NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering...

132
NEC3 Engineering and Construction Short Contract (ECSC) entered into by and between Transnet SOC Ltd Registration Number 19901000900106 (hereinafter referred to as the "Employer') and Pending Registration Number: (hereinafter referred to as the "Contractor') lRANSNEr Contract Number' Start Date Completion Date BFXl54139 To be advised To be advised

Transcript of NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering...

Page 1: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

NEC3 Engineering and Construction Short Contract (ECSC)

entered into by and between

Transnet SOC Ltd

Registration Number 19901000900106

(hereinafter referred to as the "Employer')

and

Pending

Registration Number:

(hereinafter referred to as the "Contractor')

lRANSNEr

Contract Number'

Start Date

Completion Date

BFXl54139

To be advised

To be advised

Page 2: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXjS4139DESCRIPTION OF THE WORKS: FOR THE SUPPLY,DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKERAT SERFONTEIN SUBSTATION

CONTRACT DOCUMENTS

Form of Offer and Acceptance

Contract Data

Part One - Data provided by the Employer

Part Two - Data provided by the Contractor

Conditions of Contract (3" edition - available separately)

Pricing Data

Works Information

Site Information

Appendices

NEC3 ENGINEERING AND CONSTRUCTION CONTRACTFORM: PRO-FAT-0204 Rev02 Page 2 of 2

Contract Documents

Page 3: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

lRANSNEr.rTRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T1.1 Tender Notice and Invitation to Tender

Transnet soc ltd invites tenders for Transnet Freight Rail, Infra Electrical Bloemfontein,

FOR THE SUPPL Y, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARY CIRCUIT

BREAKER AT SERFONTEIN SUBSTATION.

Tenderers should have a CIDB contractor grading designation of 1 EP or higher.

The physical address for collection of tender documents is Transnet Freight Rail, Supply Chain Services, Real

Estate Management Building, Room 1, Austen Street, Beaconsfield in Kimberley. A non-refundable tender fee of

R100.00 (inclusive of Vall is applicable per tender. Payment is to be made to Transnet Freight Rail,

Standard Bank Account number 203158598, Branch code 004805. The deposit slip must reflect RFQ:

BFXl54138 and the contractor's company name. Proof of payment presented prior to the collection of the tender.

If Bidders intend to download the RFQ document from Transnet Freiqht Rail Portal at

http://www .transnetfreightrail-tfr. neUS uppl ierlPageslT end ers .aspx OR

http://www.etenders.gov.zalcontent/advertised-tenders this downloaded tender document is FREE OF

CHARGE.

After the document has been downloaded, bidders are required to send their contact details to the following

address: [email protected] by 22 May 2017 before 15HOO.This is to ensure that any required

communication (e.g. addenda to the RFQ) in relation to this RFQ reaches those intending to respond.

For enquiries regarding collection of documents, contract Ms Maggie Pain (053) 838 3341

A compulsory clarification meeting with representatives of the Employer will take place at Shell Ultra City

Kroonstad on 10 May 2017 starting at 11H45AM hrs. All bidders attending the site meeting must have their

printed RFQ document with them before the meeting starts. Bidders who do not have their printed document

will be excluded from the meeting. as well as their bids disqualified.

The closing time for receipt of tenders is 10HOOhrs. On 23 May 2017. In the tender box and late tenders will not

be accepted.

Tenders may only be submitted on the tender documentation that is issued.

Requirements for sealing, addressing, delivery, opening and assessment of tenders are stated in the Tender

Data.

Transnet urges Clients, Suppliers and Service Providers to report any acts of fraud andlor instances of

corruption to Transnet's TIP.OFFS ANONYMOUS on 0800 003 056 or [email protected].

TENDERFORM: PRO-FAT-0164 Rev02 Page 1 of 2

Part T1: Tendering proceduresT1.1: Tender Notice and Invitation to Tender

Page 4: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

1RANSNsr

"rTRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

ACKNOWLEDGMENT OF RECEIPT OF DOCUMENTS

AND INTENTION TO TENDER

(To be returned within 3 days after receipt)

FAX TO: Transnet Freight Rail

Fax No. (053) 838 3007 Tender

No.: BFXl54139

Attention: Leonie Visagie Closing

Date: 23 May 2017

For: Refurbishment of transformers, transformer oil sampling, regeneration of oil and oil purification.

We: Do wish 10 lender for the work and shall return our tender by the duedate aboveDo nol wish 10 lender on this occasion and herewith return all your

documents received

REASON FOR NOT TENDERING:

COMPANY'S NAME, ADDRESS, CONTACT, PHONE AND TELEFAX NUMBERS

SIGNATURE: -----------------

TITLE: _

CheckYes 0

No 0

TENDERFORM: PRO-FAT -0164 Rev02 Page 2 of 2

Part T1: Tendering proceduresT1.1: Tender Notice and Invitation to Tender

Page 5: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER At SERFONTEIN SUBSTATION

lI!i!ILifiKrJID;afaXllte:r~afip11~St_The conditions of tender are the Standard Conditions of Tender as contained in Annex F of the CIDBStandard for Uniformity in Construction Procurement (January 2009) as published in Government GazetteNo 31823, Board Notice 12 of 2009 of 30 January 2009, subsequently amended (May 2010), Board Notice86 of 2010. (See www.cidb.org.za)

The Standard Conditions of Tender make several references to Tender Data for details that apply specificallyto this tender. This Tender Data shall have precedence in the interpretation of any ambiguity orinconsistency between it and the Standard Conditions of Tender.

Each item of data given below is cross-referenced in the left hand column to the clause in the StandardConditions of Tender to which it mainly applies.

Clause

F.1.1 The Employer is

DataTransnet SOC Ltd(Reg No. 1990/000900/30)

F.1.2 The tender documents issued by the Employer comprise:

Part T: The Tender

F.1.4

Part T1: Tendering procedures

Part T2 : Returnable documents

Part C: The Contract

Part C1: Agreements and contractdata

Part C2: Pricing data

Part C3: Scope of work

Part C4: Site information

The Employer's agent is:

Name:

Address:

Tel No.

Fax No.

E-mail

T1.1 Tender Notice and Invitation to TenderT1.2 Tender Data

T2.1 List of Returnable DocumentsT2.2 Returnable Schedules

C1.1 Form of Offer and AcceptanceC1.2 Contract Data (Part 1 & 2)

C2.1 Pricing InstructionsC2.2 Price List

C3.1 Works Information

C4.1 Site Information

Regional Procurement ManagerlLead

Lucky Mtotoba

Real Estate Management Building, Austen Street,Beaconsfield, Kimberley

051 408-3324

NIA

Lucky. [email protected]

5Tender documentFORM: PRO-FAT-0383 Rev01

Page 1 Part T1: Tendering ProceduresT1.2: Tender Data

Page 6: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F.2.1 Only those tenderers who satisfy the following eligibility criteria are eligible to submit tenders:

1. Tender offers will only be considered if:

a) An authorised representative of the tendering entity attends the compulsoryclarification meeting in terms F.2.7 below (if applicable)

2. Only those tenderers who are registered with the CIDB, or are capable of being so prior tothe evaluation of submissions, in a contractor grading designation equal to or higher thana contractor grading designation determined in accordance with the sum tendered or avalue determined in accordance with Regulation 25 (1B) or 25(7 A) of the ConstructionIndustry Development Regulations, for a :1Ep' or higher class of construction work, areeligible to have their tenders evaluated.

Joint ventures are eligible to submit tenders provided that:

1. every member of the joint venture is registered with the CIDB;

2. the lead partner has a contractor grading designation in the ,1E~ or higher classof construction work; and

3. the combined Contractor grading designation calculated in accordance with theConstruction Industry Development Regulations is equal to or higher than aContractor grading designation determined in accordance with the sum tenderedfor a :fER or higher class of construction work or a value determined inaccordance with Regulation 25(1B) or 25(7A) of the Construction IndustryDevelopment Regulations

3. Pre-Qualifying Quality (Functionality) Criteria

Only those tenderers who attain the minimum number of evaluation points for Quality(functionality) will be eligible for further evaluation, failure to meet the minimum threshold willresult in the tender being disqualified and removed from further consideration

3.1 Steps in Evaluation Methodology

Prequalification Stage 1 Stage 2

Step 1Administrative"._l:]

~ReturnableDocuments &Schedules

Step 1Substantive

Responsivenes5

Pre-qua litication

Step 1

Technical

WeightedScore

Step 1

Post tendernegotiationrequestingBidders toprovide Bestand FinalOffer.

