Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company...

16
QUALITY & INNOVATION COMPANY PROFILE PUT TOGETHER Australian Piling Technology

Transcript of Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company...

Page 1: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

Quality & innovation

CoMPany PRoFilE

Put together

Australian Piling Technology

Page 2: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

Welcome to AustrAliAn Piling technology llc, sPeciAlist Piling

contrActor

Page 3: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

introductionaustralian Piling technology l.l.C. is one of the leading and fast-growing Specialist Sub-Contractor in the field of Piling/ Foundation technology. the Company started and established its operations last april of 2005, in abu Dhabi, united arab Emirates. aPt is an ISO Certified Company for ISO 9001:2008, ISO 14001:2004and BS OHSAS 18001:2007 standards, by LMS Certification Pvt. And now, the organization has expanded branches to Dubai, al ain and abu Dhabi, uaE.

Page 4: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

our missionour big aim to be the most preferred Piling Contractor in the Construction Industry by providing services that conforms to different Code Construction Authority and Clients specification while strictly adhering to safety guidelines.

our oBJectiVes

To provide the client an economical and high-quality foundation design that meets the requirements and principles on various Codes of Practice.

To make significant contributions to nation building through works in the field of infrastructure developments.

Page 5: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

our core VAluesThese core values are part of every decision we make which drives our business. Our devotion to each of these core values will definitely build our customer’s trust, confidence, loyalty, and continuous patronage.

Safe and environment friendly operations.

Mutual respect and harmonious relationship among our employees.

Perpetual improvement for all leaders and employee.

Mutually beneficial relationships with our customers and business partners.

open communication lines with our customers, employees and other Business Plan.

Ethical business conduct that complies with all statutory and legal requirements.

Good Corporate and Social Responsibility

Page 6: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

our ActiVitiesTo provide a solutions to Piling Foundation problems. Combining competitive pricing with our design experience and comprehensive range of Piling Foundation techniques, we offer Design and Construction of all types of pile foundations, Shoring System / Retaining Wall (H-Beams, Secant Piles, Contiguous Piles) and Marine Piling service to our valued customers.

We pride ourselves on the efficient delivery of every stage of the project from design to completion, on time and within budget.

hAVe glAnce on our ProJects

And giVes us honor to serVe

you At our Best.

Page 7: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

Piling WorksContinuous Flight Auger (Cfa Method)

temporary Casing MethodBentonite Slurry Method

shoring WorksShoring H-Beam

Secant PilesSheet Piles

Contiguous Piles

micropilesAnchor Works

dewatering excavation

Pile head Breakdownsurveying Works

Page 8: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

We offer design And construction

of All tyPes of Pile foundAtions, shoring

system / retAining WAll (h-BeAms, secAnt

Piles, contiguous Piles) And mArine

Piling serVice to our VAlued customers.

Page 9: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

continuous flight Auger (cfA) method for Piling

Equipment And Working PlatformSetting out of PilesLateral Support Of Drilled Hole SidePile ExcavationConcretingDisposal Of Excavated MaterialsPlacing of Steel Reinforcement Cages

secAnt WAll method of Piling

Construction of Guide Wallinstallation of CasingAuger Drilling of Primary BoreholeConcreting of Primary BoreholeAuger Drilling of Secondary Boreholeinstallation of Steel CageConcreting of Secondary BoreholeRepetition of the Process

temPorAry cAsing method of Piling

Setting out of Pile lay-outPositioning EquipmentsDriving Temporary CasingBoringReinforcement Cage Preparation & installationConcretingExtracting Temporary Casing

sheet Pile instAllAtion method

Sheet Pile DrivingPlacing And DrivingCutting off and SplicingInspection Of Driven Piling

diAPhrAgm WAlls

A narrow trench excavated areasDeep basementsused in congested areasClose to existing structures

rotAry method (With Bentonite) for Piling

Surveying and Setting Outinstallation of temporary CasingDrilling with BentoniteFabrication and installation of Steel CageConcretingExtraction of Temporary Casing

loAd testing Procedure

Testing EquipmentsPile Selectiontime of testingapplication of test loadZero To Working LoadWorking Load To ZeroZero to test loadtest load to ZeroGraphsFailure of load test

our serVices

Page 10: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

ProJect:Emirati Residential 2000 villas(Ain Al Fayda – Al Ain City)

mAin contrActor:trojan General Contracting Co. l.l.C.

client:abu Dhabi urban Planning Council

consultAnt:Pace

totAl contrAct Price:AED 52,144,100

scoPe of Work:installation of Piles using Continues Flight Auger (CFA) Method of execution for 31,225 No. of Piles.

