DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS …

11
DEPARTMENT OF THE ARMY SAVANNAH DISTRICT , CORPS OF ENGINEERS PIEDMONT BRANCH, LANIER FIELD OFFICE POST OFFICE BOX 528 BUFORD, GEORGIA 30515 AUGUST 2 2 Z01Z REPLY TO ATT£NT10N OF Regulatory Division SAS-20 12-00679 JOINT PUBLIC NOTICE Savannah District/State of Georgia The Savannah District has received an application for a Department of the Army Permit, pursuant to Section 404 of the Clean Water Act (33 U.S.C. 1344), as follows: Application Number: SAS-2012-00679 Applicant: Gainesville Waste & Recycling, LLC Attention: Mr. Ken Cronan 1602 Athens Highway Gainesville, Georgia 30507 Environmental Services, Inc. Attention: Mr. Brandon Smith Post Office Box 2383 Savannah, Georgia 31402 Location of Proposed Work: The project si te is loca1ed south of Athens Highway (US Highway 129), approximately 2 miles southeast ofthe City of Gainesville, Hall County, Georgia at latitude 34.2760 and longitude -83.7917 . Description of Work Subject to the Jurisdiction of the US Army Corps of Engineers: The Gainesville Waste and Recycling, LLC, proposes the expansion of an existing operational section of the facility and proper disposal of solid waste from an unlined landfill. The unlined landfill closed in the 1970's and all h istoric solid waste must be disposed of or properly treated. The proposed proj ect activities include the relocation, construction, and maintenance of facility roads, construction and demolition (C&D) waste disposal cells, clearing and grubbing for remediation activities, side slope ·fill, and storm.water management areas and structures. The applicant proposes to purchase 4.40 wetland credits from Prichett Mitigation Bank and 2 , 246 .04 stream credits from Chicopee Woods Mitigation Bank. The purchase of wetland and stream

Transcript of DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS …

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT CORPS OF ENGINEERS

PIEDMONT BRANCH LANIER FIELD OFFICE POST OFFICE BOX 528

BUFORD GEORGIA 30515

AUGUST 2 2 Z01Z REPLY TO

ATTpoundNT10N OF

Regulatory Division SAS-2012-00679

JOINT PUBLIC NOTICE Savannah DistrictState of Georgia

The Savannah District has received an application for a Department ofthe Army Permit pursuant to Section 404 of the Clean Water Act (33 USC 1344) as follows

Application Number SAS-2012-00679

Applicant Gainesville Waste amp Recycling LLC Attention Mr Ken Cronan 1602 Athens Highway Gainesville Georgia 30507

Environmental Services Inc Attention Mr Brandon Smith Post Office Box 2383 Savannah Georgia 31402

Location ofProposed Work The project site is loca1ed south of Athens Highway (US Highway 129) approximately 2 miles southeast ofthe City of Gainesville Hall County Georgia at latitude 342760 and longitude -837917

Description ofWork Subject to the Jurisdiction of the US Army Corps ofEngineers The Gainesville Waste and Recycling LLC proposes the expansion ofan existing operational section of the facility and proper disposal of solid waste from an unlined landfill The unlined landfill closed in the 1970s and all h istoric solid waste must be disposed of or properly treated The proposed project activities include the relocation construction and maintenance offacility roads construction and demolition (CampD) waste disposal cells clearing and grubbing for remediation activities side slope middotfill and stormwater management areas and structures The applicant proposes to purchase 440 wetland credits from Prichett Mitigation Bank and 2 24604 stream credits from Chicopee Woods Mitigation Bank The purchase of wetland and stream

credits would offset the 0 78 acre ofwetland 0007 acre of ephemeral channel and 4635 linear feet ofperennial stream for lbe proposed project impacts

BACKGROUND

This Joint Public Notice announces a request for authorizations from both the US Army Corps of Engineers and the State ofGeorgia The applicants proposed work may also require local governmental approval

STATE OF GEORGIA

Water Quality Certificat10n The Georgia Department ofNatural Resources Environmental Protection Division intends to certify this project at the end of 30 days in accordance with the provisions of Section 401 of the Clean Water Act which is required for a Federal Pennit to conduct activity in on or adjacent to the waters of the State of Georgia Copies of the application and supporting documents relative 10 a specific application will be available for review and copying at the office ofthe Georgia Department ofNatural Resources Environmental Protection Division Water Protection Branch 4220 International Parkway Suite 101 Atlanta Georgia 30354 during regular office hours A copier machine is available fo r public use at a charge of25 cents per page Any person who desires to comment object or request a public hearing relative to State Water Quality Certification must do so within 30 days of the States receipt ofapplication in writing and state the reasons or basis ofobjections or request for a bearing The application can be reviewed in the Savannah District US Army Corps of Engineers Regulatory Division Piedmont Branch Lanier Field Office Post Office Box 528 Buford Georgia 30515

State-owned Property and Resources The applicant may also require assent from the State of Georgia which may be in the form of a license easement lease pennit or other appropriate instrument

