Risk Analysis and Target Reliability for Bridges Andrzej S. Nowak, Ph.D. University of Nebraska-Lincoln

description

Bridges are vulnerable to extreme events such as natural disasters in addition to hazards stemming from negligence and improper maintenance, overloading, collisions, intentional acts of vandalism, and terrorist attacks. These structures must be protected but the current approach to risk is not always rational. Sensitivity analysis will be performed to relate the reliability of bridges and reliability of the transportation network.

Transcript of Risk Mitigation for Highway and Railway Bridges

Page 1: Risk Mitigation for Highway and Railway Bridges

Risk Analysis and Target Reliability for Bridges

Andrzej S. Nowak, Ph.D.University of Nebraska-Lincoln

Page 2: Risk Mitigation for Highway and Railway Bridges

Disclaimer

The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the information presented herein. This document is disseminated under the sponsorship of the U.S. Department of Transportation’s University Transportation Centers Program, in the interest of information exchange. The U.S. Government assumes no liability for the contents or use thereof.

Page 3: Risk Mitigation for Highway and Railway Bridges

Outline Problem Statement Load and Resistance Models Reliability Analysis Procedure Selection of the Target Reliability Load and Resistance Factors

Page 4: Risk Mitigation for Highway and Railway Bridges

Problem Statement 585,000 highway bridges in USA 30-35% are inadequate 10-15% are structurally deficient How to use the available limited

resources?

Page 5: Risk Mitigation for Highway and Railway Bridges

Needs New design – how to design with

optimum life cycle costs? Existing structures – how to

assess the actual loads and capacity? How to predict the remaining life?

Select a rational safety margin

Page 6: Risk Mitigation for Highway and Railway Bridges

Uncertainties Loads (natural and created) Material properties Load carrying capacity (resistance) Basic requirement:

Load effect (Q) < Resistance (R) Safety margin

R – Q > 0

Page 7: Risk Mitigation for Highway and Railway Bridges

Reliability Index,

Page 8: Risk Mitigation for Highway and Railway Bridges

Basic Questions:• How can we measure safety of a

structure?• How safe is safe enough? What is

the target reliability?• How can we implement the

optimum safety level?

Page 9: Risk Mitigation for Highway and Railway Bridges

Safety Factors• Allowable stress• Load factors• Load combination factors• Resistance factors

Page 10: Risk Mitigation for Highway and Railway Bridges

Load Factor

Page 11: Risk Mitigation for Highway and Railway Bridges

Resistance Factor

Page 12: Risk Mitigation for Highway and Railway Bridges

Code Calibration Procedure

• Select representative structures• Develop statistical models for loads• Develop statistical models for resistance• Develop/select reliability analysis

procedure• Determine the target reliability index• Determine load and resistance factors

Page 13: Risk Mitigation for Highway and Railway Bridges

Bridge Loads• Dead load• Live load (static and dynamic)• Environmental loads (wind, snow,

earthquake, temperature, ice)• Special loads (vehicle and vessel

collision, fire, explosion)

Page 14: Risk Mitigation for Highway and Railway Bridges
Page 15: Risk Mitigation for Highway and Railway Bridges
Page 16: Risk Mitigation for Highway and Railway Bridges

Two Trucks Side by Side

Page 17: Risk Mitigation for Highway and Railway Bridges

Video Recordings of Traffic Jam Situations FHWA Data• Multiple-presence of trucks occupying three lanes• One lane is almost exclusively occupied by trucks

Video 1, time: 00:18:36

Page 18: Risk Mitigation for Highway and Railway Bridges

Resistance (Load Carrying Capacity)

• Material tests• Component tests• Diagnostic tests• Analytical simulations• Proof load tests

Page 19: Risk Mitigation for Highway and Railway Bridges
Page 20: Risk Mitigation for Highway and Railway Bridges
Page 21: Risk Mitigation for Highway and Railway Bridges
Page 22: Risk Mitigation for Highway and Railway Bridges
Page 23: Risk Mitigation for Highway and Railway Bridges
Page 24: Risk Mitigation for Highway and Railway Bridges

Reliability Index, For a linear limit state function, g = R – Q = 0,

and R and Q both being normal random variables

2Q

2R

QR

R = mean resistanceQ = mean loadR = standard deviation of resistanceQ = standard deviation of load

Page 25: Risk Mitigation for Highway and Railway Bridges

Reliability Index and Probability of Failure

PF 1010-1-1 1.281.28

1010-2-2 2.332.33

1010-3-3 3.093.09

1010-4-4 3.713.71

1010-5-5 4.264.26

1010-6-6 4.754.75

1010-7-7 5.195.19

1010-8-8 5.625.62

1010-9-9 5.995.99

Page 26: Risk Mitigation for Highway and Railway Bridges

Reliability Analysis Procedures• Closed-form equations – accurate results only

for special cases• First Order Reliability Methods (FORM),

reliability index is calculated by iterations• Second Order Reliability Methods (SORM), and

other advanced procedures• Monte Carlo method - values of random

variables are simulated (generated by computer), accuracy depends on the number of computer simulations

Page 27: Risk Mitigation for Highway and Railway Bridges

What is Optimum Reliability?

