Road safety audit report - Roads and Maritime Services€¦ · Audit type Preliminary design road...

48
Appendix 2 - Road safety audit report (Part 2 short-term study)

Transcript of Road safety audit report - Roads and Maritime Services€¦ · Audit type Preliminary design road...

Appendix 2 - Road safety audit report (Part 2 short-term study)

ROADS AND MARITIME SERVICES

RICHMOND BRIDGE AND APPROACHES

ROAD SAFETY AUDIT

Richmond Bridge and approaches - Road safety audit

Hyder Consulting Pty Ltd-ABN 76 104 485 289

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Hyder Consulting Pty Ltd

ABN 76 104 485 289

Level 5, 141 Walker Street Locked Bag 6503 North Sydney NSW 2060 Australia

Tel: +61 2 8907 9000

Fax: +61 2 8907 9001

www.hyderconsulting.com

ROADS AND MARITIME SERVICES

RICHMOND BRIDGE AND APPROACHES

ROAD SAFETY AUDIT

Author Joshua Kleinhans

Checker Damien Chee

Approver Damien Chee

Report No F0006-AA005381-AAR-01 Richmond Bridge and approaches RSA Rev01

Revision 01

Date 13 September 2012

This report has been prepared for Roads and Maritime

Services in accordance with the terms and conditions of

appointment dated 27 August 2012. Hyder Consulting Pty

Ltd (ABN 76 104 485 289) cannot accept any responsibility

for any use of or reliance on the contents of this report by

any third party.

Richmond Bridge and approaches - Road safety audit

Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page i

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

CONTENTS

1 Introduction ........................................................................................... 1

1.1 Project and audit details ....................................................................... 1

1.2 Responding to the audit report ............................................................. 2

1.3 Previous audits and outstanding issues ............................................... 3

2 Safety audit findings ............................................................................. 5

3 Concluding statement ......................................................................... 26

APPENDIX A: ROAD SAFETY AUDIT CHECKLIST

Richmond Bridge and approaches - Road safety audit

Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 1

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

1 INTRODUCTION

1.1 Project and audit details

Details of the audit have been summarised in Table 1-1.

Table 1-1 Details of the road safety audit

Audited project Proposed intersection upgrade at Bells Line of Road/ Grose Vale Road/

Terrace Road, North Richmond.

Proposed intersection upgrade at Kurrajong Road/ Old Kurrajong Road,

Richmond.

Proposed intersection upgrade at Kurrajong Road/ Bosworth Street/ March

Street, Richmond.

Existing local road precinct in Richmond and Agnes Banks including:

Old Kurrajong Road – Yarramundi Lane from Kurrajong Road to

Crowleys Lane.

Crowleys Lane from Yarramundi Lane to Castlereagh Road.

Innalls Lane from Yarramundi Lane to Castlereagh Road.

Drift Road from Castlereagh Road to Innalls Lane.

Client/ contact Siva Satchi

Project Development

Roads and Maritime Services

(02) 8849 2019

Audit type Preliminary design road safety audit.

Purpose As part of the proposed Richmond Bridge and approaches upgrade a number of intersections in the surrounding road network will need to be upgraded. The purpose of this audit was to identify potential safety issues associated with a number of intersection upgrades proposed, as well as identify safety issues associated with any potential or perceived re-distribution of traffic.

Background In July 2012 the Richmond Bridge and Approaches Congestion Study was prepared by Hyder Consulting (Hyder) documenting traffic performance of the eight short-term improvement options (Options A to H) which have potential to improve traffic flow at Richmond Bridge and approach roads in the Richmond and North Richmond areas. Each option was assessed in terms of key traffic factors which are most likely to influence a decision on the best performing option. The Congestion Study has identified Option H as the best performing option.

This road safety audit is inclusive of the existing conditions as outlined in the scope (below), and the preliminary design of Option H.

Scope of audit The auditable materials included the following:

The Bells Line of Road/ Grose Vale Road/ Terrace Road intersection with

regards to:

Its current layout.

The concept option with reference number SK1108-1 and date 10 May

2012.

The concept option with reference number 30011177-120820-Gross-

Terrace-Int-Plan.

The Kurrajong Road/ Old Kurrajong Road intersection with regards to:

Its current layout.

The concept option with reference number SK1109-4 and date 16

Richmond Bridge and approaches - Road safety audit

Page 2 Hyder Consulting Pty Ltd-ABN 76 104 485 289

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

November 2011.

The Kurrajong Road/ Bosworth Street/ March Street intersection with regards

to:

Its current layout.

The concept option with reference number SK1108-4 and date 24 May

2012.

The concept option with reference number 30011177-120820-Bosworth-

Int-Plan.

The current layout of the local road precinct in Richmond and Agnes Banks

including:

Old Kurrajong Road – Yarramundi Lane from Kurrajong Road to

Crowleys Lane.

Crowleys Lane from Yarramundi Lane to Castlereagh Road.

Innalls Lane from Yarramundi Lane to Castlereagh Road.

Drift Road from Castlereagh Road to Innalls Lane.

This local road precinct is herein referred to as the Richmond-Agnes Banks local road precinct. The review of this precinct was in consideration of the other proposed intersection improvements described above.

These roads are depicted in Figure 1.

Audit team details Damien Chee, Hyder Consulting (level 3, lead auditor – RSA-02-0094).

Josh Kleinhans, Hyder Consulting.

Audit methodology

A day and night time inspection was carried out on 6 September July 2012. This included a walkover and drive through inspection of each of the intersections as well as the Richmond-Agnes Banks local road precinct. A follow up site inspection was also carried out on 13 September 2012.

Reporting of audit deficiencies in accordance with the NSW Centre for Road Safety’s Guidelines for Road Safety Audit Practices (2011).

Report includes a completed checklist as provided in the Austroads Guide to Road Safety Part 6. The audit team chose to use the existing road checklist rather than the one associated with preliminary design. This was due to the proposed intersection upgrades being retrospective improvements on an existing road network. Furthermore, it is understood that there are no current plans to upgrade the Richmond-Agnes Banks local road precinct. As such, this component of the audit was considered to be an existing road audit.

Report does not specify suggestions or recommendations for action. This is an RMS policy and the responsibility of the project manager, it will highlight the specific deficiencies of intersections, roads and the concept design as advised in the project scope.

Material supplied See Scope of audit.

Meeting and assessment details

Project start up meeting held on 4 September 2012

Site inspection carried out on 6 September 2012.

1.2 Responding to the audit report

Road safety audits provide the opportunity to highlight potential road safety problems and have

them formally considered by the project manager in conjunction with all other project

considerations.

The responsibility for the project rests with the project manager, not with the auditor. The project

manager is under no obligation to accept the audit findings. Also, it is not the role of the auditor

to agree to, or approve the project manager’s responses to the audit.

Richmond Bridge and approaches - Road safety audit

Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 3

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

1.3 Previous audits and outstanding issues

A number of road safety issues were identified in the Richmond Bridge and Approaches

Congestion Study. These have not been formally raised as road safety deficiencies in this audit.

