Personal rapid transport (or transit) = ”automatbane(?)”
-
Upload
steven-doyle -
Category
Documents
-
view
222 -
download
1
Transcript of Personal rapid transport (or transit) = ”automatbane(?)”
Personal rapid transport (or transit) = ”automatbane(?)”
2
Førerløs offentlig transport
(Personal rapid Transit = PRT)• Ikke lenger mange mennesker i få bokser ...
• ... men få mennesker i mange bokser =>
• Tett nettverk av linjer, kort vei å gå
• Ingen eller lite venting
• Ingen stopp mellom avgangssted og
reisemål
• Privatliv
• PRT kan se slik ut:
SkyTranSkyTran
Unimodal SystemsUnimodal Systems
Irvine, CAIrvine, CA
www.unimodal.com www.unimodal.com
805-374-8454805-374-8454
What is Personal Rapid Transit?What is Personal Rapid Transit?
Small Automated Personal VehiclesSmall Automated Personal Vehicles
Elevated GuidewaysElevated Guideways
On-Demand Access at Off-Line StationsOn-Demand Access at Off-Line Stations
Non-Stop, Point-to-Point ServiceNon-Stop, Point-to-Point Service
Riders Have to Change Riders Have to Change Modes, Wait For Modes, Wait For
Departures and Stop At Departures and Stop At EVERY Stop on the RouteEVERY Stop on the Route
Fixes Fundamental Problem of Rail & BusesFixes Fundamental Problem of Rail & Buses
HomeHome
WorkWork
PRT ArchitecturePRT Architecture
Network of Non-Stop Guideways Network of Non-Stop Guideways Accessed by On-Ramps & Off-RampsAccessed by On-Ramps & Off-Ramps
Same Design as Interstate HighwaysSame Design as Interstate Highways
Like Interstate Highways you ride non-stop in Like Interstate Highways you ride non-stop in a personal vehicle traveling on a guideway a personal vehicle traveling on a guideway
“lane”anywhere in the network.“lane”anywhere in the network.
PRT ArchitecturePRT Architecture
United States First Generation PRTUnited States First Generation PRT
Operated by West Virginia University for over 30 years and to this day is primary mode of Operated by West Virginia University for over 30 years and to this day is primary mode of service for students, faculty and staff. service for students, faculty and staff.
8.7 mile system8.7 mile system
Over 63 million passengers since 1972. Handles 15,000 people per day with a peak of 30,000.Over 63 million passengers since 1972. Handles 15,000 people per day with a peak of 30,000.
Unblemished safety record. No serious accidents.Unblemished safety record. No serious accidents.
Availability rate above 98.5%.Availability rate above 98.5%.
Morgantown, West VirginiaMorgantown, West Virginia
Second Generation PRTSecond Generation PRT
Low Speed Low Speed Up to 30 mphUp to 30 mph
Small ScaleSmall Scale Local Circulators Only Local Circulators Only
High Maintenance High Maintenance Uses wheelsUses wheels
Over 1000 lbs. Over 1000 lbs. Uses larger vehiclesUses larger vehicles
Second Generation PRT Close-UpSecond Generation PRT Close-Up
Heathrow Airport, U.K. Deployment Heathrow Airport, U.K. Deployment Operational in 2008Operational in 2008
ULTRA SystemULTRA System
Next Generation PRTNext Generation PRT
High Speed High Speed Up to 150 mphUp to 150 mph
Scalable Networks Scalable Networks Local, Regional, National Local, Regional, National ServiceService
Low Maintenance Low Maintenance Uses maglev instead of Uses maglev instead of wheelswheels
Under 1000 lbs. Under 1000 lbs. Uses aerodynamic vehiclesUses aerodynamic vehicles
Energy Efficient Energy Efficient Up to 500 mpgUp to 500 mpg
Zero CarbonZero Carbon Solar PoweredSolar Powered
SkyTran Off-Line PortalSkyTran Off-Line Portal
EXITEXITOFF-RAMP OFF-RAMP
SWITCHSWITCH
BOARDBOARDON-RAMP ON-RAMP SWITCHSWITCH
NON-STOP GUIDEWAYNON-STOP GUIDEWAY
Solar Arrays (Top of Guideway)
Size MattersSize Matters
Why Does SkyTran Carry Only Two People?Why Does SkyTran Carry Only Two People?
