PVP 2009 PVP 2009 - - 77847 77847 Summary Review of Updated ASME Summary Review of Updated ASME PCC PCC - - 1 20XX 1 20XX Guideline For Pressure Guideline For Pressure Boundary Bolted Flanged Joint Assembly Boundary Bolted Flanged Joint Assembly Jerry Waterland Jerry Waterland VSP Technologies, Inc. VSP Technologies, Inc. Jim Payne Jim Payne JPAC, Inc. JPAC, Inc. Presented To: Presented To: ASME PVP ASME PVP - - 2009 2009 Prague, Czech Republic Prague, Czech Republic July 28, 2009 July 28, 2009

Transcript of Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

Page 1: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

PVP 2009PVP 2009--7784777847Summary Review of Updated ASME Summary Review of Updated ASME PCCPCC--1 20XX 1 20XX ““Guideline For Pressure Guideline For Pressure

Boundary Bolted Flanged Joint AssemblyBoundary Bolted Flanged Joint Assembly””

Jerry WaterlandJerry WaterlandVSP Technologies, Inc.VSP Technologies, Inc.

Jim PayneJim PayneJPAC, Inc.JPAC, Inc.

Presented To:Presented To:ASME PVPASME PVP--20092009

Prague, Czech RepublicPrague, Czech RepublicJuly 28, 2009July 28, 2009

Page 2: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

BackgroundBackgroundASME Post Construction ASME Post Construction Committee Committee

PCCPCC--11--2000 Update 2000 Update ProjectProject

New SubNew Sub--Committee on Committee on Flange Joint AssemblyFlange Joint Assembly

Updates Include:Updates Include:•• Expanded Guidance/Best Expanded Guidance/Best

PracticesPractices•• Updated & New Updated & New

AppendicesAppendices

Page 3: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact AppendicesAppendix A:Appendix A:Training, Qualification and Certification of Joint Training, Qualification and Certification of Joint Assembly PersonnelAssembly Personnel

•• ““Guidelines for uniform criteria for training, qualifying and Guidelines for uniform criteria for training, qualifying and certifying bolted joint assembly personnelcertifying bolted joint assembly personnel””

•• Certification levels:Certification levels:Certified Bolting SpecialistCertified Bolting SpecialistCertified Senior Bolting SpecialistCertified Senior Bolting SpecialistCertified Bolting Specialist InstructorsCertified Bolting Specialist Instructors

•• Requirements for Accreditation of Certifying OrganizationsRequirements for Accreditation of Certifying Organizations

Page 4: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

Appendix A (Cont.)Appendix A (Cont.)

CredentialsCredentials

Classroom instructionClassroom instruction

Practical flange assembly examinationPractical flange assembly examination

Written examinationWritten examination

Page 5: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

Appendix A (Cont.)Appendix A (Cont.)

Bolting Specialist: Bolting Specialist: ClassroomClassroom Instruction/Training FundamentalsInstruction/Training Fundamentals•• General health and safety precautionsGeneral health and safety precautions•• Equipment requirementsEquipment requirements•• Principles of bolt elongation, bolt load and bolt stressPrinciples of bolt elongation, bolt load and bolt stress•• Functionality of gasket and sealFunctionality of gasket and seal•• Gasket types and their limitationsGasket types and their limitations•• Bolt types and their limitationsBolt types and their limitations•• Identification of correct joint componentsIdentification of correct joint components•• Manual torque wrench joint tighteningManual torque wrench joint tightening•• Importance of thread lubricantsImportance of thread lubricants•• Techniques for load controlTechniques for load control•• Calibration and maintenance of bolt tightening equipmentCalibration and maintenance of bolt tightening equipment•• Inspection and reporting of defects and faultsInspection and reporting of defects and faults•• Preparing a joint for closurePreparing a joint for closure•• Gasket handling, preparation, and installationGasket handling, preparation, and installation•• Safe joint Safe joint disdis--assembly and assemblyassembly and assembly•• Correct use of additional joint components (washers, etc.)Correct use of additional joint components (washers, etc.)•• Joint assembly QA procedures, certification and recordsJoint assembly QA procedures, certification and records•• Joint Joint disdis--assemblyassembly

Page 6: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

Appendix A (Cont.)Appendix A (Cont.)

Bolting Specialist: Additional Training EndorsementsBolting Specialist: Additional Training Endorsements

•• Piping specific training (Required)Piping specific training (Required)

•• Powered Equipment EndorsementPowered Equipment Endorsement

•• Heat Exchanger EndorsementHeat Exchanger Endorsement

•• Special Joint EndorsementsSpecial Joint Endorsements

Page 7: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

Appendix A (Cont.)Appendix A (Cont.)