R

ichm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit 01

Page 4

H

yder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

f:

\aa005381\r

- r

eport

\f0001

-aa005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Fig

ure

1

Lo

calit

y m

ap

Ric

hm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

P

age 5

f:\a

a005381\r

- r

eport

\f0001-a

a005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

2

SA

FE

TY

AU

DIT

FIN

DIN

GS

Table

2-1

describes t

he r

oa

d s

afe

ty a

ud

it f

ind

ings b

ase

d o

n t

he e

xis

ting c

on

ditio

ns. T

able

2-2

describ

es the r

oad s

afe

ty a

ud

it f

indin

gs b

ased o

n th

e p

roposed

pre

limin

ary

desig

ns.

Ta

ble

2-1

Ro

ad

sa

fety

au

dit

fin

din

gs –

ex

isti

ng

co

nd

itio

ns

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

1

Be

lls L

ine

of R

oa

d/

Gro

se

Vale

Ro

ad

/

Te

rra

ce

Str

eet

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

On

th

e G

rose

Va

le R

oad

(so

uth

ern

) ap

pro

ach

to

in

ters

ectio

n,

the

re is a

hig

h d

eg

ree

of p

ave

me

nt sh

ovin

g c

rea

tin

g a

ro

ug

h a

nd

va

riab

le

su

rface

. T

his

ma

y d

e-s

tab

ilise

a v

eh

icle

or

com

pro

mis

e th

e s

kid

resis

tance

ava

ilab

le. T

his

is a

lso

in

an

en

vir

onm

en

t w

he

re t

he

re w

ou

ld

be

hea

vy b

rakin

g d

em

an

ds d

ue

to

the

tra

ffic

sig

nals

an

d a

sso

cia

ted

qu

eu

es.

It s

ho

uld

be

no

ted

tha

t d

urin

g th

e s

ite

in

sp

ectio

n,

the a

udit tea

m

witn

esse

d a

rea

r-e

nd

cra

sh

in

th

is a

pp

roa

ch

.

Lo

w

Fig

ure

2

Var

iab

le p

avem

ent

surf

ace

Fig

ure

3

Pav

emen

t sh

ovi

ng

R

ichm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit 01

Page 6

H

yder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

f:

\aa005381\r

- r

eport

\f0001

-aa005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

2

Be

lls L

ine

of R

oa

d/

Gro

se

Vale

Ro

ad

/

Te

rra

ce

Str

eet

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Th

e p

ed

estr

ian

ram

p d

irectiona

lity is p

oo

r fo

r m

ost

of

the c

rossin

gs.

Th

e a

lignm

en

t o

f th

e r

am

p d

oes n

ot lin

e u

p w

ith

th

e m

ark

ed

cro

ssin

g.

Th

is c

ou

ld le

ad

vis

ion

-im

pair

ed

use

rs in

to th

e c

ontr

ol a

rea

of th

e

inte

rse

ctio

n w

he

re t

he

y w

ou

ld b

e a

t in

cre

ase

d r

isk o

f im

pa

ct fr

om

ve

hic

les.

Fu

rth

erm

ore

, th

e p

oo

r con

ditio

n o

f lin

e m

ark

ing

co

uld

exa

ce

rba

te th

is

issu

e.

Lo

w

Fig

ure

4

Po

or

pra

m r

amp

dir

ecti

on

alit

y an

d p

avem

ent

mar

kin

g c

on

dit

ion

.

3

Be

lls L

ine

of R

oa

d/

Gro

se

Vale

Ro

ad

/

Te

rra

ce

Str

eet

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Th

e d

esig

na

ted

pa

rkin

g o

n t

he e

aste

rn s

ide

of

Gro

se

Vale

Ro

ad

(so

uth

ern

) d

ep

art

ure

is to

o c

lose

to t

he

in

ters

ectio

n.

Th

is c

ould

lea

d to

a n

um

be

r o

f sa

fety

ris

ks in

clu

din

g (

i) incre

ase

d r

ea

r-en

d c

rash

ris

k

asso

cia

ted w

ith

th

roug

h v

ehic

les a

nd

pa

rked

ca

rs,

(ii)

in

cre

ase

d s

ide

sw

ipe

an

d la

ne

-cha

nge

cra

sh

ris

k a

ssocia

ted

with

th

rou

gh v

eh

icle

s

ch

ang

ing

lan

es,

(iii)

rea

r-e

nd c

rash

co

nflic

ts d

ue

to

tra

ffic

flo

w

turb

ule

nce

.

Me

d

Fig

ure

5

Sta

rt o

f ke

rb s

ide

par

kin

g in

Gro

se V

ale

Ro

ad

dep

artu

re.

Ric

hm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

P

age 7

f:\a

a005381\r

- r

eport

\f0001-a

a005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

4

Be

lls L

ine

of R

oa

d/

Gro

se

Vale

Ro

ad

/

Te

rra

ce

Str

eet

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Th

e in

cre

ased

se

tback o

f th

e h

old

lin

e in t

he

Be

lls L

ine

of

Ro

ad

ea

ste

rn a

pp

roach

ha

s r

esu

lted in

a n

on

-un

ifo

rm tu

rn r

ad

ius for

rig

ht-

turn

ing

tra

ffic

he

ad

ing

to

Te

rrace

Str

ee

t. R

igh

t-tu

rnin

g d

rive

rs a

re

req

uire

d t

o a

dju

st th

eir

ste

ering

an

gle

mid

-wa

y t

hro

ugh

the

tu

rn.

Th

e

tig

hte

nin

g o

f th

e tu

rn r

ad

ius m

ay le

ad

to

encro

achm

ent

into

th

e

so

uth

bo

un

d t

raff

ic la

nes in T

err

ace

Str

ee

t.

Th

is issu

e a

lso

in

hib

its t

he

oppo

sin

g r

igh

t-tu

rn (

from

Bells

Lin

e o

f R

oad

into

Gro

se

Vale

Roa

d)

fro

m r

un

nin

g in

th

e s

am

e p

ha

se

(ie

. a d

iam

on

d

ph

ase

). A

lth

oug

h t

his

has m

ore

of

a d

irect im

pa

ct o

n t

raff

ic

pe

rfo

rma

nce

rath

er

tha

n r

oa

d s

afe

ty p

erf

orm

ance

, th

e c

apa

city issu

es

in g

en

era

l a

re a

ma

jor

sou

rce o

f ro

ad s

afe

ty r

isk d

ue

to

que

ue

s (

rea

r-

en

d c

rash

ris

ks)

and

dri

ve

r fr

ustr

atio

n le

adin

g to

un

safe

be

ha

vio

urs

.

Me

d

Fig

ure

6

Lik

ely

swep

t p

ath

fo

r ri

gh

t-tu

rnin

g v

ehic

le f

rom

Bel

ls L

ine

of

Ro

ad E

ast

to T

erra

ce S

tree

t.

