![Page 1: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/1.jpg)
Planning for the Installation of a Compact Superconducting Proton
Therapy Unit in a Busy Medical Center Environment
Barry W. Wessels, Ph.D.Director of Medical Physics and DosimetryCase Western Reserve University School of Medicine
Cleveland, OH, USA
Adapted from a presentation given by David B. Mansur, M.D.At PTCOG 53 (June 2013)
![Page 2: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/2.jpg)
Disclosures
• Collaboration Contract with Philips Medical Systems for Proton RTP (No cost)
![Page 3: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/3.jpg)
Cleveland, Ohio, USA
![Page 4: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/4.jpg)
New Brunswick
Existing Proton Centers NE USA
![Page 5: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/5.jpg)
Existing + Planned Proton Centers
New Brunswick
![Page 6: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/6.jpg)
Protons in Cleveland: Our Mission
• Build the first proton therapy facility in the region
• Establish a center of excellence for pediatric radiation oncology
• Supplement existing advanced technologies (Cyberknife, Perfexion Gamma Knife, VMAT, Tomotherapy, IORT) at Seidman CC for select patients.
• Participate in national and institutional clinical trials
![Page 7: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/7.jpg)
Proton Clinical Benefit - Avoid collateral dose
Photon Beam Delivery
Proton Beam Delivery
Pediatric Medulloblastoma% DoseRec’d
100
50
10
![Page 8: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/8.jpg)
250%
20%
40%
60%
80%
100%
0 5 10 15 20 30 35
Depth in Water (cm)
Dose (%
)
BAD DoseGood
Dose
Tumor
More BAD Dose
Good DoseGood Dose/Bad Dose
11/10/2013 8
![Page 9: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/9.jpg)
Protons in Cleveland: Our plan
• A 6,000 square foot all inclusive facility in the heart of our existing NCI designated comprehensive cancer center
• Down one corridor, 30 meters from Rainbow Babies and Children’s Hospital
• 2 phase project, one vault for each phase• Orthogonal KV, and diagnostic CT image
guidance initially for IGRT.
![Page 10: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/10.jpg)
Protons in Cleveland: Our Campus
• Case Western Reserve University and School of Medicine• > 1000 Beds:• University Hospitals
– Lerner Tower– Mather Pavilion– Lakeside Hospital– MacDonald Women’s Hospital– University Psychiatric Center– Hanna Pavilion
• Seidman Cancer Center – Dedicated Cancer hospital and outpatient treatment facility
• Rainbow Babies and Children’s Hospital– 240 bed tertiary care children’s hospital
![Page 11: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/11.jpg)
![Page 12: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/12.jpg)
![Page 13: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/13.jpg)
N
![Page 14: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/14.jpg)
N
![Page 15: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/15.jpg)
![Page 16: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/16.jpg)
![Page 17: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/17.jpg)
1717N
![Page 18: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/18.jpg)
Size Does Matter• Limited space precludes large, multi-gantry
proton therapy systems with fixed external cyclotron
• Smaller facility using a compact superconducting Cyclotron needed to meet the mission of the UH Case Medical Center – Full Energy (250 MeV) proton beam and dose on target (2 – 4 Gy/min)
• Single room system would be ideal in this location
![Page 19: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/19.jpg)
1946
1996
2000
2008
Harvard
IBA
Accel
Still River
![Page 20: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/20.jpg)
This device has not been cleared by the US Food and Drug Administration for clinical use
A 10 Tesla Superconducting Magnet enables a smaller, lower cost gantry mounted Cyclotron.