Step 1

FinalEvaluation80/20

Step 1

SelectpreferredBidder &negotiatefinal

ConcludeContractincorporatingthesecommitments

Tender documentFORM: PRO-FAT-0383 Rev01

Page 2 Part T1: Tendering ProceduresT1.2: Tender Data

Page 7: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

The pre-qualifying Quality (functionality) criteria and maximum score in respect of each ofthe criteria are as follows:

Pre-qualifying Quality criteria Sub- Weight MaximumCriteria number of

pointsCompany's Previous Experience (T2.2- 30 3025)Relevance of experience (Years ofExperience project Specific)-(comparable/similar projects).No Experience 0'> 1 Month to 1 Year's Experience 101 to 2 Year's Experience 152 to 3 Year's Experience 23'> 3 Year's Experience 30

Management Arrangements and CV's of 30 30key persons IT2.2-71

Organogram of Company 10

General Experience and qualifications 10

Adequacy for the assignment 5

Knowledge of local issues pertinent to the 5project

Quality Plan (T2.2-20) 20 20General Practice & Procedures indicatingclear understanding of intention to comply

5with legislation & meet Employer'srequirements.Outline of procedures in relation to project 5specific challenqes

Resource allocation (people, costs) 10

Health & Safety Plan (T2.2-22) 20 20

Safety File Index 4Safety Work method Statement and Risk 2AssessmentValid Letter of Good Standing (Labour, 2Insurance, SARS)

SHE Management System 2

Overview of RA process and examples 2Six months synopsis of SHE incidents, 2description, type and action taken.Safe Working Procedure for Hand Tools and 6Equipment

Maximum possible score for pre-qualifying Quality 100

1Tender documentFORM: PRO-FAT-0383 Rev01

Page 3 Part T1: Tendering ProceduresT1.2: Tender Data

Page 8: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER: INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Pre-qualifying Quality shall be scored by not less than three evaluators and averaged inaccordance with the following schedules: (List applicable evaluation schedules and include suchschedules in the returnable schedules)

• T2.2-7 Management and GV's of Key Persons

• T2.2-20 Quality Plan

• T2.2-22 Health and Safety Plan

• T2.2-25 Previous Experience

The minimum number of evaluation points for quality is: 60

The persons named in the Schedule of Key Persons of tenderers who satisfy the minimumquality criteria may be invited to an interview. Tenderers who attain a score of less than 50%of the points allocated to the interview will be declared ineligible to tender.

Each evaluation criteria will be assessed in terms of Five indicators - no response, poor,satisfactory, good and very good. Scores of 0, 40, 70, gO or 100 will be allocated to noresponse, poor, satisfactory, good and very good, respectively. The scores of each of theevaluators will be averaged, weighted and then totalled to obtain the final score for quality,unless scored collectively. (See GIDB Inform Practice Note #9)

Note: Any tender not complying with all three of the above mentioned stipulations,numbered 1 to 3, will be regarded as non-responsive and will therefore not beconsidered for further evaluation

F.2.7 The arrangements for a compulsory clarification meeting are as stated in the Tender Noticeand Invitation to Tender.

Tenderers must sign the attendance list in the name of the tendering entity. Addenda will beissued to and tenders will be received only from those tendering entities appearing on theattendance list.

F2.103

F.2.12

F.213.3

F.213.5

Provide rates and prices that are fixed for the duration of the contract and not subject toadjustment except as provided for in the conditions of contract identified in the contract data.

No alternative tender offers will be considered.

Parts of each tender offer communicated on paper shall be as an original.

The Employer's details and address for delivery of tender offers and identification details thatare to be shown on each tender offer package are:

Tender documentFORM: PRO-FAT-0383 Rev01

Page 4 Part T1: Tendering ProceduresT1 ,2: Tender Data

Page 9: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER. INSTALL. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F.2.15.1

Location of tender box:

Physical address:

Identification details:

Office No 2

Transnet SOC LimitedSecretariat of the Acquisition Council. Admin support OfficeOffice No 2Real Estate Management BuildingAusten Street. BeaconsfieldKimberley8300

The tender documents must be submitted in a sealedenvelope labelled with:

• Name of Tenderer• Contact person and detailsESiThejT enaer,numboc BFXl54139• [he'lT e~£!jDesc~iPJ@Ils"'~"p-PJ"yT:.,"de-el""iv-e-2.."'i-n"'stC"~"'II"-,1tC".e-s"'ta--n-'d

I ommissioning of,88kV,SF,6 p'rimary,Circuit Breaker, atSertonteiri"SnbstatiOri'J

Documents must be marked for the attention of:Christopher Williams

Prior arrangement on the submittal of large tender documentsshould be made with the Procurement Manager.NO LATE TENDERS WILL BE ACCEPTED

F.2.13.9 Telephonic, telegraphic, facsimile or e-mailed tender offers will not beaccepted.

F.2.15 The closing time for submission of tender offers is as stated in the TenderNotice and Invitation to Tender.

F.2.16 The tender offer validity period is 12 weeks

F.2.18 Provide, on request by the Employer, any other material information that has a bearing on thetender offer, the tenderer's commercial position (including notarized joint venture agreements),preferencing arrangements, or samples of materials, considered necessary by the Employerfor the purpose of a full and fair risk assessment. Should the tenderer not provide the material,or a satisfactory reason as to why it cannot be provided, by the time for submission stated inthe Employer's request, the Employer may regard the tender offer as non-responsive.

F.2.20 If requested, submit for the Employer's acceptance before formation of the contract, allsecurities, bonds, guarantees, policies and certificates of insurance required in terms of theconditions of contract identified in the Contract Data. (The format is included in Part T2.2 ofthis procurement document).

F.2.22 Return all retained tender documents within 28 days after the expiry of the validity period

F.2.23 The tenderer is required to submit with his tender:

1. a valid original Tax Clearance Certificate issued by the South African Revenue Services;

2. A valid certified SANAS accredited or IRBA approved B-BBEE verification certificate orBidders who qualify as EME's in terms of the Revised Codes of Good Practice issued on11 October 2013 in terms of Government Gazette No. 36928 are only required to obtain asworn affidavit on an annual basis confirming that the entity has an Annual Total Revenueof R10 million or less and the entity's Level of Black ownership, and

9Tender documentFORM: PRO-FAT-0383 Rev01

Page 5 Part T1: Tendering ProceduresT1.2: Tender Data

Page 10: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

3. A completed Supplier Declaration Form (Stamped and signed by the commissioner ofoaths)

4. Leiter of Good Standing

5. Proof of CSD Registration.

Note: Refer to Section T2.1 for List of Returnable Documents

F.3.4 The time and location for opening of the tender offers are:ifirliej1 0:15'O'T1jTuesdill23 May 2017

Location: Ground Floor, Boardroom, Real Estate Management, Austen Street, Beaconsfield,Kimberley

F.3.11.3 The procedure for the evaluation of responsive tenders is Method 2.

F.3.11.7 The financial offer will be scored using Formula 2 (option 1) in Table F.1 where the value ofW, is:

80 where the financial value inclusive of VAT of one or more responsive tender offers have a valuethat equals or is less than R 50,000 000

Up to 100 minusW, tender evaluation points will be awarded to tenderers who complete the preferencingschedule and who are found to be eligible for the preference claimed.

Should the BBBEE rating not be provided, Transnet reserves the right to award no pointsand/or declare the tender void. Transnet also reserves the right to carry out an independentaudit of the tenderers scorecard components at any stage from the date of close of the tendersuntil completion of the contract. Tenderers with no accreditation will score zero points forpreferencing.

Note:

In the event that, in the application of the 80/20 preference point system as stipulated, alltenders received exceed the estimated Rand value of R50 000 ODD, the tender invitation mustbe cancelled

F.3.13 Tender offers will only be accepted if:

a) the tenderer submits an original valid Tax Clearance Certificate issued by the SouthAfrican Revenue Services or has made arrangements to meet outstanding tax obligations;

b) the tenderer submits a leiter of intent from an insurer undertaking to provide thePerformance Bond to the format included in Part T2.2 of this procurement document

c) the tenderer is registered with the Construction Industry Development Board in anappropriate contractor grading designation;

d) the tenderer or any of its directors/shareholders is not listed on the Register of TenderDefaulters in terms of the Prevention and Combating of Corrupt Activities Act of 2004 as aperson prohibited from doing business with the public sector;

e) the tenderer does not appear on Transnet list for restricted tenderers.

f) the tenderer has completed the Compulsory Enterprise Questionnaire and there are noconflicts of interest which may impact on the tenderer's ability to perform the contract inthe best interests of the Employer or potentially compromise the tender process and

Tender documentFORM: PRO-FAT-0383 Rev01

Page 6

10Part T1: Tendering Procedures

T1.2: Tender Data

Page 11: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

persons in the employ of the state are permitted to submit tenders or participate in thecontract;

g) the tenderer is registered and in good standing with the compensation fund or with alicensed compensation insurer;

h) the Employer is reasonably satisfied that the tenderer has in terms of the ConstructionRegulations, 2003, issued in terms of the Occupational Health and Safety Act, 1993, thenecessary com petencies and resources to carry out the work safely.

F.3.17 The number of paper copies of the signed contract to be provided by the Employer is 1 (one).

Tender documentFORM: PRO-FAT-0383 Rev01

f IPage 7 Part 11: Tendering Procedures

11,2: Tender Data

Page 12: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T1.3 CIOB Standard Conditions of TenderJanuary 2009 Edition

development throughpartnership

As published in Annexure F of the CIDB Standard for Uniformity in Construction Procurement in Board Notice 12 of2009 in Government Gazette No 31823 of 30 January 2009

F.1 General

F.1.1 Actions

F,1 ,1 ,1

F.1.1.2

Note:

F.1.1.3

The employer and each tenderer submitting a tender offer shall comply withthese conditions of tender, In their dealings with each other, they shall dischargetheir duties and obligations as set out in F.2 and F.3, timeously and with integrity,and behave equitably, honestly and transparently, comply with all legalobligations and not engage in anticompetitive.