US ARMY CORPS OF ENGINEERS

The Savannah District must consider the purpose and the impacts of the applicants proposed work prior to a decision on issuance ofa Departmen1 of the Army Permit

Cultural Resources Assessment Review of the latest published version of the National Register of Historic Places indicates that no registered properties or properties listed as eligible for inclusion are located at the site or in the area affected by the proposed work Presently unknown archaeological scientific prehistorical or historical data may be located at the site and could be affected by the proposed work

Endangered Species Pursuant to Section 7(c) of the Endangered Species Act of 1973 as amended (16 U SC 1531 et seq) we request information from the US Department of the Interior Fish and Wildlife Service the US Department of Commerce the National Ocearric and Atmospheric Administration and the National Marine Fisheries Service or any other interested party on whether any species listed or proposed for listing may be present in the area

2

Public Interest Review Tbe decision whether to issue a permit will be based on an evaluation ofthe probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands~ historic properties fish and wildlife values flood hazards flood plain val ues land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people

Consideration ofPublic Comments The US Army Corps of Engineers is soliciting comments from the public federal~ state and local agencies and officials Native American T ribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the US Army Corps of Engineers to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity

Application of Section 404(b)(l) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the U ruted States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act

Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army Permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to bold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project

Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Anny Corps of Engineers Savannah District Attention Natalie Edwards Piedmont Branch Lanier Field Office Post Office Box 528 Buford Georgia 30515 no later than 30 days from the date of this notice Please refer to the applicants name and the application number in your comments

3

[f you have any further questions concerning this matter please contact Natalie Edwards Project Manager Piedmont Branch at (678) 804 5228

Enclosures 1 Project Location Map 2 Topographic Map 3 NRCS Soil Map 4 FEMA Q3 Flood Data Map 5 National Wetlands Inventory Map 6 Approximate Wetland and Stream Map 7 Estimated Offsite Alternatives impacts Map

4

~rlProject Boundary - Freeway

c- County Line = limited Access

Perennial Stream Highway

Intermittent Stream Local Road

Intermittent Canal Other Road

0 0~

01~ ThCI inloftNIion dcpdld ofliW 91~ iampfos coroptwlll llf1POIIIamp IHIiyM1o otlo fce~ f~nVIIIIJIIrQf geo~ 111-~~ p~fltbull _flkN tnd liamp loUIIfld 10 IIIMancl bullmlby IJPfO_ ~~QWCbullL

ENVIRONMENTAL SERVICES INC 11 ~aoftUI AcsSU11r tCitl StwGAS1421 (9gt1)~1amp4711 (V12 2JIXNllinbull

-middot~lttWixtt-JcCOn

Project Location Map

GWAR CampD Landfill Expansion Hall County Georgia

Project E$0808001

Date Jun2012

DrwnChkd TSSB

Ftgure 1

1000 2000

Feet

Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc

-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________

IRONM ENTA L iCpoundS INC Topographic Map

GWAR CampD Landfill Expansion Hall County Georgia

Pr~ ES0808000

Dale J un 2012

OrwnChkd TSIBS

F ure z

--

NRCS Soils ApC Apping

MdE M adison

MID2 Madison eroded

PTF Pacoletmiddot Tallapoosa

PaE Pacolet

W Water

0 100

Feet

Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia

ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711

bull - fttZ) 2J5SB bull bull Hall County Georgia

500 1000

Fshy

Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull

ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia

~_COf

Intermittent

Perennial

JOO 600

r Souroejs) usrws N WclendllnvotUlt1

c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt

ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin

~ I I I I

I

[Q)Projeet Boundary

i200-ft Boundary Buffer

Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)

Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae

__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~

____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)

Ephemeral Channel Impact Remediation I Expansion

1427-feet

-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot

I I

I-

Q) l)

~ 0

It) lt (l1J

~ ~ ~() 0

~ 0

sect atS 0 0

-middot- a _

Impacted Wetiand (~78-ac)

Jurisdictional Weiland (li)67-ac)

StreamWetland Buffer (t74-ac)

M

~

Perennial Stream Impact A

Jurisdictional Wetland Impact A Remediation I Expansion

002-acres

Perennial Stream Impact B Remediation I Expansion

388-feet

Jurisdictional Wetland Impact B Remediation I Expansion

076-acres

0 200

Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401

ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6

middotshy Intermittent Stream

Perennial Stream

Offslte Parcel 3 Impacted Intermitte nt Stream

i200middotft Boundary Buffer shy Impacted Perennial Stream

CampD Cells Impacted Wetland

Jurisdictional Wetland

StreamWalland Buffer

Offslte Alternative 1 30871-rt Impacted Perennial Stream

019-ac Impacted Jurisdictional Wetland

Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream

Offsite Alternative 3

ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp

~OIt~lfAtW~tWCOIS

12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland

Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)

