REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

33
Prepared For: U.S. Environmental Protection Agency Region I Emergency Planning and Response Branch 5 Post Office Square, Suite 100 Boston, Massachusetts 02109-3912 CONTRACT NO. 68HE0120D0001 TO/AD NO.: TOFP-01-20-07-0044 TASK NO.: 0044 DC NO.: R-50111 Submitted By: Weston Solutions, Inc. Region I Superfund Technical Assessment and Response Team V 101 Billerica Avenue, Building 5, Suite 103 North Billerica, Massachusetts 01862 October 2020 REMOVAL PROGRAM PRELIMINARY ASSESSMENT/ SITE INVESTIGATION REPORT FOR THE STAMINA MILLS SITE NORTH SMITHFIELD, PROVIDENCE COUNTY, RHODE ISLAND 30 JULY 2020

Transcript of REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

Page 1: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

Prepared For:

U.S. Environmental Protection Agency Region I

Emergency Planning and Response Branch 5 Post Office Square, Suite 100

Boston, Massachusetts 02109-3912

CONTRACT NO. 68HE0120D0001

TO/AD NO.: TOFP-01-20-07-0044

TASK NO.: 0044

DC NO.: R-50111

Submitted By:

Weston Solutions, Inc. Region I

Superfund Technical Assessment and Response Team V 101 Billerica Avenue, Building 5, Suite 103

North Billerica, Massachusetts 01862

October 2020

REMOVAL PROGRAM PRELIMINARY ASSESSMENT/

SITE INVESTIGATION REPORT FOR THE

STAMINA MILLS SITE NORTH SMITHFIELD, PROVIDENCE COUNTY, RHODE ISLAND

30 JULY 2020

Page 2: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

TABLE OF CONTENTS I. Preliminary Assessment/Site Investigation Forms II. Narrative Chronology III. Appendices Appendix A - Figures Appendix B - Tables Appendix C - Photodocumentation Log Appendix D - Analytical Data and Chain-of-Custody Record

Page 3: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

I. Preliminary Assessment/Site Investigation Forms

Page 4: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

1

R:\20070044_Stamina-RS\Reports\Final PASI\0044_Stamina Mill_PA_Form_Final.docx

EPA REGION I REMOVAL PRELIMINARY ASSESSMENT

Site Name and Location Name: Stamina Mills Site Location: School Street Town: North Smithfield County: Providence County State: Rhode Island

Site Status: (X) NPL ( ) NON-NPL ( ) RCRA ( ) TSCA ( ) ACTIVE (X) ABANDONED ( ) OTHER

(X) Attached USGS Map of Location (X) Site I.D. No.: 0148

Latitude: 41° 59' 49.5" North Longitude: 71° 33' 51.6" West

Referral

( ) Citizen ( ) City/Town (X) State ( ) Preremedial ( ) RCRA ( ) Other:

Name of referring party: Rhode Island Department of Environmental Management (RIDEM) Address: 235 Promenade Street

Providence, Rhode Island Telephone: (401) 222-4700

Contacts Identified 1) Terrence D. Gray, PE Telephone: (401) 222-4700 x 2412 2) 3)

Source of Information

( ) Verbal: (X) Report: Emery Environmental Associates. 2019. Limited Asbestos Inspection Report.

Stamina Mill Office Building, 126 School Street, Forestdale, RI. 28 April. Emery Environmental Associates. 2019. Letter to Mr. Thomas J. Kravitz, Town of North Smithfield Planning Dept, Re: TCLP Sample Result, Accessible: Interior / Exterior Building Materials - Stamina Mill Office Building, 126 School Street; Forestdale, RI. 9 May.