ProJect:Construction works of 1,017 Residential Villas, West Yas Development on Yas island, abu Dhabi, uaE

mAin contrActor:arabtec Construction l.l.C.

client:al Dar Properties PJSC

consultAnt:Jla international Engineer l.l.C.

totAl contrAct Price:AED 38,438,100

scoPe of Work:installation of Piles using Continues Flight Auger (CFA) Method of execution.

ourProJects

Page 11: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

ProJect:Kifaf Development Phase-1Plot 324-117, Sheikh Zayed Road, Dubai

mAin contrActor:australian Piling technology l.l.C.

client:Wasl Development

consultAnt:ARCHGROUP Planners Engineers Project Managers

totAl contrAct Price:aED 26,200,000

scoPe of Work:Enabling Works for Piling, Shoring and Earth Works

ProJect:Al Mafraq Shopping Mall – Al Mafraq Square Development in Abu Dhabi

mAin contrActor:australian Piling technology l.l.C.

client:Al Tawasoul Properties Investment

ProJect mAnAgement:Hill International

consultAnt:Mimar abu Dhabi Engineering Consultancy

totAl contrAct Price:AED 15,800,000

scoPe of Work:Enabling Works for Piling, Shoring and Earth Works

Page 12: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

ProJect:Watani Residential Development – Khalifa City a, abu Dhabi

mAin contrActor:Construction General Contracting House

client:Sorouh Real Estate PJSC

consultAnt:ESP Middle East / Ewan Consultants

totAl contrAct Price:AED 15,263,000

scoPe of Work:Cast in situ Bored Piles Using Temporary Casing Method of execution

ProJect:Proposed Paper Machine Project (Phase 1 & 2), ICAD III

mAin contrActor:Associated Const. and Investment Co. ascon l.l.C.

client:al Dhafra Paper Manufacturing Company

consultAnt:Capital Engineering Consultancy

totAl contrAct Price:AED 8,839,800

scoPe of Work:Cast in situ Bored Piles Using Temporary Casing Method of execution

ourProJects

Page 13: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

ProJect:R1047 Garhoud Four Star Hotel, Dubai

mAin contrActor:australian Piling technology l.l.C.

client:Al Wasl Development

consultAnt:Dewan architects

totAl contrAct Price:AED 4,705,560

scoPe of Work:Enabling Works for Piling, Shoring and Earth Works

ProJect:3B+G+ 9 Typical Floors Residential Building, Al Raha Beach

mAin contrActor:teejan trading & Contracting

client:Mr. Mohamed thaaloob al Derei

consultAnt:HERBERGER Engineers

totAl contrAct Price:AED 4,087,000

scoPe of Work:Piling and Shoring Works using Temporary Casing Method of execution

Page 14: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

commerciAl license &iso certificAtes

Page 15: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary
Page 16: Quality & innovation Put together - Australian Pilingaustralianpiling.com/documents/APT Company Profile.pdf · Setting out of Pile lay-out Positioning Equipments Driving Temporary

Abu Dhabi (Head Office):Plot 28/1 at Sector M-32Mussafah industrial areaP.O. Box 48181, Abu Dhabi, UAE.Tel (02) 550 4222, Fax (02) 550 4221Email: [email protected]

www.australianpiling.com

dubai:Office 905, Damac Business Toweral ittihad StreetP.O. Box 80714, Dubai, UAE.Tel (04) 429 3638, Fax (04) 427 4098Email: [email protected]

Al Ain:Plot 11, Industrial AreaOffice 14, P.O. Box 48181al ain, uaE.Tel (02) 550 4222Fax (02) 5504221