PROSPECTING STRIPPING TRENCHING RPT · Please refer to the pit maps attached to the pit cost...
Transcript of PROSPECTING STRIPPING TRENCHING RPT · Please refer to the pit maps attached to the pit cost...
Nov 17 06 11:49a Mabel Gionet 1-807-826-1110 11'.2
1.8851 'l
Fairies Lake Property Wark Assessment Report
RECEIVED NOV 1 7 Z006
GEOSCIENCE ASSESSMENT OFFICE
Gilles Gionet Claim#1214873, G-2857
Thunder Bay Division November 10, 2006
Report prepared by Michael Gionet
------ ---------------------NOV 17 2006 11:44 1 807 826 1110 PAGE. 02
Nov 17 06 11:50a Mabel Gionet 1-807-826-1110
Summary
The Fairies Lake property is located approximately 24 kilometres east of the town
of Manitouwadge. It is accessible by industrial road Camp 70, then Twist road and
finally by access road built by Michael and Gilles Gionet.
We felt that the area warranted further exploration because of the visible copper
seen in previous pits dug. Because ofthe large amount of overburden in this wooded and
semi-swampy area,. extensive beep-matting was done (30hrs) by Mr. Gilles Gionet in
order to detennine possible pit locations. Road construction was also done in order to
access the property with the skidder and backhoe used for trenching.
Six new pits were developed and ready to be shown to potential investors. These
pits uncovered more copper. Samples were taken to the Ministry of North em
Development and Mines office in Thunder Bay but no assay results have been received as
of yet. The site was also visited by head geologist of Freewest Minerals. Samples were
also taken during his visit. We have not seen the results of these assays.
We have conducted this further development in order to ascertain whether zinc or
PGA group metals were located on this site. Also, we wish to attract potential
exploration companies to further develop and explore the area as we feel it is rich in base
minerals with a possible PGA occurrence.
All work on this site was done by recorded holder Gilles Gionet and his son
Michael Gionet this past fall from September 20th to October 20th, 2006.
Please refer to the pit maps attached to the pit cost summaries in order to see in
more detail what mineral formation were discerned in each of the pits. Also included are
maps of the area.
NOV 17 2006 11:44
10. 3
1 807 826 1110 PAGE. 03
RECEIVED NOV 1 7 Z006
GEOSCIENCE ASSESSMENT OFfICE
Nov 17 06 11:50a Mabel Gionet
.. --
...
SCAL.E
o .... .......... 100
--~-= ....
\
1-807-826-1110 p.4
\
ft;CJ
" ~~. _ ... : ..... Q. .
RECEIVED NUV 1 7 ZU06
GEOSCIENCE ASSESSMENT OffiCe
------- --- ------ ---- ------- ---
------'--NOV 17 2006 11:45 1 807 826 1110 PAGE. 04
Q In 0 en 9 z m C:
05 <..
~rn -->
-l> --.J 0(1) moo r--..:
c:::' m C)
{;} en (l)
S m z -f
:a m 0 m ~
< m C
I Z' o <
"
J:,.' Vl
o Vl
!- , •• ·",,,r;'I."'II''''-;-'I/Ur/l'~.I',",I.·r-·'''··'.''·~''" .',"1,- .. -·----."---. .. -'f· ... ·-'·, .. ··,· ".' ~, ___ v......;. ......... _I.. .......... , ...... , ............................. ' ...•• ,. ,_ . , .. ' .. " ......•
.®(~:~.';: "'i:";:~' ,.; ''';;i '" .. '; ",;" 1,.:'.:..:. l. _'~ Ir., ; ~ '.j\l '.' \~j I: .' •••• ; _ t.~..; l.-i
~.J l -~:~. ~
t!ll El. t, ~ ~ .. Q,
J},
'::.' . ~ , .. , ,
teEne 'n
R<lDli ,,.
Claim 12l4B72 LInk to MCI System Link
Zoom In
r: ; . .\)' _.. -. .- I
~ -J'~'" 1
, ..... " ..... ,~; ... .
• ..1.,' ':0,\" .:;.'_'.
