Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation...

48
Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation, Michael Todsen James P. Donnelly, Paul D. Krauss and John S. Lawler Wiss, Janney, Elstner Associates

Transcript of Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation...

Page 1: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Performance of Corrosion Mitigation

Systems in Iowa Bridges

Work Performed on Behalf of Iowa Department of Transportation,

Michael Todsen

James P. Donnelly, Paul D. Krauss

and John S. LawlerWiss, Janney, Elstner Associates

Page 2: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Application to 3 Iowa Bridges

• US 63 Ottumwa

– Cathodic Protection - Arc-sprayed zinc

• IA 192 Council Bluffs• IA 192 Council Bluffs

– Chloride extraction (ECE)

– Cathodic protection - Discrete anode

• I-380 Cedar Rapids

– Cathodic Protection – Zinc-hydrogel sheet

Page 3: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Corrosion in Bridge Substructures

• Repair complicated and

expensive since

deck/superstructure must deck/superstructure must

be supported

• Exposure worst at leaking

joints

Page 4: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Corrosion Process

electrolyte

Cathode

Anode

Page 5: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Galvanic Protection

Sacrificial Anode CP

• Sacrificial anode

- Zinc sheets

- Arc-sprayed zinc

- Discrete probes

• Current flows by

Sacrificial

anode

Current

• Current flows by

galvanic action

• Proven record

• Lower initial cost

• Little maintenance

• Requires electrical

connection

Current

Page 6: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Chloride Extraction

• Higher current

• Applied temporarily

• Electrolyte (water)

– Ponded

– Porous covering

• Current draws out

chlorides

• Time consuming

Page 7: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,
Page 8: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Application to 3 Iowa Bridges

• US 63 Ottumwa

– Cathodic Protection - Arc-sprayed zinc

• IA 192 Council Bluffs• IA 192 Council Bluffs

– Chloride extraction (ECE)

– Cathodic protection - Discrete anode

• I-380 Cedar Rapids

– Cathodic Protection – Zinc-hydrogel sheet

Page 9: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

US 63 Ottumwa

Page 10: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Arc Sprayed Zinc CP

Page 11: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,
Page 12: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,
Page 13: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,
Page 14: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,
Page 15: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,
Page 16: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,
Page 17: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

30” by 48” test area

Page 18: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Black wire from

Rebar Ground

Blue wire from

Ref. Halfcell

Resistor (0.1 ohm)

[Red to Black]

Red wire from

Zn Anode (coating)

Switch

(single toggle)

Meter setup to measure embedded reference halfcell

(+ to gnd [blk], - to cell [blue])

Page 19: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Off

On

Page 20: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

US 63 Ottumwa - Arc Sprayed Zinc

• Current was minimal

• Total shift of test area only about 20 mV (Instant

off and depolarization)

• Blisters filled with zinc corrosion products have • Blisters filled with zinc corrosion products have

formed in coating (no chloride)

• Zinc coating thickness at blisters was 0.026” (0.018”

to 0.047”), [Spec was 0.020”]

• No initial data

• Minimal concrete deterioration

Page 21: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

US 63 Ottumwa - Arc Sprayed Zinc

Comments and Questions

• No site installation report was available

• Should install more than one test area and in both

highly exposed and lightly exposed areas

• When is protection lost due to blisters and zinc

consumption?

• Is it possible to consume all zinc applied?

Page 22: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Application to 3 Iowa Bridges

• US 63 Ottumwa

– Cathodic Protection - Arc-sprayed zinc

• IA 192 Council Bluffs• IA 192 Council Bluffs

– Chloride extraction (ECE)

– Cathodic protection - Discrete anode

• I-380 Cedar Rapids

– Cathodic Protection – Zinc-hydrogel sheet

Page 23: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

IA 192 Council Bluffs

• Corrosion-induced

deterioration widespread

under expansion joints

• Repaired in 1998• Repaired in 1998

– Conventional repair

– ECE on caps & cols.

– ECE and discrete anodes in

exterior beams

– SealerPhoto from www.vector-corrosion.com

Page 24: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Electrochemical Chloride Extraction (ECE)

Page 25: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

ECE and Discrete Anodes

Discrete anodes

Photos from www.vector-corrosion.com

Page 26: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

IA 192 Council Bluffs - 2009 Survey

• Visual condition

• Sounding

Half-cell testing• Half-cell testing

• Chloride sampling

• Electrical testing of

discrete anode

performance

Page 27: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

IA 192 Council Bluffs - 2009 Survey

Pier 14 West

Delam

Page 28: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

IA 192 Council Bluffs –

Chloride in Pier Caps

• Core samples taken

for comparison

with values

reported by

contractor0.400

0.500

0.600

Wa

ter

So

lub

le C

hlo

rid

e

(% b

y w

t)

Pier 3

NE-3 0-1

NE-3 1-2

SW-3 0-1

contractor

0.000

0.100

0.200

0.300

1998 - Before

Treatment

(Vector)

1998 - After

Treatment

(Vector)

2009

(WJE)

Wa

ter

So

lub

le C

hlo

rid

e

(% b

y w

t)

SW-3 0-1

CT= 0.035%

Page 29: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

IA 192 Council Bluffs –

Chloride in Pier Caps

0.400

0.500

0.600

Wa

ter

So

lub

le C

hlo

rid

e

(% b

y w

t)

Pier 14

NE-14 0-1

NE-14 1-2

NW-14 0-1

0.000

0.100

0.200

0.300

1998 - Before

Treatment

(Vector)

1998 - After

Treatment

(Vector)

2009

(WJE)

Wa

ter

So

lub

le C

hlo

rid

e

(% b

y w

t)

SE-14 0-1

SE-14 1-2

CT= 0.035%

Threshold

changed?

