Programme of Action (POA) Quarterly Progress Reports on ... Guide - POA Quarterly... · DPME Guide:...
Transcript of Programme of Action (POA) Quarterly Progress Reports on ... Guide - POA Quarterly... · DPME Guide:...
DPME Guide: Programme of Action (POA) Quarterly Progress Reports 22 October 2014
1
Addressed to Ministers and Directors General, Outcomes Coordinating Departments All departments involved in outcome implementation forums
Purpose The purpose of this guide is to provide guidance on the development and submission of Outcome Programme of Action (POA) quarterly progress reports during the 2014-2019 MTSF period.
Reference documents
1. This guide draws from the 2014-2019 Medium Term Strategic Framework
2. This guide is linked to the Guide Number 1 (2014) on Outcomes Coordination
Contact person Ms. Nolwazi Gasa, Deputy Director General: Outcomes Monitoring and Evaluation Branch, the Department of Planning, Monitoring and Evaluation (DPME) in the Presidency. Email address: [email protected]
1. MONITORING IMPLEMENTATION OF THE NDP
1.1 The MTSF is a high-level strategic document for Cabinet to use to monitor the
implementation of the NDP. It does not contain everything in Departmental strategic plans. To ensure alignment, Departmental strategic plans will contain relevant MTSF commitments, but will also contain other commitments and information which are not in the MTSF.
1.2 The Programme of Action:
Focuses on the 2014 – 2019 MTSF period
Reflects all the outcomes, sub-outcomes, key actions, indicators and targets – as articulated in the MTSF – and not the whole of government work
Seeks to provide a clear line of sight from the NDP to the MTSF, as five year building blocks of the 2030 Vision as articulated in the NDP
Draws from POA quarterly progress reports submitted by government departments.
DPME Guide Number 2 (2014) Programme of Action (POA) Quarterly Progress Reports on Outcomes Created 22 October 2014
DPME Guide: POA Quarterly Progress Report 22 October 2014
2
2. POA QUARTERLY PROGRESS REPORTING
2.1 To enable Cabinet to effectively oversee the implementation of the actions
described in the MTSF for the realisation of priority outcomes, it needs to be provided with reports which provide both an indication of progress with the MTSF actions as well as insights into the impacts on society. The reports should also describe the major challenges and blockages affecting implementation, the interventions needed to address the constraints and challenges, and recommendations for any decisions or guidance required from Cabinet to improve delivery.
2.2 Outcome Coordinating Departments should:
Produce a quarterly POA progress report that clearly outlines the substantive progress made in implementing the MTSF during the reporting period, based on reports from the departments or entities which are responsible for MTSF actions for the outcome.
Ensure that the report covers higher level indicators and targets and does not only focus on activities and processes. To use fighting corruption as an example, progress with arranging workshops and conferences would be activities, whereas the number of people successfully prosecuted for corruption-related offences or changes in public perceptions of corruption would be higher level indicators.
Ensure that the report outlines challenges and blockages affecting delivery and interventions needed and taken to address the blockages and challenges.
2.3 The reporting departments or entities must keep a portfolio of evidence to support their reports and these should be readily available for verification by the Auditor-General and DPME.
2.4 The steps to be followed in the POA quarterly reporting are:
POA quarterly reporting steps Responsibility Timelines
1. Submission of POA quarterly progress reports to Coordinating department
Departments Within three weeks from the end of each quarter
2. Production of a draft Cabinet memorandum, including impact indicator table and key action table.
Coordinating Department, with support from DPME and other departments
Within 30 days from the end of each quarter
3. Technical Implementation Forum reviews the Cabinet Memorandum including the impact indicator and key action tables, revises it where necessary and prepares the Cabinet Memorandum for submission to the Ministerial Implementation Forum.
Technical Implementation Forum
Within 5 weeks from the end of each quarter
DPME Guide: POA Quarterly Progress Report 22 October 2014
3
POA quarterly reporting steps Responsibility Timelines
4. Minister’s Implementation Forum considers the Cabinet Memorandum including impact indicator and key action tables, summarising progress and indicates any changes required before submission to the Cabinet Committee.
Implementation Forum
Within 6 to 7 weeks from the end of each quarter
5. Submission of Cabinet Memorandum, including impact indicator and key action tables, to Cabinet Committee and DPME.
Coordinating department
One week before the Cabinet Committee meetings.
6. Cabinet Committee meetings. Coordinating Department
As scheduled
7. Cabinet considers reports. As scheduled
8. POA website updated DPME Within one month of Cabinet meeting.
3. THE POA REPORTING TEMPLATE 3.1 The quarterly progress reports should consist of a covering narrative memorandum
and an Annexure consisting of two tables. The Cabinet Memorandum should provide a succinct strategic overview of progress with the outcome and no Powerpoint presentation should be necessary.