Average Number of Auto Passengers = 1.2Average Number of Auto Passengers = 1.2
SkyTran Is Designed For Rule Not the ExceptionSkyTran Is Designed For Rule Not the Exception
Larger Vehicles Used For Infrequent Larger Capacities Larger Vehicles Used For Infrequent Larger Capacities Increase Overall System Size, Weight & CostIncrease Overall System Size, Weight & Cost
Metro linesMetro lines
Heavy concrete work, costly, difficult Heavy concrete work, costly, difficult to install, and visually obtrusiveto install, and visually obtrusive
SkyTranSkyTran Lightweight, low cost, quick to Lightweight, low cost, quick to install, and visually unobtrusiveinstall, and visually unobtrusive
Size MattersSize Matters
TransrapidTransrapid
SkyTran PRTSkyTran PRT
> $150 Million Per Mile> $150 Million Per Mile
$15 Million Per Mile$15 Million Per Mile
Size MattersSize Matters
Passive MagLev Provides A Compact Suspension Passive MagLev Provides A Compact Suspension
for Linear Synchronous Motors (LSM) for Linear Synchronous Motors (LSM) Propulsion.Propulsion.
Small MagLev & LSM Combo Provides Extreme Energy Efficiency Small MagLev & LSM Combo Provides Extreme Energy Efficiency
Up to 500 MPG EquivalentUp to 500 MPG Equivalent
Only one moving part…Only one moving part…Virtually No MaintenanceVirtually No Maintenance
Solar Powered SkyTranSolar Powered SkyTran
SkyTran is the only surface SkyTran is the only surface transportation technology that transportation technology that can be powered 100% by solar can be powered 100% by solar
photovoltaicsphotovoltaics
Using The SystemUsing The System
Easy Access Getting In and Out of the VehicleEasy Access Getting In and Out of the Vehicle
Small Small Personalized Personalized
VehiclesVehicles
LightweightLightweightGuidewaysGuideways
InexpensiveInexpensivePortalsPortals
Standard Utility Pole Standard Utility Pole SupportsSupports
Low Cost, Mass Produced Modular ComponentsLow Cost, Mass Produced Modular Components
Apply Henry Ford’s 100 Year Old Principles of Mass ProductionApply Henry Ford’s 100 Year Old Principles of Mass Production
Nonstop Nonstop GuidewayGuideway
Boarding Boarding portalportal
Minimum visual impact compared to an equivalent Minimum visual impact compared to an equivalent capacity three lane highway or a lower capacity light railcapacity three lane highway or a lower capacity light rail
No expensive, destructive right-of-way acquisitions No expensive, destructive right-of-way acquisitions required, just easements on existing sidewalksrequired, just easements on existing sidewalks
Parked vehicles Parked vehicles waiting for youwaiting for you
SkyTran Disappears into the CityscapeSkyTran Disappears into the Cityscape
Scale Comparison of Visual PollutionScale Comparison of Visual Pollution
ETC Monorail Intermediate Monorail
Uni-Modal
Elevated LightRail
Taxi 2000(SkyWeb Express) Micro Rail ULTra SkyTranSkyTran
Scale Comparison of Visual PollutionScale Comparison of Visual Pollution
SkyTranSkyTran
SkyTranSkyTran
”Kostnadsanslag”
“For early phase systems the cost is $US 6 million per unidirectional Km and $US 9 million for a bi-directional Km. In later phase systems, when the manufacturing processes are mature and the economy of scales are maximized probably in the realm of $US 3.5 million per unidirectional Km and $US 5 million for a bi-directional Km. These figures exclude survey, regulatory approvals, utility relocation, specific site related expenses, etc. They include vehicles and portals. Early phase vehicles probably will cost us about $15-20,000 each. We hope we can cut this down to $5,000 in mass production.”