Prestressed High Density Flooring & Precast Concrete Stairs

2
SpanWright Case Study Prestressed High Density Flooring & Precast Concrete Stairs Apartment Development, Camden, Central London CLIENT: Capitol London Ltd LOCATION: 7 Northington St & 13-17 Kings Mews, London, WC1N 2JF COMPLETION DATE: July 2011 SECTOR: Residential / Commercial ABOUT THE PROJECT SpanWright UK Ltd were delighted to be chosen to supply & install to this project in the Bloomsbury area of Camden Borough, Central London. The development on a prime corner site, 8 minutes from Chancery Lane Tube, is made up of a three storey structure in six split level individually designed units including a 3rd floor 3 bedroom penthouse apartment with roof terraces. PROJECT CHALLENGES Spanwright UK with Capitol London Ltd had to work within Code 3 Sustainable Homes & London Borough of Camden Conservation Policies in the planning, design and construction of this development. In addition, Kings Mews being a busy thoroughfare, deliveries & fitting had to be scheduled within allotted road closure slots. Fitting of Precast Flooring and Stairs allows for Rapid Construction, once installed precast stairs provide the safest way to access other floors during construction. The sound insulation and thermal efficiency properties inherent in the High Density Prestressed Flooring and Precast Stairs contributes to this Capitol London Apartment Development’s safety, durability and thermal performance.

description

SpanWright UK Ltd were delighted to be chosen to supply & install to this project in the Bloomsbury area of Camden Borough, Central London. The development on a prime corner site, 8 minutes from Chancery Lane Tube, is made up of a three storey structure in six split level individually designed units including a 3rd floor 3 bedroom penthouse apartment with roof terraces.

Transcript of Prestressed High Density Flooring & Precast Concrete Stairs

Page 1: Prestressed High Density Flooring & Precast Concrete Stairs

SpanWright Case Study

Prestressed High Density Flooring & Precast Concrete Stairs Apartment Development, Camden, Central London

CLIENT:Capitol London Ltd

LOCATION:7 Northington St &13-17 Kings Mews, London,WC1N 2JF

COMPLETION DATE:July 2011

SECTOR:Residential / Commercial

ABOUT THE PROJECT

SpanWright UK Ltd were delighted to be chosen to supply & install to this project in the Bloomsbury area of Camden Borough, Central London. The development on a prime corner site, 8 minutes from Chancery Lane Tube, is made up of a three storey structure in six split level individually designed units including a 3rd floor 3 bedroom penthouse apartment with roof terraces.

PROJECT CHALLENGES

Spanwright UK with Capitol London Ltd had to work within Code 3 Sustainable Homes & London Borough of Camden Conservation Policies in the planning, design and construction of this development. In addition, Kings Mews being a busy thoroughfare, deliveries & fitting had to be scheduled within allotted road closure slots.

Fitting of Precast Flooring and Stairs allows for Rapid Construction, once installed precast stairs provide the safest way to access other floors during construction. The sound insulation and thermal efficiency properties inherent in the High Density Prestressed Flooring and Precast Stairs contributes to this Capitol London Apartment Development’s safety, durability and thermal performance.

Page 2: Prestressed High Density Flooring & Precast Concrete Stairs

Windmill Hill Business Park, Whitehill Way, Swindon SN5 6QR

Tel: 01793 441474 Fax: 01793 441401 Mob: 07543 180455Email: [email protected]

www.spanwright.co.uk

We would like to thank Spanwright UK for providing design solution, accommodating unavoidable delay and managing to keep within overall time schedules allotted to them to keep this development within budget.

David Spencer - Captiol London Ltd

Spanwright UK’s In House Design Team tailored flooring unit design to include service points and cutting of flooring slabs to suit the angular, open plan split level design of the apartment block. Solid End finishes to slabs guarded against shear and crushing, strengthening overall structure. Spanwright supplied and fitted stairs and slabs working with Capitol London to plan, including accommodating a change to the fitting and delivery schedule at final floor level. Flooring and stairs once installed provided a safe working platform for following on trades.

PRODUCTS & SERVICES

PRECAST CONCRETE FLOORING 150mm

PRECAST CONCRETE FLOORING 210mm

PRESTRESSED CONCRETE FLOORING 150mm

PRESTRESSED CONCRETE FLOORING 150mm High Density 4

PRESTRESSED CONCRETE FLOORING 200mm

PRESTRESSED CONCRETE FLOORING 250mm

PLATE FLOORING

CONCRETE STAIRS 4

DESIGN 4

INSTALLATION 4

BESPOKE PRODUCT DESIGN

PRODUCT DETAIL Prestressed/Precast finishes to BS 8110. Available in a range of depths and sizes and manufactured to comply with the recommendations of the Precast Flooring Federation

STAIRS manufactured and tailored to suit each project in compliance with relevant building regulations.