................... 413

    C901000028 Number of EGPRS DL TBF establishment

    failure on PACCH due to other reasons ................... 414

    C901000031 Number of EGPRS DL TBF establishment

    failure on CCCH/PCCCH due to time out.................. 414

    C901000032 Number of EGPRS DL TBF establishment

    failure on CCCH/PCCCH due to other reasons .......... 416

    C901000033 Number of EGPRS DL TBF establishment

    execution on CCCH/PCCCH ................................... 416

    C901000034 Number of EGPRS DL TBF establishment

    execution failure on CCCH/PCCCH due to polling

    failed ................................................................. 418

    C901000035 Number of EGPRS DL TBF establishment

    execution success on CCCH/PCCCH due to polling

    succeeded .......................................................... 419

    C901000036 Number of EGPRS DL TBF establishment

    success on CCCH/PCCCH ...................................... 421

    C901000037 Number of EGPRS DL TBF normal

    release............................................................... 423

    C901000045 Time of GPRS DL TBF connection ................ 424

    C901000046 Time of EGPRS DL TBF connection............... 425

    C901000047 Time of DL signaling TBF connection............ 426

    C901000048 Max number of GPRS DL TBF simultaneous

    establishment ..................................................... 427

    C901000050 Max number of EGPRS DL TBF simultaneous

    establishment ..................................................... 427

  • C901000052 Number of GPRS DL signaling TBF normal

    release............................................................... 428

    C901000058 Number of EGPRS DL signaling TBF normal

    release............................................................... 429

    Uplink Data TBF Measurement.......................431Overview.................................................................... 432

    C901010001 Number of GPRS UL TBF resumption in

    extend uplink state .............................................. 432

    C901010002 Number of GPRS UL TBF resource reassign

    in delay uplink state............................................. 433

    C901010006 Number of GPRS establishment failure on

    PACCH due to time out ......................................... 434

    C901010007 Number of GPRS establishment failure on

    PACCH due to other reasons ................................. 434

    C901010010 Number of GPRS UL TBF establishment

    failure on CCCH/PCCCH due to competition solving

    failed ................................................................. 435

    C901010011 Number of GPRS UL TBF establishment

    failure on CCCH/PCCCH due to not receive resource

    request .............................................................. 436

    C901010012 Number of GPRS UL TBF establishment

    failure on CCCH/PCCCH due to other reasons .......... 437

    C901010013 Number of GPRS UL TBF establishment

    success on CCCH/PCCCH ...................................... 438

    C901010014 Number of GPRS UL TBF normal

    release............................................................... 440

    C901010022 Number of EGPRS UL TBF resumption in

    extend uplink state .............................................. 440

    C901010023 Number of EGPRS UL TBF resource reassign

    in delay uplink state............................................. 441

    C901010027 Number of EGPRS establishment failure on

    PACCH due to time out ......................................... 442

    C901010028 Number of EGPRS establishment failure on

    PACCH due to other reasons ................................. 443

    C901010031 Number of EGPRS UL TBF establishment

    failure on CCCH/PCCCH due to competition solving

    failed ................................................................. 443

    C901010032 Number of EGPRS UL TBF establishment

    failure on CCCH/PCCCH due to not receive resource

    request .............................................................. 444

  • C901010033 Number of EGPRS UL TBF establishment

    failure on CCCH/PCCCH due to other reasons .......... 445

    C901010034 Number of EGPRS UL TBF establishment

    success on CCCH/PCCCH ...................................... 446

    C901010035 Number of EGPRS UL TBF normal

    release............................................................... 448

    C901010043 Time of GPRS UL TBF connection................. 448

    C901010044 Time of EGPRS UL TBF connection............... 449

    C901010045 Time of UL signaling TBF connection............ 449

    C901010046 Max number of GPRS UL TBF simultaneous

    establishment ..................................................... 449

    C901010048 Max number of EGPRS UL TBF simultaneous

    establishment ..................................................... 450

    C901010050 Number of GPRS UL signaling TBF normal

    release............................................................... 450

    C901010056 Number of EGPRS UL signaling TBF normal

    release............................................................... 451

    Data Flow Measurement................................453Overview.................................................................... 454