GWAR CampD Landfill Expansion Hall County Georgia

0 100 1100

Fool

Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----

=~-==~~~toor___- Project E$0808001

Date Jun 2012

DrwnChkd TSJSB

F ure 11

credits would offset the 0 78 acre ofwetland 0007 acre of ephemeral channel and 4635 linear feet ofperennial stream for lbe proposed project impacts

BACKGROUND

This Joint Public Notice announces a request for authorizations from both the US Army Corps of Engineers and the State ofGeorgia The applicants proposed work may also require local governmental approval

STATE OF GEORGIA

Water Quality Certificat10n The Georgia Department ofNatural Resources Environmental Protection Division intends to certify this project at the end of 30 days in accordance with the provisions of Section 401 of the Clean Water Act which is required for a Federal Pennit to conduct activity in on or adjacent to the waters of the State of Georgia Copies of the application and supporting documents relative 10 a specific application will be available for review and copying at the office ofthe Georgia Department ofNatural Resources Environmental Protection Division Water Protection Branch 4220 International Parkway Suite 101 Atlanta Georgia 30354 during regular office hours A copier machine is available fo r public use at a charge of25 cents per page Any person who desires to comment object or request a public hearing relative to State Water Quality Certification must do so within 30 days of the States receipt ofapplication in writing and state the reasons or basis ofobjections or request for a bearing The application can be reviewed in the Savannah District US Army Corps of Engineers Regulatory Division Piedmont Branch Lanier Field Office Post Office Box 528 Buford Georgia 30515

State-owned Property and Resources The applicant may also require assent from the State of Georgia which may be in the form of a license easement lease pennit or other appropriate instrument

US ARMY CORPS OF ENGINEERS

The Savannah District must consider the purpose and the impacts of the applicants proposed work prior to a decision on issuance ofa Departmen1 of the Army Permit

Cultural Resources Assessment Review of the latest published version of the National Register of Historic Places indicates that no registered properties or properties listed as eligible for inclusion are located at the site or in the area affected by the proposed work Presently unknown archaeological scientific prehistorical or historical data may be located at the site and could be affected by the proposed work

Endangered Species Pursuant to Section 7(c) of the Endangered Species Act of 1973 as amended (16 U SC 1531 et seq) we request information from the US Department of the Interior Fish and Wildlife Service the US Department of Commerce the National Ocearric and Atmospheric Administration and the National Marine Fisheries Service or any other interested party on whether any species listed or proposed for listing may be present in the area

2

Public Interest Review Tbe decision whether to issue a permit will be based on an evaluation ofthe probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands~ historic properties fish and wildlife values flood hazards flood plain val ues land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people

Consideration ofPublic Comments The US Army Corps of Engineers is soliciting comments from the public federal~ state and local agencies and officials Native American T ribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the US Army Corps of Engineers to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity

Application of Section 404(b)(l) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the U ruted States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act

Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army Permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to bold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project

Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Anny Corps of Engineers Savannah District Attention Natalie Edwards Piedmont Branch Lanier Field Office Post Office Box 528 Buford Georgia 30515 no later than 30 days from the date of this notice Please refer to the applicants name and the application number in your comments

3

[f you have any further questions concerning this matter please contact Natalie Edwards Project Manager Piedmont Branch at (678) 804 5228

Enclosures 1 Project Location Map 2 Topographic Map 3 NRCS Soil Map 4 FEMA Q3 Flood Data Map 5 National Wetlands Inventory Map 6 Approximate Wetland and Stream Map 7 Estimated Offsite Alternatives impacts Map

4

~rlProject Boundary - Freeway

c- County Line = limited Access

Perennial Stream Highway

Intermittent Stream Local Road

Intermittent Canal Other Road

0 0~

01~ ThCI inloftNIion dcpdld ofliW 91~ iampfos coroptwlll llf1POIIIamp IHIiyM1o otlo fce~ f~nVIIIIJIIrQf geo~ 111-~~ p~fltbull _flkN tnd liamp loUIIfld 10 IIIMancl bullmlby IJPfO_ ~~QWCbullL

ENVIRONMENTAL SERVICES INC 11 ~aoftUI AcsSU11r tCitl StwGAS1421 (9gt1)~1amp4711 (V12 2JIXNllinbull

-middot~lttWixtt-JcCOn

Project Location Map

GWAR CampD Landfill Expansion Hall County Georgia

Project E$0808001

Date Jun2012

DrwnChkd TSSB

Ftgure 1

1000 2000

Feet

Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc

-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________

IRONM ENTA L iCpoundS INC Topographic Map

GWAR CampD Landfill Expansion Hall County Georgia

Pr~ ES0808000

Dale J un 2012

OrwnChkd TSIBS

F ure z

--

NRCS Soils ApC Apping

MdE M adison

MID2 Madison eroded

PTF Pacoletmiddot Tallapoosa

PaE Pacolet

W Water

0 100

Feet

Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia

ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711

bull - fttZ) 2J5SB bull bull Hall County Georgia

500 1000

Fshy

Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull

ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia

~_COf

Intermittent

Perennial

JOO 600

r Souroejs) usrws N WclendllnvotUlt1

c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt

ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin

~ I I I I

I

[Q)Projeet Boundary

i200-ft Boundary Buffer

Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)

Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae

__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~

____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)

Ephemeral Channel Impact Remediation I Expansion

1427-feet

-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot

I I

I-

Q) l)

~ 0

It) lt (l1J

~ ~ ~() 0

~ 0

sect atS 0 0

-middot- a _

Impacted Wetiand (~78-ac)

Jurisdictional Weiland (li)67-ac)

StreamWetland Buffer (t74-ac)

M

~

Perennial Stream Impact A

Jurisdictional Wetland Impact A Remediation I Expansion

002-acres

Perennial Stream Impact B Remediation I Expansion

388-feet

Jurisdictional Wetland Impact B Remediation I Expansion

076-acres

0 200

Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401

ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6

middotshy Intermittent Stream

Perennial Stream

Offslte Parcel 3 Impacted Intermitte nt Stream

i200middotft Boundary Buffer shy Impacted Perennial Stream

CampD Cells Impacted Wetland

Jurisdictional Wetland

StreamWalland Buffer

Offslte Alternative 1 30871-rt Impacted Perennial Stream

019-ac Impacted Jurisdictional Wetland

Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream

Offsite Alternative 3

ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp

~OIt~lfAtW~tWCOIS

12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland

Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)

GWAR CampD Landfill Expansion Hall County Georgia

0 100 1100

Fool

Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----

=~-==~~~toor___- Project E$0808001

Date Jun 2012

DrwnChkd TSJSB

F ure 11

Public Interest Review Tbe decision whether to issue a permit will be based on an evaluation ofthe probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands~ historic properties fish and wildlife values flood hazards flood plain val ues land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people

Consideration ofPublic Comments The US Army Corps of Engineers is soliciting comments from the public federal~ state and local agencies and officials Native American T ribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the US Army Corps of Engineers to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity

Application of Section 404(b)(l) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the U ruted States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act

Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army Permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to bold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project

Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Anny Corps of Engineers Savannah District Attention Natalie Edwards Piedmont Branch Lanier Field Office Post Office Box 528 Buford Georgia 30515 no later than 30 days from the date of this notice Please refer to the applicants name and the application number in your comments

3

[f you have any further questions concerning this matter please contact Natalie Edwards Project Manager Piedmont Branch at (678) 804 5228

Enclosures 1 Project Location Map 2 Topographic Map 3 NRCS Soil Map 4 FEMA Q3 Flood Data Map 5 National Wetlands Inventory Map 6 Approximate Wetland and Stream Map 7 Estimated Offsite Alternatives impacts Map

4

~rlProject Boundary - Freeway

c- County Line = limited Access

Perennial Stream Highway

Intermittent Stream Local Road

Intermittent Canal Other Road

0 0~

01~ ThCI inloftNIion dcpdld ofliW 91~ iampfos coroptwlll llf1POIIIamp IHIiyM1o otlo fce~ f~nVIIIIJIIrQf geo~ 111-~~ p~fltbull _flkN tnd liamp loUIIfld 10 IIIMancl bullmlby IJPfO_ ~~QWCbullL

ENVIRONMENTAL SERVICES INC 11 ~aoftUI AcsSU11r tCitl StwGAS1421 (9gt1)~1amp4711 (V12 2JIXNllinbull

-middot~lttWixtt-JcCOn

Project Location Map

GWAR CampD Landfill Expansion Hall County Georgia

Project E$0808001

Date Jun2012

DrwnChkd TSSB

Ftgure 1

1000 2000

Feet

Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc

-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________

IRONM ENTA L iCpoundS INC Topographic Map

GWAR CampD Landfill Expansion Hall County Georgia

Pr~ ES0808000

Dale J un 2012

OrwnChkd TSIBS

F ure z

--

NRCS Soils ApC Apping

MdE M adison

MID2 Madison eroded

PTF Pacoletmiddot Tallapoosa

PaE Pacolet

W Water

0 100

Feet

Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia

ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711

bull - fttZ) 2J5SB bull bull Hall County Georgia

500 1000

Fshy

Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull

ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia

~_COf

Intermittent

Perennial

JOO 600

r Souroejs) usrws N WclendllnvotUlt1

c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt

ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin

~ I I I I

I

[Q)Projeet Boundary

i200-ft Boundary Buffer

Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)

Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae

__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~

____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)

Ephemeral Channel Impact Remediation I Expansion

1427-feet

-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot

I I

I-

Q) l)

~ 0

It) lt (l1J

~ ~ ~() 0

~ 0

sect atS 0 0

-middot- a _

Impacted Wetiand (~78-ac)

Jurisdictional Weiland (li)67-ac)

StreamWetland Buffer (t74-ac)