':4' .• (Q)
. -. . . I i '''·'1';·111 .... I' " .. I 1'.1.;",.
jlJil~m
IdI!5tartl!1 @l t! ~ II (Wa ... 1 ~[ ... I ;}'Jc .. 1 ~r~·;IIillB .. 1 @)s .. 1 [ljA .. 1 ~c .. lI~lc. ..
i f' ft i _i~
.~ '.rr.'.""·
..i,~~~ '_~:~9~:j'~:~~
Parl(s
.... ; . ~~:
Pending Claims - '.; Including Flied Only"
' .. ' Claims
~ .'
Disposition Symbols '.':
Dispositions
.Pendlng Disposition Symbols ",0
, ;
W Pending Dispositions ... ,
",,,,,'
P' lots Fl Concessions ::.';
P' Cliff, Pit & Pile
P UtIlities - W Trails
P' Roads
~ Railways
W Mine Sites \.
.!J 1'7 Mine Headtrarnes
~ ~
~ rt ~ ~
2. 0 <:
..... --J
,0 .en
..... ...... :" til
:0 .OJ ,
:::I OJ
:tT
r .......
. ~ r,:J
r ~
I ~ .....
~~ ~~ " 1
t~ t~ t, ..... ~ ...... ,~o r·
f 1= I· ~.
~.
~: " I'.
I:
~ r !
Nov 17 06 11:51a
: : "
'1,
J l )
I :
.I
)
NOV 17
, I
~)J;lld.~l~~ I
(
200611~5
.. - ,) ,:,K .. I t ~-. ,'I .
I. \ 0 ( ! y-
,~ .. :.~.I ,~ ., .u~~
--
PAGE. 06
Nov 17 OS 11:51a Mabel Gionet 1-807-82S-1110 p.7
Fairies Lake Property, claim# 1214873
Thunder Bay Division Cecil Twp, G-2857
Gilles Gionet Cost of Beep;matting Area
Dates worked: Sept 20-24,2006
Km travelled: 3 days (l44km)
Work done: 1 man @$18.00lhr x 30 hours= $540.00
Cost of gas: 60 litres x $1.25/litre=$ 75.00
Total cost of Beep-matting: $615.00
Please refer to Beepmatting map included for details of area done.
-------NOV 17 2006 11:46
----,-_. ,--- -- --------- --------- ----
1 807 826 1110 PAGE. 07
Nov 17 06 11:52a
NOV 17 2006 11:46
Habel Gionet 1-807-826-1110
I J t--'f1\{~\~ LF\\L.E ~R~ER\l
rlU: -rD ~CALf
~, -J857 LEel LIWpl lHuroDER 13AV 1
10. 8
tLruTf\~ 3001LS3
_____________ -'L--'-- --__
1 807 826 1110 PAGE. 08
RECE~VED-NUV i 7 "lU06
Nov 17 06 11:52a Mabel Gionet 1-807-826-1110 p.S
Fairies Lake Property, c1aim# 1214873 Thunder Bay Division
Cecil Twp, G-2857
Gilles Gionet
Road Cutting Costs
Dates worked: Sept 25-28th, 2006'
Km travelled: 3 days (144km) Work done: 2 men x $lS.00lhr x30 hours=$lOS0.00 Cost ofSkidder: $65.00/hr x 30 hours=$1950.00 Cost of diesel fuel for skidder120 hues x $0.95/Jitre=$114.00 Cost of gas for truck: 60 litres xSl.25/litre=$75.00 Total Road building costs: $3219.00 Please refer to road building map for further details.
- --.--.- --- --. --_._---NOV 17 2006 11:47 1 807 826 1110 PAGE. 09
Nov 17 06 11:52a Mabel Gionet 1-807-826-1110
~(11l~\~ LF\\(f.' fR~ER\~ f'lcrr 1'D SCALE.
