OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

14
OP- Navigation.ppt 1 U.S Army Corps of U.S Army Corps of Engineers Engineers Savannah District Savannah District

Transcript of OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

Page 1: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 1

U.S Army Corps of U.S Army Corps of EngineersEngineers

Savannah DistrictSavannah District

Page 2: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 2

SCSC

GAGA

ATLANTIC O

CEAN

Savannah R

.

St. Mary’s R.St. Mary’s R.

Savannah HarborSavannah Harbor

Brunswick Brunswick HarborHarbor

AIWWAIWW

Civil Works & NavigationCivil Works & Navigation BoundariesBoundaries

Page 3: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 3

Sav’h HarborSav’h Harbor 32.5 Miles32.5 Miles

AIWWAIWW 161 Miles161 Miles

Brunswick Brunswick 24 Miles24 Miles

TotalTotal 217.5 Miles217.5 Miles

Navigation ProjectsNavigation Projects

Page 4: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 4

ScheduledScheduled FY08 Dredging Work in FY08 Dredging Work in Savannah District Savannah District

South Atlantic DivisionSouth Atlantic Division

Savannah & Brunswick Savannah & Brunswick Inner HarborInner Harbor

FY08 Savannah &FY08 Savannah &Brunswick Entrance ChlBrunswick Entrance Chl

OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP

Sea Turtles-screens & observersSea Turtles-screens & observers

Striped bass spawningStriped bass spawning

Hopper DredgeHopper DredgeMaintenance DredgingMaintenance Dredging

Hydraulic Pipeline DredgeHydraulic Pipeline DredgeMaintenance DredgingMaintenance Dredging

Est. 6,000K CYEst. 6,000K CY

BOBO10/1510/15Est. 2,000K CYEst. 2,000K CY

BOBO2323

BOBO1515

Page 5: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 5

Savannah DistrictSavannah District

FY 07 Hopper Dredge ProgramFY 07 Hopper Dredge Program

Page 6: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 6

ScheduledScheduled FY08 Dredging Work in FY08 Dredging Work in Savannah District Savannah District

South Atlantic DivisionSouth Atlantic Division

FY08 Savannah &FY08 Savannah &Brunswick Entrance ChlBrunswick Entrance Chl

OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP

Sea Turtles-screens & observersSea Turtles-screens & observers

Hopper DredgeHopper DredgeMaintenance DredgingMaintenance Dredging

BOBO10/1510/15Est. 2,000K CYEst. 2,000K CY

BOBO2323

Page 7: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 7

Savannah DistrictSavannah District

Project: Savannah Entrance ChannelProject: Savannah Entrance Channel Type of work: MaintenanceType of work: Maintenance Depth: 42/44 ftDepth: 42/44 ft Width: 600 ftWidth: 600 ft Length: 11.4 milesLength: 11.4 miles Quantity: 1.0 MCYQuantity: 1.0 MCY Type of Material: sand/silt/clayType of Material: sand/silt/clay Placement Areas: EPA approved ocean Placement Areas: EPA approved ocean

site and near shore sitessite and near shore sites Distance to Placement Area: up to 11.5 Distance to Placement Area: up to 11.5

milesmiles Type of Equipment: HopperType of Equipment: Hopper Small Business Set Aside: NoSmall Business Set Aside: No Last Dredged: FY06Last Dredged: FY06 Environmental Window: Dec 15- March Environmental Window: Dec 15- March

3131 Reason for Window: Right Whales and Reason for Window: Right Whales and

Sea TurtlesSea Turtles

Page 8: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 8

Savannah DistrictSavannah District

Project: Brunswick Entrance ChannelProject: Brunswick Entrance Channel Type Work: MaintenanceType Work: Maintenance Depth: 36/38 feetDepth: 36/38 feet Width: 500 feetWidth: 500 feet Length: 16.8 milesLength: 16.8 miles Quantity: 1.0 MCYQuantity: 1.0 MCY Type of Material: Sand/silt/clayType of Material: Sand/silt/clay Placement Areas: EPA approved ocean Placement Areas: EPA approved ocean

site and near shore sitessite and near shore sites Distance to Placement Area: up to 19 Distance to Placement Area: up to 19

milesmiles Type of Equipment: HopperType of Equipment: Hopper Small Business Set Aside: NoSmall Business Set Aside: No Last Dredged: FY07Last Dredged: FY07 Environmental Window: 15 Dec-13 Environmental Window: 15 Dec-13