The employer and the tenderer and all their agents and employees involved inthe tender process shall avoid conflicts of interest and where a conflict of interestis perceived or known, declare any such conflict of interest, indicating the natureof such conflict. Tenderers shall declare any potential conflict of interest in theirtender submissions. Employees, agents and advisors of the employer shalldeclare any conflict of interest to whoever is responsible for overseeing theprocurement process at the start of any deliberations relating to the procurementprocess or as soon as they become aware of such conflict, and abstain from anydecisions where such conflict exists or recuse themselves from the procurementprocess, as appropriate.

1) A conflict of interest may arise due to a conflict of roles which might providean incentive for improper acts in some circumstances. A conflict of interestcan create an appearance of impropriety that can undermine confidence inthe ability of that person to act properly in his or her position even if noimproper acts result.

2) Conflicts of interest in respect of those engaged in the procurementprocess include direct, indirect or family interests in the tender or outcomeof the procurement process and any personal bias, inclination, obligation,allegiance or loyalty which would in any way affect any decisions taken.

The employer shall not seek and a tenderer shall not submit a tender withouthaving a firm intention and the capacity to proceed with the contract.

F.1.2 Tender Documents

The documents issued by the employer for the purpose of a tender offer are listed in the tender data.

F.1.3 Interpretation

F.1.3.1 The tender data and additional requirements contained in the tender schedulesthat are included in the returnable documents are deemed to be part of theseconditions of tender.

TENDERFORM: PRO-FAT-0166 Rev02 Page 1 of13

Part T1: Tendering ProceduresT1.3: Standard Conditions of Tender

Page 13: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

F.1.3.3

F.1.3.2

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

These conditions of tender, the tender data and tender schedules which are onlyrequired for tender evaluation purposes, shall not form part of any contractarising from the invitation to tender,

For the purposes of these conditions of tender, the following definitions apply:

a) conflict of interest means any situation in which:

i) someone in a position of trust has competing professional or personalinterests which make it difficult to fulfill his or her duties impartially;

ii) an individual or organisation is in a position to exploit a professional orofficial capacity in some way for their personal or corporate benefit; or

iii) incompatibility or contradictory interests exist between an employee andthe organisation which employs that employee,

b) comparative offer means the tenderer's financial offer after all tenderedparameters that will affect the value of the financial offer have been taken intoconsideration in order to enable comparisons to be made between offers on acomparative basis

c) corrupt practice means the offering, giving, receiving or soliciting of anythingof value to influence the action of the employer or his staff or agents in thetender process; and

d) fraudulent practice means the misrepresentation of the facts in order toinfluence the tender process or the award of a contract arising from a tenderoffer to the detriment of the employer, including collusive practices intended toestablish prices at artificial levels

e) organisation means a company, firm, enterprise, association or other legalentity, whether incorporated or not, or a public body

f) quality (functionality) means the totality of features and characteristics of aproduct or service that bear on its ability to satisfy stated or implied needs

F.1.4 Communication and employer's agent

Each communication between the employer and a tenderer shall be to or from the employer's agentonly, and in a form that can be readily read, copied and recorded, Communications shall be in theEnglish Ilanguage, The employer shall not take any responsibility for non-receipt of communications

, from or by a tenderer. The name and contact details of the employer's agent are stated in the tenderdata,

F.1.5 The employer's right to accept or reject any tender offer

F.1.5.1 The employer may accept or reject any variation, deviation, tender offer, oralternative tender offer, and may cancel the tender process and reject all tenderoffers at any time before the formation of a contract. The employer shall notaccept or incur any liability to a tenderer for such cancellation and rejection, butwill give written reasons for such action upon written request to do so,

F.1.5.2 The employer may not subsequent to the cancellation or abandonment of atender process or the rejection of all responsive tender offers re-issue a tendercovering substantially the same scope of work within a period of six monthsunless only one tender was received and such tender was returned unopened tothe tenderer,

F.1.6 Procurement procedures

F.1.6.1 GeneralUnless otherwise stated in the tender data, a contract will, subject to F,3.13, be concludedwith the tenderer who in temnsof F,3,11 is the highest ranked or the tenderer scoring thehighest number of tender evaluation points, as relevant, based on the tender submissionsthat are received at the closing time for tenders.

TENDERFORM: PRO-FAT-0166 Rev02 Page 2 of 13

\3

Part T1: Tendering ProceduresT1.3: Standard Conditions of Tender

Page 14: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F,1.6,2

F,1,6,2.1

F.1,6,2,2

F.1.6.2,3

F.1.6,2.4

F.1,6.3

F.1,6,3,1

F.1.6,3,2

F,1.6.3,2,1

F.1.6.3,2.2

Competitive negotiation procedure

Where the tender data require that the competitive negotiation procedure is to befollowed, tenderers shall submit tender offers in response to the proposedcontract in the first round of submissions, Notwithstanding the requirements ofF,3.4, the employer shall announce only the names of the tenderers who make asubmission, The requirements of F,3,8 relating to the material deviations orqualifications which affect the competitive position of tenderers shall not apply,

All responsive tenderers, or not less than three responsive tenderers that arehighest ranked in terms of the evaluation method and evaluation criteria stated inthe tender data, shall be invited in each round to enter into competitivenegotiations, based on the principle of equal treatment and keeping confidentialthe proposed solutions and associated information, Notwithstanding theprovisions of F,2,17, the employer may request that tenders be clarified,specified and fine-tuned in order to improve a tenderer's competitive positionprovided that such clarification, specification, fine-tuning or additional informationdoes not alter any fundamental aspects of the offers or impose substantial newrequirements which restrict or distort competition or have a discriminatory effect.

At the conclusion of each round of negotiations, tenderers shall be invited by theemployer to make a fresh tender offer, based on the same evaluation criteria,with or without adjusted weightings, Tenderers shall be advised when they are tosubmit their best and final offer,

The contract shall be awarded in accordance with the provisions of F,3,11 andF,3,13 after tenderers have been requested to submit their best and final offer,

Proposal procedure using the two stage-system

Option 1Tenderers shall in the first stage submit technical proposals and, if required, costparameters around which a contract may be negotiated, The employer shallevaluate each responsive submission in terms of the method of evaluation statedin the tender data, and in the second stage negotiate a contract with the tendererscoring the highest number of evaluation points and award the contract in termsof these conditions of tender,

Option 2

Tenderers shall submit in the first stage only technical proposals, The employershall invite all responsive tenderers to submit tender offers in the second stage,following the issuing of procurement documents,

The employer shall evaluate tenders received during the second stage in termsof the method of evaluation stated in the tender data, and award the contract interms of these conditions of tender,

F.2 Tenderer's obligations

F.2,1 Eligibility

F.2,1.1

F.2.1.2

Submit a tender offer only if the tenderer satisfies the criteria stated in the tenderdata and the tenderer or any of his principals, is not under any restriction to dobusiness with employer.

Notify the employer of any proposed material change ,in the capabilities orformation of the tendering entity (or both) or any other criteria which formed partof the qualifying requirements used by the employer as the basis in a priorprocess to invite the tenderer to submit a tender offer and obtain the employer'swritten approval to do so prior to the closing time for tenders,

TENDERFORM: PRO-FAT-0166 Rev02 Page30f13

14-

Part T1: Tendering ProceduresT1.3: Standard Conditions of Tender

Page 15: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F,2,2 Cost of tendering

Accept that, unless otherwise stated in the tender data, the employer will not compensate thetenderer for any costs incurred in the preparation and submission of a tender offer, includingthe costs of any testing necessary to demonstrate that aspects of the offer complies withrequirements,

F,2,3 Check documents

Check the tender documents on receipt for completeness and notify the employer of anydiscrepancy or omission,

F,2,4 Confidentiality and copyright of documents

Treat as confidential all matters arising in connection with the tender. Use and copy the documentsissued by the employer only for the purpose of preparing and submitting a tender offer in response tothe invitation.

F,2,5 Reference documents

Obtain, as necessary for submitting a tender offer, copies of the latest versions of standards,specifications, conditions of contract and other publications, which are not attached but whichare incorporated into the tender documents by reference,

F,2,6 Acknowledge addenda

Acknowledge receipt of addenda to the tender documents, which the employer may issue,and if necessary apply for an extension to the closing time stated in the tender data, in orderto take the addenda into account.

F,2,7 Clarification meeting

Attend, where required, a clarification meeting at which tenderers may familiarise themselveswith aspects of the proposed work, services or supply and raise questions. Details of themeeting(s) are stated in the tender data.

F,2,8 Seek clarification

Request clarification of the tender documents, if necessary, by notifying the employer at leastfive working days before the closing time stated in the tender data.

