Transcript of RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission...
![Page 1: RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.](https://reader036.fdocuments.net/reader036/viewer/2022072014/56649eb45503460f94bbc5de/html5/thumbnails/1.jpg)
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction
Transmission Workstream, 2 April 2009
![Page 2: RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.](https://reader036.fdocuments.net/reader036/viewer/2022072014/56649eb45503460f94bbc5de/html5/thumbnails/2.jpg)
2
Agenda
Compare Results for Winter (Nov – Mar) 07/08 to
Winter (Nov – Mar) 08/09
Future RMTTSEC Auctions
– Online processes
– Review update of Methodology
![Page 3: RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.](https://reader036.fdocuments.net/reader036/viewer/2022072014/56649eb45503460f94bbc5de/html5/thumbnails/3.jpg)
3
Capacity Allocated Winter 07/08
Capacity Allocated (GWh)
Location Nov-
07 Dec-07 Jan-08 Feb-08 Mar-08
Barrow Allocated from same ASEP
2 2 2 2 0
Transfer & Trade 0 0 0 0 0
Easington Allocated from same ASEP 0 0 0 0 0
Transfer & Trade 85.39 85.83 85.83 85.83 85.83
Isle of Grain Allocated from same ASEP 42.33 0 0 0 0
Transfer & Trade 0 0 0 0 0
Teesside Allocated from same ASEP 0 0 0 0 0
Transfer & Trade 23.82 48.32 42.62 41.22 0
• Single Auction (2 rounds) run in October for whole Winter 07/08
• Run in addition to RMSEC
• 4 ASEPs allocated capacity
![Page 4: RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.](https://reader036.fdocuments.net/reader036/viewer/2022072014/56649eb45503460f94bbc5de/html5/thumbnails/4.jpg)
4
Capacity Allocated Winter 08/09
Capacity Allocated ( GWh)
Location Stage Nov-
08Dec-
08Jan-
09Feb-
09Mar-
09
Easington
1
Surrendered
Unsold
4.9
0
4.4
0
0
0
0
0
7.9
0
2 Trade 9.8 83.1 102.3 42.2 17.3
2 Transfer 0 0 0 0 0
Total 14.7 87.5 102.3 42.2 25.2
Hatfield Moor
1
Surrendered
Unsold
0
10.1
0
7.2
0
1.3
0
4.2
0
7.2
2 Trade 9.7 7.4 7.5 7.5 6.8
2 Transfer 0 0 0 0 0
Total 19.8 14.6 8.8 11.7 14
• RMTTSEC allocated at 8 ASEPs
• All Allocations met by unsold/surrendered at the ASEP except :
• Easington
• Hatfield Moor Storage
![Page 5: RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.](https://reader036.fdocuments.net/reader036/viewer/2022072014/56649eb45503460f94bbc5de/html5/thumbnails/5.jpg)
5
Comparison summaryWinter 07/08
Winter 08/09
All bid satisfied
Unable to satisfy all bidsAdditional capacity made available atsome ASEPs requesting firm capacity
Stimulated secondary trading Stimulated secondary trading
Aggregate capacity allocations atEasington and Teesside exceeded obligated levels
Stimulated secondary trading
Aggregate capacity allocations atEasington and Hatfield Moor Storage exceeded obligated levels
Winter 08/09
Specific Exchange Rates determined in advance (1:1 within zone within limits and up to 19.5:1 out of zone)
All at 1:1 Exchange Rates
Users at four ASEPs obtained additional capacity , two via T&T
Users at eight ASEPs obtained additional capacity, two via T&T
Capacity allocated for each of the five months for which it was available
Capacity allocated for each of the five months for which it was available
One single (2 rounds) auction Auctions held monthly in two stages
All bids satisfied Additional capacity made available atall ASEPs requesting firm capacity
![Page 6: RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.](https://reader036.fdocuments.net/reader036/viewer/2022072014/56649eb45503460f94bbc5de/html5/thumbnails/6.jpg)
6
CONCLUSION
The RMTTSEC has been successful in moving
capacity to where it is valued most
Through undertaking Exchange Rate analysis after
the auction , it has been possible to provide the best
Exchange Rates
The process has worked smoothly and is now fully
embedded into the commercial regime.
It also provides an additional “secondary trading”
mechanism
![Page 7: RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.](https://reader036.fdocuments.net/reader036/viewer/2022072014/56649eb45503460f94bbc5de/html5/thumbnails/7.jpg)
7
Future RMTTSEC Auctions
No changes proposed to Methodology Statement
National Grid required to consult annually on MS
Expected implementation of online system process
17th May 2009
Shortening of process timeline by 5 days
Surrender window opens approx 23 Business days before
month end (currently approx 28 Business days)
RMTTSEC bid window opens approx 15 Business days
before month end (currently approx 20 Business days)
![Page 8: RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.](https://reader036.fdocuments.net/reader036/viewer/2022072014/56649eb45503460f94bbc5de/html5/thumbnails/8.jpg)
8
Results of RMTTSEC can be found
www.nationalgrid.com/uk/Gas/Data/CA/reports/RMSEC.
htm
Any Queries regarding RMTTSEC Auction contact
the Entry Capacity Auctions team:-
- on telephone number 01926 654057
- or email on [email protected]