S141M
-
Upload
mohammed-3014 -
Category
Documents
-
view
31 -
download
5
description
Transcript of S141M
-
Project
Client
Foster + PartnersRiverside, 22 Hester Road
London SW11 4AN
T +44 (0)20 7738 0455
F +44 (0)20 7738 1107 Foster + partners 2010
Buro Happold
17 Newman Street
London W1T 1PD
T +44 (0)20 7927 9700
F +44 (0)87 0787 4145
Consulting Engineers
SSH InternationalSabhan Industrial Area
Block 1, Plot 75 A
T +965 2226 5600
F +965 2226 5700
Projacs25944 Safat
13120 Kuwait
T +965 2243 9255
F +965 2240 9897
NBK-National Bank of Kuwait
NBK
New Headquarters
Key Plan
Project No.
Number
Date Scale @ ISO A0
Revision
Title
028905
N
Shaab National Real Estate Co .TEL. 22245246 FAX. 22496846
Owner Representative
General Notes
Rev. Date Reason For Issue Chk
1. DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE
PROCEEDING WITH THE WORK.
4. FOSTER + PARTNERS SHALL BE NOTIFIED IN WRITING OF ANY
DISCREPANCIES.
5. ANY AREAS INDICATED ON THIS SHEET ARE APPROXIMATE
AND INDICATIVE ONLY.
6. FOR SETTING-OUT INFORMATION, REFER TO NOTE IV ON
DRAWING S001.
1. FOR GENERAL NOTES REFER TO DRAWING S001.
2. FOR STEEL ELEMENT SCHEDULE REFER TO DRAWINGS
S310 & S311
3. FOR TYPICAL FLOOR CONNECTION AND DECK DETAILS REFER
TO S450 & S460 DRAWING SERIES.
4. FOR FLOOR DECK AND BEAM TYPE KEY PLANS REFER TO
S160, S170 & S180 DRAWING SERIES.
5. FOR OPENINGS REQUIRED THROUGH BEAM WEBS, REFER TO
S451 FOR DETAILING AND P1200 AND P1300 SERIES FOR
INDICATIVE ARRANGEMENT.
STRUCTURAL NOTES:
TOWER LEVEL 41 MEZZANINE
GA PLAN
S141M 05
1:10017/01/12
00 29/06/2012 FINAL DESIGN FOR TENDER GK
01 01/08/2012 FINAL DESIGN FOR TENDER GK
02 31/08/2012 FINAL DESIGN FOR TENDER GK
03 31/10/2012 CONTRACT ISSUE : BP3 GK
04 21/12/2012 CONTRACT ISSUE : BP3 GK
05 22/03/2013 FOR CONSTRUCTION GK
S141M.dwgLayout1