F,2,9 Insurance

Be aware that the extent of insurance to be provided by the employer (if any) might not be for the fullcover required in terms of the conditions of contract identified in the contract data. The tenderer isadvised to seek qualified advice regarding insurance.

F.2.10 Pricing the tender offer

F.2.10,1

F,2.10.2

F.2.10.3

F.2.10.4

Include in the rates, prices, and the tendered total of the prices (if any) all duties,taxes (except Value Added Tax (VAT), and other levies payable by thesuccessful tenderer, such duties, taxes and levies being those applicable 14days before theclosing time stated in the tender data.

Show VAT payable by the employer separately as an addition to the tenderedtotal of the prices.

Provide rates and prices that are fixed for the duration of the contract and notsubject to adjustment except as provided for in the conditions of contractidentified in the contract data.

State the rates and prices in Rand unless instructed otherwise in the tender data.The conditions of contract identified in the contract data may provide for partpayment in other currencies.

15TENDERFORM: PRO-FAT-0166 Rev02 Page 4 of 13

Part T1: Tendering ProceduresT1.3: Standard Conditions of Tender

Page 16: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

F.2.12.2

F.2.12.1

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F.2.11 Alterations to documents

Do not make any alteralions or additions to the tender documents, except to comply withInstructions. issued by the employer, or necessary to correct errors made by the tenderer. Allsignatories to the tender offer shall Initial all such alterations. Erasures and the use ofmasking fluid are prohibited.

F.2.12 Alternative tender offers

Unless otherwise stated in the tender data, submit alternative tender offers only ifa main tender offer, strictly in accordance with all the requirements of the tenderdocuments, is also submitted as well as a schedule that compares therequirements of the tender documents with the alternative requirements that areproposed.

Accept that an alternative tender offer may be based only on the criteria stated inthe tender data or criteria otherwise acceptable to the employer.

F.2.13 Submitting a tender offer

F.2.13.1

F.2.13.2

F.2.13.3

F.2.13.4

F.2.13.5

F.2.13.6

F.2.13.7

F.2.13.8

F.2.13.9

Submit one tender offer only, either as a single tendering entity or as a memberin a joint venture to provide the whole of the works, services or supply identifiedin the contract data and described in the scope of works, unless stated otherwisein the tender data.

Return all returnable documents to the employer after completing them in theirentirety, either electronically (if they were issued in electronic format) or bywriting legibly in non-erasable ink.

Submit the parts of the tender offer communicated on paper as an original plusthe number of copies stated in the tender data, with an English translation of anydocumentation in a language other than English, and the parts communicatedelectronically in the same format as they were issued by the employer.

Sign the original and all copies of the tender offer where required in terms of thetender data. The employer will hold all authorized signatories liable on behalf ofthe tenderer. Signatories for tenderers proposing to contract as joint venturesshall state which of the signatories is the lead partner whom the employer shallhold liable for the purpose of the tender offer.

Seal the original and each copy of the tender offer as separate packagesmarking the packages as "ORIGINAL" and "COPY". Each package shall state onthe outside the employer's address and identification details stated in the tenderdata, as well as the tenderer's name and contact address.

Where a two-envelope system is required in terms of the tender data, place andseal the returnable documents listed in the tender data in an envelope marked"financial proposal" and place the remaining returnable documents in anenvelope marked "technical proposal". Each envelope shall state on the outsidethe employer's address and identification details stated in the tender data, as wellas the tenderer's name and contact address.

Seal the original tender offer and copy packages together in an outer packagethat states on the outside only the employer's address and identification detailsas stated in the tender data.

Accept that the employer will not assume any responsibility for the misplacementor premature opening of the tender offer if the outer package is not sealed andmarked as stated.

Accept that tender offers submitted by facsimile or e-mail will be rejected by theemployer, unless stated otherwise in the tender data.

II:,TENDERFORM: PRO-FAT-0166 Rev02

~-_.-

Page 5 of 13Part T1: Tendering Procedures

T1.3: Standard Conditions of Tender

Page 17: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F,2,14 Information and data to be completed in all respects

Accept that tender offers, which do not piovide all the data or information requestedcompletely and in the form required, may be regarded by the employer as non-responsive.

F.2.15 Closing time

F.2.15.1 Ensure that the employer receives the tender offer at the address specified in thetender data not later than the closing time stated in the tender data. Accept thatproof of posting shall not be accepted as proof of delivery.

F.2.15.2 Accept that, if the employer extends the closing time stated in the tender data forany reason, the requirements of these conditions of tender apply equally to theextended deadline,

F.2.16 Tender offer validity

F.2.16.1 Hold the tender offer(s) valid for acceptance by the employer at any time duringthe validity period stated in the tender data after the closing time stated in thetender data,

F.2.16.2

F.2.16.3

F.2,16.4

If requested by the employer, consider extending the validity period stated in thetender data for an agreed additional period with or without any conditionsattached to such extension,

Accept that a tender submission that has been submitted to the employer mayonly be withdrawn or substituted by giving the employer's agent written noticebefore the closing time for tenders that a tender is to be withdrawn or substituted.

Where a tender submission is to be substituted, submit a substitute tender inaccordance with the requirements of F.2.13 with the packages clearly marked as"SUBSTITUTE".

F.2.18.1

F.2.18.2

F.2.17 Clarification of tender offer after submission

Provide clarification of a tender offer in response to a request to do so from the employerduring the evaluation of tender offers. This may include providing a breakdown of rates orprices and correction of arithmetical errors by the adjustment of certain rates or item prices (orboth). No change in the competitive position of tenderers or substance of the tender offer issought, offered, or permitted.

Note: Sub-clause F.2.17 does not preclude the negotiation of the final terms of the contractwith a preferred tenderer following a competitive selection process, should theEmployer elect to do so.

F.2.18 Provide other material

Provide, on request by the employer, any other material that has a bearing on thetender offer, the tenderer's commercial position (including notarized joint ventureagreements), preferencing arrangements, or samples of materials, considerednecessary by the employer for the purpose of a full and fair risk assessment.Should the tenderer not provide the material, or a satisfactory reason as to why itcannot be provided, by the time for submission stated in the employer's request,the employer may regard the tender offer as non-responsive.

Dispose of samples of materials provided for evaluation by the employer, whererequired.

F.2.19 Inspections, tests and analysis

Provide access during working hours to premises for inspections, tests and analysis asprovided for in the lender data.

TENDERFORM: PRO-FAT-0166 Rev02 Page 6 of 13

Part T1; Tendering ProceduresT1.3: Standard Conditions of Tender

Page 18: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F.2.20 Submit securities, bonds, poiicies, etc.

If requested, submit for the employer's acceptance before formation of the contract, allsecurities, bonds, guarantees, policies and certificates of insurance required in terms of theconditions of contract identified in the contract data.

F.2.21 Check final draft

Check the final draft of the contract provided by the employer within the time available for theemployer to issue the contract.

F.2.22 Return of other tender documents

If so instructed by the employer, return all retained tender documents within 28 days after theexpiry of the validity period stated in the tender data.

F.2.23 Certificates

Include in the tender submission or provide the employer with any certificates as stated in thetender data.

F.3 The employer's undertakings

F,3.1 Respond to requests from the tenderer

F.3.1,1

F.3.1.2

Unless otherwise stated in the tender Data, respond to a request for clarificationreceived up to five working days before the lender closing time stated in theTender Data and notify all tenderers who drew procurement documents.

Consider any request to make a material change in the capabilities or formationof the tendering entity (or both) or any other criteria which formed part of thequalifying requirements used to prequalify a tenderer to submit a tender offer interms of a previous procurement process and deny any such request if as aconsequence:

a) an individual firm, or a joint venture as a whole, or any individual member ofthe joint venture fails to meet any of the collective or individual qualifyingrequirements;

b) the new partners to a joint venture were not prequalified in the first instance,either as individual firms or as another joint venture; or

c) in the opinion of the Employer, acceptance of the material change wouldcompromise the outcome of the prequalification process.

F.3.2 Issue Addenda

If necessary, issue addenda that may amend or amplify the tender documents to eachtenderer during the period from the date that tender documents are available until three daysbefore the tender closing time stated in the Tender Data. If, as a result a tenderer applies foran extension to the closing time stated in the Tender Data, the Employer may grant suchextension and, shall then notify all tenderers who drew documents.

F.3.3 Return late tender offers

Return tender offers received after the closing time stated in the Tender Data,unopened,(unless it is necessary to open a tender submission to obtain a forwardingaddress), to the tenderer concerned.

F,3.4 Opening of tender submissions

F,3.4.1 Unless the two-envelope system is to be followed, open valid tender submissionsin the presence of tenderers' agents who choose to attend at the time and placestated in the tender data. Tender submissions for which acceptable reasons forwithdrawal have been submitted will not be opened.

TENDER. FORM: PRO-FAT-0166 Rev02 Page 7 of 13

Part T1: Tendering ProceduresT1.3: Standard Conditions of Tender

Page 19: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F.3.4.2

F.3.4.3

Announce at the meeting held immediately after the opening of tendersubmissions, at a venue indicated in the tender data, the name of each tendererwhose tender offer is opened and, where applicable, the total of his prices,preferences claimed and time for completion for the main tender offer only,

Make available the record outlined in F.3.4.2 to all interested persons uponrequest.