( ) Other:

Page 5: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

REMOVAL PRELIMINARY ASSESSMENT

2

R:\20070044_Stamina-RS\Reports\Final PASI\0044_Stamina Mill_PA_Form_Final.docx

Potential Responsible Parties

Owner 1: Town of North Smithfield Telephone: (401) 767-2202 Address: PO Box 248/One Main Street, Slatersville, RI 02876 Operator: Telephone: Address:

Owner 2: Brigg, LLC Telephone: (401) 273-1787 Address: 1445 Wampanoag Trail #203, East Providence, RI 02915 Operator: Telephone: Address:

Site Access

Authorizing Person 1 : Mr. Gary S. Ezovski, PE, Town Administrator

Date: 1 September 2020 (X) Obtained ( ) Verbal Telephone: (401) 767-2202

x301 ( ) Not Obtained (X) Written

Authorizing Person 2: Mr. Patrick T. Conley, Esquire

Date: 1 September 2020 (X) Obtained ( ) Verbal Telephone: (401) 273-1787 ( ) Not Obtained (X) Written

Historical Preservation

(X) Site is Historically Significant or Eligible for Historic Preservation

Contacts Identified 1) State Historical Preservation Officer (SHPO) Name: Mr. J. Paul Loether, SHPO Telephone: (401) 222-4130 2) Tribal Historical Preservation Officer (THPO) Name: Telephone:

Comments:

Physical Site Characterization Background Information: The Stamina Mills Site (the Site) is located on School Street in North Smithfield, Providence County, Rhode Island. The 4.87-acre parcel is located in the Forestdale section of North Smithfield, Rhode Island. The site is identified by the Town of North Smithfield Tax Assessors Office as Parcel 005-033. The Site is bordered to the north by School Street and residential properties; to the east by wooded areas and residential properties; and to the south and west by wooded areas, commercial properties, and the Branch River. A dam immediately south of the Site forms the Forestdale Pond and the Site’s southern boundary. Two raceways passed beneath

Page 6: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

REMOVAL PRELIMINARY ASSESSMENT

3

R:\20070044_Stamina-RS\Reports\Final PASI\0044_Stamina Mill_PA_Form_Final.docx

the former mill buildings before reentering the Branch River downstream of the dam. The southeastern section of the Site includes an area in the 100-year floodplain. According to the EPA Region 1 ARCGIS mapping tool, 178 residents reside within a ¼-mile radius of the site. EJSCREEN, EPA’s Environmental Justice Screening tool, resulted in 0 out of 11 Environmental Justice Indices, exceeding the 80th percentile on a national basis, being met for the 1-radial mile area surrounding the site. Site operations date back to the early 1900s as a textile mill. In 1969, a solvent scouring system that used trichloroethylene (TCE) to remove oil and dirt from newly woven fabric was installed, and subsequently an unknown quantity of TCE was released. In 1975, the mill closed. In 1977, a fire destroyed the manufacturing complex, leaving the site vacant and unused. The mill office building, which was connected to the manufacturing complex via a bridge, was not impacted by the fire and currently remains as the only mill building which still exists at the Site. In 1981, in response to private drinking water well contamination, the Rhode Island Water Resources Board and the Town of North Smithfield installed a public waterline to some of the area residences; and by 1987, all residences impacted by the spill were connected to the public water supply. In 2000, construction of the site’s long-term remediation system was completed. Currently, groundwater treatment continues, while soil treatment was completed in the 2010s. A separate building (not part of the treatment process) containing confirmed asbestos-containing material (ACM) still stands adjacent to School Street, and has been deemed unsafe to enter. This building directly abuts a guardrail on School Street. The building appears to be a one-story wooden building, with a basement level in the rear as the ground slopes downward and away from the street. On 5 April 2019, Emery Environmental Associates conducted a limited asbestos inspection of the on-site building. A total of 20 representative samples of 12 separate suspect building materials were collected for asbestos analysis. In addition, one sample was collected from accessible interior and exterior construction materials (painted wood, plaster, clean wood, field stone, and roofing) for toxicity characteristic leaching procedure (TCLP) lead analysis. Analytical results of the asbestos samples indicated that chrysotile asbestos was detected in three of the 20 samples at up to 90%. Analytical results of the construction material sample indicated 6.0 milligrams per Liter (mg/L) for TCLP lead, which exceeded the current EPA standard of 5.0 mg/L. This indicated that the material must be disposed of as a hazardous material at a facility licensed to accept lead waste. Description of Substances Possibly Present, Known or Alleged: Asbestos-containing material (ACM) and lead.