M

~

Perennial Stream Impact A

Jurisdictional Wetland Impact A Remediation I Expansion

002-acres

Perennial Stream Impact B Remediation I Expansion

388-feet

Jurisdictional Wetland Impact B Remediation I Expansion

076-acres

0 200

Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401

ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6

middotshy Intermittent Stream

Perennial Stream

Offslte Parcel 3 Impacted Intermitte nt Stream

i200middotft Boundary Buffer shy Impacted Perennial Stream

CampD Cells Impacted Wetland

Jurisdictional Wetland

StreamWalland Buffer

Offslte Alternative 1 30871-rt Impacted Perennial Stream

019-ac Impacted Jurisdictional Wetland

Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream

Offsite Alternative 3

ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp

~OIt~lfAtW~tWCOIS

12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland

Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)

GWAR CampD Landfill Expansion Hall County Georgia

0 100 1100

Fool

Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----

=~-==~~~toor___- Project E$0808001

Date Jun 2012

DrwnChkd TSJSB

F ure 11

[f you have any further questions concerning this matter please contact Natalie Edwards Project Manager Piedmont Branch at (678) 804 5228

Enclosures 1 Project Location Map 2 Topographic Map 3 NRCS Soil Map 4 FEMA Q3 Flood Data Map 5 National Wetlands Inventory Map 6 Approximate Wetland and Stream Map 7 Estimated Offsite Alternatives impacts Map

4

~rlProject Boundary - Freeway

c- County Line = limited Access

Perennial Stream Highway

Intermittent Stream Local Road

Intermittent Canal Other Road

0 0~

01~ ThCI inloftNIion dcpdld ofliW 91~ iampfos coroptwlll llf1POIIIamp IHIiyM1o otlo fce~ f~nVIIIIJIIrQf geo~ 111-~~ p~fltbull _flkN tnd liamp loUIIfld 10 IIIMancl bullmlby IJPfO_ ~~QWCbullL

ENVIRONMENTAL SERVICES INC 11 ~aoftUI AcsSU11r tCitl StwGAS1421 (9gt1)~1amp4711 (V12 2JIXNllinbull

-middot~lttWixtt-JcCOn

Project Location Map

GWAR CampD Landfill Expansion Hall County Georgia

Project E$0808001

Date Jun2012

DrwnChkd TSSB

Ftgure 1

1000 2000

Feet

Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc

-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________

IRONM ENTA L iCpoundS INC Topographic Map

GWAR CampD Landfill Expansion Hall County Georgia

Pr~ ES0808000

Dale J un 2012

OrwnChkd TSIBS

F ure z

--

NRCS Soils ApC Apping

MdE M adison

MID2 Madison eroded

PTF Pacoletmiddot Tallapoosa

PaE Pacolet

W Water

0 100

Feet

Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia

ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711

bull - fttZ) 2J5SB bull bull Hall County Georgia

500 1000

Fshy

Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull

ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia

~_COf

Intermittent

Perennial

JOO 600

r Souroejs) usrws N WclendllnvotUlt1

c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt

ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin

~ I I I I

I

[Q)Projeet Boundary

i200-ft Boundary Buffer

Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)

Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae

__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~

____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)

Ephemeral Channel Impact Remediation I Expansion

1427-feet

-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot

I I

I-

Q) l)

~ 0

It) lt (l1J

~ ~ ~() 0

~ 0

sect atS 0 0

-middot- a _

Impacted Wetiand (~78-ac)

Jurisdictional Weiland (li)67-ac)

StreamWetland Buffer (t74-ac)

M

~

Perennial Stream Impact A

Jurisdictional Wetland Impact A Remediation I Expansion

002-acres

Perennial Stream Impact B Remediation I Expansion

388-feet

Jurisdictional Wetland Impact B Remediation I Expansion

076-acres

0 200

Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401

ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6

middotshy Intermittent Stream

Perennial Stream

Offslte Parcel 3 Impacted Intermitte nt Stream

i200middotft Boundary Buffer shy Impacted Perennial Stream

CampD Cells Impacted Wetland

Jurisdictional Wetland

StreamWalland Buffer

Offslte Alternative 1 30871-rt Impacted Perennial Stream

019-ac Impacted Jurisdictional Wetland

Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream

Offsite Alternative 3

ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp

~OIt~lfAtW~tWCOIS

12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland

Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)

GWAR CampD Landfill Expansion Hall County Georgia

0 100 1100

Fool

Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----

=~-==~~~toor___- Project E$0808001

Date Jun 2012

DrwnChkd TSJSB

F ure 11

~rlProject Boundary - Freeway

c- County Line = limited Access

Perennial Stream Highway

Intermittent Stream Local Road

Intermittent Canal Other Road

0 0~

01~ ThCI inloftNIion dcpdld ofliW 91~ iampfos coroptwlll llf1POIIIamp IHIiyM1o otlo fce~ f~nVIIIIJIIrQf geo~ 111-~~ p~fltbull _flkN tnd liamp loUIIfld 10 IIIMancl bullmlby IJPfO_ ~~QWCbullL

