paginas_TELsmithHP3

download paginas_TELsmithHP3

of 5

Transcript of paginas_TELsmithHP3

  • 7/25/2019 paginas_TELsmithHP3

    1/5

    CyCLONE CLASSIFIERS

    These fne sand reclaiming units have nmoving parts. They operate on the principle ocentriugal orce. This orce, introduced by thslurry in-ow separates the coarser ractions romthe non-desired fnes. They normally separate a

    the 150 mesh sie range. !n operations wherminus "0 mesh sand is in short supply they casignifcantly increase plant capacity ospecifcation materials.

  • 7/25/2019 paginas_TELsmithHP3

    2/5

    1#0

  • 7/25/2019 paginas_TELsmithHP3

    3/5

    SAND RECOvERy WITH THE TELSMITHCyCLONE

    TheTelsmith $yclone recovers fne sand in the %00 mesh sie range to increase sand recovcapacity and restores those fne sies neededmeet present day sand specifcations. T

    premium sand, ormerly discharged into wasettling basins where re&uent removal necessary, becomes a source o income ratthan an e'pense.

  • 7/25/2019 paginas_TELsmithHP3

    4/5

    releases recovery sand through bottom discha

    valve.

    1

  • 7/25/2019 paginas_TELsmithHP3

    5/5

    WATER CAPACITy 24" TELSMITH CyCLONE ST & RL

    OPERATIN

    G HEADEXPECTED MAX. FLOWSW/5" vORTEX FINDER

    EXPECTED MAX.FLOWS W/" vORTEX

    EXPECTED MW/!" vORT

    ,-oT. %/ ,-oT. "/ ,-oT. #/ ,-oT. #/ ,-oT. #/

    t

    .

    ps

    i

    gp

    m

    pump

    -oT. 5

    gp

    m

    pump

    -oT. 5

    gpm

    1#50

    (pe' alves oT 2/ 113%4 to "4 iameter %4 to "4 iameter %4 to #4

    SPECIFICATIONS#NOTE !. ! the water overowing rom your sand classiferis insu6cient to supply a pump o the gpm shown, part ooverow rom the Telsmith cyclone may be recirculatedthru the pump and cyclone to give proper operation. Theproper design o a sump ahead o the pump is importantand the data to build a sump will be urnished uponre&uest. ata in table is based on ma7ing classifcation atabout %00 mesh, the generally accepted dividing linebetween silt and sand.NOTE 2. The operating head is the pressure drop throughthe cyclone. To this you must add the vertical head distancein eet rom the surace o the water in the sump to thecenterline o the cyclone/ and the estimated head loss ineet due to riction in the pipe and fttings. 8se the totalhead operating head plus vertical head plus riction head/or selecting the proper pump. 9ee note 5.NOTE $. )9! is pounds per s&uare inch o pressure re&uiredat eed inlet o the Telsmith cyclone to give proper

    operation. :est pressure or the %#4 $yclone is about %0-"0psi. ;igher pressures will recover more o the fner sand butmay also recover some o the coarser silt.

    NOTE 4. The gpm is the ma'imum gallons per the %#4 $yclone will handle under ordinary conwith the sie o orte' 50-00 gpm using a