    C901020001 Number of Kbytes of IP packet sent to

    BIPB .................................................................. 454

    C901020002 Number of packets sent to BIPB.................. 454

    C901020003 Number of Kbytes of IP packet received

    from BIPB........................................................... 455

    C901020004 Number of packets received from BIPB......... 456

    C901020005 Number of Kbytes of IP packet sent to

    GIPB.................................................................. 456

    C901020006 Number of packets sent to GIPB ................. 457

    C901020007 Number of Kbytes of IP packet received

    from GIPB .......................................................... 458

    C901020008 Number of packets received from GIPB......... 458

    C901020009 Number of Kbytes carried by EGPRS DL LLC

    frame................................................................. 459

    C901020014 Number of Kbytes carried by DL signaling

    LLC frame........................................................... 460

    C901020019 Number of Kbytes carried by UL LLC

    frame................................................................. 460

    C901020020 Number of UL LLC frames .......................... 461

    C901020021 Number of Bytes of GPRS DL TBF LLC

    frame................................................................. 462

  • C901020022 Number of Bytes of EGPRS DL TBF LLC

    frame................................................................. 462

    C901020023 Number of Bytes of DL signaling TBF LLC

    frame................................................................. 463

    C901020024 Number of Bytes of UL GPRS TBF LLC

    frame................................................................. 464

    C901020025 Number of Bytes of EGPRS UL TBF LLC

    frame................................................................. 465

    C901020026 Number of Bytes of UL signaling TBF LLC

    frame................................................................. 465

    C901020031 Number of GPRS UL data TBF

    completion ......................................................... 466

    C901020034 Number of GPRS DL data TBF

    completion ......................................................... 467

    C901020041 Number of EGPRS UL data TBF

    completion ......................................................... 468

    C901020044 Number of EGPRS DL data TBF

    completion ......................................................... 469

    C901020050 Number of Kbytes carried by GPRS DL LLC

    frame................................................................. 470

    Uplink/Downlink RLC Statistic Measure-

    ment.......................................................473Overview.................................................................... 473

    C901030041 Bytes of GPRS DL RLC lost on PDTCH........... 475

    C901030042 Bytes of EGPRS DL RLC lost on PDTCH......... 476

    C901030083 Number of UL RLC Blocks lost ..................... 476

    C901030084 Bytes of GPRS UL RLC lost on PDTCH........... 476

    C901030085 Bytes of EGPRS UL RLC lost on PDTCH ......... 477

    C901030086 Number of standstill of GPRS UL TBF

    receiving window................................................. 478

    C901030087 Number of standstill of EGPRS UL TBF

    receiving window................................................. 479

    C901030088 Number of standstill of GPRS DL TBF sending

    window .............................................................. 479

    C901030089 Number of standstill of EGPRS DL TBF

    sending window................................................... 480

    C901030090 Number of increment of DL coding

    mode................................................................. 480

    C901030091 Number of decrement of DL coding

    mode................................................................. 482

  • C901030092 Number of increment of UL coding

    mode................................................................. 483

    C901030093 Number of decrement of UL coding

    mode................................................................. 484

    C901030094 Number of conversion from GMSK to

    8PSK ................................................................. 485

    C901030095 Number of conversion from 8PSK to

    GMSK ................................................................ 487

    PS Resource Used Statistic Measure-

    ment.......................................................491Overview.................................................................... 492

