Date: April 13, 2015 ITEM DESCRIPTION OF WORK QTY UNIT I Materials Armourwood s4s Premium 3" x 3" x 8 pcs Armourwood s4s Premium 1" x 2" x 75 pcs Tubular Steel Bar 50mm x 200mm x 7 pcs Base Plate 10mm thk x 150mm x 40 9 pcs Base Plate 10mm thk x 150mm x 15 6 pcs Base Plate 10mm thk x 200mm x 20 12 pcs Base Plate 10mm thk x 250mm x 15 3 pcs Base Plate 10mm thk x 150mm x 20 6 pcs Bolt with Nut & Washer 12mmø (A3 6 pcs Bolt with Nut & Washer 16mmø (A3 3 pcs Chembolt 20mmø x 12" 6 pcs Chembolt 16mmø x 12" 6 pcs Welding Rod 1/8" ø 20 kls Epoxy Primer w/ Hardener (Gray) 1 gal Epoxy Top Coat w/ Hardener 1 gal Lacquer Thinner 1 gal Epoxy Reducer 1 gal Oxygen Acetelyne (Full) 1 set Grinding Disc 4"ø 2 pcs Cutting Disc 4"ø 5 pcs Stikwel 1l Finishing Nail 3" 10 kls Finishing Nails 2 1/2 5 kls Drill bit 1/8" ø 2 pcs Drill bit 12mmø (Metal) 1 pc Drill bit 16mmø (Metal) 1 pc Screw 2" x 1/4" ø 50 pcs Angle bar 25 x 25 x 3mm 1 pc II Painting Works Sadolin (Teak) 4 gals Sanding Sealer 4 gals Lacquer Thinner 4 gals Sanding Belt 5 pcs Sanding Paper 30 pcs Stopa Rag 2 kls

description

sedae

Transcript of sedade

Sheet3

Date:April 13, 2015

ITEMDESCRIPTION OF WORKQTYUNITUNIT RATEUNIT COSTIMaterialsArmourwood s4s Premium 3" x 3" x 14'8pcs3,400.0027,200.00Armourwood s4s Premium 1" x 2" x 10'75pcs550.0041,250.00Tubular Steel Bar 50mm x 200mm x 3/16" thk7pcsBase Plate 10mm thk x 150mm x 400mm9pcs430.003,870.00Base Plate 10mm thk x 150mm x 150mm6pcs200.001,200.00Base Plate 10mm thk x 200mm x 200mm12pcs300.003,600.00Base Plate 10mm thk x 250mm x 150mm3pcs300.00900.00Base Plate 10mm thk x 150mm x 200mm6pcs250.001,500.00Bolt with Nut & Washer 12mm (A307)6pcs150.00900.00Bolt with Nut & Washer 16mm (A307)3pcs175.00525.00Chembolt 20mm x 12"6pcs1,500.009,000.00Chembolt 16mm x 12"6pcs800.004,800.00Welding Rod 1/8" 20kls320.006,400.00Epoxy Primer w/ Hardener (Gray)1gal1,300.001,300.00Epoxy Top Coat w/ Hardener1gal2,000.002,000.00Lacquer Thinner1gal750.00750.00Epoxy Reducer1gal880.00880.00Oxygen Acetelyne (Full)1set2,000.002,000.00Grinding Disc 4"2pcs240.00480.00Cutting Disc 4"5pcs240.001,200.00Stikwel1l250.00250.00Finishing Nail 3"10kls120.001,200.00Finishing Nails 2 1/25kls120.00600.00Drill bit 1/8" 2pcsDrill bit 12mm (Metal)1pcDrill bit 16mm (Metal)1pcScrew 2" x 1/4" 50pcsAngle bar 25 x 25 x 3mm1pc

IIPainting WorksSadolin (Teak)4gals7,800.0031,200.00Sanding Sealer4gals1,300.005,200.00Lacquer Thinner4gals750.003,000.00Sanding Belt5pcs240.001,200.00Sanding Paper30pcs40.001,200.00Stopa Rag2kls70.00140.00

IIITools & EquipmentWelding Machine1pc30,000.00Baby GrinderElectric DrillCompressor (for painting)Electric PlanerSanding MachineH-Frame Scaffoldings12sets

IVManpowerWelder24mdCarpenter36mdPainter30mdHelper24mdSupervision8,500.00

IVVehicle1unit7,500.00

TOTAL199,745.00NOTE:Excluding Coring of holes for Chembolts.3" X 3" x 14' ARMOURWOOD WILL BE AVAILABLE WITHIN 3 WEEKS UPON ORDER

Sheet1Notes:TREE GRATES2pcs- 10mm defbar4pcs- 8mm defbarBollards1pc - 10mm.5pc- 8mm

8-ROCKWELLProject: Various Hardscape Works

Date :May 5, 2015

Scope of WorkQtyUnitAPRILMAYIPHASE 1:aHardscape WorksConcrete Curbs & Gutter (excluding gravel/compaction)64.5lm60.4Mountable Curb54lm37.2Greenchips Wash-out Finished Sidewalk95sq.m.57.34Concrete Bollard @ 200mm15pcs

Sub- Total

IIPHASE 2: aChipping WorksGreenchips and Sidewalk51.75sq.m51.75Curbs & Gutter102.79lm21.2

bHardscape WorksConcrete Curbs & Gutter (excluding gravel/compaction)57lm4Mountable Curb45.786lm30.04Broom Finished Sidewalk (excluding gravel/compaction)122.5sq.m.44.8977.61Concrete Tree Grates5sets

Sub- Total

IIIPHASE 3: aHardscape WorksConcrete Curbs & Gutter (excluding gravel/compaction)52.50lm52.5Mountable Curb12lmBroom Finished Sidewalk (excluding gravel/compaction)123.19sq.m.50.7572.44

Sub- Total

IVPHASE 4: aChipping WorksCurbs & Gutter114lm76.2

bHardscape WorksConcrete Curbs & Gutter (excluding gravel/compaction)91.38lm44.919.2Mountable Curb86.25lm21.3Greenchips Wash-out Finished Sidewalk110sq.m.40.5Concrete Bollard @ 200mm19pcsConcrete Tree Grates3sets

Sheet2HelperSkilledExcavation8Hauling of Excav Materials4Compaction2Laying of gravel bedding4Inst of mesh wire2Formworks Installation4Removal of pavers4Excavation in preparation of inst. Pipe2Chipping2inst of pipe1restoration of pavers & MH22Concrete pouring & masonry works124Inst of nor drain2cleaning2demobilization4710