• If reliability index is too small – there are problems, even structural failures

• If reliability index is too large – the structures are too expensive

Page 28: Risk Mitigation for Highway and Railway Bridges

Selection Criteria for the Target Reliability

• Consequences of failure• Economic analysis• Past practice• Human perception• Social/political decisions

Page 29: Risk Mitigation for Highway and Railway Bridges

Target Reliability Index – Major Considerations

• Primary and secondary components

• Multiple and single load paths (redundancy)

• Element and system reliability

• New design and existing structure

• Ductile and brittle materials and components

• Important, historical and ordinary structures

Page 30: Risk Mitigation for Highway and Railway Bridges

Types of Components• Primary component – its failure causes

failure of other components (or total collapse)

• Secondary component – its failure does not affect performance of other components

Page 31: Risk Mitigation for Highway and Railway Bridges

Examples of the Target Reliability Indices for Bridge Components

Primary component (multiple load path)T = 3.5

Primary component (single load path)T = 5.0

Secondary componentT = 2.0

Page 32: Risk Mitigation for Highway and Railway Bridges

T for Strength vs. Service Limit States

• Consequences of exceeding the limit state are different

• For decompression, T = 1

• For deflection, T = 0

• For fatigue, T = 1-2

Page 33: Risk Mitigation for Highway and Railway Bridges

System vs. Component

• Structures are systems made of components

• Failure of a component may not mean failure of the system

• Ductile and brittle components• Correlation between components

Page 34: Risk Mitigation for Highway and Railway Bridges

Structural Systems

• Series systems – weakest link systems, to be avoided

• Parallel systems – components share the load, preferred systems

• Avoid brittle materials and elements, use ductile materials and elements

Page 35: Risk Mitigation for Highway and Railway Bridges

The weakest linkdetermines the strength

Page 36: Risk Mitigation for Highway and Railway Bridges
Page 37: Risk Mitigation for Highway and Railway Bridges

37

Page 38: Risk Mitigation for Highway and Railway Bridges

38

Page 39: Risk Mitigation for Highway and Railway Bridges
Page 40: Risk Mitigation for Highway and Railway Bridges

Parallel system

Page 41: Risk Mitigation for Highway and Railway Bridges
Page 42: Risk Mitigation for Highway and Railway Bridges

Golden Gate Bridge, San Franciscobuilt in 1933-1935, span of 1280 m

Page 43: Risk Mitigation for Highway and Railway Bridges

Examples of the Target Reliability Indices for Bridges - Materials

For steel, reinforced concrete, prestressed concrete girders,

T = 3.5For sawn wood bridge components,

T = 2.0For girder bridge as a system (all materials),

T = 5.5-6.5

Page 44: Risk Mitigation for Highway and Railway Bridges

Operational Importance

• Regional and national economy

• Emergency situations (floods, earthquakes, fires, hurricanes)

Page 45: Risk Mitigation for Highway and Railway Bridges

Historical Value• Historical structures can have a

special value for the society

• Preservation of the general features

Page 46: Risk Mitigation for Highway and Railway Bridges

New Design vs. Existing Structure

• For a new design, reliability can be increased with little extra cost

• For an existing structure, any strengthening can be prohibitively expensive

• Current practice accepts lower reliability levels for existing structures

DFiala
Inserted comma.
Page 47: Risk Mitigation for Highway and Railway Bridges

Reliability of Connections

• For a bolted connection, the reliability can be increased with negligible extra cost (extra bolts)

• For a steel component, the increase of reliability is much more costly (heavier section)

• Target reliability index for bolts is T = 5-6, while for beams, T = 3-4

Page 48: Risk Mitigation for Highway and Railway Bridges

How can we implement the target reliability?

• Design and evaluation of existing bridges – by load and resistance factors, safety margins in the design, fool-proof design

• Construction – quality control of materials and work skill, fool-proof construction

• Proper use and operation, maintenance, preventive repairs

Page 49: Risk Mitigation for Highway and Railway Bridges

Recommended T

TIME PERIOD

PRIMARY COMPONENTS SECONDARY COMPONENTSSingle Path Multiple Path

5 years 3.50 3.00 2.2510 years 3.75 3.25 2.5050 years 4.00 3.50 2.75

Page 50: Risk Mitigation for Highway and Railway Bridges

Conclusions• Target reliability index varies depending on

consequences of failure, costs, and other considerations

• For new design, bT can be significantly higher than for evaluation of existing structures

• For historical structures, in addition, bT

depends on social and political considerations

Page 51: Risk Mitigation for Highway and Railway Bridges

Slide design © 2009, Mid-America Transportation Center. All rights reserved.

Thank You!

CREDITS