3.2 The covering narrative memorandum must be written in a manner that is consistent with the submission of Cabinet Memoranda and specifically include the following:
3.2.1 Subject Progress report on implementation towards the realisation of Outcome X for quarter Y
3.2.2 Purpose The purpose of this Cabinet Memorandum is to provide Cabinet with a report on progress with outcome X (as articulated in the 2014-2019 MTSF) and to facilitate executive oversight over implementation and interventions required to improve delivery related to outcome X.
3.2.3 Summary This must give an overview of the main achievements and challenges in the quarter.
3.2.4 Strategic focus of the memorandum Key here is the extent to which the whole of government is geared towards implementing the critical actions required in the first 5 years, as described in the MTSF, to move the country towards realising the 2030 Vision in the NDP.
3.2.5 Discussion This section should provide a narrative analysis of the information provided in the tables in the Annexure. This analysis should:
DPME Guide: POA Quarterly Progress Report 22 October 2014
4
a) Highlight and explain any positive or negative changes to the key higher level
(impact) indicators which may been measured during the last quarter
b) Identify the major challenges and blockages affecting the implementation of
the main activities, particularly for those which are rated amber or red
c) Outline the interventions needed to address major constraints and
challenges
d) Where necessary, identify activities that are not producing the intended
results and proposing alternative interventions
e) Outline the extent to which the key recommendations made by Cabinet
during the last quarter of reporting have been addressed
f) Identify issues which cut across outcomes and the extent to which these are
being addressed in Implementation Fora
g) Make recommendations for any decisions and guidance required from
Cabinet to improve delivery.
3.2.6 Implementation plan
Indicate the key interventions required, by whom and by when.
3.2.7 Organisational and personnel implications
Describe any organisational and personnel implications arising from the
discussions in the previous sections.
3.2.8 Financial implications
Describe any financial implications arising from the discussions in the previous
sections. Key here is the extent to which we are able to demonstrate that there is
concerted effort to ensure alignment between budgets and priorities and
improved efficiences, especially given the constrained budget environment.
3.2.9 Communication implications
Describe the communication implications arising from the discussions in the
previous sections and the extent to which Implementation Fora are ensuring that
there is improved awareness regarding the implementation of key activites
towards the realisation of the NDP 2030 Vision.
3.2.10 Constitutional implications
Describe any constitutional implications arising from the discussions in the
previous sections.
3.2.11 Implications for vulnerable groups
Describe implications for vulnerable groups, including women, youth, the
disabled and the unemployed. Provide information on progress with job creation,
e.g. from local procurement initiatives.
3.2.12 Security implications
Describe any security implications arising from the discussions in the previous
sections.
3.2.13 Departments and parties consulted, responses and comments
Highlight any key consultation issues related to the outcome (e.g. the extent to
which the quarterly progress report has been informed by departmental progress
reports, analysis thereof, the tabling and approval of the draft quartely progress
DPME Guide: POA Quarterly Progress Report 22 October 2014
5
reports in Technical and Ministerial Implementation Forums, and ultimately, the
submission to Cabinet Committees. It is also critical that the relevant Outcome
Coordinating Department indicates the extent to which key Cabinet
recommendations tabled in the last reporting period have been addressed.
3.2.14 Recommendations
Indicate clearly and succinctly what decisions are needed by Cabinet.
3.3 It is recommended that departments also draw from their Quarterly Performance
Reporting (QPR) reports against their APPs when preparing the quarterly POA progress reports against the MTSF.
3.4 Regarding the Annexure, the first table will contain the set of key high level impact indicators in the MTSF chapter for the outcome. For the first table, the traffic light colours reflect the extent to which the impact indicators have shifted (if at all) and whether we are on course to achieve the 2019 targets. NB: It is recognised that some impact indicators are not measured on a quarterly basis or will not change on a quarterly basis. In such cases, the latest measurement of the impact indicator should be given. It is useful for Cabinet to have sight of the latest measurement of these indicators when considering the quarterly progress report.
3.5 The second table will contain quarterly progress against the MTSF actions for the
outcome. For the second table, the traffic light colours reflect the progress being made in implementing the MTSF actions.
3.6 A hypothetical example, for illustrative purposes only, of the two aforementioned tables for reporting progress in the realisation of Outcome 10 is provided in Annexure A to this memorandum. As indicated in Annexure A, both tables contain traffic lights to describe progress.