Existing Analytical Data ( ) Real-Time Monitoring Data: (X) Sampling Data: ACM and building material TCLP lead sampling conducted by Emery

Environmental Associates.

Page 7: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

REMOVAL PRELIMINARY ASSESSMENT

4

R:\20070044_Stamina-RS\Reports\Final PASI\0044_Stamina Mill_PA_Form_Final.docx

Potential Threat

Description of potential hazards to environment and/or population-identify any of the criteria for a Removal Action (from NCP) that may be met by the site under 40 CFR 300.415 [b] [2]. i. Actual or potential exposure to nearby human populations, animals, or the food chain from

hazardous substances, pollutants or contaminants. iv. High levels of hazardous substances or pollutants or contaminants in soils largely at or near

the surface, that may migrate. v. Weather conditions that may cause hazardous substances or pollutants or contaminants to

migrate or be released. vii. The availability of other appropriate federal or state response mechanisms to respond to

the release.

Prior Response Activities ( ) PRP ( ) STATE (X) FEDERAL ( ) OTHER Brief Description: The Site is currently a National Priorities List (NPL) site, and already undergoing pump/treat for groundwater (solvent) contamination under the remedial program.

Priority for Site Investigation

(X) High ( ) Medium Low ( ) None ( ) Comments:

Report Generation

Originator: Eric D. Ackerman Date: 21 October 2020 Affiliation: Weston Solutions, Inc. (START) Telephone: (978) 552-2127

Contract No. 68HE0120D0001 Contract Name: START V AD No.: TOFP-01-20-07-0044 Task No.: 0044

Page 8: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

1 R:\20070044_Stamina-RS\Reports\Final PASI\0044_Stamina Mill_SI Form_Final.docx

EPA REGION I REMOVAL SITE INVESTIGATION

Inspection Information

Site Name: Stamina Mills Address: School Street

Town: North Smithfield County: Providence County State: Rhode Island Date of Inspection: 30 July 2020 Time of Inspection: 0830 hours Weather Conditions: 90° Fahrenheit, Sunny, hot and humid Site Status at Time of Inspection: ( ) ACTIVE (X) INACTIVE Comments: The Site is currently a National Priorities List (NPL) site and undergoing

pump/treat for groundwater (GW) (solvent) contamination under the remedial program. The remaining on-site building, which is the focus of this investigation, contains confirmed asbestos-containing material (ACM), stands adjacent to School Street, and has been deemed unsafe to enter. This building directly abuts a guardrail on School Street.

Agencies/Personnel Performing Inspection

Names Program (X) EPA: Catherine Young U.S. Environmental Protection Agency

(EPA) Region I, Emergency Planning and Response Branch (EPRB), On-Scene Coordinator (OSC)

(X) EPA Contractor: Eric Ackerman Bill Mahany

Weston Solutions, Inc. (WESTON), Superfund Technical Assessment and Response Team V (START)

( ) State: Current Owner Based on Field Interview: Town of Smithfield, Rhode Island.

Physical Site Characteristics

Parameter Quantities/Extent ( ) Cylinders: ( ) Drums: ( ) Lagoons: ( ) Tanks: ( ) Above: ( ) Below: (X) Asbestos: Previous analytical results of building material samples

indicated that chrysotile asbestos was detected at up to 90%.

Page 9: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

REMOVAL SITE INVESTIGATION

2

R:\20070044_Stamina-RS\Reports\Final PASI\0044_Stamina Mill_SI Form_Final.docx

(X) Piles: Piles of building debris are located throughout the interior and exterior of the on-site building.