5

Te

rra

ce

Str

eet,

de

pa

rtu

re f

rom

inte

rse

ctio

n w

ith

Be

lls L

ine

of R

oa

d –

exis

tin

g c

on

ditio

ns.

Th

e d

rain

ag

e fa

cili

tie

s o

n th

e w

este

rn s

ide

of

this

in

ters

ection

de

pa

rtu

re a

re d

isco

ntin

uou

s w

ith

po

or

tra

nsitio

n fro

m o

ne t

rea

tmen

t to

the

oth

er.

Th

e k

erb

an

d g

utte

r sto

ps a

bru

ptly w

ith

no

inle

t d

rain

or

ke

rb

sp

lay. W

ate

r th

en r

uns o

ff t

o the

un

-form

ed

sh

ou

lde

r are

a a

nd

in

to t

he

mo

unta

in d

rain

. T

he

po

or

tra

nsitio

n b

etw

ee

n t

hese

dra

ina

ge fa

cili

tie

s

ha

s r

esulte

d in

wa

ter

da

mag

e o

f th

e p

ave

me

nt,

wh

ich

has led

to

pa

ve

me

nt

dep

ressio

ns. T

his

ha

s f

urt

he

r le

d to

de

positio

n o

f le

af

and

dir

t m

ate

ria

ls w

hic

h c

om

pro

mis

es r

ide q

uality

and

skid

re

sis

tan

ce.

Th

e p

oo

r su

rface

co

nd

itio

ns a

nd

dis

co

ntin

uity o

f th

e f

ootp

ath

ma

y a

lso

incre

ase t

he p

ote

ntia

l fo

r p

ed

estr

ian

slip

s a

nd

trip

s.

low

Fig

ure

7

Po

or

tran

siti

on

bet

wee

n d

rain

age

faci

litie

s o

n

Ter

race

Str

eet

dep

artu

re.

R

ichm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit 01

Page 8

H

yder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

f:

\aa005381\r

- r

eport

\f0001

-aa005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

6

Old

Ku

rra

jon

g R

oa

d,

at

the

in

ters

ectio

n

with

Ku

rra

jong

Ro

ad

– e

xis

tin

g c

ond

itio

ns.

Th

e g

ua

rdra

ils a

t th

is inte

rse

ctio

n lack d

iap

hra

gm

pla

tes in

the

bu

ffe

red

en

d t

erm

ina

ls.

Th

is w

ou

ld incre

ase t

he

sp

ea

ring

pote

ntia

l o

f th

e

term

ina

ls.

Me

d

Fig

ure

8

Bu

ffer

ed e

nd

ter

min

al.

7

Old

Ku

rra

jon

g R

oa

d /

Ku

rra

jong

Ro

ad

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Th

e in

ters

ectio

n a

lignm

en

t is

a m

ajo

r is

sue

. B

oth

Old

Ku

rra

jon

g R

oa

d

ap

pro

ache

s a

re s

tag

ge

red

fo

rcin

g v

eh

icle

s to

neg

otia

te lo

ng

er

dis

tan

ce

s fo

r rig

ht-

turn

s a

nd

thro

ug

h m

ove

me

nts

on O

ld K

urr

ajo

ng

Roa

d.

For

a r

oa

d w

ith

hig

h t

raffic

vo

lum

es a

nd

po

or

ga

p a

va

ilab

ility

,

the

extr

a d

ura

tio

n r

eq

uir

ed

to

co

mp

lete

th

ese

mo

ve

men

ts incre

ases

the

cra

sh e

xp

osu

re.

Th

e s

tag

ge

red

alig

nm

en

t o

f th

e tw

o s

ide

ro

ad

ap

pro

ache

s a

lso

me

ans t

ha

t op

po

sin

g r

ight-

turn

s o

n K

urr

ajo

ng

Ro

ad

ca

nno

t occu

r a

t th

e s

am

e t

ime w

ith

ou

t a

he

ad

-on

cra

sh

co

nflic

t.

Hig

h

Fig

ure

9

Old

Ku

rraj

on

g R

oad

loo

kin

g s

ou

thb

ou

nd

tow

ard

s th

e in

ters

ecti

on

wit

h K

urr

ajo

ng

Ro

ad.

Ric

hm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

P

age 9

f:\a

a005381\r

- r

eport

\f0001-a

a005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

8

Old

Ku

rra

jon

g R

oa

d /

Ku

rra

jong

Ro

ad

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Th

ere

is a

lack o

f lig

htin

g a

t th

e in

ters

ectio

n c

rea

tin

g d

ang

ero

us n

ight

tim

e d

rivin

g c

on

ditio

ns.

Th

e lack o

f d

elin

ea

tors

als

o e

xa

ce

rba

tes th

is

pro

ble

m.

Me

d

Fig

ure

10

Lac

k o

f lig

hti

ng

at

Ku

rraj

on

g R

oad

/ Old

Ku

rraj

on

g R

oad

inte

rsec

tio

n.

R

ichm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit 01

Page 1

0

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

f:

\aa005381\r

- r

eport

\f0001

-aa005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

9

Old

Ku

rra

jon

g R

oa

d /

Ku

rra

jong

Ro

ad

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Old

Ku

rra

jon

g R

oa

d h

as p

oo

r p

ave

me

nt

qua

lity in

clu

din

g lo

ose

gra

ve

l

an

d a

na

rro

w s

eale

d w

idth

(le

ss t

han

5.5

m).

Th

is m

ay le

ad

to lo

ss o

f

co

ntr

ol o

f ve

hic

les e

nte

ring

and

eg

ressin

g fro

m t

he

ro

ad

. It

ma

y a

lso

lea

d to

lo

ss o

f co

ntr

ol w

he

n b

rakin

g in a

dva

nce

of

the

in

ters

ection

hold

lines a

nd

associa

ted

qu

eu

es.

Lo

w

Fig

ure

11

Po

or

pav

emen

t q

ual

ity

in O

ld K

urr

ajo

ng

Ro

ad

10

O

ld K

urr

ajo

ng

Roa

d /

Ku

rra

jong

Ro

ad

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Ve

hic

les t

urn

ing

rig

ht

from

Ku

rra

jon

g R

oa

d W

est

to O

ld K

urr

ajo

ng

Roa

d S

outh

(ye

llow

ve

hic

le in

dia

gra

m)

blo

ck th

e e

astb

oun

d th

rou

gh

tra

ffic

on K

urr

ajo

ng

Ro

ad

. A

s a

re

su

lt, m

an

y e

astb

ou

nd

th

rou

gh

ve

hic

les (

wh

ite

ve

hic

les in

dia

gra

m)

we

re o

bse

rve

d to

pa

ss a

rou

nd t

he

qu

eu

ed

ve

hic

le b

y u

sin

g th

e s

pa

ce in

th

e O

ld K

urr

ajo

ng R

oad

No

rth

inte

rse

ctio

n a

pp

roach

. T

his

cou

ld in

cre

ase

th

e r

isk o

f co

llisio

n w

ith

qu

eu

ed

tra

ffic

in

Old

Ku

rrajo

ng R

oa

d N

ort

h (

blu

e v

ehic

le in d

iag

ram

).