3.7 Based on experience form the 2009-2014 Administration, the classification of performance reporting has been revised as outlined below:
Classification of performance
Target has been achieved, exceeded, almost been achieved or is likely to be achieved by the stipulated time
Target could possibly be achieved by the stipulated time or substantial progress has been made towards meeting the target
No substantial progress towards meeting the target
System for measuring the indicator not yet in place
3.8 To further improve the quality of the reporting, the following recommendations
are made: 3.8.1 Data sources for the key indicators should be specified. Some data is released
only annually or twice per year and this has a bearing on performance reporting. Where the latter applies, the frequency of data release per indicator should be specified.
DPME Guide: POA Quarterly Progress Report 22 October 2014
6
3.8.2 Progress reporting should be seen as a tool to improve performance. POA quarterly progress reporting is not intended to be onerous or a compliance exercise.
3.8.3 To ensure improved alignment and minimise onerous reporting, there has been a concerted effort by government to ensure alignment between the MTSF and Departmental Strategic Plans and Annual Performance Plans.
3.8.4 It is critical that every effort is made to ensure that the quarterly progress report is consistent in the use of traffic lights and assigning of traffic light colours according to actual results achieved, rather than according to processes or activities.
DPME Guide: Programme of Action (POA) Quarterly Progress Reports 22 October 2014
7
Annexure A: Example of Annexures to the Cabinet memorandum for Outcome 10 Outcome 10 Environment: POA report for the period April 2015 to June 2015 as at August 2015 Progress rating key:
Target has been achieved, exceeded, almost been achieved or is likely to be achieved by the stipulated time
Target could possibly be achieved by the stipulated time or substantial progress has been made towards meeting the target
No substantial progress towards meeting the target
System for measuring the indicator not yet in place
Impact Indicator Table
Indicator Baseline Target Progress up to end June 2015
Progress rating
Data Source
Percentage of area of state managed protected areas assessed with a METT score above 67 percent
85 percent of area of state managed protected areas assessed with a METT score above 67 percent
90 percent of area of state managed protected areas assessed with a METT score above 67 percent ( 2018/19)
Percentage of coastline with full protection
9 percent 12 percent ( 2018/19)
Percentage of coastline with partial protection
13.5 percent 15 percent ( 2018/19)
Percentage level of compliance of mines in accordance with the National Water Act
35 percent 60 percent ( 2018/19)
Reduced total emissions of CO2 March 2014 progress 34 percent reduction from "Business As Usual" by 2020
DPME Guide: Programme of Action (POA) Quarterly Progress Reports 22 October 2014
8
Indicator Baseline Target Progress up to end June 2015
Progress rating
Data Source
Percentage Biomass increase of stock levels in Deep-water Hake
March 2014 progress 22 percent of prefished biomass ( 2018/19)
Percentage Biomass increase of stock levels in Abalone
March 2014 progress 27 percent above the prefished level ( 2018/19)
Percentage Biomass increase of stock levels in West Coast Rock Lobster
March 2014 progress 26 percent above the 2006 level ( 2018/19)
Reduced vulnerability and risks associated with climate change impacts
National Climate Change Response Policy White Paper approved by Cabinet
Climate Change Response for 5 key sectors implemented ( 2018/19)
Report on progress against MTSF Actions
Indicator Baseline Target Progress up to end June 2015 Progress Rating
Data Source
Sub-Outcome 01: Ecosystems are sustained and natural resources are used efficiently
Action: Implement strategies for water conservation and demand management
Percentage reduction of projected demand for 8 large water supply systems
9.6 percent 20 percent by 2019 (2018/19)
Action: Protect water resources
DPME Guide: Programme of Action (POA) Quarterly Progress Reports 22 October 2014
9
Indicator Baseline Target Progress up to end June 2015 Progress Rating
Data Source
Percentage of water use license applications processed
66 percent 80 percent annually (2014/15)
Number of water resources classified Not available 10 ( 2018/19)
Number of sites with River Health Programme implemented
180 550 river sites ( 2018/19)
Action: Maintain or improve water-shed services in key rural Strategic Water Source Areas
Number of significant, integrated water- related ecological infrastructure maintenance or improvement interventions
Numerous un-integrated projects country-wide
20 Integrated interventions in each of 5 key rural Strategic Water Source Areas by March 2019 (March 2018/19)
Action: Expand the conservation area estate through declaration of state owned protected areas, MPAs and biodiversity stewardship
Number of hectares in the conservation estate
