Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a...
Transcript of Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a...
![Page 1: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/1.jpg)
Outsourcing the CSSD a threat?
Or a challenge?!
![Page 2: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/2.jpg)
7 may 2004 R. Vis 2
Introduction• René Vis
– VU medical center, Amsterdam– Responsible person for sterilization and all sterile medical devices
in the hospital• Deskundige steriele medische hulpmiddelen
• 1984– Legislation on sterilization in hospitals
• Board of directors is responsible• Appoint a responsible person for sterilization and sterile
medical devices– Quality control of production – Quality control of storage and distribution– Responsible for the validation of washer disinfectors and
sterilizers
![Page 3: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/3.jpg)
7 may 2004 R. Vis 3
VU medical center
•University hospital•750 beds•4000 staff•21 operation rooms
![Page 4: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/4.jpg)
7 may 2004 R. Vis 4
Outsourcing
• The practice of subcontracting manufacturing work to outside companies
• Critical words:– (sub) contracting– Outside companies
![Page 5: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/5.jpg)
7 may 2004 R. Vis 5
Outsourcing is a trend
• IT Services• Maintenance departments• Restaurants• Laundry
• Is the CSSD going to be next?!– England– France– Germany
![Page 6: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/6.jpg)
7 may 2004 R. Vis 6
In-sourcing?
• Is the CSSD the “inside company”?• Is there a contract for the reprocessing?
• Is the CSSD considered to be the money consuming cleaning department or the businesslike unit that is the professional partner within the hospital?
![Page 7: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/7.jpg)
7 may 2004 R. Vis 7
Why outsource?
• Improve quality of the service– Qualified staff– Complying with national or international standards and
guidelines– Implementing a quality system
• Major investments – Equipment– Building– Staff training
• Limited space
![Page 8: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/8.jpg)
7 may 2004 R. Vis 8
Back to core business!
• Cost reduction!– No staff?– No equipment?– No maintenance?– No validation of equipment and processes?– No housing costs?
• Only doctors and nurses?
• Is the CSSD and the reprocessing and quality control of medical devices seen as the core business?
![Page 9: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/9.jpg)
7 may 2004 R. Vis 9
Core business of the Turkish airlines
![Page 10: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/10.jpg)
7 may 2004 R. Vis 10
Who makes the decisions?
• Board of directors• Triggered by:
• Customers within the hospital• Outsourcing companies• Government
– Legislation– Regulations– Standards– Requirements
![Page 11: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/11.jpg)
7 may 2004 R. Vis 11
Considerations for reprocessing in a hospital or by an outside company
• Cost containment– Costs per reprocessed tray:
• Salaries of staff• Continuous education and training • Equipment, maintenance, validation • Overheads
• Quality of the service• Turnover time and the limitations • Ownership of the surgical instruments
![Page 12: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/12.jpg)
7 may 2004 R. Vis 12
Services provided by CSSD?
• Reprocess surgical instruments– Compliance with prEN 17664
• Information to be provided by the manufacturer for the processing of resterilizable medical devices
• Managing sterile storage • Distributing sterile medical devices • Quality control sterile medical devices
![Page 13: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/13.jpg)
7 may 2004 R. Vis 13
Additional value
• Knowledge of reprocessing surgical instruments• Knowledge of cleaning, disinfection and sterilization• Co-decision maker in the process of purchasing
medical devices• Part of the quality chain of sterile medical devices
![Page 14: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/14.jpg)
7 may 2004 R. Vis 14
Reprocessing
• Collection of used instruments at point of use• Transport from point of use• Collection at sterilization facility• Identification of instruments and trays• Cleaning• Disinfection• Function control• Tray assembly• Packaging• Sterilization• Storage• Distribution to point of use
![Page 15: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/15.jpg)
7 may 2004 R. Vis 15
What are the parameters?
• Costs to run a CSSD– Staff– Housing– Energy
• Steam• Electricity• Heating• Air-treatment unit
– Maintenance and validation of equipment
![Page 16: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/16.jpg)
7 may 2004 R. Vis 16
Logistics
• Turnover time of instrument trays– General trays – Specific trays– Critical trays – Replacing lost or damaged instruments
• Production and storage– Cleaning and disinfection– Packaging and sterilization – Transport systems– Storage systems
![Page 17: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/17.jpg)
7 may 2004 R. Vis 17
Equipment
• Machines– Washers disinfectors– Sterilizers– Tables, sinks, ultrasonic cleaners– Computers
• Surgical instruments– Amount and types of trays– Standardised instruments– Specialized instruments
![Page 18: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/18.jpg)
7 may 2004 R. Vis 18
Consumables
• Bowie & Dick tests packs• Cleaning and disinfection tests• Packaging material• Chemicals
– Detergents, disinfectants
![Page 19: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/19.jpg)
7 may 2004 R. Vis 19
What to do?