Me

d

Fig

ure

12

Cra

sh c

on

flic

t d

ue

to t

he

lack

of

turn

ing

faci

litie

s at

Ku

rraj

on

g R

oad

/ Old

Ku

rraj

on

g

Ro

ad in

ters

ecti

on

.

Ric

hm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

P

age 1

1

f:\a

a005381\r

- r

eport

\f0001-a

a005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

11

K

urr

ajo

ng

Ro

ad

/ O

ld

Ku

rra

jong

Ro

ad

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Th

e e

nte

rin

g s

ight

dis

tan

ce f

rom

Old

Ku

rra

jon

g R

oad

So

uth

to

Ku

rra

jong

Ro

ad

we

st

is o

bscu

red

by r

oad

sid

e v

ege

tatio

n.

This

cre

ate

s

issu

es w

he

n t

urn

ing

rig

ht

fro

m O

ld K

urr

ajo

ng

Roa

d W

est. T

his

tra

ffic

ma

y n

eed

to

ad

va

nce

fu

rth

er

be

yo

nd

the

hold

lin

e in

th

is a

pp

roa

ch t

o

esta

blis

h a

go

od

sig

ht lin

e.

Th

is c

ou

ld incre

ase

cra

sh

ris

k w

ith

we

stb

ou

nd

th

roug

h v

ehic

les o

n K

urr

ajo

ng

Ro

ad

.

Th

e la

ck o

f cle

ar

sig

ht lin

e f

rom

th

is a

pp

roa

ch t

o th

e w

est

incre

ase

s t

he

“fo

llow

up

” (t

f) t

ime

wh

ich m

ay a

ffe

ct

the c

ap

acity o

f th

is a

pp

roa

ch.

Th

at

is,

with

out

a c

lea

r sig

ht lin

e,

veh

icle

s q

ueu

ed

be

hin

d a

lea

d v

eh

icle

are

un

ab

le t

o t

ake

ad

van

tage

of la

rge

gap

s in

the

ea

stb

ou

nd

tra

ffic

str

eam

.

Rath

er

the

y w

ou

ld e

ach

ne

ed

to

pro

gre

ss t

o th

e h

old

lin

e a

nd c

heck f

or

se

pa

rate

fiv

e s

econ

d g

ap

s.

As o

bse

rve

d b

y t

he

au

dit t

eam

, th

e lo

ng d

ela

ys d

ue

to t

he

abo

ve

issu

e,

ha

ve

re

su

lted

in p

oo

r g

ap

acce

pta

nce

be

ha

vio

ur

du

e t

o d

rive

r

fru

str

ation

. T

he

incre

ased

sta

rt-s

top

pa

tte

rn in

the

Old

Ku

rra

jon

g R

oad

So

uth

ap

pro

ach (

du

e t

o th

e lack o

f fo

llow

up

sig

ht d

ista

nce

) a

lso

incre

ases th

e r

ea

r-e

nd

cra

sh

ris

k in

this

ap

pro

ach

.

Lo

w

Fig

ure

13

Po

or

ente

rin

g s

igh

t d

ista

nce

fro

m O

ld

Ku

rraj

on

g R

oad

So

uth

to

Ku

rraj

on

g R

oad

Wes

t.

R

ichm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit 01

Page 1

2

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

f:

\aa005381\r

- r

eport

\f0001

-aa005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

12

K

urr

ajo

ng

Ro

ad

/ O

ld

Ku

rra

jong

Ro

ad

inte

rse

ctio

n –

exis

tin

g la

you

t.

Th

e c

on

sta

nt tr

affic

flo

w a

long

Ku

rra

jong

Ro

ad

du

rin

g p

eak t

raff

ic

pe

rio

ds d

oes n

ot p

rovid

e s

uff

icie

nt

ga

ps t

o a

llow

ve

hic

les t

o tu

rn r

igh

t

into

an

d le

ft/r

igh

t o

ut o

f th

e t

wo

Old

Ku

rrajo

ng

Ro

ad

app

roach

es.

Th

e

lack o

f g

aps is d

ue

to t

he

lack o

f m

ete

rin

g p

oin

ts in

th

e u

p a

nd

do

wn

str

ea

m r

oa

d n

etw

ork

. T

he

au

dit t

ea

m o

bse

rve

d d

ela

ys o

f u

p to

two

min

ute

s w

hic

h m

ay f

orc

e th

e lo

we

r p

rio

rity

tra

ffic

to

ta

ke u

nsafe

ga

ps.

Th

e a

ud

it te

am

note

d a

num

ber

of

sym

pto

ms o

f u

nsa

fe g

ap

acce

pta

nce s

uch

as h

ard

accele

ratio

n f

rom

re

st, d

rive

rs c

reep

ing

ou

t

into

th

e m

ain

ro

ad

tra

ve

l la

ne

s,

dri

ve

rs s

talli

ng

be

yo

nd

th

e h

old

lin

e,

an

d m

ain

lin

e t

raff

ic “

bo

rkin

g”

an

d b

rakin

g h

ard

in

resp

on

se to

un

exp

ecte

d e

gre

ssin

g v

ehic

les.

Hig

h

See

Fig

ure

13 a

nd F

igur

e 14

.

Fig

ure

14

Hig

h t

raff

ic v

olu

mes

on

Ku

rraj

on

g R

oad

.

13

R

ich

mo

nd

Brid

ge

exis

tin

g c

on

ditio

ns.

Th

e b

rid

ge b

arr

iers

are

no

t cra

sh

wo

rth

y a

nd

are

not

cap

able

of

co

nta

inin

g a

nd

re

-dir

ectin

g e

rra

nt

ve

hic

les.

An

y e

rra

nt

ve

hic

les m

ay b

e

at

risk o

f b

rea

chin

g th

e s

yste

m o

r a

lte

rna

tive

ly e

xp

eri

en

cin

g p

oo

r

rid

ed

ow

n p

erf

orm

an

ce

co

mpa

red

with

th

e a

pp

rove

d b

arr

ier

syste

ms.

Me

d

Fig

ure

15 –

Su

bst

and

ard

bri

dg

e b

arri

ers.

Ric

hm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

P

age 1

3

f:\a

a005381\r

- r

eport

\f0001-a

a005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

14

K

urr

ajo

ng

Ro

ad

/

Bo

sw

ort

h S

tre

et/

Ma

rch

Str

ee

t

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Th

e s

pe

ed

lim

it s

ign

in

the

Bosw

ort

h S

tre

et

(no

rth

ern

) in

ters

ection

ap

pro

ach

ob

scu

re v

isib

ility

to

th

e p

rim

ary

sig

na

l la

nte

rns. A

pp

roa

ch

ing

dri

ve

rs m

ay n

ot b

e a

wa

re o

f th

e p

reva

ilin

g s

ign

al p

ha

se.

