SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017...

34
37 th DBE Small Business Conference March 28, 2017 SBE Engagement Opportunities

Transcript of SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017...

Page 1: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

37th DBE Small Business ConferenceMarch 28, 2017

SBE Engagement Opportunities

Page 2: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

I-94 Advanced Bridges SBE Engagement Opportunities

Page 3: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Agenda

I. Welcome/Introductions

II. I-94 Mega Project Overview

III. Advanced Bridges Phase I

IV. Upcoming SBE CEI Consultant Opportunities

V. Upcoming SBE Design Consultant Opportunities

VI. Upcoming SBE Contractor Opportunities

VII. Questions

I-94 Advanced Bridges SBE Engagement Opportunities

Page 4: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

DesignRight‐of‐WayConstruction

Construction

I-94 Mega Project Overview

Page 5: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Maintain regional mobility during construction for freight users and access to businesses and homes.

Deliver Advanced Bridges within programmed budget.

Construct Advanced Bridges in three years (2016-2018).

Maximize the number of contracting opportunities for prequalified consultants to compete.

Maximize the opportunity for prequalified and non-prequalified small business consultants while increasing the technical capacity for small businesses to become prequalified and grow their technical capacity.

Advanced Bridges Phase I - Goals

Page 6: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Advanced Bridges Phase I - SBE Initiative

Small Businesses meet or exceed 20% participation on the Advanced Bridges Program

Increase the number of MDOT prequalified SBE consultants through the delivery of the Advanced Bridges

Increase technical capacity/capabilities of SBEs through project delivery experience in a mentoring environment

Enhance the business acumen of SBE owners through senior leadership training focusing on: project delivery, strategic planning, sales/marketing, business finance and operations, and human resource management

Page 7: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Advanced Bridges Phase I - Contracting

Page 8: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

8 Small BusinessesDesign Support Contracts

MDOT& Owner’s Representative

Consultant Contract

8 Bridge Design Contracts3 Design Support Contracts

I‐94 SMALL BUSINESS DESIGNERSAccess EngineeringCarter & AssociatesOnyx EnterpriseRS Engineering

Somat EngineeringSpaulding DeDeckerTyme EngineeringValue Engineering

BRIDGE DESIGNERSTetra TechAECOM

E‐ConstructOHMRSE

FTC&HDLZ 

Bergman

Advanced Bridges Phase I - Project Team

DESIGN SUPPORTTetra TechOHM

Value Engineering

Page 9: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Foster “One Team” Collaborative Approach

Establish a Goal Oriented Partnering Charter

Goals focused on:– Public Support– Teamwork– Quality, Schedule & Cost– Innovation– Small Business Development

Advanced Bridges Phase I - Project Team

Page 10: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Co-located team– Collaborative

– Mentoring/Coaching atmosphere

– Technology equipped

– In-house subject matter experts

Team Meetings SBE Roundtables Improved Productivity

PROJECT OFFICE ENVIRONMENT

Advanced Bridges Phase I - Project Team

Page 11: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Technical, software and business development training

Training schedule/project schedule alignment

“Just-in-Time” training

Bi-weekly SBE Roundtable discussion

Monthly over-the-shoulder reviews

Quality Audits

75% design level and final evaluations at Plan turn-in

Advanced Bridges Phase I - SBE Training

Page 12: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Small Business Assessment– Core Skills

– Business Skills

– MDOT Technical Skills

Personalized Training Plan– Senior Leadership Training

– Business Development (4 Modules)

– Technical Training (6 Modules)

– Technology (software training)

MDOT Program Evaluations– Interim

– Final (at Plan Turn-In)“The I‐94 training opportunities have helped us to train staff on MDOT processes, improve our work plan and quality processes, and learn best practices from the ORC – a leader in the industry,” – Jon 

Kolbasa, P.E., Value Engineering. 