    C901040001 Max number of Abis TS used ...................... 492

    C901040002 Average number of Abis TS used................. 492

    C901040004 Average number of unavailable PDCH .......... 493

    C901040005 Number of available static PDCH ................. 493

    C901040006 Number of unavailable static PDCH.............. 493

    C901040009 Time of DL PDCH congestion ...................... 494

    C901040010 Time of UL PDCH congestion....................... 494

    C901040011 Time of PDCH used at least one UL/DL TBF

    exists................................................................. 495

    C901040012 Time of PDCH used at least one UL/DL

    EGPRS TBF exists ................................................ 496

    C901040013 Time of PDCH used at least one DL TBF

    exists................................................................. 496

    C901040014 Time of PDCH used at least one UL TBF

    exists................................................................. 497

    C901040018 Number of immediate assignment on

    AGCH................................................................. 497

    C901040019 Number of paging PS requests on PCH......... 498

    C901040020 Number of paging CS requests on PCH......... 499

    C901040021 Number of immediate assignment on

    PCH ................................................................... 500

    C901040022 Number of immediate assignment on

    PAGCH ............................................................... 500

    C901040023 Number of paging PS requests on

    PPCH ................................................................. 501

    C901040024 Number of paging CS requests on

    PPCH ................................................................. 502

    C901040025 Number of immediate assignment on

    PPCH ................................................................. 503

  • C901040026 Number of Sig blks prach load .................... 503

    C901040027 Sum of Abis TS used sampling .................... 504

    C901040028 Number of Abis TS used sampling ............... 504

    C901040029 Sum of PDCH used sampling ...................... 505

    C901040030 Number of PDCH used sampling.................. 505

    C901040031 Maximum value of Abis TS used to CS ......... 505

    C901040032 Minimum value of Abis TS used to CS .......... 506

    C901040033 Total value of the regular sampling used to

    CS..................................................................... 506

    C901040034 Number of sampling of CS.......................... 507

    C901040035 Maximum value of Abis TS used to PS.......... 507

    C901040036 Minimum value of Abis TS used to PS .......... 507

    C901040037 Total value of the regular sampling used to

    PS ..................................................................... 508

    C901040038 Number of sampling of PS.......................... 508

    RMM Assignment Measurement.....................509Overview.................................................................... 511