( ) Stained Soil: ( ) Sheens: ( ) Stressed Vegetation: ( ) Landfill: (X) Population in Vicinity: The site is located in a residential area. ( ) Wells: ( ) Drinking: ( ) Monitoring: ( ) Other:

Physical Site Observations

Comments: An on-site building containing confirmed ACM stands adjacent to School Street,

and has been deemed unsafe to enter. This building directly abuts a guardrail on School Street. The building is a one-story wood-framed building, with a basement level constructed of granite that is accessed at the rear due to significant slope downward and away from the street.

Field Sampling and Analysis

Matrix Field Instrumentation Readings CGI/O2 (%) RAD (µR/hr) PID (ppm) FID (ppm) Other

Background: 0.0/20.9 12-15 0.0 -- -- Air: 0.0/20.9 12-15 0.0 -- -- Soil:

Surface Water: Tanks:

Drums: Vats:

Lagoons: Spillage: Run Off:

Piles: Sediments:

Groundwater: Other:

CGI/O2 (%) = Combustible Gas Indicator/Oxygen (percentage) RAD (µR/hr) = Radiation (microRoentgens per hour) PID = PhotoIonization Detector (parts per million) FID (ppm) = Flame Ionization Detector (parts per million)

Page 10: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

REMOVAL SITE INVESTIGATION

3

R:\20070044_Stamina-RS\Reports\Final PASI\0044_Stamina Mill_SI Form_Final.docx

Field Quality Control Procedures (X) SOP Followed ( ) Deviation from SOP Comments: Sampling was conducted according to the site Sampling and Analysis Plan (SAP), prepared as a separate document, entitled Sampling and Analysis Plan for the Stamina Mill Site, North Smithfield, Providence County, Rhode Island, dated July 2020.

Description of Sampling Conducted On 30 July 2020, START personnel collected eight bulk ACM samples for asbestos analysis. All samples were submitted to EPA Laboratory Services and Applied Sciences Division (LSASD), New England Regional Laboratory (NERL), located in North Chelmsford, Massachusetts, for analysis.

Analyses

Analytical Parameter Media Laboratory ( ) VOC ( ) AIR (X) NERL ( ) PCB ( ) WATER ( ) CLP ( ) PESTICIDE ( ) SOIL ( ) PRIVATE ( ) METALS (X) SOURCE ( ) DAS ( ) CYANIDE ( ) SEDIMENT ( ) SOW ( ) SVOC ( ) SOIL GAS ( ) FIELD ( ) TOXICITY ( ) DIOXIN (X) ASBESTOS ( ) OTHER

Receptors

Comments ( ) Drinking Water: ( ) Private: ( ) Municipal: ( ) Groundwater: (X) Unrestricted Access: Access to the site is restricted by a locked gate on an

access road/driveway approximately 500 feet southwest of the building, and a chain-link fence adjacent to the building. There is no restriction to climbing over the chain-link fence. The building is located directly along School Street.

(X) Population in Proximity: The site is located in a residential area. ( ) Sensitive Ecosystem:

Page 11: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

REMOVAL SITE INVESTIGATION

4

R:\20070044_Stamina-RS\Reports\Final PASI\0044_Stamina Mill_SI Form_Final.docx

(X) Other: The building is in a structurally unsound, dilapidated condition and is unsafe to enter.

Additional Procedures for Site Determination

( ) Biological Evaluation ( ) ATSDR ( ) None To be determined by the On-Scene Coordinator (OSC).

Site Determination Depending on further information, criteria that may be met by the site include 40 CFR 300.415 [b] [2], parts: i. Actual or potential exposure to nearby human populations, animals, or the food chain from

hazardous substances, pollutants or contaminants. iv. High levels of hazardous substances or pollutants or contaminants in soils largely at or near

the surface, that may migrate. v. Weather conditions that may cause hazardous substances or pollutants or contaminants to

migrate or be released. vii. The availability of other appropriate federal or state response mechanisms to respond to

the release.