Superconducting Synchrocyclotron
![Page 21: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/21.jpg)
Vive la difference
• Cyclotron– Single large magnet– Constant (in time) magnetic field– Orbits increase is size as energy increases
• Synchrotron– Many small magnets– Orbit is constant in size (ring)– Magnetic field increases (ramping) as energy
increases11/10/2013 Penn Ohio AAPM Chapter Meeting 21
![Page 22: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/22.jpg)
Mevion S250
![Page 23: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/23.jpg)
Beam Shaping
Passive Scattering and Active Scanning Beams
![Page 24: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/24.jpg)
Passive Beam Delivery Schematic
Cyclotron
![Page 25: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/25.jpg)
Patient Specific Apertures and Energy Range Shifters
![Page 26: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/26.jpg)
Pencil Beam Scanning
![Page 27: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/27.jpg)
Mevion Proton TherapyBeam Delivery: Uniform Field and Dedicated IMPT
• Uniform Field: modern 4th generation with exclusive direct beam modulation –passive scattering– Safe, automated, and precise– Standard with 2012 deliveries– Retrofittable and upgradable
• IMPT: fast spot scanning supported by exclusive direct beam modulation– Under development: working prototype end 2012 with release in
2014 – High speed with up to 10 target painting per minute– Retrofittable and upgradable
![Page 28: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/28.jpg)
IMPT – Spot Scanning - Mevion
Spot Size exit accelerator: 1.3 x 1.3 mm 2 Gy/min to 1 liter with 10 repainting Work-in-Progress – Feb.
2012
![Page 29: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/29.jpg)
Comparison – Beam Scattering to Scanning
Modality/Property Passive Scattering Active Scattering
2 D field shaping Yes Yes
3 D field shaping No Yes
Sensitive to organ motion Moderate High
Field Adapter Yes Superior field definition if used
Range Compensator Yes No
Neutron activation Moderate - safe Low - safe
System Maturity Standard – 80,000 patient worldwide experience
Emerging technology < 1,000 patient worldwide
System maintenance and required QA
Standard, patient specific compensator fabrication required
High, Patient specific QA required, no compensator
Patient through-put per room/day
10 -15 – 10 hr day Low - < 6 pts/day (March 2012)
![Page 30: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/30.jpg)
![Page 31: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/31.jpg)
![Page 32: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/32.jpg)
![Page 33: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/33.jpg)
![Page 34: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/34.jpg)
Unique Shielding Considerations
• Primary Proton beam and neutron production– Occupancy
Factors• Neutrons
– CT scanner• Magnetic Field and
Radio waves– Proximity of MRI
![Page 35: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/35.jpg)
Scattered Beam
Corridor
Finance Office
Department
CT angio
*
![Page 36: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/36.jpg)
Primary and Scattered Beam
Analytical Calculations
Courtesy Jim Brindle, Ph.D and Barry Wessels ,Ph.D
Monte Carlo Calculations Courtesy Jeff Siebers, Ph.D
![Page 37: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/37.jpg)
11/10/2013 UH Shielding Evaluation© 2013 J.V. Siebers
Note: Wall is angled here, so
attenuation does
correspond with wall
Elevation Section Through Maze 1’ thick maze ceiling to match tx room roof
Towards MR
![Page 38: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/38.jpg)
Neutron Damage to CT?
![Page 39: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/39.jpg)
RF and Magnetic Fields
MRI
Suite
![Page 40: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/40.jpg)
RF Grounded Shield
![Page 41: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/41.jpg)
Magnetic Field
![Page 42: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/42.jpg)
Setting up a commissioning plan
•We just bought a proton-therapy system!
•A cyclotron based system with not one, not two, but three gantries!
•We are going to treat 1200 patients a year, 14 hours a day, and for six days a week.
•There will be pediatric cases, prostates, head&neck, lung, radio-surgery…..
•We will be starting on September 1.
•Can you commission the system for us?
Boss
UHCMC approach is scaled appropriately for anticipated market
![Page 43: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/43.jpg)
Business plan • Patient mix
– Pediatric Anesthesia 35%– Lung 15 %– Brain/spine 15%– Targeted Reirradiation or boost 15%– Head and Neck 10%– GU/Prostate 10%
• Operation – after year 2– 14-16 hours scheduled – with Physics QA– 15-25 patients per day
![Page 44: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/44.jpg)
Definitions of acceptance and commissioning
• Acceptance Testing
‘.. to determine that all applicable radiation safety standards are met or exceeded and that the machine meets or exceeds the contractual specifications.’
