SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017...
Transcript of SBE Engagement Opportunities - Michigan · ustry Forum/Financial Workshop –April 17, 2017...
37th DBE Small Business ConferenceMarch 28, 2017
SBE Engagement Opportunities
I-94 Advanced Bridges SBE Engagement Opportunities
Agenda
I. Welcome/Introductions
II. I-94 Mega Project Overview
III. Advanced Bridges Phase I
IV. Upcoming SBE CEI Consultant Opportunities
V. Upcoming SBE Design Consultant Opportunities
VI. Upcoming SBE Contractor Opportunities
VII. Questions
I-94 Advanced Bridges SBE Engagement Opportunities
DesignRight‐of‐WayConstruction
Construction
I-94 Mega Project Overview
Maintain regional mobility during construction for freight users and access to businesses and homes.
Deliver Advanced Bridges within programmed budget.
Construct Advanced Bridges in three years (2016-2018).
Maximize the number of contracting opportunities for prequalified consultants to compete.
Maximize the opportunity for prequalified and non-prequalified small business consultants while increasing the technical capacity for small businesses to become prequalified and grow their technical capacity.
Advanced Bridges Phase I - Goals
Advanced Bridges Phase I - SBE Initiative
Small Businesses meet or exceed 20% participation on the Advanced Bridges Program
Increase the number of MDOT prequalified SBE consultants through the delivery of the Advanced Bridges
Increase technical capacity/capabilities of SBEs through project delivery experience in a mentoring environment
Enhance the business acumen of SBE owners through senior leadership training focusing on: project delivery, strategic planning, sales/marketing, business finance and operations, and human resource management
Advanced Bridges Phase I - Contracting
8 Small BusinessesDesign Support Contracts
MDOT& Owner’s Representative
Consultant Contract
8 Bridge Design Contracts3 Design Support Contracts
I‐94 SMALL BUSINESS DESIGNERSAccess EngineeringCarter & AssociatesOnyx EnterpriseRS Engineering
Somat EngineeringSpaulding DeDeckerTyme EngineeringValue Engineering
BRIDGE DESIGNERSTetra TechAECOM
E‐ConstructOHMRSE
FTC&HDLZ
Bergman
Advanced Bridges Phase I - Project Team
DESIGN SUPPORTTetra TechOHM
Value Engineering
Foster “One Team” Collaborative Approach
Establish a Goal Oriented Partnering Charter
Goals focused on:– Public Support– Teamwork– Quality, Schedule & Cost– Innovation– Small Business Development
Advanced Bridges Phase I - Project Team
Co-located team– Collaborative
– Mentoring/Coaching atmosphere
– Technology equipped
– In-house subject matter experts
Team Meetings SBE Roundtables Improved Productivity
PROJECT OFFICE ENVIRONMENT
Advanced Bridges Phase I - Project Team
Technical, software and business development training
Training schedule/project schedule alignment
“Just-in-Time” training
Bi-weekly SBE Roundtable discussion
Monthly over-the-shoulder reviews
Quality Audits
75% design level and final evaluations at Plan turn-in
Advanced Bridges Phase I - SBE Training
Small Business Assessment– Core Skills
– Business Skills
– MDOT Technical Skills
Personalized Training Plan– Senior Leadership Training
– Business Development (4 Modules)
– Technical Training (6 Modules)
– Technology (software training)
MDOT Program Evaluations– Interim
– Final (at Plan Turn-In)“The I‐94 training opportunities have helped us to train staff on MDOT processes, improve our work plan and quality processes, and learn best practices from the ORC – a leader in the industry,” – Jon
Kolbasa, P.E., Value Engineering.