Hig

h

Fig

ure

16

Ob

scu

red

tra

ffic

sig

nal

s.

R

ichm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit 01

Page 1

4

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

f:

\aa005381\r

- r

eport

\f0001

-aa005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

15

K

urr

ajo

ng

Ro

ad

/

Bo

sw

ort

h S

tre

et/

Ma

rch

Str

ee

t

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Th

ere

are

nu

me

rou

s p

ave

me

nt

failu

res a

t th

is inte

rse

ctio

n inclu

din

g

po

lish

ing

an

d c

rackin

g.

Th

ese

ma

y le

ad

to

loss-o

f-con

tro

l a

nd

re

ar-

en

d

cra

sh

es,

esp

ecia

lly s

ince t

his

is a

hig

h b

rakin

g e

nvir

on

men

t.

Lo

w

Fig

ure

17

Exa

mp

le o

f B

osw

ort

h S

tree

t / K

urr

ajo

ng

Ro

ad/

Mar

ch S

tree

t p

avem

ent

issu

es.

Ric

hm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

P

age 1

5

f:\a

a005381\r

- r

eport

\f0001-a

a005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

16

K

urr

ajo

ng

Ro

ad

/

Bo

sw

ort

h S

tre

et/

Ma

rch

Str

ee

t

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Th

e k

erb

ram

ps a

t th

is in

ters

ection

ha

ve

po

or

dir

ection

alit

y a

s t

he

y d

o

no

t lin

e u

p w

ith

the

alig

nm

en

t o

f th

e m

ark

ed c

rossin

gs.

Th

is m

ay le

ad

vis

ua

lly im

pa

ired

ped

estr

ians in

to t

he

co

ntr

ol a

rea

of th

e in

ters

ectio

n

wh

ere

th

ey w

ou

ld b

e a

t in

cre

ase

d r

isk o

f im

pa

ct fr

om

ve

hic

les.

Th

ere

wa

s a

lso a

hig

h d

eg

ree

of

pa

ve

me

nt cra

ckin

g w

hic

h m

ay f

orm

a

trip

ha

za

rd f

or

pe

de

str

ians.

Lo

w

Fig

ure

18

Mis

lead

ing

Inte

rsec

tio

n d

irec

tio

nal

ity

.

17

K

urr

ajo

ng

Ro

ad

/

Bo

sw

ort

h S

tre

et/

Ma

rch

Str

ee

t

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Duri

ng

th

e tim

e o

f th

e n

igh

t tim

e insp

ection

, th

ere

we

re t

wo

str

ee

t lig

hts

on

th

e n

ort

he

rn a

pp

roa

ch

to

the

in

ters

ectio

n t

ha

t w

ere

no

t o

pe

rating

.

Lo

w

R

ichm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit 01

Page 1

6

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

f:

\aa005381\r

- r

eport

\f0001

-aa005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

18

K

urr

ajo

ng

Ro

ad

/

Bo

sw

ort

h S

tre

et/

Ma

rch

Str

ee

t

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Th

e w

este

rn a

pp

roa

ch

to

th

e in

ters

ectio

n d

oes n

ot

ha

ve

a m

ark

ed f

oo

t

cro

ssin

g.

Th

is m

ay le

ad

to

pede

str

ian

s ja

yw

alk

ing

acro

ss t

his

ap

pro

ach

rath

er

tha

n w

alk

ing

th

e m

ore

cir

cu

ito

us r

oute

via

th

e o

the

r th

ree

cro

ssin

gs. T

his

co

uld

incre

ase t

he

ris

k o

f pe

destr

ian

cra

sh

es.

Hig

h

Fig

ure

19

No

ped

estr

ian

cro

ssin

g o

n K

urr

ajo

ng

Ro

ad

wes

tern

inte

rsec

tio

n a

pp

roac

h.

Ric

hm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

P

age 1

7

f:\a

a005381\r

- r

eport

\f0001-a

a005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

19

K

urr

ajo

ng

Ro

ad

/

Bo

sw

ort

h S

tre

et/

Ma

rch

Str

ee

t

inte

rse

ctio

n –

exis

tin

g c

on

ditio

ns.

Th

ere

is a

pro

no

unce

d r

oad

cro

wn

in

th

e M

arc

h S

tree

t ap

pro

ach

. T

his

ma

y a

ct a

s a

pe

destr

ian

trip

ha

za

rd.

Lo

w

Fig

ure

20

- P

ron

ou

nce

d c

row

n in

th

e ro

ad.

20

In

na

ls L

an

e

-

exis

tin

g c

on

ditio

ns.

Th

ere

is a

lack o

f lig

htin

g a

nd n

igh

t-tim

e d

elin

ea

tio

n o

n t

his

ro

ute

wh

ich

pro

vid

es insu

ffic

ien

t g

uid

ance

to

ro

ad u

se

rs. F

urt

he

rmo

re,

the

re is

limite

d th

e s

igh

t dis

tan

ce

and

little

wa

rnin

g p

rovid

ed

reg

ard

ing

ve

hic

les

eg

ressin

g (

an

d p

ossib

ly r

eve

rsin

g)

fro

m d

rive

wa

ys.

Lo

w

Fig

ure

21 –

Lac

k o

f st

reet

ligh

tin

g in

Inn

als

Lan

e.

R

ichm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit 01

Page 1

8

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

f:

\aa005381\r

- r

eport

\f0001

-aa005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

21

In

na

ls L

an

e -

exis

tin

g c

on

ditio

ns.

Th

is r

oa

d c

on

tain

s s

eve

ral p

ave

me

nt

de

ficie

ncie

s in

clu

din

g s

ho

vin

g,

de

pre

ssio

ns a

nd

polis

hin

g w

hic

h m

ay incre

ase

th

e lo

ss o

f con

tro

l cra

sh

po

ten

tia

l. T

his

ro

ad

als

o c

on

tain

s r

eve

rse

cu

rve

s o

n a

do

wn

hill

gra

de

wh

ich

ma

y f

urt

he

r e

xa

ce

rba

te th

e lo

ss o

f co

ntr

ol a

nd

ru

n o

ff r

oa

d c

rash

risk.

Ad

ditio

na

lly t

he

roa

d h

as u

nsea

led

sho

uld

ers

, p

oo

r e

dge

co

nditio

ns a

nd

a lack o

f ru

n o

ff r

oa

d a

reas.

Me

d

Fig

ure

22

Inn

als

Lan

e p

avem

ent

issu

es –

no

te p

olis

hin

g

in r

igh

t-h

and

lan

e.

22

In

na

ls L

an

e-

exis

tin

g

co

nditio

ns.

Utilit

y p

ole

s a

re loca

ted

with

in th

e c

lea

r zon

e w

hic

h c

an p

rese

nt

a

po

ten

tia

l cra

sh

ha

za

rd fo

r e

rran

t ve

hic

les.