ENVIRONMENTAL SERVICES INC 11 ~aoftUI AcsSU11r tCitl StwGAS1421 (9gt1)~1amp4711 (V12 2JIXNllinbull

-middot~lttWixtt-JcCOn

Project Location Map

GWAR CampD Landfill Expansion Hall County Georgia

Project E$0808001

Date Jun2012

DrwnChkd TSSB

Ftgure 1

1000 2000

Feet

Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc

-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________

IRONM ENTA L iCpoundS INC Topographic Map

GWAR CampD Landfill Expansion Hall County Georgia

Pr~ ES0808000

Dale J un 2012

OrwnChkd TSIBS

F ure z

--

NRCS Soils ApC Apping

MdE M adison

MID2 Madison eroded

PTF Pacoletmiddot Tallapoosa

PaE Pacolet

W Water

0 100

Feet

Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia

ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711

bull - fttZ) 2J5SB bull bull Hall County Georgia

500 1000

Fshy

Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull

ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia

~_COf

Intermittent

Perennial

JOO 600

r Souroejs) usrws N WclendllnvotUlt1

c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt

ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin

~ I I I I

I

[Q)Projeet Boundary

i200-ft Boundary Buffer

Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)

Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae

__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~

____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)

Ephemeral Channel Impact Remediation I Expansion

1427-feet

-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot

I I

I-

Q) l)

~ 0

It) lt (l1J

~ ~ ~() 0

~ 0

sect atS 0 0

-middot- a _

Impacted Wetiand (~78-ac)

Jurisdictional Weiland (li)67-ac)

StreamWetland Buffer (t74-ac)

M

~

Perennial Stream Impact A

Jurisdictional Wetland Impact A Remediation I Expansion

002-acres

Perennial Stream Impact B Remediation I Expansion

388-feet

Jurisdictional Wetland Impact B Remediation I Expansion

076-acres

0 200

Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401

ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6

middotshy Intermittent Stream

Perennial Stream

Offslte Parcel 3 Impacted Intermitte nt Stream

i200middotft Boundary Buffer shy Impacted Perennial Stream

CampD Cells Impacted Wetland

Jurisdictional Wetland

StreamWalland Buffer

Offslte Alternative 1 30871-rt Impacted Perennial Stream

019-ac Impacted Jurisdictional Wetland

Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream

Offsite Alternative 3

ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp

~OIt~lfAtW~tWCOIS

12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland

Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)

GWAR CampD Landfill Expansion Hall County Georgia

0 100 1100

Fool

Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----

=~-==~~~toor___- Project E$0808001

Date Jun 2012

DrwnChkd TSJSB

F ure 11

1000 2000

Feet

Soloobull lmiddot USGS T-o ptno SJ middot Gshy GA Quodrongc

-shymiddot __ lOft ~ ~aidl~~ osbr _ _ _ _ _ _ ________

IRONM ENTA L iCpoundS INC Topographic Map

GWAR CampD Landfill Expansion Hall County Georgia

Pr~ ES0808000

Dale J un 2012

OrwnChkd TSIBS

F ure z

--

NRCS Soils ApC Apping

MdE M adison

MID2 Madison eroded

PTF Pacoletmiddot Tallapoosa

PaE Pacolet

W Water

0 100

Feet

Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia

ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711

bull - fttZ) 2J5SB bull bull Hall County Georgia

500 1000

Fshy

Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull

ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia

~_COf

Intermittent

Perennial

JOO 600

r Souroejs) usrws N WclendllnvotUlt1

c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt

ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin

~ I I I I

I

[Q)Projeet Boundary

i200-ft Boundary Buffer

Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)

Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae

__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~

____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)

Ephemeral Channel Impact Remediation I Expansion

1427-feet

-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot

I I

I-

Q) l)

~ 0

It) lt (l1J

~ ~ ~() 0

~ 0

sect atS 0 0

-middot- a _

Impacted Wetiand (~78-ac)

Jurisdictional Weiland (li)67-ac)

StreamWetland Buffer (t74-ac)

M

~

Perennial Stream Impact A

Jurisdictional Wetland Impact A Remediation I Expansion

002-acres

Perennial Stream Impact B Remediation I Expansion

388-feet

Jurisdictional Wetland Impact B Remediation I Expansion

076-acres

0 200

Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401

ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6

middotshy Intermittent Stream

Perennial Stream

Offslte Parcel 3 Impacted Intermitte nt Stream

i200middotft Boundary Buffer shy Impacted Perennial Stream

CampD Cells Impacted Wetland

Jurisdictional Wetland

StreamWalland Buffer

Offslte Alternative 1 30871-rt Impacted Perennial Stream

019-ac Impacted Jurisdictional Wetland

Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream

Offsite Alternative 3

ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp

~OIt~lfAtW~tWCOIS

12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland

Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)