Advanced Bridges Phase I - SBE Training
Innovative Contracting Strategies
8 Small Businesses Primed contracts on I-94 Advanced Bridges Phase I -Design
I-94 SBE Training Program Unlimited Mentor/Mentee
engagement opportunities 5 SBE firms worked toward
MDOT prequalification 2 New SBE Service
Providers for MDOT
MDOT Exceeded SBE Project Goal of 20%
MDOT Exceeded Statewide DBE Goal
Advanced Bridges Phase I – Results
3 new SBE offices
4 SBE firms hired one or more employees
Onyx Engineering was featured by DPTV for the STEM Heroes video project
Value Engineering serves as mentor for a LTU Capstone Course
SBE partnerships on MDOT and other agency pursuits
Onyx featured during USDOT Women History Month “Women Impacting the Nation in Transportation”
SBEs featured at local and national DBE conferences
Value Engineering received 2 MDOT prequalifications
Advanced Bridges Phase I – Results
Tarolyn BucklesPresident of Onyx Enterprise
⁻ I‐94 Small Business ⁻ HNTB Partner Participant⁻ President of NACME⁻ Hired two new employees⁻ Opened three new offices⁻ Participated in Major Duggan’s
summer internship program⁻ Featured during USDOT Women
History Month as a “Women Impacting the Nation in Transportation”
⁻ Featured by DPTV for the STEM Heroes video project
Advanced Bridges Phase I –
Advanced Bridges Phase I –
Jon Kolbasa, PEPresident of Value Engineering
⁻ I‐94 Small Business ⁻ Awarded 2 MDOT Service Prequalifications⁻ Serves as Mentor for Lawrence ⁻ Technological University Capstone Course⁻ Owner/Operator of Hip Homes⁻ Participated in outreach to students at
DEPSA Prep School in Detroit⁻ Added two new employees
dvanced Bridges Phase I –
G. Ramanujam, PEPresident of Somat Engineering
⁻ HNTB Partner’s Program Participant⁻ Expanded Client base to include
ODOT with recent prime contract win⁻ I‐94 Small Business ⁻ ACEC – Board of Directors⁻ Opened three new offices⁻ Participated in Major Duggan’s
summer internship program⁻ Participated in M‐1 RAIL summer
internship program⁻ Hired total of 6 interns last summer⁻ Teaches Sunday School
What’s Next ?
y Success Factorsmall Businesses meet or exceed 20% DBE articipationncrease the number of MDOT prequalified SBE onsultants by providing up to 10 construction ervices support contracting opportunitiesncrease SBE technical capacity through delivery f just-in-time Training/Mentoring program. rogram includes informal on-the-job Field raining
BE CEI Consultant Opportunities - Phase I
Package #1 (Nov. 17’ letting):tiot and Chene Bridges
Package #3 (Nov. 17’ letting):Elliott, French & Concord Bridges
BE CEI Consultant Opportunities - Phase I
Advanced Bridges Phase I
Structure Reconstruction Year/Package
Gratiot Avenue over I-94 2018/ Package #1Chene Street over I-94 2018/ Package #1Second Avenue over I-94 2019/ Package #2Cass Avenue over I-94 2019/ Package #2Brush Street over I-94 2019/ Package #2Mt. Elliott Street over I-94 2018-2019/ Package #3Concord Avenue over I-94 2018-2019/ Package #3French Road over I-94 2018-2019/ Package #3
Advanced Bridges Phase II
Advanced Bridges Phase I
I Support Service Areasield Inspection
Materials Testing*urveyingocumentation (Office Tech)
BE CEI Consultant Opportunities - Phase I
MDOT
(includes Owner’s Rep)
Project Engineer
MDOT
(includes Owner’s Rep)
Project Engineer
Materials Testing
Lead Material Testers
SBE Materials Tester1SBE Materials Tester2
Materials Testing
Lead Material Testers
SBE Materials Tester1SBE Materials Tester2
Documentation
Lead Office Techs
SBE Office Tech1SBE Office Tech2
Documentation
Lead Office Techs
SBE Office Tech1SBE Office Tech2
Surveying
Lead Surveyors
SBE Surveyor1SBE Surveyor2
SS
Field Inspection
Lead Inspectors
SBE Bridge Tech1SBE Bridge Tech2
SBE Road Tech1SBE Road Tech2
Field Inspection
Lead Inspectors
SBE Bridge Tech1SBE Bridge Tech2
SBE Road Tech1SBE Road Tech2
Legend
Construction Support Contracts
MDOT Owner’s Representative
S
S
S S
curement Scheduleustry Forum/Financial Workshop – April 17, 2017ocation: MDOT DOSC; Time: 1:00pm – 4:00pm
ue Request for Letter of Interest (LOI) – May 2017I Response/Request for Proposal – June 2017
oposal Response/Selection – July/August 2017ope Verification Meeting – August 2017ntract Execution – October 2017y personnel at I-94 Project Office – November 2017
BE CEI Consultant Opportunities - Phase I
ining Schedulelassroom Training December to March 2018eld Training/Mentoring Spring/Summer 2018nticipated Start of Construction - April 2018nticipated Completion – November 2018
BE CEI Consultant Opportunities - Phase I
BE Design Consultant Opportunities - Phase II
y Success Factorsmall Businesses meet or exceed 20% DBE articipationncrease the number of MDOT prequalified BE consultants by providing up to 8 design upport contracting opportunitiesncrease SBE technical capacity through elivery of just-in-time Training/Mentoring rogram at the I-94 Project Office.
