Rapid KL Transport System

38
SUSTINABILITY OF RAPID KL SYSTEM (RAPIDKL) KKKA6354 TRANSPORT ECONOMY PRESENTED BY : YOUSEF HASANAIN

Transcript of Rapid KL Transport System

Page 1: Rapid KL Transport System

 SUSTINABILITY OF RAPID KL SYSTEM (RAPIDKL)

KKKA6354TRANSPORT ECONOMY

PRESENTED BY : YOUSEF HASANAIN

Page 2: Rapid KL Transport System

CONTENT Introduction Transit Rail Kelana Jaya Line Ampang Line Monorail System Future of rail system Buses Conclusion

Page 3: Rapid KL Transport System

INTRODUCTION

RapidKL, is a government – owned company which was formed in 2004.

It operates an integrated public transport system comprising Bus, Monorail and LRT services. 

The largest stage bus route and the feeder bus service in Kuala Lumpur .

Single line of the KL Monorail as a part of transit route inside the capital city.

Page 4: Rapid KL Transport System

IMPLEMENTATION

RapidKL’s integrated transportation network which transports …. APPROXIMATE

LY 4.8 MILLION EVRY

WEEKWith 1092 buses

60 rail station

Page 5: Rapid KL Transport System

TRANSPORT IMPACTS ON SUSTAINABILITYEconomic Social Environmental

Traffic congestion Inequity of impacts Air and water pollution

Accident damages Human health impacts

Habitat loss

Mobility barriers Community interaction

Hydrologic impacts

Facility costs Community livability Depletion of non-renewable resources.

Page 6: Rapid KL Transport System

TRANSIT RAPID KL

RapidKL’s rail system currently comprises of 3 lines.

First line •Kelana Jaya Line

Second line •Ampang Line

Third line •Monorail System

Page 7: Rapid KL Transport System

RAIL ROUTES

Page 8: Rapid KL Transport System

INCREASING COACHES

2010 2011 2020140,000145,000150,000155,000160,000165,000170,000175,000180,000185,000

Daily Passenger Capacity

No. of passengers

Page 9: Rapid KL Transport System

KELANA JAYA LINE Was officially changed

from Putra line to Kelana Jaya Line in July 2005.

The line is currently owned by(SPNB) and operated by rapid kl.

With 24 stations and a route distance of 29 km

Page 10: Rapid KL Transport System

ATTRIBUTES The system consists of centralized control centre, fully

automated driverless trains, minimum 90-second headway.

Can accommodate 400 passengers per 2-car train with the average speed of 40 kph.

There are thirty five (35) 2-car trains and ten (10) 4-car trains with an average ridership of 165,000 per day.

 Maintenance is carried out from 1.00am until 4.30am.

Page 11: Rapid KL Transport System

CONT. ATTRIBUTES Line lies in its five (5) underground stations with the distance of 4.36km

twin independent bore.

There are two (2) tunnels with an internal diameter of 4.88m and the distance between two tunnels is 5m.

There are a lot of safety features in this system such as CCTV, Stop Button, Evacuation shaft, Zones, Fire Protection system, covered power rail, etc.

 the work of the extended line commenced by final quarter of 2010 and is targeted to be completed by 2013.

Page 12: Rapid KL Transport System

OPERATING HOURS

Increasing operating hours for the crowded populated area among other areas to fetch up more travelers.

Page 13: Rapid KL Transport System

TRAIN FREQUENCY

System is provided extra coaches in the stations during peak hours.

Page 14: Rapid KL Transport System

FARES

Fares has been settled on the stations according the distance travel.

The Kelana Jaya Line has a minimum fare of RM 0.70 and the maximum fare of RM 2.50.

Page 15: Rapid KL Transport System

AMPANG LINE Was known as STAR line

formerly.

Line consists of double track route with a total length of 27 km.

Transit includes 25 stations.

Page 16: Rapid KL Transport System

ATTRIBUTES There is a Control Centre for the whole Ampang

Line situated at Ampang Station.

All train operations are under SCADA systems.

There is also a Fixed Block Automatic Signaling System for vehicle movement.

Page 17: Rapid KL Transport System

CONT. ATTRIBUTES The operating hours are from 6.00am until

midnight whilst maintenance is carried out from 1.00am until 4.30am.

There are twenty five (25) trains rolling on the track, each consisting of 6 cars.

 the average ridership is only 130,000 per day.

Page 18: Rapid KL Transport System

OPERATING HOURS

Masjid Jamik as populated area is provided with extra time to allow sufficient users to travel.