‘A satisfactorily completed acceptance test simply assures that the accelerator and its associated systems satisfy all performance specifications and pertinent safety requirements.’
• Commissioning
‘….refers to the process whereby the needed machine-specific beam data are acquired and operational procedures are defined.’
AAPM code of practice for radiotherapy accelerators: Report of AAPM Radiation Therapy Task Group No. 45
→ Vendor and customer
→ Customer
![Page 45: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/45.jpg)
Determine the parameters to verify
• range• modulation width• dose variation uniform region• distal fall-off• skin dose / proximal region D
epth
dos
e
• uniformity profile (tilt/flatness) • maximum field size• lateral penumbra vs. depth• field size vs. depth
Late
ral
• dose per MU• dose rate
Abso
lute
Prescription
• range• modulation width• field size• dose rate• dose• gantry angle• SSD (air gap)• snout size
DeliveryEquipment settings
For what subset of prescribed parameters do these need to be
verified?
![Page 46: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/46.jpg)
Defining the subset – PDD uniformity
Option YesSuboption YesModulation NoField size YesSnout size MaybeGantry angle UnlikelyDose rate UnlikelyDose NoSSD Yes
Does the pdd uniformity depend on……
Measure…• 1 full-mod SOBP per suboption• 2 sobp for all snouts• 1 sobp for 2 gantry angles • 1 sobp for 3 dose rates• 2 sobp for varying SSD• sobp’s for small aperture size
![Page 47: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/47.jpg)
Treatment PlanningTreatment Planning: : Eclipse, CMS, Pinnacle
Oncology Information SystemOncology Information System: : IMPAC or ARIA
• Workflow anticipated to be similar to conventional linear accelerator• Schedule, treat, verify and record
R&V IntegrationR&V IntegrationTPSTPS
Oncology Information System and TPS
Treatment ConsoleTreatment Console
Clinical Integration
![Page 48: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/48.jpg)
University Hospitals Team• Physics and Dosimetry
• Director of UH Proton Medical Physics (1 FTE) - TBA• Staff Proton physicist and Physicist Assistant (2 FTE) - TBA• Proton Dosimetrist (1 FTE) - TBA• Barry Wessels, PhD -- Director of Medical Physics• Jeff Siebers, PhD and Charles Bloch, PhD. – Technical and Shielding
Consultants
• Therapist – TBA - 4 FTE
• Physicians• David Mansur, MD – Director UH Proton Center• Mitch Machtay, MD – Chairman of Radiation Oncology
• Administration• Nathan Levitan, MD, MBA – President Seidman Cancer Center• Linda Mangosh, RTT, MBA – VP Operations Seidman Cancer Center • Brenda Myers, RTT – Clinical Manager Radiation Oncology
• Construction• Crandall Miller• Linda Hulsman
• Administrative Assistance• Edie Cawley
![Page 49: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/49.jpg)
Shovel in the Ground – 10/11/13
![Page 50: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/50.jpg)
Timeline• Complete architectural &
construction design Sept 2013
• Ground breaking Sept 2013
• Gantry embeds Jan 2013
• Receive Accelerator Sept 2014
• Complete installation Jan 2015
• Acceptance Mar 2015
• Commissioning August 2015
• Clinical operation September 2015
![Page 51: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/51.jpg)
![Page 52: Planning for the Installation of a Compact Superconducting ...chapter.aapm.org/pennohio/2013FallSympPresentations/SI8_Barry... · Planning for the Installation of a Compact Superconducting](https://reader034.fdocuments.net/reader034/viewer/2022051803/5b06e1b17f8b9abf568d9fb5/html5/thumbnails/52.jpg)