vanced Bridges Phase II
Structure Reconstruction Year
and Blvd. over I-94 2020-2021ail Railroad over I-94 2020-2021enac St. over I-94 2020-2021s St. over I-94 2020-2021d River Ave. over I-94 2020-2021aukee Ave. over I-75 2020-2021
BE Design Consultant Opportunities - Phase II
Advanced Bridges Phase II
Advanced Bridges Phase I
Design Support Service Areas Roadway Design Maintenance of Traffic Traffic Signing & Pavement Markings Traffic Signal Design Roadway Lighting Roadway Geotechnical Municipal Utilities Landscaping
curement Scheduleustry Forum/Financial Workshop – April 17, 2017ocation: MDOT DOSC; Time: 1:00pm – 4:00pm
ue Request for Proposal – May 2017oposal Response/Selection – June/July 2017ope Verification Meeting – August 2017ntract Execution – October 2017y personnel at I-94 Project Office – November 2017
BE Design Consultant Opportunities - Phase II
all Business Packaging & Schedule200K - $300K Contract Sizeon-critical work itemsain Bridge Packages let datesNovember 2017 (Package #1/3)March 2018 (Package #2)
mall Business Packages let datesLate 2017 (Package #4)Early 2018 (Package #5)
BE Construction Contractor Opportunities
BE Construction Contractor Opportunities
tential SBE Contract Work ElementsLandscapingTurf EstablishmentConcrete Surface CoatingFencing/GuardrailSewer InspectionElectrical Work
asic Training Prior to Bid - Part AFinancial LiteracyBusiness Strategy & PlanUnderstanding Your CostsCash Flow Bonding and Access to Capital
BE Construction Contractor Opportunities
asic Training - Part BEstimating & Bidding StrategiesPreparation and Submittal of BidContractual Payment Process, Contractor Prompt Payment RequirementsControl and Execution of the Work Scheduling Requesting Payment Documentation Requirements
BE Construction Contractor Opportunities
ngoing Support ServicesFacilitated by Owner’s RepresentativesIssue ResolutionConsultation on Performing as a Prime Contractor
BE Construction Contractor Opportunities
ining Schedulere-Training Workshop Registration July 2017asic Training – Part Aasic Training – Part B
BE Construction Contractor Opportunities
dustry Forum/Financial Workshop April 17, 2017, 1:00pm – 4:00pmMDOT DOSC - 1060 W. Fort Street Detroit, MI
ontractor Pre-Training Workshop RegistrationJuly 2017
ey Dates to Remember!
uestionsntact Information:Tony Kratofil, PEMDOT Metro Region EngineerEmail: [email protected]
Terry Stepanski, PEMDOT Senior Project ManagerEmail: [email protected]
Dr. Audrey L. Andrews‐94 Owner’s Rep ConsultantHNTB Michigan, Inc.Email: [email protected]