Page 30: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

IA 192 Council Bluffs - 2009 Survey

East Beams at Pier 3 – Discrete AnodesWest Beams at Pier 3 - ECE

Page 31: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

IA 192 Council Bluffs –

Discrete Anode Performance

• Test station not functional – Embedded ref. cell

• Current from anode to • Current from anode to

reinforcing bars was

negligible

– Zinc may be consumed

– Minimal potential

• Limited installation

Page 32: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

0.400

0.500

0.600

Wa

ter

So

lub

le C

hlo

rid

e

(% b

y w

t)Beam End

C67 0-1

C67 1-2

IA 192 Council Bluffs –

Chloride in Beam Ends

0.000

0.100

0.200

0.300

1998 - Before

Treatment

(Vector)

1998 - After

Treatment

(Vector)

2009

(WJE)

Wa

ter

So

lub

le C

hlo

rid

e

(% b

y w

t) C67 1-2

CT= 0.035%

Page 33: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

IA 192 Council Bluffs - Conclusions

• Study limited by imperfect baseline test

information

• Effectiveness of ECE:

– Chloride concentration in pier caps was apparently – Chloride concentration in pier caps was apparently

reduced and has stayed lower than before test

– Corrosion-related damage is growing 11 years after

treatments

• Effectiveness of Discrete Anodes:

– Discrete anode protection limited: Corrosion evident at

protected ends, but not a good test

Page 34: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Application to 3 Iowa Bridges

• US 63 Ottumwa

– Cathodic Protection - Arc-sprayed zinc

• IA 192 Council Bluffs• IA 192 Council Bluffs

– Chloride extraction (ECE)

– Cathodic protection - Discrete anode

• I-380 Cedar Rapids

– Cathodic Protection – Zinc-hydrogel sheet

Page 35: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

I-380 Cedar Rapids

• Corrosion of beam ends

at abutments and under

expansion joints

• Repaired in 2000

– Zinc sheet

Page 36: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

I- 380 Cedar Rapids - 2009 Survey

• Visual condition

• Sounding

Debonding• Debonding

• Anode evaluation

Page 37: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Northbound Lanes: Not Protected

Page 38: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Southbound Lanes: Zinc-Hydrogel Sheet

Rebar

connectionconnection

Page 39: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

I-380 Cedar Rapids –

Condition of beam ends at abutments

LocationArea of Delam.

or Spall (in2)

Number of

Beams with

Damage

Southbound Lanes

(with CP system)815 8

Northbound Lanes

(without CP system)2129 20

Page 40: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

I-380 Cedar Rapids - 2009 Survey

Page 41: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

I-380 Cedar Rapids - 2009 Survey

Page 42: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

I-380 Cedar Rapids - 2009 Survey

Debonded areaDebonded area

(>50%)

Page 43: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

I-380 Cedar Rapids - Anode Performance

• Despite

specification

requiring test

stations and stations and

report, stations

were minimal and

vandalized and

report not

available

Page 44: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

I-380 Cedar Rapids - 2009 Survey

Zn corrosion product

in debonded area

Page 45: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

I-380 Cedar Rapids – Performance

• Current ranged from 0.7

to 4.4 mA/sq m [Design:

10 mA/sq m]Resistor

• For North Abut.:Test sites

Distance

from end of

beam (in.)

Average

depol. after

15 hrs (mV)

6 94

18 151

Page 46: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

I-380 Cedar Rapids - Conclusions

• No baseline data

• Zinc sheet debonded in many areas and consumed

at areas of greatest exposureat areas of greatest exposure

• Zinc sheet protecting beam ends

– Depolarization adequate

– Delam. or spalled area in southbound lanes only 40%

of unprotected northbound lanes

Page 47: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Conclusions

• Comparison of system performance in these three

bridges:

System Protection

CP Discrete Anodes Limited (may be poor test)

CP Arc-Spray Zinc Likely but uncertain

CP Zinc Sheet Good

Chloride ExtractionSome protection, may have

extended life

Page 48: Performance of Corrosion Mitigation Systems in Iowa Bridges · Performance of Corrosion Mitigation Systems in Iowa Bridges Work Performed on Behalf of Iowa Department of Transportation,

Conclusions

CP systems offer promise to reduce ongoing

corrosion of substructure and superstructure

elements