Me

d

23

In

na

ls L

an

e -

exis

tin

g c

on

ditio

ns.

Inn

als

La

ne

ru

ns t

hro

ug

h a

flo

od

pla

in w

hic

h h

as r

esu

lte

d in

a f

ill

em

ban

km

en

t o

n e

ithe

r sid

e o

f th

e r

oad

. A

lth

oug

h d

elin

ea

tors

are

pre

sen

t to

mitig

ate

th

is r

isk,

the

se

do

no

t p

rovid

e s

uff

icie

nt sa

feg

ua

rds

ag

ain

st e

rra

nt ve

hic

les t

hat

may r

un

off

roa

d.

Me

d

Fig

ure

23

Fill

em

ban

kmen

t an

d d

rop

off

.

Ric

hm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

P

age 1

9

f:\a

a005381\r

- r

eport

\f0001-a

a005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

24

Y

arr

am

un

di L

ane

-

exis

tin

g c

on

ditio

ns.

Th

ere

is a

lack o

f lin

e m

ark

ing

an

d n

igh

t-tim

e d

elin

ea

tio

n th

rou

gh

out

the

entire

le

ng

th o

f Y

arr

am

un

di L

ane

. T

his

wo

uld

lea

d t

o v

ery

po

or

vis

ibili

ty o

f th

e r

oa

d a

he

ad

.

Me

d

Fig

ure

24

Yar

ram

un

di L

ane.

25

Y

arr

am

un

di L

ane

-

exis

tin

g c

on

ditio

ns.

Th

ere

is a

lack o

f lig

htin

g a

nd n

igh

t-tim

e d

elin

ea

tio

n o

n t

his

ro

ute

wh

ich

pro

vid

es insu

ffic

ien

t g

uid

ance

to

ro

ad u

se

rs. F

urt

he

rmo

re,

the

re is

limite

d th

e s

igh

t dis

tan

ce

and

little

wa

rnin

g p

rovid

ed

reg

ard

ing

ve

hic

les

eg

ressin

g (

an

d p

ossib

ly r

eve

rsin

g)

fro

m d

rive

wa

ys.

Lo

w

As s

ee

n in

Fig

ure

24

th

ere

are

no

str

ee

tlig

hts

an

d a

gen

era

l

lack o

f d

elin

eation

.

26

Y

arr

am

un

di la

ne

-

exis

tin

g c

on

ditio

ns.

Th

ere

are

utilit

y p

ole

s lo

ca

ted

with

in t

he

cle

ar

zo

ne

wh

ich

can

pre

se

nt

a p

ote

ntia

l cra

sh

ha

za

rd f

or

err

an

t ve

hic

les.

Th

ere

is a

lso

a len

gth

of

ba

rbe

d w

ire

fe

nce

in

th

e c

lea

r zo

ne

pre

se

ntin

g a

cra

sh h

aza

rd f

or

err

an

t ve

hic

les.

Lo

w

Re

fer

to F

igu

re 2

4.

R

ichm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit 01

Page 2

0

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

f:

\aa005381\r

- r

eport

\f0001

-aa005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

27

C

row

leys L

an

e –

exis

tin

g c

on

ditio

ns.

A s

pe

ed

lim

it a

nd

wa

rnin

g s

ign a

re o

bstr

ucte

d o

n t

his

rou

te, w

he

n

tra

ve

llin

g n

ort

hbo

un

d

Lo

w

Fig

ure

25

Ob

stru

cted

war

nin

g s

ign

.

28

C

row

leys la

ne

exis

tin

g c

on

ditio

ns.

Th

ere

are

a n

um

be

r o

f p

avem

en

t d

eficie

ncie

s a

long

this

ro

ute

inclu

din

g

a n

arr

ow

se

ale

d w

idth

with

no

se

ale

d s

ho

uld

ers

. T

he

pa

ve

me

nt

als

o

co

nta

ins d

ep

ressio

ns,

sho

vin

g a

nd

po

or

ed

ge q

ualit

y.

Th

is m

ay r

esu

lt

incre

ase loss o

f co

ntr

ol cra

sh

po

ten

tia

l.

It s

ho

uld

be

no

ted

tha

t th

e r

oad

sid

e v

eg

eta

tio

n is d

en

se

and p

rese

nts

run

off r

oa

d c

rash

ha

za

rds.

Lo

w

Fig

ure

26

Pav

emen

t d

efic

ien

cies

.

29

C

row

leys L

an

e –

exis

tin

g c

on

ditio

ns.

Th

ere

is a

lack o

f lig

htin

g a

nd n

igh

t-tim

e d

elin

ea

tio

n o

n t

his

ro

ute

wh

ich

pro

vid

es insu

ffic

ien

t g

uid

ance

to

ro

ad u

se

rs. F

urt

he

rmo

re,

the

re is

limite

d th

e s

igh

t dis

tan

ce

and

little

wa

rnin

g p

rovid

ed

reg

ard

ing

ve

hic

les

eg

ressin

g (

an

d p

ossib

ly r

eve

rsin

g)

fro

m d

rive

wa

ys.

Lo

w

Ref

er to

Fig

ure

26.

Ric

hm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

P

age 2

1

f:\a

a005381\r

- r

eport

\f0001-a

a005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ta

ble

2-2

: R

oa

d s

afe

ty a

ud

it f

ind

ing

s –

Pre

lim

ina

ry d

es

ign

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

30

O

ld K

urr

ajo

ng

Roa

d

to t

he

no

rth

of

Ku

rra

jong

Ro

ad

-

Pre

limin

ary

de

sig

n

SK

11

09

-4

Th

ere

are

utilit

y p

ole

s lo

ca

ted

on

th

e w

este

rn s

ide

of

Old

Ku

rra

jon

g

Roa

d.

If th

ese

are

not

relo

ca

ted

, th

ey m

ay p

ose

as c

rash

ha

za

rds to

tra

ffic

on t

his

roa

d.

Th

e o

ffset b

etw

ee

n t

he

ed

ge

of tr

affic

la

ne

an

d th

e

po

les w

ou

ld r

ed

uce

with

th

e p

rop

ose

d d

esig

n.

Th

is c

ou

ld incre

ase t

he

likelih

oo

d a

nd

se

ve

rity

of

ha

zard

ou

s p

ole

cra

she

s.

Me

d

31

B

ells

Lin

e o

f R

oa

d/

Gro

se

Vale

Ro

ad

/

Te

rra

ce

Str

eet

inte

rse

ctio

n –

Pre

limin

ary

de

sig

n

30

01

11

77

-12

082

0.

Th

e t

urn

path

s o

f th

e d

ua

l rig

ht-

turn

la

nes f

rom

Gro

se

Va

le R

oa

d in

to

Be

lls L

ine

of R

oa

d a

ppe

ar

to c

lash

with

the

rig

ht-

turn

fro

m T

err

ace

Roa

d.