10.7 of land under conservation
16 121 794 hectares ( 2018/19)
Percentage of hectares in the conservation estate
10.7 of land under conservation
13.2 percent hectares ( 2018/19)
Number of biodiversity stewardship sites
Stewardship guidelines 3 per Province and 3 National ( 2018/19)
National:
EC:
FS:
DPME Guide: Programme of Action (POA) Quarterly Progress Reports 22 October 2014
10
Indicator Baseline Target Progress up to end June 2015 Progress Rating
Data Source
G:
KZN:
L:
M:
NC:
NW:
WC:
Number of squared kilometer (km) MPAs
9 percent full protection and 13.5 percent partial protection
193 317 hectares ( 2018/19) National:
EC:
FS:
G:
KZN:
L:
M:
NC:
NW:
WC:
Action: Identify and develop management interventions for reducing species loss
Number of legislative tools to ensure the protection of species and ecosystems developed and implemented
National Environmental Management: Biodiversity Act, 2004 (and amendments); Threatened or Protected Species list and regulations
20 legislative tools (2018/19) National:
DPME Guide: Programme of Action (POA) Quarterly Progress Reports 22 October 2014
11
Indicator Baseline Target Progress up to end June 2015 Progress Rating
Data Source
EC:
FS:
G:
KZN:
L:
M:
NC:
NW:
WC:
Action: Integrate ecological infrastructure considerations into land- use planning and decision- making about new developments
Percentage of spatial development frameworks (SDF's) supported by a standard minimum environmental requirements
Not available 100 percent of all SDFs being developed and reviewed by 2019
National:
EC:
FS:
G:
KZN:
L:
M:
NC:
NW:
WC:
DPME Guide: Programme of Action (POA) Quarterly Progress Reports 22 October 2014
12
Indicator Baseline Target Progress up to end June 2015 Progress Rating
Data Source
Percentage of environmental impact assessment applications processed within timeframes, reported quarterly from the National Environmental Assessment System
87 percent 98 percent ( 2018/19)
Action: Implement environmental regulations to mitigate negative environmental impacts in exploitation of mineral resources
Number of environmentally significant areas identified and published for restriction for mining activities
Matrix of biodiversity areas sensitive to mining identified
1 environmentally significant area identified, negotiated and published through NEMA by 2016
Number of derelict and ownerless mine sites rehabilitated
Not available 50 per year ( 2014/15)
Number of catchments identified for Acid Mine Drainage
Not available 6 ( 2018/19)
Number of mines monitored for non- compliance in accordance with water license conditions
289 450 ( 2018/19)
Action: Undertake integrated environmental assessments for major infrastructure and provide incentives for green economic activities
DPME Guide: Programme of Action (POA) Quarterly Progress Reports 22 October 2014
13
Indicator Baseline Target Progress up to end June 2015 Progress Rating
Data Source
Number of regulatory interventions developed and implemented to streamline the environmental authorisation process for SIP projects
Not available 8 ( 2018/19)
Action: Combat land degradation
Hectares of land under rehabilitation/ restoration
2 283 340 hectares 1 370 600 hectares (Total both DEA and DAFF) ( 2018/19)
Hectares of land under rehabilitation/ restoration
152 500 (DAFF) ( 2018/19)
Hectares of land under rehabilitation/ restoration
2 283 340 hectares 1 218 106 (DEA) ( 2018/19)
Number of wetlands rehabilitated 96 695 ( 2018/19)
Number of emerging invasive species targeted for early detection
60 300 ( 2018/19)
Action: Produce scientific update of resources status and recommendations for the following season's sustainable catch for abalone, West Coast Rock Lobster and deep- water hake
Status of the stocks report for abalone, rock lobster and hake
Sectors identified Abalone at 31 percent above the pre-fished level by 2019
Status of the stocks report for abalone, rock lobster and hake
Deep- water Hake at 30 percent of pre- fished biomass by 2019
DPME Guide: Programme of Action (POA) Quarterly Progress Reports 22 October 2014
14
Indicator Baseline Target Progress up to end June 2015 Progress Rating
Data Source
Status of the stocks report for abalone, rock lobster and hake
West Coast Rock Lobster at 26 percent above the 2006 level by 2019
Sub-Outcome 02: An effective climate change mitigation and adaptation response
Action: Develop strategic policy and regulatory frameworks and programmes to promote a low carbon economy
Green Transport Strategy and Implementation Plan formulated
Not available 2018 ( 2018/19)
Number of thematic areas in implementing environmental fiscal reform policy instruments
Not available Carbon tax policy, carbon offsets scheme, energy efficiency tax incentive, biodiversity tax incentive, fuel levy system ( 2018/19)
Percentage of new build that is renewable power generation (to incorporate off-grid energy)
Not available 42 percent MW by 2030 for renewable energy
Percentage of new build that is renewable power generation (to incorporate off-grid energy)
6 percent MW by 2030 for import hydro
Etc. ⁞