Advanced Bridges Phase I - SBE Training

Page 13: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Innovative Contracting Strategies

8 Small Businesses Primed contracts on I-94 Advanced Bridges Phase I -Design

I-94 SBE Training Program Unlimited Mentor/Mentee

engagement opportunities 5 SBE firms worked toward

MDOT prequalification 2 New SBE Service

Providers for MDOT

MDOT Exceeded SBE Project Goal of 20%

MDOT Exceeded Statewide DBE Goal

Advanced Bridges Phase I – Results

Page 14: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

3 new SBE offices

4 SBE firms hired one or more employees

Onyx Engineering was featured by DPTV for the STEM Heroes video project

Value Engineering serves as mentor for a LTU Capstone Course

SBE partnerships on MDOT and other agency pursuits

Onyx featured during USDOT Women History Month “Women Impacting the Nation in Transportation”

SBEs featured at local and national DBE conferences

Value Engineering received 2 MDOT prequalifications

Advanced Bridges Phase I – Results

Page 15: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Tarolyn BucklesPresident of Onyx Enterprise  

⁻ I‐94 Small Business ⁻ HNTB Partner Participant⁻ President of NACME⁻ Hired two new employees⁻ Opened three new offices⁻ Participated in Major Duggan’s 

summer internship program⁻ Featured during USDOT Women 

History Month as a “Women Impacting the Nation in Transportation” 

⁻ Featured by DPTV for the STEM Heroes video project

Advanced Bridges Phase I –

Page 16: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Advanced Bridges Phase I –

Jon Kolbasa, PEPresident of Value Engineering

⁻ I‐94 Small Business ⁻ Awarded 2 MDOT Service Prequalifications⁻ Serves as Mentor for Lawrence ⁻ Technological University Capstone Course⁻ Owner/Operator of Hip Homes⁻ Participated in outreach to students at 

DEPSA Prep School in Detroit⁻ Added two new employees

Page 17: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

dvanced Bridges Phase I –

G. Ramanujam, PEPresident of Somat Engineering

⁻ HNTB Partner’s Program Participant⁻ Expanded Client base to include 

ODOT with recent prime contract win⁻ I‐94 Small Business ⁻ ACEC – Board of Directors⁻ Opened three new offices⁻ Participated in Major Duggan’s 

summer internship program⁻ Participated in M‐1 RAIL summer 

internship program⁻ Hired total of 6 interns last summer⁻ Teaches Sunday School

Page 18: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

What’s Next ?

Page 19: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

y Success Factorsmall Businesses meet or exceed 20% DBE articipationncrease the number of MDOT prequalified SBE onsultants by providing up to 10 construction ervices support contracting opportunitiesncrease SBE technical capacity through delivery f just-in-time Training/Mentoring program. rogram includes informal on-the-job Field raining

BE CEI Consultant Opportunities - Phase I

Page 20: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

Package #1 (Nov. 17’ letting):tiot and Chene Bridges

Package #3 (Nov. 17’ letting):Elliott, French & Concord Bridges

BE CEI Consultant Opportunities - Phase I

Advanced Bridges Phase I

Structure Reconstruction Year/Package

Gratiot Avenue over I-94 2018/ Package #1Chene Street over I-94 2018/ Package #1Second Avenue over I-94 2019/ Package #2Cass Avenue over I-94 2019/ Package #2Brush Street over I-94 2019/ Package #2Mt. Elliott Street over I-94 2018-2019/ Package #3Concord Avenue over I-94 2018-2019/ Package #3French Road over I-94 2018-2019/ Package #3

Advanced Bridges Phase II

Advanced Bridges Phase I

Page 21: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

I Support Service Areasield Inspection

Materials Testing*urveyingocumentation (Office Tech)

BE CEI Consultant Opportunities - Phase I

MDOT

(includes Owner’s Rep)

Project Engineer

MDOT

(includes Owner’s Rep)

Project Engineer

Materials Testing

Lead Material Testers

SBE Materials Tester1SBE Materials Tester2

Materials Testing

Lead Material Testers

SBE Materials Tester1SBE Materials Tester2

Documentation

Lead Office Techs

SBE Office Tech1SBE Office Tech2

Documentation

Lead Office Techs

SBE Office Tech1SBE Office Tech2

Surveying

Lead Surveyors

SBE Surveyor1SBE Surveyor2

SS

Field Inspection

Lead Inspectors

SBE Bridge Tech1SBE Bridge Tech2

SBE Road Tech1SBE Road Tech2

Field Inspection

Lead Inspectors

SBE Bridge Tech1SBE Bridge Tech2

SBE Road Tech1SBE Road Tech2

Legend

Construction Support Contracts

MDOT Owner’s Representative

S

S

S S

Page 22: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

curement Scheduleustry Forum/Financial Workshop – April 17, 2017ocation: MDOT DOSC; Time: 1:00pm – 4:00pm

ue Request for Letter of Interest (LOI) – May 2017I Response/Request for Proposal – June 2017

oposal Response/Selection – July/August 2017ope Verification Meeting – August 2017ntract Execution – October 2017y personnel at I-94 Project Office – November 2017