GWAR CampD Landfill Expansion Hall County Georgia

0 100 1100

Fool

Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----

=~-==~~~toor___- Project E$0808001

Date Jun 2012

DrwnChkd TSJSB

F ure 11

--

NRCS Soils ApC Apping

MdE M adison

MID2 Madison eroded

PTF Pacoletmiddot Tallapoosa

PaE Pacolet

W Water

0 100

Feet

Scr-u(s) USDA Soil SUltWJ ot HallCouJ Geotgia

ENVI RONMENTA L NRCS Soil MapSERVICES INC bullur--Sit__bullbull 400 GWAR CampD Landfill Expansion1121 Z5-f711

bull - fttZ) 2J5SB bull bull Hall County Georgia

500 1000

Fshy

Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull

ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia

~_COf

Intermittent

Perennial

JOO 600

r Souroejs) usrws N WclendllnvotUlt1

c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt

ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin

~ I I I I

I

[Q)Projeet Boundary

i200-ft Boundary Buffer

Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)

Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae

__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~

____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)

Ephemeral Channel Impact Remediation I Expansion

1427-feet

-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot

I I

I-

Q) l)

~ 0

It) lt (l1J

~ ~ ~() 0

~ 0

sect atS 0 0

-middot- a _

Impacted Wetiand (~78-ac)

Jurisdictional Weiland (li)67-ac)

StreamWetland Buffer (t74-ac)

M

~

Perennial Stream Impact A

Jurisdictional Wetland Impact A Remediation I Expansion

002-acres

Perennial Stream Impact B Remediation I Expansion

388-feet

Jurisdictional Wetland Impact B Remediation I Expansion

076-acres

0 200

Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401

ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6

middotshy Intermittent Stream

Perennial Stream

Offslte Parcel 3 Impacted Intermitte nt Stream

i200middotft Boundary Buffer shy Impacted Perennial Stream

CampD Cells Impacted Wetland

Jurisdictional Wetland

StreamWalland Buffer

Offslte Alternative 1 30871-rt Impacted Perennial Stream

019-ac Impacted Jurisdictional Wetland

Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream

Offsite Alternative 3

ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp

~OIt~lfAtW~tWCOIS

12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland

Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)

GWAR CampD Landfill Expansion Hall County Georgia

0 100 1100

Fool

Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----

=~-==~~~toor___- Project E$0808001

Date Jun 2012

DrwnChkd TSJSB

F ure 11

500 1000

Fshy

Sotoroo(ltJbull H- 1-Ql f _OO HOI Counoy Gecwtibull

ENV I RONMENTAL FEMA Q3 Flood Data MapSERVICES INC lttlEugt~shy_ GWAR CampD landfill Expansion(nl)llbullbull 1 n (nZI~Fu Hall County Georgia

~_COf

Intermittent

Perennial

JOO 600

r Souroejs) usrws N WclendllnvotUlt1

c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt

ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin

~ I I I I

I

[Q)Projeet Boundary

i200-ft Boundary Buffer

Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)

Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae

__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~

____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)

Ephemeral Channel Impact Remediation I Expansion

1427-feet

-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot

I I

I-

Q) l)

~ 0

It) lt (l1J

~ ~ ~() 0

~ 0

sect atS 0 0

-middot- a _

Impacted Wetiand (~78-ac)

Jurisdictional Weiland (li)67-ac)

StreamWetland Buffer (t74-ac)

M

~

Perennial Stream Impact A

Jurisdictional Wetland Impact A Remediation I Expansion

002-acres

Perennial Stream Impact B Remediation I Expansion

388-feet

Jurisdictional Wetland Impact B Remediation I Expansion

076-acres

0 200

Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401

ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6

middotshy Intermittent Stream

Perennial Stream

Offslte Parcel 3 Impacted Intermitte nt Stream

i200middotft Boundary Buffer shy Impacted Perennial Stream

CampD Cells Impacted Wetland

Jurisdictional Wetland

StreamWalland Buffer

Offslte Alternative 1 30871-rt Impacted Perennial Stream

019-ac Impacted Jurisdictional Wetland

Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream

Offsite Alternative 3

ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp

~OIt~lfAtW~tWCOIS

12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland

Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)

GWAR CampD Landfill Expansion Hall County Georgia

0 100 1100

Fool

Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----

=~-==~~~toor___- Project E$0808001

Date Jun 2012

DrwnChkd TSJSB

F ure 11

Intermittent

Perennial

JOO 600

r Souroejs) usrws N WclendllnvotUlt1

c-c o ~ ~~~on Jp-isb ccwceilblll~9flly ~~tCfide_d~ ~lltfl)nel8f~ bulltvllft anlfb subjecc ___ itpgtCICt

ENVIRONMENTAL National Wetlands Inventory MapSERV ICES IN C 01I e-1 Letlt Soot -Goctpbulll1bull01 GWAR CampD Landfill (911)-rn (Ill f ampl bull Hall County Georgia -~COin

~ I I I I

I

[Q)Projeet Boundary

i200-ft Boundary Buffer

Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)

Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae

__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~

____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)

Ephemeral Channel Impact Remediation I Expansion

1427-feet

-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot

I I

I-

Q) l)