    C901050001 Number of general assignment executions

    for voice channel ................................................. 511

    C901050002 Number of assignments attempts for voice

    due to forced release ........................................... 512

    C901050003 Number of assignment executions for voice

    channel due to forced release................................ 513

    C901050004 Number of handover attempts for voice due

    to forced release ................................................. 514

    C901050005 Number of handover executions for voice

    channel due to forced release................................ 514

    C901050006 Number of assignments for voice channel

    due to queuing.................................................... 515

    C901050007 Number of assignments for execution for

    voice channel due to queuing ................................ 516

    C901050008 Duration of assignment success voice

    channel due to queuing ........................................ 517

    C901050009 Number of assignments success for voice

    channel due to queuing ........................................ 518

    C901050010 Number of assignments for directed retry

    attempts for voice channel.................................... 519

    C901050011 Number of assignments for execution for

    voice channel due to directed retry ........................ 520

  • C901050012 Number of general assignments for

    execution for data ............................................... 521

    C901050013 Number of assignments attempts for data

    due to forced release ........................................... 522

    C901050014 Number of assignment executions for data

    due to forced release ........................................... 523

    C901050015 Number of handover attempts for data due

    to forced release ................................................. 524

    C901050016 Number of handover executions for data due

    to forced release ................................................. 525

    C901050017 Number of assignments attempts for data

    due to queuing.................................................... 526

    C901050018 Number of assignments for execution for

    data due to queuing............................................. 527

    C901050019 Total duration of successful assignments for

    data due to queuing............................................. 528

    C901050020 Number of assignments success due to

    queuing.............................................................. 529

    C901050021 Number of assignments attempts for data

    due to directed retry ............................................ 530

    C901050022 Number of assignment executions for data

    due to directed retry ............................................ 531

    C901050023 Number of assignment for retry attempts

    FDD cell for voice channel..................................... 532

    C901050024 Number of assignment executions for

    data due to directed retry to FDD cell for voice

    channel .............................................................. 533

    C901050025 Number of assignment for retry attempts

    FDD cell for data ................................................. 534

    C901050026 Number of assignment executions for data

    due to directed retry to FDD cell for data ................ 535

    C901050027 Number of assignment for retry attempts

    TDD cell for voice channel..................................... 536

    C901050028 Number of assignment executions for

    data due to directed retry to TDD cell for voice

    channel .............................................................. 537

    C901050029 Number of assignment for retry attempts

    TDD cell for data ................................................. 538

    C901050030 Number of assignment executions for data

    due to directed retry to TDD cell for data ................ 539

  • C901050031 Assignment unsuccessful due to circuit

    obstruction ......................................................... 540

    C901050032 Assignment unsuccessful due to circuit

    obstruction unmatched......................................... 541

    C901050033 Assignment unsuccessful due to no valid

    radio resource..................................................... 542

    C901050034 Assignment unsuccessful due to other

    causes ............................................................... 543

    C901050035 Number of assignments attempts due to

    forced release (emergency service)........................ 544

    C901050036 Number of assignment executions channel

    due to forced release (emergency service) .............. 545

    C901050037 Number of assignment attempts due to

    forced handover (emergency service)..................... 546

    C901050038 Number of assignment executions channel

    due to forced handover (emergency service) ........... 547

    C901050039 Number of assignments channel due to

    queuing (emergency service) ................................ 548

    C901050040 Number of assignments for execution

    channel due to queuing (emergency service)........... 549

    C901050041 Number of forced handover target not found

    (assignment forced handover)............................... 550

    C901050042 Number of send forced handover request to

    lower PRI user (assignment forced handover).......... 551

    C901050043 Number of received failure from lower

    PRI user request resource for forced handover

    (assignment forced handover)............................... 552

    C901050044 Number of lower PRI user handover failure

    (assignment forced handover)............................... 553

    C901050045 Number of time out for wait resource

    (assignment forced handover)............................... 554

    C901050046 Number of forced release target not found

    (assignment forced release).................................. 555

    C901050047 Number of time out for wait resource

    (assignment forced release).................................. 556

    C901050048 Number of get before grab released channel

    (assignment forced handover)............................... 557

    C901050049 Number of get before grab released

    channel(assignment forced release) ....................... 558

    Handover Cause Measurement ......................561

  • Overview.................................................................... 563

    C901060001 Number of handover attempts due to

    directed retry...................................................... 563

    C901060002 Number of SDCCH handover attempts due

    to UL received strength ....................................... 564

    C901060003 Number of SDCCH handover attempts due

    to DL received strength ........................................ 565

    C901060004 Number of SDCCH Handover attempt due to

    UL quality .......................................................... 566

    C901060005 Number of SDCCH Handover attempt due to

    DL quality........................................................... 566

    C901060006 Number of SDCCH handover attempts due

    to UL interference................................................ 567

    C901060007 Number of SDCCH handover attempts due

    to DL interference................................................ 568

    C901060008 Number of SDCCH handover attempts due

    to C/I RATIO due to good C/I ................................ 568

    C901060009 Number of SDCCH handover attempts due

    to C/I RATIO due to bad C/I ................................. 569

    C901060010 Number SDCCH of handover attempts due

    to PBGT.............................................................. 570

    C901060011 Number of SDCCH handover attempts due

    to large TA ......................................................... 571

    C901060012 Number of SDCCH handover attempts due

    to quick break up of UL ........................................ 571

    C901060013 Number of SDCCH handover attempts due

    to macro-micro switch ......................................... 572

    C901060014 Number of SDCCH handover attempts due

    to MSC request .................................................. 573

    C901060015 Number of SDCCH handover attempts due

    to traffic ............................................................. 573

    C901060016 Number of SDCCH handover attempts due

    to large T