F.3.5 Two-envelope system

F,3.5.1

F.3.5.2

Where stated in the tender data that a two-envelope system is to be followed,open only the technical proposal of valid tenders in the presence of tenderers'agents who choose to attend at the time and place stated in the tender data andannounce the name of each tenderer whose technical proposal is opened.

Evaluate the quality of the technical proposals offered by tenderers, then advisetenderers who remain in contention for the award of the contract of the time andplace when the financial proposals will be opened. Open only the financialproposals of tenderers, who score in the quality evaluation more than theminimum number of points for quality stated in the tender data, and announcethe score obtained for the technical proposals and the total price and anypreferences claimed. Return unopened financial proposals to tenderers whosetechnical proposals failed to achieve the minimum number of points for quality.

F.3,6 Non-disclosure

Not disclose to tenderers, or to any other person not officially concerned with such processes,information relating to the evaluation and comparison of tender offers, the final evaluationprice and recommendations for the award of a contract, until after the award of the contract tothe successful tenderer.

F,3.7 Grounds for rejection and disqualification

Determine whether there has been any effor! by a tenderer to influence the processing oftender offers and instantly disqualify a tenderer (and his tender offer) if it is established that heengaged in corrupt or fraudulent practices.

F.3.8 Test for responsiveness

F.3.8.1

F.3.8.2

F.3,8.3

Determine, after opening and before detailed evaluation, whether each tenderoffer properly received:

a) complies with the requirements of these Conditions of Tender,

b) has been properly and fully completed and signed, and

c) is responsive to the other requirements of the tender documents.

A responsive tender is one that conforms to all the terms, conditions, andspecifications of the tender documents without material deviation or qualification.A material deviation or qualification is one which, in the Employer's opinion,would:

a) detrimentally affect the scope, quality, or performance of the works, servicesor supply identified in the Scope of Work,

b) significantly change the Employer's or the tenderer's risks and responsibilitiesunder the contract, or

c) affect the competitive position of other tenderers presenting responsivetenders, if it were to be rectified.

Reject a non-responsive tender offer, and not allow it to be subsequently maderesponsive by correction or withdrawal of the non-conforming deviation orreservation.

19TENDERFORM: PRO.FAT.0166 Rev02 Page8of13

Part T1: Tendering ProceduresT1.3: Standard Conditions of Tender

Page 20: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F.3.9 Arithmetical errors, omissions and discrepancies

F.3,9.1

F.3.9.2

F.3.9.3

F.3.9.4

Check responsive tenders for discrepancies between amounts in words andamounts in figures. Where there is a discrepancy between the amounts in figuresand the amounl in words, the amount in words shall govern.

Check the highest ranked tender or tenderer with the highest number of tenderevaluation points after the evaluation of tender offers in accordance with F.3.11for:

a) the gross misplacement of the decimal point in any unit rate:

b) omissions made in completing the pricing schedule or bills of quantities; or

c) arithmetic errors in:i) line item totals resulting from the product of a unit rate and a quantity in

bills of quantities or schedules of prices; or

ii) the summation of the prices.

Notify the tenderer of all,errors or omissions that are identified in the tender offerand either confirm the tender offer as tendered or accept the corrected total ofprices.

Where the tenderer elects to confirm the tender offer as tendered, correct theerrors as follows:

a) If bills of quantities or pricing schedules apply and there is an error in the lineitem total resulting from the product of the unit rate and the quantity, the lineitem total shall govern and the rate shall be corrected. Where there is anobviously gross misplacement of the decimal point in the unit rate, the lineitem total as quoted shall govern, and the unit rate shall be corrected.

b) Where there is an error in the total of the prices either as a result of othercorrections required by this checking process or in the tenderer's addition ofprices, the total of the prices shall govern and the tenderer will be asked torevise selected item prices (and their rates if bills of quantities apply) toachieve the tendered total of the prices.

F.3.10 Clarification of a tender offer

Obtain clarification from a tenderer on any matter that could give rise to ambiguity in acontract arising from the tender offer.

F.3.11 Evaluation of tender offers

F.3.11.1

F.3.11.2

GeneralAppoint an evaluation panel of not less than three persons. Reduce eachresponsive tender offer to a comparative offer and evaluate them using thetender evaluation methods and associated evaluation criteria and weightings thatare specified in the tender data.

Method 1: Financial offerIn the case of a financial offer:

a) Rank tender offers from the most favourable to the least favourablecomparative offer.

b) Recommend the highest ranked tenderer for the award of the contract, unlessthere are compelling and justifiable reasons not to do so.

c) Re-rank all tenderers should there be compelling and justifiable reasons not torecommend the highest ranked tenderer and recommend the highest rankedtenderer, unless there are compelling and justifiable reasons not to do so andthe process set out in this subclause is repeated.

TENDERFORM: PRD-FAT-0166 Rev02 Page 9 of 13

Part T1: Tendering ProceduresT1.3: Standard Conditions of Tender

Page 21: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

where:

F,3.11.3

F.3,11,4

F.3.11.5

Methods 2: Financial offer and preference

In the case of a financial offer and preferences:

a) Score each tender in respect of the financial offer made and preferencesclaimed. if any, in accordance with the provisions of F.3.11. 7 and F,3.11.8,

b) Calculate the total number of tender evaluation points (TEV) in accordancewith the following form ula:TEV= NFO + NP

where: NFO is the number of tender evaluation points awarded for thefinancial offer made in accordance with F.3.11 ,7;NP is the number of tender evaluation points awarded forpreferences claimed in accordance with F.3.11.8.

c) Rank tender offers from the highest number of tender evaluation points to thelowest.

d) Recommend the tenderer with the highest number of tender evaluation pointsfor the award of the contract, unless there are compelling and justifiablereasons not to do so.

e) Rescore and re-rank all tenderers should there be compelling and justifiablereasons not to recommend the tenderer with the highest number of tenderevaluation points, and recommend the tenderer with the highest number oftender evaluation points, unless there are compelling and justifiable reasonsnot to do so and the process set out in this subclause is repeated

Method 3: Financial offer and quality

In the case of a financial offer and quality:

a) Score each tender in respect of the financial offer made and the qualityoffered in accordance with the provisions of F,3.11.7 and F.3.11.9, rejectingall tender offers that fail to score the minimum number of points for qualitystated in the tender data, if any.

b) Calculate the total number of tender evaluation points (TEV) in accordancewith the following formula:

TEV=NFO+ NO

NFO is the number of tender evaluation points awarded for thefinancial offer made in accordance with F,3.11. 7;NQ is the number of tender evaluation points awarded for qualityoffered in accordance with F.3.11.9.

c) Rank tender offers from the highest number of tender evaluation points to thelowest. .

d) Recommend tenderer with the highest number of tender evaluation points forthe award of the contract, unless there are compelling and justifiabie reasonsnot to do so.

e) Rescore and re-rank all tenderers should there be compelling and justifiablereasons not to recommend the tenderer with the highest number of tenderevaluation points and recommend the tenderer with the highest number oftender evaluation points, unless there are compelling and justifiable reasonsnot to do so and the process set out in this subclause is repeated.

Method 4: Financial offer, quality and preferencesIn the case of a financial offer, quality and preferences:

a) Score each tender in respect of the financial offer made, preference claimed,if any, and the quality offered in accordance with the provisions of F.3.11,7 to

TENDERFORM: PRO-FAT -0166 Rev02 Page 10 of 13

Part T1: Tendering ProceduresT1.3: Standard Conditions of Tender

Page 22: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F,3,11.9, rejecting all tender offers that fail to score the minimum number ofpoints for quality stated in the tender data, if any,

b) Calculate the total number of tender evaluation points (TEV) in accordancewith the following formula, unless otherwise stated in the Tender Data:

TEV = NFO + NP + NO

F.3.11.6

F.3.11.7

where: NFO is the number of tender evaluation points awarded for thefinancial offer made in accordance with F,3, 11,7;NP is the number of tender evaluation points awarded forpreferences claimed in accordance with F,3.11.8,NQ is the number of tender evaluation points awarded for qualityoffered in accordance with F.3.11.9.

c) Rank tender offers from the highest number of tender evaluation points to thelowest.

d) Recommend the tenderer with the highest number of tender evaluation pointsfor the award of the contract, unless there are compelling and justifiablereasons not to do so.

e) Rescore and re-rank all tenderers should there be compelling and justifiablereasons not to recommend the tenderer with the highest number of tenderevaluation points and recommend the tenderer with the highest number oftender evaluation points, unless there are compelling and justifiable reasonsnot to do so and the process set out in this subclause is repeated,

Decimal placesScore financial offers, preferences and quality, as relevant, to two decimalplaces.

Scoring Financial Offers

Score the financial offers of remaining responsive tender offers using thefollowing formula:

NFO = WI xA

where: NFO is the number of tender evaluation points awarded for the financialoffer.WI is the maximum possible number of tender evaluation pointsawarded for the financial offer as stated in the Tender Data,A is a number calculated using the formula and option described inTable F,1 as stated in the Tender Data.