~ 0

It) lt (l1J

~ ~ ~() 0

~ 0

sect atS 0 0

-middot- a _

Impacted Wetiand (~78-ac)

Jurisdictional Weiland (li)67-ac)

StreamWetland Buffer (t74-ac)

M

~

Perennial Stream Impact A

Jurisdictional Wetland Impact A Remediation I Expansion

002-acres

Perennial Stream Impact B Remediation I Expansion

388-feet

Jurisdictional Wetland Impact B Remediation I Expansion

076-acres

0 200

Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401

ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6

middotshy Intermittent Stream

Perennial Stream

Offslte Parcel 3 Impacted Intermitte nt Stream

i200middotft Boundary Buffer shy Impacted Perennial Stream

CampD Cells Impacted Wetland

Jurisdictional Wetland

StreamWalland Buffer

Offslte Alternative 1 30871-rt Impacted Perennial Stream

019-ac Impacted Jurisdictional Wetland

Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream

Offsite Alternative 3

ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp

~OIt~lfAtW~tWCOIS

12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland

Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)

GWAR CampD Landfill Expansion Hall County Georgia

0 100 1100

Fool

Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----

=~-==~~~toor___- Project E$0808001

Date Jun 2012

DrwnChkd TSJSB

F ure 11

~ I I I I

I

[Q)Projeet Boundary

i200-ft Boundary Buffer

Ephemeral Channel (t3742middotft) faelRemediation I Expansion- Intermittent Stream (t168Qft) aJproposec~ Expansion Cell (t61middotac)

Source(e)20IO NAil Alaquota~ HalCConly GA4247-feet - Perennial Stream (plusmn19186-ft) Expansion Dlstumance Area (t57middotac) ACAD_GWAIJG_ESICed Ae

__--~Impacted Ephemeral Channel (t1427middotft) []CampO Cell (t370-ae) ____ ____ to~

____ Y~Impacted Perennial Stream (~35-ft) Pennltted Dlsrurbance Area (1532-ac)

Ephemeral Channel Impact Remediation I Expansion

1427-feet

-middot-middot -- _ middot--middot- --- __ middot-- middot --middot~ middot

I I

I-

Q) l)

~ 0

It) lt (l1J

~ ~ ~() 0

~ 0

sect atS 0 0

-middot- a _

Impacted Wetiand (~78-ac)

Jurisdictional Weiland (li)67-ac)

StreamWetland Buffer (t74-ac)

M

~

Perennial Stream Impact A

Jurisdictional Wetland Impact A Remediation I Expansion

002-acres

Perennial Stream Impact B Remediation I Expansion

388-feet

Jurisdictional Wetland Impact B Remediation I Expansion

076-acres

0 200

Project ES0808001ENVIRONMENTAI Approximate Wetland amp Stream Sketch __SE_RVICES INC Datemiddot Jun 2012GWAR CampD Landfill Expansion--31401

ll1ll) lraquo-4711 DrwnChkdmiddot TSSB ~~ Hall County Georgia middotshy A ure 6

middotshy Intermittent Stream

Perennial Stream

Offslte Parcel 3 Impacted Intermitte nt Stream

i200middotft Boundary Buffer shy Impacted Perennial Stream

CampD Cells Impacted Wetland

Jurisdictional Wetland

StreamWalland Buffer

Offslte Alternative 1 30871-rt Impacted Perennial Stream

019-ac Impacted Jurisdictional Wetland

Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream

Offsite Alternative 3

ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp

~OIt~lfAtW~tWCOIS

12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland

Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)

GWAR CampD Landfill Expansion Hall County Georgia

0 100 1100

Fool

Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----

=~-==~~~toor___- Project E$0808001

Date Jun 2012

DrwnChkd TSJSB

F ure 11

middotshy Intermittent Stream

Perennial Stream

Offslte Parcel 3 Impacted Intermitte nt Stream

i200middotft Boundary Buffer shy Impacted Perennial Stream

CampD Cells Impacted Wetland

Jurisdictional Wetland

StreamWalland Buffer

Offslte Alternative 1 30871-rt Impacted Perennial Stream

019-ac Impacted Jurisdictional Wetland

Offsitc Alternative 2 1 0086-ft Impacted Perennial Stream

Offsite Alternative 3

ENVIRONMENTAL SERVICES INC ISI_hln_dRO ~ oegllbull l1cot ltlliU~JII amp

~OIt~lfAtW~tWCOIS

12778-rt Impacted Perennial Stream 21 904middotft Impacted Intermittent Stream 315-ac Impacted Jurisdictional Wetland

Estimated Offslte Alternatives Impa cts (NWI amp National Hydrologic Database Based)

GWAR CampD Landfill Expansion Hall County Georgia

0 100 1100

Fool

Soca(I)Z010 NAP Aerw~ Hll County GA ACAO_GWARJG ESt Cd File----

=~-==~~~toor___- Project E$0808001

Date Jun 2012

DrwnChkd TSJSB

F ure 11