Bolting Specialist: Bolting Specialist: Practical Flange Assembly DemonstrationsPractical Flange Assembly Demonstrationsand Examinationand Examination

•• Importance of gasket placement/alignmentImportance of gasket placement/alignment

•• Importance of joint alignmentImportance of joint alignment

•• Importance of bolt assembly patternsImportance of bolt assembly patterns

•• Importance of bolt assembly pattern and correct gasket selectionImportance of bolt assembly pattern and correct gasket selection

•• Reaction of different gasket types to standard tightening procedReaction of different gasket types to standard tightening procedureure

•• Demonstration of effect of lubricantsDemonstration of effect of lubricants

ReRe--Certification exam every three yearsCertification exam every three years

Page 8: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact Appendices

Appendix D:Appendix D:Guidelines for Allowable Gasket Contact Surface Guidelines for Allowable Gasket Contact Surface Flatness and Defect DepthFlatness and Defect Depth

Page 9: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact Appendices

Appendix D:Appendix D:Guidelines for Allowable Gasket Contact Surface Guidelines for Allowable Gasket Contact Surface Flatness and Defect DepthFlatness and Defect Depth

Page 10: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact Appendices

Appendix D:Appendix D:Guidelines for Allowable Gasket Contact Surface Guidelines for Allowable Gasket Contact Surface Flatness and Defect DepthFlatness and Defect Depth

Page 11: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact AppendicesAppendix E:Appendix E:Flange Joint Alignment GuidelinesFlange Joint Alignment Guidelines

CenterlineParallelism

RotationalFlange Face Gap

Page 12: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact AppendicesAppendix F:Appendix F:Alternatives to Legacy Tightening Alternatives to Legacy Tightening Sequence/PatternSequence/Pattern

1.Five alternative (non-Legacy) assembly procedures detailed

2.Guidelines for developing and qualifying additional alternative assembly procedures

Page 13: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact AppendicesAppendix F:Appendix F:Alternatives to Legacy Tightening Alternatives to Legacy Tightening Sequence/PatternSequence/Pattern

Detailed Instructions

Page 14: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact AppendicesAppendix F:Appendix F:Alternatives to Legacy Tightening Alternatives to Legacy Tightening Sequence/PatternSequence/Pattern

Summary Instructions

Page 15: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact AppendicesAppendix F:Appendix F:Alternatives to Legacy Tightening Alternatives to Legacy Tightening Sequence/PatternSequence/Pattern

Diagram Examples

Page 16: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact AppendicesAppendix M:Appendix M:Washer Usage GuidanceWasher Usage Guidance

Washer usage guidance

Purchase specification for through-hardened washers

Dimensional requirements

Dimensional tolerances

Page 17: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact AppendicesAppendix O:Appendix O:Assembly Bolt Stress DeterminationAssembly Bolt Stress Determination

Method for establishing assembly bolt stresses considering:

• Sufficient assembly and operating gasket stress

• Maximum gasket stress

• Maximum bolt stress

• Permanent flange deformation

1. Simple Approach

2. Joint Component Approach

Page 18: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact Appendices

Appendix O:Appendix O:Assembly Bolt Stress DeterminationAssembly Bolt Stress Determination

Example Analysis:

Page 19: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

High Impact AppendicesHigh Impact AppendicesAppendix P:Appendix P:Guidance On Troubleshooting Guidance On Troubleshooting Flanged Joint Leakage IncidentsFlanged Joint Leakage Incidents

• Investigative and Diagnostic Evaluation Guide

• Checklist of Flange Design and Acceptable Practice Considerations

• Leakage Problems and Potential Solutions

Page 20: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx
Page 21: Presentation Pvp 2009 Summary Review of Updated Asme Pcc 1 20xx

Publication Status Publication Status PCCPCC--11--2000 Update:2000 Update:

•• Post Construction Standards Committee (PCSC) approval Post Construction Standards Committee (PCSC) approval Of Updated PCCOf Updated PCC--1 (minus Appendix A)1 (minus Appendix A)

•• Appendix A recirculation ballot submitted to PCSC Appendix A recirculation ballot submitted to PCSC Ballot closes July 28, 2009 (minor editorial comments rcvd)Ballot closes July 28, 2009 (minor editorial comments rcvd)22ndnd recirculation ballot closes August 18, 2009recirculation ballot closes August 18, 2009

•• Submit complete PCCSubmit complete PCC--1 Update, including Appendix A, 1 Update, including Appendix A, for review by Board of Pressure Technology Codes and for review by Board of Pressure Technology Codes and Standards (BPTCS) ~August 19, 2009Standards (BPTCS) ~August 19, 2009

•• Submit to Codes & Standards Publishing ~August 19, Submit to Codes & Standards Publishing ~August 19, 20092009

•• Publication expected late 2009Publication expected late 2009