Me

d

R

ichm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit 01

Page 2

2

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

f:

\aa005381\r

- r

eport

\f0001

-aa005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

32

K

urr

ajo

ng

Ro

ad

/ O

ld

Ku

rra

jong

Ro

ad

inte

rse

ctio

n –

pre

limin

ary

de

sig

n

SK

11

09

-4

Th

e p

rop

ose

d a

cce

lera

tio

n la

ne

on

Ku

rra

jon

g R

oa

d f

or

left-t

urn

ing

ve

hic

les f

rom

Old

Ku

rrajo

ng

Ro

ad

Sou

th w

ill im

pro

ve

th

e a

bili

ty o

f ca

rs

to e

nte

r K

urr

ajo

ng

ro

ad

in h

eavy t

raff

ic c

on

ditio

ns (

ie.

red

uced

ga

p

acce

pta

nce r

eq

uir

em

en

t fr

om

5 s

eco

nd

s to

3 s

eco

nds).

How

eve

r th

is

ma

y le

ad

to

ne

w c

rash

ris

ks a

s d

escrib

ed b

elo

w.

Du

e t

o th

e h

igh

an

d c

on

sta

nt

we

stb

ou

nd

tra

ffic

vo

lum

es o

n K

urr

ajo

ng

Ro

ad

(p

art

icu

larly d

urin

g t

he

PM

pe

ak)

the

re m

ay s

till

be

difficu

lty in

fin

din

g a

cce

pta

ble

ga

ps f

or

sid

e r

oa

d tra

ffic

to

ente

r. If

a v

ehic

le in

th

e

acce

lera

tion

lan

e is u

na

ble

to fin

d a

ga

p,

the

y m

ay e

ith

er:

Att

em

pt

to m

erg

e v

ia a

sub

sta

nd

ard

ga

p w

hic

h incre

ases s

ide

sw

ipe

, la

ne

ch

ang

ing a

nd r

ea

r e

nd

cra

sh

ris

k (

blu

e v

eh

icle

), o

r

“Bo

rk”

or

bra

ke

ha

rd a

nd

be

at ri

sk o

f re

ar-

end

cra

sh

es fro

m

follo

win

g v

ehic

les in

th

e a

cce

lera

tion

lan

e (

red

ve

hic

les).

Th

e a

ud

it te

am

ackn

ow

led

ge

s th

at

this

cra

sh

ris

k w

ou

ld in

vo

lve

lo

w-

an

gle

d im

pacts

with

sm

all

diffe

ren

ces in

re

lative

ve

locity b

etw

ee

n t

he

en

terin

g t

raff

ic a

nd

the

ma

in lin

e t

raffic

. A

s s

uch

, th

e p

ote

ntia

l cra

sh

se

ve

rity

wo

uld

be c

on

trolle

d in t

his

man

ne

r. B

y c

on

tra

st, t

he “

do

no

thin

g”

ap

pro

ach

wo

uld

re

tain

th

e p

ote

ntial fo

r h

igh

er

an

gle

d c

rash

es

with

hig

he

r spe

ed

diffe

ren

tia

ls w

hic

h a

re p

ote

ntially

mo

re s

eve

re.

Me

d

Fig

ure

27

Lik

ely

safe

ty r

isks

wit

h a

ccel

erat

ion

lan

e.

33

O

ld K

urr

ajo

ng

Roa

d /

Ku

rra

jong

Ro

ad

inte

rse

ctio

n –

pre

limin

ary

de

sig

n

SK

11

09

-4

Und

er

the

pre

limin

ary

de

sig

n th

e h

old

lin

e o

n O

ld K

urr

ajo

ng R

oa

d

No

rth

is b

ein

g m

ove

d b

ack to

acco

mm

od

ate

th

e p

rop

ose

d inte

rsectio

n

wid

en

ing

wo

rks. D

rive

rs a

t th

e n

ew

ho

ld lin

e w

ou

ld h

ave

red

uce

d

en

terin

g s

igh

t d

ista

nce d

ue t

o th

e p

rese

nce

of

tree

s a

nd

ve

geta

tion

on

the

no

rth

ern

sid

e o

f K

urr

ajo

ng

Roa

d.

Th

is c

ou

ld r

esult in

dri

ve

rs c

ree

pin

g f

orw

ard

s to

esta

blis

h a

be

tte

r

sig

htlin

e.

Th

is c

ou

ld in

tu

rn r

esu

lt in

incre

ased

cra

sh

ris

k w

ith

ve

hic

les

on

Ku

rrajo

ng

Ro

ad.

Me

d

Ric

hm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

P

age 2

3

f:\a

a005381\r

- r

eport

\f0001-a

a005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

34

K

urr

ajo

ng

Ro

ad

/ O

ld

Ku

rra

jong

Ro

ad

inte

rse

ctio

n –

pre

limin

ary

de

sig

n

SK

11

09

-4.

Sim

ilar

to ite

m 1

2,

the

co

nsta

nt

tra

ffic

flo

w a

lon

g K

urr

ajo

ng

Ro

ad

du

rin

g p

ea

k t

raff

ic p

eri

ods d

oes n

ot p

rovid

e s

uff

icie

nt

gap

s to a

llow

ve

hic

les to

tu

rn r

igh

t in

to a

nd

le

ft/r

igh

t ou

t o

f th

e tw

o O

ld K

urr

ajo

ng

Roa

d a

pp

roach

es.

Th

e la

ck o

f g

ap

s is d

ue t

o th

e la

ck o

f m

ete

rin

g

po

ints

in

the

up

an

d d

ow

nstr

eam

ro

ad

ne

two

rk.

Th

e a

udit t

eam

ob

se

rve

d d

ela

ys o

f u

p to

tw

o m

inute

s w

hic

h m

ay f

orc

e t

he

lo

we

r

pri

ori

ty t

raff

ic t

o ta

ke

unsa

fe g

ap

s.

Th

e a

ud

it te

am

note

d a

num

ber

of

sym

pto

ms o

f u

nsa

fe g

ap

acce

pta

nce s

uch

as h

ard

accele

ratio

n f

rom

re

st, d

rive

rs c

reep

ing

ou

t

into

th

e m

ain

ro

ad

tra

ve

l la

ne

s,

dri

ve

rs s

talli

ng

be

yo

nd

th

e h

old

lin

e,

an

d m

ain

lin

e t

raff

ic “

bo

rkin

g”

an

d b

rakin

g h

ard

in

resp

on

se to

un

exp

ecte

d e

gre

ssin

g v

ehic

les.

Und

er

the

pro

po

se

d d

esig

n, it w

as n

ote

d th

at

the

wid

enin

g o

f th

e

inte

rse

ctio

n w

ill incre

ase

th

e t

rave

l p

ath

fo

r ve

hic

les t

urn

ing

in

to a

nd

ou

t o

f th

e tw

o O

ld K

urr

ajo

ng

Ro

ad

ap

pro

ache

s (

as w

ell

as t

he

th

roug

h

mo

ve

men

ts b

etw

ee

n th

ese

app

roa

ch

es).