Tabte F.1: Formulae for calculating the value of A

Formula Comparison aimed at achieving Option 1" Option 2"

2

Highest price or discount

Lowest price or percentagecommission I fee

A = (1 +( P - Pm))Pm

A = (1 +( P - Pm))

Pm

A = PIPm

A=PmIP

" Pm is the comparative offer of the most favourable comparative offer.

P is the comparative offer of the tender offer under consideration.

TENDERFORM: PRO-FAT-0166 Rev02 Page11of13

Part T1: Tendering ProceduresT1.3: Standard Conditions of Tender

Page 23: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F.3.11.8

F.3.11.9

Scoring preferencesConfirm that tenderers are eligible for the preferences claimed in accordancewith the provisions of the tender data and reject all claims for preferences wheretenderers are not eligible for such preferences, Calculate the total number oftender evaluation points for preferences claimed in accordance with theprovisions of the tender data,

Scoring qualityScore each of the criteria and subcriteria for quality in accordance with theprovisions of the Tender Data,

Calculate the total number of tender evaluation points for quality using thefollowing formula:

NQ = W2 x SO / MS

where: SO is the score for quality allocated to the submission underconsideration;MS is the maximum possible score for quality in respect of asubmission; andW2 is the maximum possible number of tender evaluation pointsawarded for the quality as stated in the tender data

F.3,12 Insurance provided by the employer

If requested by the proposed successful tenderer, submit for the tenderer's information the policies andI or certificates of insurance which the conditions of contract identified in the contract data, require theemployer to provide,

F.3.13 Acceptance of tender offer

Accept the tender offer, if in the opinion of the employer, it does not present any unacceptablecommercial risk and only if the tenderer:

a) is not under restrictions, or has principals who are under restrictions, preventingparticipating in the employer's procurement,

b) can, as necessary and in relation to the proposed contract, demonstrate that he or shepossesses the professional and technical qualifications, professional and technicalcompetence, financial resources, equipment and other physical facilities, managerialcapability, reliability, experience and reputation, expertise and the personnel, toperform the contract,

c) has the legal capacity to enter into the contract,

d) is not insolvent, in receivership, bankrupt or being wound up, has his affairsadministered by a court or a judicial officer, has suspended his business activities, or issubject to legal proceedings in respect of any of the foregoing,

e) complies with the legal requirements, if any, stated in the tender data, and

f) is able, in the opinion of the employer, to perform the contract free of conflicts ofinterest.

F.3.14 Prepare contract documents

F.3.14,1 If necessary, revise documents that shall form part of the contract and that wereissued by the employer as part of the tender documents to take account of:

a) addenda issued during the tender period,

b) inclusion of some of the returnable documents, and

c) other revisions agreed between the employer and the successful tenderer,

TENDERFORM: PRO-FAT-0166 Rev02 Page12of13

,;23

Part T1: Tendering ProceduresT1.3: Standard Conditions of Tender

Page 24: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENOUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER. INSTALL. TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

F.3.14.2 Complete the schedule of deviations attached to the form of offer andacceptance. if any,

F.3.15 Complete adjudicator's contract

Unless alternative arrangements have been agreed or otherwise provided for in the contract,arrange for both parties to complete formalities for appointing the selected adjudicator at thesame time as the main contract is signed.

F.3.16 Notice to unsuccessful tenderers

F.3.16.1

F.3.16.2

Notify the successful tenderer of the employer's acceptance of his tender offer bycompleting and returning one copy of the form of offer and acceptance before theexpiry of the validity period stated in the tender data, or agreed additional period.

After the successful tenderer has been notified of the employer's acceptance ofthe tender, notify other tenderers that their tender offers have not been accepted.

F.3.17 Provide copies of the contracts

Provide to the successful tenderer the number of copies stated in the Tender Data of thesigned copy of the contract as soon as possible after completion and signing of the form ofoffer and acceptance.

F.3.18 Provide written reasons for actions taken

Provide upon request written reasons to tenderers for any action that is taken in applyingthese conditions of tender, but withhold information which is not in the public interest to bedivulged, which is considered to prejudice the legitimate commercial interests of tenderers ormight prejudice fair competition between tenderers.

TENDERFORM: PRO-FAT-0166 Rev02 Page 13 of 13

Part T1: Tendering ProceduresT1.3: Standard Conditions of Tender

Page 25: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.1 List of Returnable Documents

1, These schedules are required for eligibility purposes:

T2.2-15

meeting

Eligibility Criteria Schedule: Certification of attendance at a tender ciarification

2. These schedules will be utilised for the evaluation of Functionality Criteria

T2.2.7

T2.2-25

T2.2-20

T2.2-22

Management and CV's of Key Persons

Previous Experience

Quality Plan

Health and Safely Plan

3. Returnable Schedules

T2.2-3

T2.2-4

T2.2-7

T2.2-8

T2.2-9

T2.2-14

T2.2-15

T2.2-16

T2.2-17

T2.2-20

T2.2-22

T2.2-24

T2.2-25

T2.2-31

T2.2-34

T2.2-36

T2.2.43

T2.2-50

T2.2-51

Risk Elements

Availability of equipment and other resources

Management and CV's of key persons

Schedule of proposed Subcontractors/consultants

Insurance provided by the Contractor

Authority to submit tender

'Certificate of attendance at tender ciarification meeting

Record of addenda to tender documents

Compulsory Enterprise Questionnaire

Quality Plan

Health and Safety Plan

Capacity and ability to meet deiivery schedule

Previous experience

Supplier Code of Conduct

Supplier Declaration Form

RFQ Declaration Form

Breach of Law

B-BBEE Preference Points ciaim Form

Certificate of Acquaintance with Tender Documents

TENDERFORM: PRO-FAT-0167 Rev02 Page 1012

Part T2: Returnable DocumentsT2.2: Returnable Schedules

Page 26: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

4, C1.1: Offer portion of Form of Offer & Acceptance

5. C1.2: Contract Data Part 2: Data by Contractor

6. C2.2: Price List

7. C3.1: Works Information

8. C4.1: Site Information

TENDERFORM: PRO-FAT-0167 Rev02 Page 2 of 2

Part T2: Returnable DocumentsT2.2: Returnable Schedules

Page 27: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTIQN OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-3: Risk Elements

Tenderers to review the potential risk elements associated with the Project, The risk elements are to be

listed separately in this Schedule, If No Risks are identified "No Risks" must be stated on this schedule,

Notwithstanding this information, all costs related to risk elements which are at the Contractors risk are

deemed to be included in the tenderer's offered total of the Prices,

Signed

Name

Tenderer

March 201S

Date

Position

Page 1 of 1Part T2: Returnable Schedules

T2,2-3: Risk Elements

Page 28: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXf54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-4: Availability of Equipment and Other Resources

Tenderers to submit a list of all Equipment and other resources that he proposes to use to execute the

work as described in the Works Information, as well as the availability and details of ownership for each

item, Amongst others, he needs to provide detailed schedules of the following:

• Material delivery schedule

• Plant schedule

• Labour schedule

Number ofEquipment Equipment Type - Description Hourly

Rate

--------------------------- -- ---------- -

---------------------- ------------------ --- -------------- ----------- -------

-------------------------------------------- ----- ----------

--- ------- -- --- ----- -------------------------------------- ---------- ------

--_ ..- ------._- ---

- ------ -- ----------

Signed

Name

Tenderer

TENDERMarch 2015

Date

Position

Page 1 of 2Part T2: Returnable Schedules

T2.2-4: Availability of Equipmentand Other Resources

Page 29: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-7: Management & CV's of Key Persons - ECCl

Pleasedescribe the management arrangements for the works,

Submit the following documents as a minimum with your tender document:

1, An organisation chart showing on site and off-site management (including the key people you

have identified in the Contract Data Part two and identify the required legal appointments,)

2, CV's for people proposed for all identified posts including Safety Officer and Quality Assurance

Representative,

3, Details of the experience of the staff who will be working on the works with respect to:

• Working with the NEC3 Term Service Contract Option chosen for this contract. If staff

experience of these matters is limited, an indication of relevant training that they have

attended would be helpful.

4, An explanation of how you propose to allocate adequate resources to enable you to comply

with the requirements and prohibitions imposed on you by or under the statutory provisions

relating to health and safety,

Attached submissions to this schedule:

Signed Date

Name Position

Tenderer

'NEC3 Engineering & Construction Contract (with amendments June 2006 and April 2013)

IMarch 201S

1of!

;;>qPartT2: Retumable SChedules

T2.2-7: Management& OJ's of Key Persons

Page 30: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-8: Schedule of Proposed Subcontractors

We notify you that it is our intention to employ the following subcontractors / sub consultants for

work in this contract,

If we are awarded a contract we agree that this notification does not change the requirement for

us to submit the names of proposed Subcontractors in accordance with requirements in the

contract for such appointments, If there are no such requirements in the contract, then your

written acceptance of this list shall be binding between us,

Name and Previous B-BBEEE Value of % Ownershipaddress of Nature and experience Level subcontracte Blackproposed extent of with Certificates d Work (excl, OwnershipSubcontractor / work Subcontractor / to be 14% Vat)Consultant Consultant, attached

1.