• Prepare!– Research on production data– Research on inventory– Condition of inventory– Annual costs
• Staff• Training• Maintenance • Overheads
– Knowledge of national and international standards and requirements
![Page 20: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/20.jpg)
7 may 2004 R. Vis 20
Talk to the customers
• What is the desired service?– Is that a realistic demand?
• Awareness of two-way partnership? • Is further standardisation of instruments and trays an
option?• Will there be a need for a facility for reprocessing
surgical instruments within or near the operation theatre complex?– Who will be responsible for that unit?
![Page 21: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/21.jpg)
7 may 2004 R. Vis 21
Compliance with standards
• EN 285– steamsterilizers
• EN 554– Validation of steamsterilizers
• EN 1422– ETO
• EN 14180– LTSF
• EN 15883– Washer disinfectors
![Page 22: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/22.jpg)
7 may 2004 R. Vis 22
VUmc CSSD
• 35 staff members • 7 washers disinfectors (7 x 10 instrument trays)• 4 large steam sterilizers (4 x 24 instrument trays)• 1 small steam sterilizer (6 instrument trays)• 12 packaging tables
![Page 23: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/23.jpg)
7 may 2004 R. Vis 23
Decontamination area
![Page 24: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/24.jpg)
7 may 2004 R. Vis 24
Packaging and sterilization
![Page 25: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/25.jpg)
7 may 2004 R. Vis 25
CSSD Statistics
• Production hours:– Monday to Friday 7.30 till 23.00– Sunday 7.30 till 17.00
• Turnover time 5-6 hours• Production is 60.000 sterilization modules
– 30x60x30 cm (EN 285)• 120.000 instrument units
• Instrument inventory– Over 10.000 instruments– 8 million Euros
![Page 26: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/26.jpg)
7 may 2004 R. Vis 26
Calculating price per tray
Annual costs• Staff € 1.110.000• Equipment/inventory €
120.000• Consumables € 205.000• Validation € 20.000• Maintenance € 20.000 • Training and education € 10.000• Unforeseen € 15.000
total € 1.500.000Price per tray VUmc € 12,50
(at 120.000 units a year, housing and energy where not calculated)
![Page 27: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/27.jpg)
7 may 2004 R. Vis 27
Accurate measuring and pricing is needed!
• Categories for specific trays and instruments– Measure time needed to compose instruments and trays– Set up difficulty levels for types of trays– Calculate the time and skills needed to compose the trays
• Pricing of the individual difficulty levels
![Page 28: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/28.jpg)
7 may 2004 R. Vis 28
Compare information with colleagues
• Production data• Staff data• Budgets• Equipment
Find out what you already knew!
You are doing a great job with very limited resources
![Page 29: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/29.jpg)
7 may 2004 R. Vis 29
Is outsourcing a threat?
• Yes!– Comparing business investments to hospital budgets– Comparing business information to hospital non-information– Comparing business management to hospital management
• Money consuming cleaning department– Complying to standards – Quality control– Staffing is a big part of the costs
![Page 30: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/30.jpg)
7 may 2004 R. Vis 30
Is outsourcing a threat?
• NO!– Run your CSSD as a business– Know your critical parameters
• Collect them over the years– Comply with the standards– Apply a quality system
• Use the additional value of the department– Knowledge– Experience
![Page 31: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/31.jpg)
7 may 2004 R. Vis 31
Accept the challenge
• Set up a “contract” with your customers• Provide the hospital with a periodical and annual
reports• Set up a adequate budget• Set up a price per tray• Validate your reprocessing process • Communicate with colleagues
– National association MSüD– International EFHSS
![Page 32: Outsourcing the CSSD a threat? - IDI · 2015-05-09 · Outsourcing the CSSD a threat? Or a challenge?! 7 may 2004 R. Vis 2 Introduction • René Vis – VU medical center, Amsterdam](https://reader030.fdocuments.net/reader030/viewer/2022040316/5e28db0883cccd1ab41ce358/html5/thumbnails/32.jpg)
7 may 2004 R. Vis 32
Outsourcing is reality
Accept the challengeAnd be prepared!