Th

is m

ay p

rolo

ng r

oa

d u

se

rs’

exp

osu

re t

o c

rash

es in t

he

“con

flic

t a

rea

” o

f th

e in

ters

ectio

n.

Hig

h

R

ichm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit 01

Page 2

4

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

f:

\aa005381\r

- r

eport

\f0001

-aa005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

35

K

urr

ajo

ng

Ro

ad

/

Bo

sw

ort

h S

tre

et/

Ma

rch

Str

ee

t

inte

rse

ctio

n –

Pre

limin

ary

de

sig

n

SK

30

01

11

77

-

12

08

20

-Bo

sw

ort

h-

Int-

Pla

n

Th

e M

arc

h S

tre

et

(easte

rn)

app

roa

ch

to

th

e in

ters

ection

has a

pro

no

un

ce

d r

oa

d c

row

n w

ith

ste

ep

cro

ssfa

lls e

ith

er

sid

e.

Th

e p

rop

ose

d

inte

rse

ctio

n w

ide

nin

g w

ork

s in

Ma

rch

Str

ee

t m

ay le

ad t

o th

e r

igh

t-tu

rn

lan

e s

trad

dlin

g th

e c

row

n (

if t

he

cro

wn

is n

ot

relo

ca

ted

). T

his

co

uld

resu

lt in v

ari

able

an

d a

wkw

ard

le

ve

l tr

an

sitio

ns fo

r ve

hic

les turn

ing

rig

ht.

Th

is c

ou

ld a

lso

resu

lt in

ve

hic

les “

bo

ttom

ing

ou

t” o

r scra

pin

g o

f th

e

un

de

rca

rria

ge

.

Lo

w

Fig

ure

28

Po

ssib

le g

rad

ing

issu

e K

urr

ajo

ng

Ro

ad a

nd

Mar

ch S

tree

t.

36

K

urr

ajo

ng

Ro

ad

/

Bo

sw

ort

h S

tre

et/

Ma

rch

Str

ee

t

inte

rse

ctio

n –

Pre

limin

ary

de

sig

n

SK

30

01

11

77

-

12

08

20

-Bo

sw

ort

h-

Int-

Pla

n

Th

e p

rop

ose

d w

ide

nin

g w

ork

s o

n t

he n

ort

he

rn s

ide

s o

f K

urr

ajo

ng

Ro

ad

an

d M

arc

h S

tree

t a

pp

ea

r to

cla

sh

with

the

pro

pe

rty lin

es.

Th

is m

ay

lea

d to

fen

ces a

nd

wa

lls a

ssocia

ted w

ith

pro

pe

rtie

s b

ein

g a

t a

sig

nific

an

tly r

ed

uce

d o

ffse

t fr

om

th

e r

oa

d,

and

hen

ce a

hig

her

risk r

oad

sid

e h

aza

rd. F

urt

he

rmo

re,

the

re a

re a

num

be

r o

f d

rive

wa

ys t

ha

t w

ou

ld

ha

ve

an

ab

rupt

leve

l tr

ansitio

n to

th

e n

ew

ro

ad

bo

und

ary

.

Lo

w

Ric

hm

ond B

rid

ge a

nd a

ppro

aches -

Road s

afe

ty a

udit

Hyder

Consultin

g P

ty L

td-A

BN

76 1

04 4

85 2

89

P

age 2

5

f:\a

a005381\r

- r

eport

\f0001-a

a005381-a

ar-

01 r

ichm

ond b

rid

ge r

sa r

ev01.d

ocx

Ite

m

Lo

ca

tio

n

Sa

fety

fin

din

gs

R

isk

rati

ng

Ph

oto

37

K

urr

ajo

ng

Ro

ad

/

Bo

sw

ort

h S

tre

et/

Ma

rch

Str

ee

t

inte

rse

ctio

n –

Pre

limin

ary

de

sig

n

SK

30

01

11

77

-

12

08

20

-Bo

sw

ort

h-

Int-

Pla

n

Weste

rn C

olo

nia

l

Hote

l R

ichm

on

d.

Dri

ve

rs e

gre

ssin

g f

rom

th

e h

ote

l a

nd

sto

ppe

d a

t th

e n

ew

ho

ld lin

e w

ill

ha

ve

re

duce

d e

nte

ring

sig

ht

dis

tance

availa

ble

du

e to

ve

ge

tatio

n a

nd

utilit

y p

ole

s.

Me

d

38

K

urr

ajo

ng

Ro

ad

/

Bo

sw

ort

h S

tre

et/

Ma

rch

Str

ee

t

inte

rse

ctio

n –

Pre

limin

ary

de

sig

n

SK

11

08

-4.

Th

e in

cre

ased

se

tback o

f th

e h

old

lin

e in t

he

Ma

rch

Str

ee

t ap

pro

ach

co

uld

resu

lt in

a la

rge

r tu

rnin

g p

ath

fo

r ri

gh

t-tu

rns in

to B

osw

ort

h S

tre

et

Nort

h.

Th

is m

ay c

lash

with

th

e o

pp

osin

g r

igh

t tu

rn f

rom

Ku

rrajo

ng

Roa

d (

into

Bosw

ort

h S

tre

et S

ou

th).

Me

d

Richmond Bridge and approaches - Road safety audit

Page 26 Hyder Consulting Pty Ltd-ABN 76 104 485 289

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

3 CONCLUDING STATEMENT

We have undertaken a preliminary design road safety audit using reference documents detailed

in Section 1 of this report.

The audit has been carried out for the sole purpose of identifying any features of road and

intersections surrounding Richmond Bridge that are deemed to be unsafe. These identified

issues to outline roadways which could be reviewed for safety performance.

Issues identified have been noted in this report for the Project Manager and Designer to review

and assess, and where appropriate make the necessary recommendations to improve safety,

this report does not make any suggestions and recommendations.

Damien Chee

Audit Team Leader

Hyder Consulting Pty Ltd

Joshua Kleinhans

Hyder Consulting Pty Ltd

Richmond Bridge and approaches - Road safety audit

Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 27

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

APPENDIX A: ROAD SAFETY AUDIT CHECKLIST

Richmond Bridge and approaches - Road safety audit

Page 28 Hyder Consulting Pty Ltd-ABN 76 104 485 289

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 29

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Page 30 Hyder Consulting Pty Ltd-ABN 76 104 485 289

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 31

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Page 32 Hyder Consulting Pty Ltd-ABN 76 104 485 289

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 33

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Page 34 Hyder Consulting Pty Ltd-ABN 76 104 485 289

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 35

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Page 36 Hyder Consulting Pty Ltd-ABN 76 104 485 289

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 37

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Page 38 Hyder Consulting Pty Ltd-ABN 76 104 485 289

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 39

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx

Richmond Bridge and approaches - Road safety audit

Page 40 Hyder Consulting Pty Ltd-ABN 76 104 485 289

f:\aa005381\r - report\f0001-aa005381-aar-01 richmond bridge rsa rev01.docx