2,

3,

4.

S.

6

Signed

Name

Tenderer

March 2015

Date

Position

30Page 1 of 1

Part T2: Returnable SchedulesT2,2-8: Schedule of Proposed Subcontractors

Page 31: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER. INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-9: Insurance provided by the Contractor

Clause 84.1 in NEC3 Engineering & Construction Contract (June 2005)(amended June 2006 and April 2013)

requires that the Contractor provides the insurance stated in the insurance table except any insurance which the

Employer is to provide as stated in the Contract Data.

Please provide the following details for insurance which the Contractor is still to provide. Notwithstanding this

information all costs related to insurance are deemed included in the tenderer's rates and prices.

Insurance against Name of Insurance PremiumCover(See clause 84.2 of the ECC) Company

Loss of or damage to the works, Piant and j .Materials -----_:_-------------------------------------------------------------- ------------- .------ --------------------------------- ----------------------------- ---------------------------

Loss of or damage to Equipment---------- ------------- ------------------ ---~-~--~------------------------------ ------------------------------------------ ------------------. --------- ---------- --------------Liability for loss of or damage to property(except the works, Plant and Materials andEquipment) and liability for bodily injury toor death of a person (not an employee ofthe Contractolj caused by activity inconnection with this contract.------------------------------------------------------------------- ---------------~-- --~-- -------------------------- -- -------- ---------------- -------------------------

Liability for death of or bodily injury toemployees of the Contractor arising out ofand in the course of their employment inconnection with this contract

--------- -------------- ----- ------- ---------- -------- ----- --------------------------------------------------- -------------------------------~ -------------------------

(Other)--------- -- ---------~--------------~------- ----------------- ---------- ----------------- -------- -------------- ------------------------------ -------------~---

-------------------~------------------------------------------~- ------------ ----------------------- -------------

I------------------------------ -------------------

Signed

Name

Tenderer

March 2015

Date

Position

31Page 1 of 1

Part T2: Returnable Schedules12.2-9: Insurance provided by the Contractor

Page 32: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-14: Authority to submit a Tender

Indicate the status of the tenderer by ticking the appropriate box hereunder. The tenderer must complete the

certificate set out below for his category of organisation or alternatively attach a certified copy of a company [

organisation document which provides the same information for the relevant category as requested here.

A- COMPANY

A. Certificate for Company

B - PARTNERSHIP C - JOINT VENTURE D - SOLE PROPRIETOR

1, ~ , chairperson of the board of directors of _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , hereby confirm that byresolution of the board taken on _

_____ (date), Mr[Ms , acting in the capacity of _

_ _ _ _ _ _ _ _ _ ~ was authorised to sign all documents in connection with this tender offer and any

contract resulting from it on behalf of the company,

Signed

Name

March 201S

Date

Position

Page 1 of 4

Chairman of the Board of Directors

Part T2: Returnable Schedules12,2-14; Authority to submit a Tender

Page 33: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENOUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER. INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

B. Certificate for Partnership

We, the undersigned, being the key partners in the business trading as _

_ _ _ _ _ _ _ _ _ _ hereby authorise MrjMs ~ acting in the capacity of _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, to sign all documents in connection with the tender offer for Contract _

_ _ _ _ _ _ _ _ _ _ _ and any contract resulting from it on our behalf.

Name Address Signature Date

NOTE: This certificate is to be completed and signed by the full number of Partners necessary to commit the

Partnership. Attach additional pages if more space is required.

March 2015Page 2 of 4

Part T2: Returnable SchedulesT2.2-14: Authority to submit a Tender

Page 34: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFX154139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER. INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION .

C. Certificate for Joint Venture

We, the undersigned, are submitting this tender offer in Joint Venture and hereby authorise Mr/Ms _

_ _ _ _ _ _ _ _ _ _ ~ an authorised signatory of the company _

_ _ _ _ _ _ , acting in the capacity of lead partner, to sign all documents in connection with the tender offer for

Contract and any contract resulting from it on our behalf.

This authorisation is evidenced by the attached power of attorney signed by legally authorised signatories of all the

partners to the Joint Venture.

Furthermore we attach to this Schedule a copy of the joint venture agreement which incorporates a statement that

all partners are liable jointly and severally for the execution of the contract and that the lead partner is authorised

to incur liabilities, receive instructions and payments and be responsible for the entire execution of the contract for

and on behalf of any and all the partners.

Name of firm

March 2015

Address

34-Page 3 of 4

Authorising signature, name (incaps) and capacity

Part T2: Returnable SChedulesT2.2-14: Authority to submit a Tender

Page 35: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

D. Certificate for Sole Proprietor

I, , hereby confirm that I am the sole owner of the business trading as

Signed

Name

March 2015

Date

Position

35

Page 4 of 4

Sole Proprietor

Part T2: Returnable SchedulesT2.2-14: Authority to submit a Tender

Page 36: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-15: Certificate of Attendance at Tender Clarification Meeting

This is to certify that

(Tenderer)

of (address)

was represented by the person(s) named below at the compulsory tender clarification meeting

Held at: Shell Ultra City Kroonstad

On (date) 10 May 2017 Starting time: 11:45AM hrs

As the tenderer we undertake that by said persons attending the clarification meeting we have made it our

business to familiarise ourselves with all aspects of the works / service / supply specified in the tender documents

in order for us to take account of everything necessary to provide a responsive tender offer and to compile our

rates and prices included in the tender offer.

We further understand that in addition to any queries raised on behalf of us at the meeting we may still approach

the Employer / Purchasels Representative to request clarification of the tender documents until no later then five

working days before the tender closing time stated in the Tender Data.

March 2015Page 1 of 2

Part T2: Returnable SchedulesT2.2-15: certificate of Attendance

at Tender Clarification Meeting

Page 37: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Particulars of person(s) attending the meeting:

Name

Capacity

Signature

Name Signature

Capacity

Attendance of the above persons at the meeting was confirmed by the procuring organisation'srepresentative as follows:

Name

Capacity

March 2015

Signature

Date & time

31Page 2 of 2

Part T2: Returnable ScheduiesT2,2-15: Certificate of Attendance

at Tender Clarification 'Meeting

Page 38: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-16: Record of Addenda to Tender Documents

We confirm that the following communications received from the Employer before the submission of thistender offer, amending lhe lender documents, have been taken into accounl in this lender offer:

Date Title or Details

1

2

3

4

5

6

7

8

9

10

Attach additional pages if more space is required.

Signed

Name

Tenderer

TENDERFORM: PRO-FAT-0184 Rev02

Dale

Posilion

Page 1 of 1Part T2: Returnable Schedules

T2.2-16: Record of Addenda to Tender documents

Page 39: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2.17: Compulsory Enterprise Questionnaire

The following particulars must be furnished, In the case of a joint venture, separate enterprise

questionnaires in respect of each partner must be completed and submitted,

Section 1: Name of enterprise: . .

Section 2: VAT registration number, if any: .

Section 3: CIDB registration number, if any: .

Section 4: Particulars of sole proprietors and partners in partnerships

Name Identity number Personal income tax number

* Complete only if sale proprietor or partnership and attach separate page if more than 3 partners

Section 5: Particulars of companies and close corporations

Company registration number, , ,

Close corporation number, , , , , , , _

Tax reference number, . , " , , , . , , , , , , , , , , ,

TENDERFORM: PRO.FAT.0185 Rev02 Page 1 of 4

Part T2: Returnable SchedulesT2.2-17: Compulsory Questionnaire

Page 40: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Section 6: Record in the service of the state

Indicate by marking the relevant boxes with a cross, if any sale proprietor, partner in a partnership or

director, manager, principal shareholder or stakeholder in a company or close corporation is currently or

has been within the last 12 months in the service of any of the following:

D a member of any municipal council D an employee of any provincial department,

D a member of any provincial legislaturenational or provincial public entity orconstitutional institution within the meaning of the

D a member of the National Assembly or the Public Finance Management Act, 1999 (Act 1 of

National Council of Province 1999)

D a member of the board of directors of any D a member of an accounting authority of any

municipal entity national or provincial public entity

D an official of any municipality or municipal D an employee of Parliament or a provincial

entity legislature

If any of the above boxes are marked, disclose the following:

Name of sole proprietor, Name of institution, public office, Status of service (tickpartner, director, manager, board or organ of state and position appropriate column)principal shareholder or held Current Within last 12stakeholder months

*insert separate page if necessary

4-0TENDERFORM: PRO-FAT-0185 Rev02 Page 2 of 4

Part T2: Returnable SchedulesT2.2-17: Compulsory Questionnaire

Page 41: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Section 7: Record of spouses, children and parents in the service of the state

Indicate by marking the relevant boxes with a cross, if any spouse, child or parent of a sole proprietor,

partner in a partnership or director, manager, principal shareholder or stakeholder in a company or close

corporation is currently or has been within the last 12 months been in the service of any of the following:

0 a member of any municipal council 0 an employee of any provincial department, national

0 a member of any provincial legislatureor provincial public entity or constitutionalinstitution within the meaning of the Public Finance