Report Generation

Originator: Eric D. Ackerman Date: 21 October 2020 Affiliation: Weston Solutions, Inc. (START) Telephone: (978) 552-2127

Contract No. 68HE0120D0001 Contract Name: START V AD No.: TOFP-01-20-07-0044 Task No.: 0044

Page 12: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

II. Narrative Chronology

Page 13: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

5

Narrative Chronology Site Background The Stamina Mills site (the Site) is located on School Street in North Smithfield, Providence County, Rhode Island (see Appendix A, Figure 1) [1]. The 4.87-acre parcel is located in the Forestdale section of North Smithfield, Rhode Island. The Site is identified by the Town of North Smithfield Tax Assessors Office as Parcel 005-033 [2]. The Site is bordered to the north by School Street and residential properties; to the east by wooded areas and residential properties; and to the south and west by wooded areas, commercial properties, and the Branch River. A dam immediately south of the Site forms the Forestdale Pond and the Site’s southern boundary. Two raceways passed beneath the former mill buildings before reentering the Branch River downstream of the dam. The southeastern section of the Site includes an area in the 100-year floodplain. (see Appendix A, Figure 2) [3]. According to the EPA Region 1 ARCGIS mapping tool, 178 residents reside within a ¼-mile radius of the Site. EJSCREEN, EPA’s Environmental Justice Screening tool, resulted in 0 out of 11 Environmental Justice Indices exceeding the 80th percentile, on a national basis, being met for the 1-radial mile area surrounding the Site. Site operations date back to the early 1900s as a textile mill. In 1969, a solvent scouring system that used trichloroethylene (TCE) to remove oil and dirt from newly woven fabric was installed, and subsequently an unknown quantity of TCE was released. In 1975, the mill closed. In 1977, a fire destroyed the manufacturing complex, leaving the Site vacant and unused. The mill office building, which was connected to the manufacturing complex via a bridge, was not impacted by the fire and currently remains as the only mill building which still exists at the Site. In 1981, in response to private drinking water well contamination, the Rhode Island Water Resources Board and the Town of North Smithfield installed a public waterline to some of the area residences; and by 1987, all residences impacted by the spill were connected to the public water supply. In 2000, construction of the Site’s long-term remediation system was completed. Currently, groundwater treatment continues, while soil treatment was completed in the 2010s. A separate building (not part of the treatment process) containing confirmed asbestos-containing material (ACM) still stands adjacent to School Street, and has been deemed unsafe to enter. This building directly abuts a guardrail on School Street. The building appears to be a one-story wooden building, with a basement level in the rear as the ground slopes downward and away from the street [4]. On 5 April 2019, Emery Environmental Associates (Emery) conducted a limited asbestos inspection of the on-site building. A total of 20 representative samples of 12 separate suspect building materials were collected for asbestos analysis. In addition, one sample was collected from accessible interior and exterior construction materials (painted wood, plaster, clean wood, field stone, and roofing) for toxicity characteristic leaching procedure (TCLP) lead analysis. Analytical results of the asbestos samples indicated that chrysotile asbestos was detected in three of the 20 samples at up to 90%. Analytical results of the construction material sample indicated 6.0