Page 19: Rapid KL Transport System

TRAIN FREQUENCY

Peak hours in the morning and the evening is supported with extra trains to make the travel easier for the passengers.

Page 20: Rapid KL Transport System

FARES

The fare for Ampang Line has a minimum of RM 0.70 and a maximum of RM 2.80, which is RM 0.30 more than the Kelana Jaya Line.

Page 21: Rapid KL Transport System

DEPOT OF RAPID KL RAIL SYSTEM The service depot and primary train

depot is at Ampang. There is a secondary train depot at Sri Petaling.

Page 22: Rapid KL Transport System

KL MONORAIL

The KL Monorail, completed at a cost of RM 1.2 billion, is owned by Syarikat Prasarana Negara.

There are 11 monorail stations in the 8.6 km Kuala Lumpur Monorail route with two parallel elevated tracks.

Page 23: Rapid KL Transport System

ATTRIBUTES

It has twelve (12) 2-car trains running on a 8.6km track with 11 stations in total.

The average daily ridership is 57,000 in 2009 and approximately 65,000 in 2011.

The Kuala Lumpur Monorail Line system consists of a single dual-way line that linked the inner areas of Kuala Lumpur.

Page 24: Rapid KL Transport System

TRAIN FREQUENCY

Page 25: Rapid KL Transport System

OPERATING HOURS

First Train 6:00 a.m.

Last Train11:30 (from KL Sentral towards Titiwangsa)11:50 (from Titiwangsa to KL Sentral)

Page 26: Rapid KL Transport System

FARES

Fares cost is between 1.2 and 2.5 RM.

Page 27: Rapid KL Transport System

FUTURE WORK EXTENTION The overall route of new line starting from Sri

Petaling and Kelana Jaya, both converging at Putra Heights.

There is also a proposed new line from Sg Buloh

to Kajang across the Central Business District (CBD) of Kuala Lumpur which is envisaged to be completed by 2020.

Page 28: Rapid KL Transport System

RAPID KL BUSES

Page 29: Rapid KL Transport System

RAPID KL BUSES  Is the largest bus operator in the

Klang Valley.

RapidKL buses services 6 key areas of the Klang Valley with a total of 165 routes.

It provides 5 types of bus services to the commuter, namely Tempatan , Utama, Bandar and Ekspres.

Page 30: Rapid KL Transport System

ATTRIBUTES The Bus service covers 6 major areas in Klang Valley

serving an average of 280,000 passengers daily.

The fleet consists of 1091 buses maintained by 10 bus depots and the network covers more than 980 residential areas compared to the 638 before..

The 15 buses will be operated for Melaka area in a few months according MOU which signed in 4th March 2012, as an interim measure to the demand.

Page 31: Rapid KL Transport System

CONT. ATTRIBUTES More buses added to the fleet and operation times have been

increased to a whopping 18.5 hours (5.30am to 12 midnight).

At 31 December 2011, up to 4.04 million more passengers used the RapidKL bus service in comparison to the preceding year.

The new Pudu Sentral( buduraya ) reopened to the public in April 2011 and now offers modern world-class facilities.

Page 32: Rapid KL Transport System

BUSES AREAS

Page 33: Rapid KL Transport System

OPERATING HOURS

OPERATING HOUR PEAK AND OFF PEAK PERIOD WEEKDAYS SATURDAY

SUNDAY & PUBLIC HOLIDAY

First Bus 5.30 am 5.30 am 5.30 am

First Bus Peak 6.30 am 7.00 am 7.30 am

Last Bus 12.00 pm 11.30 pm 12.00 pm

Buses working 18.5 hours per day and buses frequented approximately every 15 minutes .

Page 34: Rapid KL Transport System

FARESFares range between 0.5 and 3.8 according to travel distance.

Page 35: Rapid KL Transport System

FEATURES OF RAPID KL BUSES Grandma’ or ‘Mother-and-Child’ seats above the front wheel arches.

 Gradual floor incline.

Leaf doors at the rear entrance.

 Bright yellow ‘No standing area’ demarcation at doorways and steps.

Special stop button and announcement for wheelchair users.

Emergency windows with hammers.

Monitoring routes by GPS system.

Page 36: Rapid KL Transport System

DEPOT OF RAPID KL RAIL SYSTEM

Page 37: Rapid KL Transport System

CONCLUSION

Rapid kl corporate has applying an effective plan to sustain the system .

System has sufficient facilities providing for the trains and buses to ease the traveling for the passengers .

Page 38: Rapid KL Transport System

THANK YOU