S -JgS'1 CECIL T~' I~Of\l()Ef.BAY DI~
L\ . .f1\/I~J~S13 (jJ)) - ~EEP .. mAT ReSPDfI
\---j - ~DRD Cur 10 f,TS 8rofhefEf(
p. 10
Ll1\Jrt\ ~ 30011S3
,---,-------, ___________ .1--'--__ _
NOV 17 2006 11:47 1 807 826 1110 PAGE, 10 -
\'1 U V '\ 7 'LUOS
GEOSCIENce I\SSESSME.NT OfFice -
Nov 17 06 11:53a Mabel Gionet 1-807-826-1110 f'. 1 1
Fairies Lake Property, claim# 1214873 Thunder Bay Division
Cecil T\vp, G-2857
Gilles Gionet
Claim#1214873-Pit 1 Costs
Dates worked: Sept 29-0ctl, 2006 Km travelled: 2 days (96km) Dig pit wlbackhoe: 8 hours x$65.001hr=520.00 Drilling: 5 holes x 4'deep (20'), 2 men x $ 18.001hr x5hours=$ I 80.00 Blasting time: 2 men x $18.00t1u x 1 hour=$36.00 Dynamite: 20 sticks x $4.00/stick=$80.00 Caps: 5 caps x $5.50/cap=$27.50 Drill bits: 2 bits x $60.00Ibit=$120.00 Air compressor rental: $200.00/day x 2 days=$400.00 Drill rental: $lOO.OO/day x 2 days=$200.00 Diesel fuel for skidder: 80 litres x $0.95/litre=76.00 Gas for air compressor: 40 litres x $1.25/litre=$50.00 Gas for truck: 40 litres x $ 1. 25/litre=$50.00 Total cost for pit 1: $1739.50 Please refer to attached pit map for details
I~\~I - GAB&RD
----- ---- ---NOV 17 2006 11:47 1 807 826 1110 PAGE. 11
Nov 17 06 11:53a Mabel Gionet 1-807-826-1110 p. 12
Fairies Lake Property, claim# 1214873 Thunder Bay Division
Cecil Twp, G-2857
Gilles Gionet Claim#1214873-Pit 2
Dates worked: Oct 2-4 th, 2006 km travelled: 2 days (96lcm) Dig pjt wlbackhoe: 7 hours x $65. OOIhr=$4S5. 00 Drilling: 4 holes x 4'deep (16'),2 men x$lS.DOIhr x 4hours=$144.00 Blasting time: 2 men x $18.00/hr xl hr=$36.00 Dynamite: 16 sticks x$4.00/stick =$64.00 Caps: 4 caps x $5.50/cap=$22.00 Drill bits: 2 bits x $60.00lbit=$120.00 Air compressor rental: S200.00/day x 2 days=S400.00 Drill rental: $lOO/day x 2 days=$200.00 Diesel for skidder: ,80 litres x O.95/litre=$76.00 Gas for compressor: 40 Jitres x $1.25I1itre=$50.00 Gas for truck: 40 litres x $1.25/litre=$50.00 Total cost of pit 2: $1617.00 refer to attached pit map #2 for further details.
, F', .'" '" ...~,
------------------- -NOV 17 2006 11:48 1 807 826 1110 PAGE. 12
Nov 17 06 11:54a Mabel Gionet 1-807-826-1110 p. 13
Fairies Lake Property, claim# 1214873 Thunder Bay Division
Cecil Twp, G~2857
Gilles Gionet Claim #1214873-Pit 3
Dates worked: OctS-7,2006 Ian travelled: 2 days (96km) Drill pit wlbackhoe: 9 hours x $65.00Ihour=$585.00 Drilling: 6 holes x 4'deep (24'), 2 men x $18.00Ihrx6hrs=$216.00 Blasting time: 2 men x S18. OOIhr x 1 hour=S36.00 Dynamite: 24 sticks x $4.00/stick=$96.00 Caps: 6 caps x $S.50/cap=S33.00 Drill bits: 3 bits x $60.00Ibit=$180.00 Air compressor rental: $200.00/day x 2 days=$400.00 Drill rental: $lOO.OO/day x 2 days=$200.00 Diesel for skidder: 100 litres x $0.95/litre=$9S.00 Gas for compressor: 60 litres x $1.25Ilitre=$75.00 Gas for truck: 40 litres x $1.25/ litre=$50.00 Total cost of developing pit 3: $1966.00 please refer to attached pit #3 map for further details .