MarchMarch Reason for Window: Right Whales and Reason for Window: Right Whales and

Sea TurtlesSea Turtles

Page 9: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 9

Savannah DistrictSavannah District

FY07 Hydraulic Cutter Head FY07 Hydraulic Cutter Head Dredge ProgramDredge Program

Page 10: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 10

ScheduledScheduled FY08 Dredging Work in FY08 Dredging Work in Savannah District Savannah District

South Atlantic DivisionSouth Atlantic Division

Savannah & Brunswick Savannah & Brunswick Inner HarborInner Harbor

OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP

Striped bass spawningStriped bass spawning

Hydraulic Pipeline DredgeHydraulic Pipeline DredgeMaintenance DredgingMaintenance Dredging

Est. 6,000K CYEst. 6,000K CY

BOBO1515

Page 11: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 11

Savannah DistrictSavannah District Project: Savannah & Brunswick Inner Project: Savannah & Brunswick Inner

HarborsHarbors Type of work: MaintenanceType of work: Maintenance Depth: (SH)40/46 ft, (BH)36 ftDepth: (SH)40/46 ft, (BH)36 ft Width: (SH)500 ft, (BH)400 ftWidth: (SH)500 ft, (BH)400 ft Length: (SH)21.3 miles, (BH)3 milesLength: (SH)21.3 miles, (BH)3 miles Quantity: 6.0 mcyQuantity: 6.0 mcy Type of Material: sand/silt/mudType of Material: sand/silt/mud Placement Area: Upland placement Placement Area: Upland placement

sitessites Distance to Placement Area: up to 2 Distance to Placement Area: up to 2

milesmiles Type of Equipment: Hydraulic Type of Equipment: Hydraulic

cutterhead pipelinecutterhead pipeline Small Business Set Aside: YesSmall Business Set Aside: Yes Last Dredged: FY07Last Dredged: FY07 Environmental Window: (SH) March 15-Environmental Window: (SH) March 15-

May 30 (above Station 63+000) (BH)April May 30 (above Station 63+000) (BH)April 1-August 11-August 1

Reason for Window: (SH)Striped Bass Reason for Window: (SH)Striped Bass Spawning (BH) Least tern nestingSpawning (BH) Least tern nesting

Page 12: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 12

SAVANNAH DISTRICTNEW WORK

DREDGING PROGRAM

SAVANNAH DISTRICTNEW WORK

DREDGING PROGRAM

NAD/SAD REGIONAL DREDGING

MEETING/WEDA

NAD/SAD REGIONAL DREDGING

MEETING/WEDA US Army Corps of Engineers Savannah District

US Army Corps of Engineers Savannah District

Page 13: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 13

Savannah DistrictSavannah District

FY09 FY10 FY11 FY12

Project Dredge QuantityDisposal

Area1st Qtr

2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd

Qtr3rd Qtr

4th Qtr

1st Qtr

2nd Qtr

3rd Qtr

4th Qtr

1st Qtr

2nd Qtr

3rd Qtr

4th Qtr

Savannah Harbor Expansion Entrance Channel

Hopper Pipeline

11.4 MBeach Ocean Littoral

Savannah Harbor Expansion

Inner HarborPipeline 14.3 M Upland

Page 14: OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

OP-Navigation.ppt 14

Type of Work: New WorkDepth: 47‘Width: variesLength: 36+ MilesQuantity: 25.7 McyType of Material: Hard Sand, Silts and Clay Placement Area: Upland & Open waterDistance to Placement Area: upto 15MilesType of Equipment: Hopper/PipelineSmall Business Set Aside: NoLast Dredged: 2007Schedule: Bid Opening November 2008POC: T. Alan Garrett