BE CEI Consultant Opportunities - Phase I

Page 23: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

ining Schedulelassroom Training December to March 2018eld Training/Mentoring Spring/Summer 2018nticipated Start of Construction - April 2018nticipated Completion – November 2018

BE CEI Consultant Opportunities - Phase I

Page 24: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

BE Design Consultant Opportunities - Phase II

y Success Factorsmall Businesses meet or exceed 20% DBE articipationncrease the number of MDOT prequalified BE consultants by providing up to 8 design upport contracting opportunitiesncrease SBE technical capacity through elivery of just-in-time Training/Mentoring rogram at the I-94 Project Office.

Page 25: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

vanced Bridges Phase II

Structure Reconstruction Year

and Blvd. over I-94 2020-2021ail Railroad over I-94 2020-2021enac St. over I-94 2020-2021s St. over I-94 2020-2021d River Ave. over I-94 2020-2021aukee Ave. over I-75 2020-2021

BE Design Consultant Opportunities - Phase II

Advanced Bridges Phase II

Advanced Bridges Phase I

Design Support Service Areas Roadway Design Maintenance of Traffic Traffic Signing & Pavement Markings Traffic Signal Design Roadway Lighting Roadway Geotechnical Municipal Utilities Landscaping

Page 26: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

curement Scheduleustry Forum/Financial Workshop – April 17, 2017ocation: MDOT DOSC; Time: 1:00pm – 4:00pm

ue Request for Proposal – May 2017oposal Response/Selection – June/July 2017ope Verification Meeting – August 2017ntract Execution – October 2017y personnel at I-94 Project Office – November 2017

BE Design Consultant Opportunities - Phase II

Page 27: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

all Business Packaging & Schedule200K - $300K Contract Sizeon-critical work itemsain Bridge Packages let datesNovember 2017 (Package #1/3)March 2018 (Package #2)

mall Business Packages let datesLate 2017 (Package #4)Early 2018 (Package #5)

BE Construction Contractor Opportunities

Page 28: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

BE Construction Contractor Opportunities

tential SBE Contract Work ElementsLandscapingTurf EstablishmentConcrete Surface CoatingFencing/GuardrailSewer InspectionElectrical Work

Page 29: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

asic Training Prior to Bid - Part AFinancial LiteracyBusiness Strategy & PlanUnderstanding Your CostsCash Flow Bonding and Access to Capital

BE Construction Contractor Opportunities

Page 30: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

asic Training - Part BEstimating & Bidding StrategiesPreparation and Submittal of BidContractual Payment Process, Contractor Prompt Payment RequirementsControl and Execution of the Work Scheduling Requesting Payment Documentation Requirements

BE Construction Contractor Opportunities

Page 31: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

ngoing Support ServicesFacilitated by Owner’s RepresentativesIssue ResolutionConsultation on Performing as a Prime Contractor

BE Construction Contractor Opportunities

Page 32: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

ining Schedulere-Training Workshop Registration July 2017asic Training – Part Aasic Training – Part B

BE Construction Contractor Opportunities

Page 33: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

dustry Forum/Financial Workshop April 17, 2017, 1:00pm – 4:00pmMDOT DOSC - 1060 W. Fort Street Detroit, MI

ontractor Pre-Training Workshop RegistrationJuly 2017

ey Dates to Remember!

Page 34: SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017 ocation: MDOT DOSC; Time: 1:00pm –4:00pm ue Request for Proposal –May 2017 oposal Response/Selection

uestionsntact Information:Tony Kratofil, PEMDOT Metro Region EngineerEmail: [email protected]

Terry Stepanski, PEMDOT Senior Project ManagerEmail: [email protected]

Dr. Audrey L. Andrews‐94 Owner’s Rep ConsultantHNTB Michigan, Inc.Email: [email protected]