Page 14: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

6

milligrams per Liter (mg/L) for TCLP lead, which exceeded the current EPA standard of 5.0 mg/L. This indicated that the material must be disposed of as a hazardous material at a facility licensed to accept lead waste [5, 6]. Sampling Activities On 30 July 2020, EPA On-Scene Coordinator (OSC) Catherine Young and Weston Solutions, Inc. (WESTON) Superfund Technical Assessment and Response Team (START) V members Eric Ackerman and Bill Mahany met at the Site to conduct sampling activities. START member Ackerman conducted a safety and operations meeting but did not sign the Site-specific Health and Safety Plan (HASP) due to WESTON COVID-19 protocols. The Site HASP had been prepared as a separate document, entitled Weston Solutions, Inc., Region I START V Site Health And Safety Plan (HASP) for the Stamina Mills Site, North Smithfield, Rhode Island. START established a support zone and calibrated the air monitoring instruments, including a RAE Systems MultiRAE multi-gas meter and a Ludlum Model 19A gamma radiation meter (MicroR) [7; 8]. Background levels were recorded in the HASP as follows: volatile organic compounds (VOCs) = 0.0 parts per million (ppm); lower explosive limit (LEL) = 0%; oxygen (O2) = 20.9%; carbon monoxide (CO) = 0.0 ppm; and MicroR = 10-15 microRoentgens per hour (μR/hr). No readings above background were noted on the air monitoring instruments. START personnel collected a total of eight bulk/debris samples for asbestos analysis (see Appendix B, Table 1) [9]. All sample locations were recorded using a Global Positioning System (GPS) unit (see Appendix A, Figure 2) and were photodocumented (see Appendix C) [10]. Sampling activities were performed in accordance with the Site Sampling and Analysis Plan (SAP), which has been prepared as a separate document, entitled Sampling and Analysis Plan for the Stamina Mills Site, North Smithfield, Rhode Island. [11]. All samples were delivered and submitted to the EPA Laboratory Services and Applied Sciences Division (LSASD)/New England Regional Laboratory (NERL) for asbestos analysis. Analytical Data Summaries On 5 August 2020, START received the analytical data results from NERL [12]. These data are summarized in Appendix B, Table 2, and are included in Appendix D. Asbestos Samples Eight bulk asbestos samples were collected and delivered to NERL. The samples were analyzed for bulk asbestos using EPA Region 1 SOP EIASOP-INGASBSED2. Analytical results of the bulk asbestos samples indicated that two of the eight samples had at least one asbestos mineral present. Specifically, two of the six asbestos minerals were detected above the laboratory reporting limit (RL), including the following [maximum concentration, in percent (%), and sample number in parentheses]: amosite (5% in ACM-08) and chrysotile (60% in ACM-05). Actinolite, anthophylite, crocidolite, and tremolite were not detected above the laboratory RLs in any of the samples submitted for bulk asbestos analysis (see Appendix D, Analytical Data and Chain-of-Custody Records).

Page 15: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

7

REFERENCES [1] US. Geological Survey. 2018. 7.5-minute topographic map, Georgiaville, Rhode Island. [2] Town of North Smithfield, Rhode Island. 2020. Property Record Card, 0 School St, Parcel

ID: 005-033. Internet Accessed on 28 July. [3] Esri, i-cubed, USDA FSA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGP. 2020.

ArcGIS.com World Imagery Map. July. [4] US EPA. 2020. Stamina Mills Superfund Site Background Information. Available from

www.epa.gov/superfund/stamina/background. Internet Accessed 11 August 2020. [5] Emery Environmental Associates. 2019. Limited Asbestos Inspection Report. Stamina

Mill Office Building, 126 School Street, Forestdale, RI. 28 April. [6] Emery Environmental Associates. 2019. Letter to Mr. Thomas J. Kravitz, Town of North

Smithfield Planning Dept, Re: TCLP Sample Result, Accessible: Interior / Exterior Building Materials - Stamina Mill Office Building, 126 School Street; Forestdale, RI. 9 May.

[7] Weston Solutions, July 2020. Standard Operating Procedure for the PID-MultiRAE Model PGM-50; SOP No. WSI/S5-018, Superfund Technical Assessment and Response Team (START), Billerica, Massachusetts.

[8] Weston Solutions, Inc. July 2020. Standard Operating Procedure for Ludlum Model 19 Micro R Meter, SOP No. WSI/S5-022, Superfund Technical Assessment and Response Team (START), Billerica, Massachusetts.

[9] Weston Solutions, Inc. July 2020. Standard Operating Procedure for Bulk Asbestos Sampling, SOP No. WSI/S5-019, Superfund Technical Assessment and Response Team (START), Billerica, Massachusetts.

[10] Weston Solutions, Inc. July 2020. Standard Operating Procedure for TrimbleTM Global Positioning System (GPS), SOP No. WSI/S5-020, Superfund Technical Assessment and Response Team (START), Billerica, Massachusetts.