.- ._._--_. --- . __ ... --_ .. --- --.--.-.----.----- - -_ .. _-NOV 17 2006 11:48 1 807 826 1110 PAGE. 13
Nov 17 06 11:54a Mabel Gionet 1-807-826-1110 p.14
Fairies Lake Property, c1aim# 1214873 Thunder Bay Division
Cecil Twp, G-2857
Gilles' Gionet
Claim#1214873-Pit 4
Dates worked: Oct 8-11, 2006 Km travelled: 3 days (l44km) Dig pit wlbackhoe: 12 hours x $65.001hr=$780.00 Drilling: 8 holes x 6'deep (48'), 2men x $18.001hr x 10 hrs=$360.00 Blasting time: 2 men x $18.00 hour x 2 hours=$72.00 Dynamite: 48 sticks x $4.00/stick=$192.00 Caps: 8 caps x $5.50/cap=$44.00 Drill bits: 4 bits x S65.00Ibit=$240.00 Air compressor rental: $200.00/day x 3 days=$600.00 Drill rental: $IOO.OO/day x 3 days=$300.00 Diesel for skidder: 150 titres x 0.95/litre=$142.50 Gas for compressor 95litres x $1.25/litre=$118. 75 Gas for truck: 60 litres x $1.25Ilitre=$75.00 Total cost of developing pit 4: S2924.25 For further details please refer to pit map 4 attached.
------------_.-_ .. -_ .. -... -.. -.-------_.---_ .. ----._--._--._------------
.. _-----------------------------------------NOV 17 2006 11:49 1 807 826 1110 PAGE. 14
Nov 17 06 11:55a Mabel Gionet 1-807-826-1110 f'. 15
Fairies Lake Property, claim# 1214873 Thunder Bay Division
Cecil Twp, G-2857
Gilles Gionet Claim#1214873-Pit 5
Dates worked: Oct 12-16, 2006 Km travelled: 4 days (192km) Dig pit wlbackhoe: 22 hours x S65.00/hr=$1430.00 Drilling: 12 holes x 8' (96'),2 men x $18.00Ihr x 14 hrs=$504.00 Blasting time: 2 men x S18.00/hr x 3 hours=$108.00 Dynamite: 96 sticks x $4.00/stick=$384.00 Caps: 12 caps x $5.50/cap=$66.00 Drill bits: 6 bits x $60.00Ibit=S360.00 Air compressor rental: $200.001 day x 4 days=$800.00 Drill rental $lOO.OO/day x 4 days=$400.00 Diesel for skidder: 200 litres x $0.95/litre=$190.00 Gas for compressor: 130 litres x $ 1. 25Ilitre=$ 162.50 Gas for truck: 80 litres x $ 1. 25I1itre=$ 100.00 Total cost of developing pit 5: $4504.50 Please refer to attached pit 5 map for further details.
CI- t~, ~ ..... ~' ... _ .,:"
;:' I I' .... -__ '.j f'. t·.l
--------_._--- .-NOV 17 2006 11:49 1 807 826 1110 PAGE. 15
Nov 17 06 11:55a Mabel Gionet 1-807-826-1110
[~~;Dj -
Fairies Lake Property, c1aim# 1214873 Thunder Bay Division Gilles Gionet
Claim #1214873-Pit 6
Dates worked: Oct 17-20, 2006 Km travelled: 3 days (144km) Dig pit wlbackhoe: 19 hours x $65.00/hr-$1235.00
CecH Twp, G-2857
Drilling: ]0 holes x 6'deep (60'), 2 men x$18.00Ihr x lOhrs=$360.00 Blasting time: 2 men x $18.00lhr x 3 hrs=$108.00 Dynamite: 60 sticks x $4.00/stick=$240.00 Caps: 10 caps x S5.50/cap=$55.00 Drill bits: 3 bits x $60.00Ibit=$180.00 Air compressor rental: $200.00/day x 3 days=$600.00 Drill rental: $lOO.OO/day x 3 days=S300.00 Diesel for skidder: 120 litres x O.95ilitre=$114.00 Gas for compressor: 110litres x $ 1. 25Ilitre=$ 137.50 Gas for truck: 60 htres x $1.25/]itre=$75.00 Total cost of developing Pit 6: $3404.50 Please refer to attached pit map 6 for further details.
". ~ ..
" . .J
NOV 17 2006 11:50 1 807 826 1110
F'. 16
PAGE. 16