Features Can be used with monitoring devices for accurate pressure and temperature recording Design encompasses two retrievable mechanisms No addional rig me required for operaon Simple to install and use Enables easy removal Benefits Technical Specificaon Retrievable Swell Right Packer Swellable Packer System for Zonal Isolaon TDK-DS-SR-0218 ©2018 Tendeka. All rights reserved. www.tendeka.com SwellRight retrievable packers provide reliability for maximum performance zonal isolaon. Tendeka’s Retrievable SwellRight Packer has been designed to isolate the wellbore whilst enabling the easy removal of the enre assembly from the wellbore without any milling operaons. The Retrievable packer can be designed to be ulised with monitoring systems as part of Tendeka’s Guardian Zonewatch range. The Swellable Packers isolate the wellbore into mulple zones allowing for independent measurements of pressure and temperature from each zone. These packers come with feed-thru slots to enable cable to be passed through the packer and clamped to the pipe. Tendeka’s standard swellable packer range is available with an oil or water swelling elastomer. This single element design uses a patent pending technology to provide high performance over short element lengths. The design enables the packer to be released by straight pull, releasing the sealing element and enabling the assembly to be pulled out of hole. SwellRight packers are shipped from Tendeka’s manufacturing plants to the well site or customer’s warehouse where they are delivered in ‘ready-to-run’ condion, keeping rig me costs minimal. ZONAL ISOLATION Base Pipe OD Standard Element OD Swellable length Max Pressure Fluid Acvaon Control line capability 2.375” 3.5” 3.875” 4.500’’ - 5.75’’ 1ſt 1-3ſt 1000psi 3000psi Water Water or Oil Yes No

Transcript of Retrievable SwellRight Packer - Tendeka Website...Tendeka’s Retrievable SwellRight Packer has been...

Page 1: Retrievable SwellRight Packer - Tendeka Website...Tendeka’s Retrievable SwellRight Packer has been designed to isolate the wellbore whilst enabling the easy removal of the entire

Features

— Can be used with monitoring devices for accurate pressure and temperature recording

— Design encompasses two retrievable mechanisms

— No additional rig time required for operation— Simple to install and use— Enables easy removal

Benefits

Technical Specification

Retrievable SwellRight PackerSwellable Packer System for Zonal Isolation

TDK-DS-SR-0218©2018 Tendeka. All rights reserved. www.tendeka.com

SwellRight retrievable packers provide reliability for maximum performance zonal isolation.

Tendeka’s Retrievable SwellRight Packer has been designed to isolate the wellbore whilst enabling the easy removal of the entire assembly from the wellbore without any milling operations.

The Retrievable packer can be designed to be utilised with monitoring systems as part of Tendeka’s Guardian Zonewatch range. The Swellable Packers isolate the wellbore into multiple zones allowing for independent measurements of pressure and temperature from each zone. These packers come with feed-thru slots to enable cable to be passed through the packer and clamped to the pipe.

Tendeka’s standard swellable packer range is available with an oil or water swelling elastomer. This single element design uses a patent pending technology to provide high performance over short element lengths.

The design enables the packer to be released by straight pull, releasing the sealing element and enabling the assembly to be pulled out of hole.

SwellRight packers are shipped from Tendeka’s manufacturing plants to the well site or customer’s warehouse where they are delivered in ‘ready-to-run’ condition, keeping rig time costs minimal.

ZONAL ISOLATION

Base Pipe OD

Standard Element OD

Swellable length

Max Pressure

Fluid Activation

Control line capability

2.375” 3.5”

3.875” 4.500’’ - 5.75’’

1ft 1-3ft

1000psi 3000psi

Water Water or Oil