[11] Weston Solutions, Inc. 2020. Sampling and Analysis Plan for the Stamina Mills Site, North Smithfield, Providence County, Rhode Island. Document Control No. R-50020. July.

[12] U.S. Environmental Protection Agency. 4 August 2020. Laboratory Services and Applied Sciences Division (LSASD). Laboratory Report. Project No. 20070057. Stamina Mills - North Smithfield, RI. Bulk Asbestos Analysis by PLM.

Page 16: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

III. Appendices

Page 17: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

Appendix A

Figures

Figure 1 - Site Location Map Figure 2 - Site Diagram and Sample Location Map

Page 18: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

SITE

Copyright:© 2013 National Geographic Society, i-cubed

Figure 1

TOFP-01-20-07-0044B. Mahany24 July 2020B. Mahany24 July 2020

Stamina MillsSchool Street

North Smithfield, Rhode Island

Site Location Map

EPA Region I Superfund Technical Assessment and

Response Team (START) VContract No. 68HE0120D0001

Topos: MicroPath/USGS/USA Topo MapsQuadrangle Name(s): GeorgiavilleAll other data: START

Data Sources:

0 10.5Miles

0 10.5Kilometers

E:\RI_GIS\Stamina Mills\MXD\0044_Figure1.mxd

AD Number:Created by:Created on:Modified by:Modified on:

Page 19: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

School Street

Former Mill Location

ACM-01

ACM-08

ACM-05

ACM-04ACM-03

ACM-07

ACM-06

ACM-02

Figure 2

0 5025Feet

0 5025Feet

Imagery: ESRI, i-cubed, USDA FSA, USGSAEX, GeoEye, Getmapping, Aerogrid, IGPTopos: USA TopoMapsAll other data: START

Stamina MillsSchool Street

North Smithfield, Rhode Island

Site Diagram andSample Location Map

Data Sources:

EPA Region I Superfund Technical Assessment and

Response Team (START) VContract No. 68HE0120D0001

E:\RI_gis\Stamina Mills\MXD\0044_Figure2.mxd

LEGENDSample LocationApproximate Site Boundary

TOFP-01-20-07-0044B. Mahany23 July 2020B. Mahany31 July 2020

AD Number:Created by:Created on:Modified by:Modified on:

Page 20: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

Appendix B

Tables

Table 1 - Sample Descriptions Table 2 - Summary of Bulk Asbestos Sample Results

Page 21: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

TABLE 1

SAMPLE DESCRIPTIONSSTAMINA MILLS SITE

NORTH SMITHFIELD, RHODE ISLAND

R:\20070044_Stamina-RS\Reports\Final PASI\0044_Stamina Mills_Table 1_Final.xlsx Page 1 of 1

ACM-01 S50044RI-0001 N/A 7/28/2020 Grab Roofing material collected from the front of the building. None.

ACM-02 S50044RI-0002 N/A 7/28/2020 Grab Flooring material collected from within the building footprint on the front of the building. None.

ACM-03 S50044RI-0003 N/A 7/28/2020 Grab Friable plaster lathe material from the basement window area. None.

ACM-04 S50044RI-0004 N/A 7/28/2020 Grab Roofing shingle material collected from the ground surface in the southern exterior of the site building. None.

ACM-05 S50044RI-0005 N/A 7/28/2020 Grab Pipe wrap collected from pipe wrap on the ground surface along the eastern side of the site building. None.

ACM-06 S50044RI-0006 N/A 7/28/2020 Grab Pipe wrap sample collected from electrical conduit on the western side of the building. None.

ACM-07 S50044RI-0007 N/A 7/28/2020 Grab Roofing material collected from the drainage swale along the southwestern portions of the site building. None.

ACM-08 S50044RI-0008 N/A 7/28/2020 Grab Pipe wrap material collected from pipe protruding from the eastern side of the site building. None.

NOTESN/A = Not Applicable

CommentsSample Location Sample Number Sample

DepthCollection

DateSample

Type Sample Description

Page 22: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

TABLE 2

SUMMARY OF BULK ASBESTOS SAMPLE RESULTSSTAMINA MILLS SITE

NORTH SMITHFIELD, RHODE ISLAND% Volume

R:\20070044_Stamina-RS\Reports\Final PASI\0044_Stamina Mills_Table 2_Final.xlsx 1 of 1

SAMPLE LOCATION ACM-01 ACM-02 ACM-03 ACM-04 ACM-05 ACM-06 ACM-07 ACM-08SAMPLE NUMBER S50044RI-0001 S50044RI-0002 S50044RI-0003 S50044RI-0004 S50044RI-0005 S50044RI-0006 S50044RI-0007 S50044RI-0008

LABORATORY NUMBER AB87312 AB87313 AB87314 AB87315 AB87316 AB87317 AB87318 AB87319DATE SAMPLED 7/30/2020 7/30/2020 7/30/2020 7/30/2020 7/30/2020 7/30/2020 7/30/2020 7/30/2020

COMPOUNDActinolite ND ND ND ND ND ND ND NDAmosite ND ND ND ND ND ND ND 5Anthophylite ND ND ND ND ND ND ND NDChrysotile ND ND ND ND 60 ND ND NDCrocidolite ND ND ND ND ND ND ND NDTremolite ND ND ND ND ND ND ND ND

NOTES:

%

1) Samples were analyzed by U.S. EPA Office of Environmental Measurement and Evaluation (OEME) New England Regional Laboratory (NERL) via Polarized Light Microscopy (PLM).2) All quantities are estimated volume percent. 3) ND = Not Detected4) % = Percent

Page 23: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

Appendix C

Photodocumentation Log

Page 24: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

PHOTODOCUMENTATION LOG Stamina Mills ● North Smithfield, Rhode Island

AD No. TOFP-01-20-07-0044 Page 1 of 3 TASK No. 0044

SCENE: View of the front of the building along School Street. Photograph taken facing south. DATE: 30 July 2020 TIME: 1024 hours PHOTOGRAPHER: B. Mahany CAMERA: Apple iPhone 8

SCENE: View of the rear area and foundation of the building. Photograph taken facing northeast.

DATE: 30 July 2020 TIME: 0956 hours PHOTOGRAPHER: B. Mahany CAMERA: Apple iPhone 8

Page 25: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

PHOTODOCUMENTATION LOG Stamina Mills ● North Smithfield, Rhode Island

AD No. TOFP-01-20-07-0044 Page 2 of 3 TASK No. 0044

SCENE: View of sample location ACM-05 on the east side of the building. Photograph taken facing northeast.

DATE: 30 July 2020 TIME: 0933 hours PHOTOGRAPHER: B. Mahany CAMERA: Apple iPhone 8

SCENE: View of sample location ACM-08 on the east side of the building. Photograph taken facing northeast.

DATE: 30 July 2020 TIME: 1006 hours PHOTOGRAPHER: B. Mahany CAMERA: Apple iPhone 8

Page 26: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

PHOTODOCUMENTATION LOG Stamina Mills ● North Smithfield, Rhode Island

AD No. TOFP-01-20-07-0044 Page 3 of 3 TASK No. 0044

SCENE: View of the southern sloped area behind the building. Note typical site debris in the lower left foreground. Photograph taken facing northeast. DATE: 30 July 2020 TIME: 0956 hours PHOTOGRAPHER: B. Mahany CAMERA: Apple iPhone 8

Page 27: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

Appendix D

Analytical Data and Chain-of-Custody Records

Page 28: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

Page 1 of 6

DANIEL BOUDREAU

Digitally signed by DANIEL BOUDREAU Date: 2020.08.04 15:26:05 -04'00'

Page 29: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

Page 2 of 6

Page 30: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

Page 3 of 6

Page 31: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

Page 4 of 6

Page 32: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

Page 5 of 6

Page 33: REMOVAL PROGRAM PRELIMINARY ASSESSMENT/SITE …

20070057 $ASBES

Page 6 of 6