0 a member of the National Assembly or the Management Act, 1999 (Act 1 of 1999)

National Council of Province 0 a member of an accounting authority of any

0 a member of the board of directors of any national or provincial public entity

municipal entity 0 an employee of Parliament or a provincial

0 an official of any municipality or municipallegislature

entity

Name of spouse, child or Name of institution, public office, Status of serviceparent board or organ of state and (tick appropriate column)position held

Current Within last 12months

'insert separate page if necessary

41TENDERFORM: PRO-FAT-0185 Rev02 Page 3 of 4

Part T2: Returnable SchedulesT2.2-17: Compulsory Questionnaire

Page 42: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION '

The undersigned, who warrants that he I she is duly authorised to do so on behalf of the enterprise:

i) authorizes the Employer to obtain a tax clearance certificate from the South African Revenue

Services that my lour tax matters are in order;

ii) confirms that the neither the name of the enterprise or the name of any partner, manager,

director or other person, who wholly or partly exercises, or may exercise, control over the

enterprise appears on the Register of Tender Defaulters established in terms of the Prevention

and Combating of Corrupt Activities Act of 2004;

iii) confirms that no partner, member, director or other person, who wholly or partly exercises, or

may exercise, control over the enterprise appears, has within the last five years been convicted

of fraud or corruption;

iv) confirms that I I we are not associated, linked or involved with any other tendering entities

submitting tender offers and have no other relationship with any of the tenderers or those

responsible for compiling the scope of work that could cause or be interpreted as a conflict of

interest; and

v) confirms that the contents of this questionnaire are within my personal knowledge and are to the

best of my belief both true and correct.

Signed

Name

Enterprisename

TENDERFORM: PRO-FAT-0185 Rev02

Date

Position

Page 4 of 4Part T2: Returnable Schedules

T2.2-17: Compulsory Questionnaire

Page 43: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENOUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-20: Quality Plan

Due consideration must be given to the deliverables required to execute and complete the contract as per the

Quality ManagementStandard stated in the Works Information and should include but not be limited to:

1. Project Quality Plan for the contract,

2, The Contractor's Quality Policy.

3. Index of proceduresto be used during the contract.

4. Audit Schedulefor internal and external audits during the contract.

5. .150 9001 certification.

6. Typical Quality Manual.

7. Typical Quality Control Plan.

8. Typical data book index.

Attached submissions to this schedule:

Signed

Name

Tenderer

March 2015

Date

Position

Page1 of 1PartT2: Returnable Schedules

T2.2-20: Quality Plan

Page 44: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER. INSTALL. TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-22: Health and Safety Plan

Submit the following documents as a minimum with your tender:

1. Valid letter of good standing with insurance body.

2. Rolesand responsibilities of legal appointees.

3. Safety Officer's role and responsibility.

4. Safety, Health & Environmental Policies.

5. Overview of Tenderer's SHEsystem for project.

6. Overview of RAprocessand examples.

7. List of job categories for project and competencies required per category .and plan to address and meet

outstanding competencies.

8. Six months synopsisof SHEincidents, description, type and action taken.

9. Overview of selection processof subcontractors.

10. SHEchallengesenvisaged for the project and how they will be addressedand overcome.

11. Signedstatement acknowledging receiving and budget provision for SHEpack requirements.

12, Complete and return with tender documentation the Contractor Safety Questionnaire included in the Health

and Safety SpecificationTCP-HAS-STD-0001Rev00.

13. Construction Safety File (Index)

14. Construction SafetyWork Method Statement

4-4-March 2015

Page1 of 2Part T2: Returnable Schedules

T2.2-22: Health and Safety Plan

Page 45: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Attached submissions to this schedule:

Signed

Name

Tenderer

March 2015

Date

Position

Page 2 of 2Part T2: Returnable Schedules

T2,2-22: Health and Safety Plan

Page 46: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-25: Previous Experience

Note to tenderers:Tenderers are required to demonstrate their experience in the delivery of similar works, and to this end shall

supply a sufficiently detailed reference list with contact details of existing customers and also indicate their

previous experience of, their design, installation and commissioning capability,

Employer, contact Description cif Value of work Date

person and contract Inclusive of VAT Completed

telephone number (Rand)

Signed

Name

Tenderer

March 2015

Date

Position

4-6

Page1 of 1Part T2: Returnable SchedulesT2,2-25: PreviousExperience

Page 47: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER, INSTAll. TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-31: Supplier Code of Conduct

Transnet limited aims to achieve the best value for money when buying or selling goods and obtaining

services. This however must be done in an open and fair manner that supports and drives a

competitive economy. Underpinning our process are several acts and policies that any supplier dealing

with Transnet must understand and support. These are:

• The Transnet Procurement Policy - A guide for Tenderers.

• Section 217 of the Constitution - the five pillars of Public PSCM (Procurement and Supply Chain

Management): fair, equitable, transparent, competitive and cost effective;

• The Public Finance Management Act (PFMA);

• The Broad Based Black Economic Empowerment Act (BBBEE)

• The Prevention and Combating of Corrupt Activities Act (PRECCA); and

• The Construction Industry Development Board Act (CIDB Act).

This code of conduct has been included in this contract to formally appraise Transnet Suppliers of

Transnet's expectations regarding behaviour and conduct of its Suppliers.

Prohibition of Bribes, Kickbacks, Unlawful Payments, and Other Corrupt Practices

Transnet is in the process of transforming itself into a self-sustaining State Owned Enterprise, actively

competing in the logistics industry. Our aim is to become a world class, profitable, logistics organisation.

As such, our transformation is focused on adopting a performance culture and to adopt behaviours that

will enable this transformation.

1. Transnet Limited will not participate in corrupt practices. Therefore, it expects its'

suppliers to act in a similar manner.

• Transnet and its employees will follow the laws of this country and keep accurate business

records that refiect actual transactions with, and payments to, our suppliers.

• Employees must not accept or request money or any1hing of value, directly or indirectly,

from suppliers.

• Employees may not receive any1hing that is calculated to:

Illegally infiuence their judgement or conduct or to ensure the desired outcome of a

sourcing activity;

Win or retain business or to infiuence any act or decision of any person involved in

sourcing decisions; or

Gain an improper advantage.

4-lTENDERFORM: PRO-FAT-0199 Rev04 Page 1 of 3

Part T2: Returnable SchedulesT2.2-31: Supplier Code of Conduct

Page 48: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

• There may be times when a supplier is confronted with fraudulent or corrupt behaviour of

Transnet employees. We expect our Suppliers to use our "Tip-oils Anonymous" Hot line to

report these acts. (0800 003 056).

2. Transnet Limited is firmly committed to the ideas of free and competitive enterprise.

• Suppliers are expected to comply with all applicable laws and regulations regarding fair

competition and antitrust practices.

• Transnet does not engage with non-value adding agents or representatives solely for the

purpose of increasing BBBEE spend (fronting).

3. Transnet's relationship with suppliers requires us to clearly define requirements, to

exchange information and share mutual benefits.

• Generally, suppliers have .their own business standards and regulations. Although

Transnet cannot control the actions of our suppliers, we will not tolerate any illegal

activities. These include, but are not limited to:

Misrepresentation of their product (origin of manufacture, specifications, intellectual

property rights, etc);

Collusion;

Failure to disclose accurate information required during the sourcing activity

(ownership, financial situation, BBBEE status, etc.);

Corrupt activities listed above; and

Harassment, intimidation or other aggressive actions towards Transnet employees.

• Suppliers must be evaluated and approved before any materials, components, products or

services are purchased from them. Rigorous due diligence is conducted and the supplier is

expected to participate in an honest and straight forward manner.

• Suppliers must record and report facts accurately, honestly and objectively. Financial

records must be accurate in all material respects.

TENDERFORM: PRO.FAT.0199 Rev04 Page 2 of 3

Part T2: Returnable SchedulesT2.2~31: Supplier Code of Conduct

Page 49: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Conflicts oflnterest

A conflict of interest arises when personal interests or activities influence (or appear to influence) the

ability to act in the best Interests of Transnet limited.

• Doing business with family members.

• Having a financial interest in another company in our industry

Where possible, contracts will be negotiated to include the above in the terms of such contracts. To the

extent such terms are not included in contractual obligations and any of the above code is breached,

then Transnet reserves its right to review doing business with these suppliers.

I, of

(insert name of Director or as per Authority Resolution from (insert name of Company)

Board of Directors)

hereby acknowledge having read, understood and agree to the terms and conditions set out in the

"Transnet Supplier Code of Conduct."

Signed this on day at _

Signature

TENDERFORM: PRO.FAT.0199 Rev04 Page 3 of 3

Part T2: Returnable Schedules12.2-31: Supplier Code of Conduct

Page 50: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

1RANSNEr

'" ""J '''9"' ",:~ rSUPPLIER DECLARATION FORM

Transnet Vendor Management has received a request to load / change your company details on tothe Transnet vendor database. Please return the completed Supplier Declaration Form (SDF)together with the required supporting documents as per Appendix V to the Transnet Official who isintending to procure your company's services / products, to enable us to process this request.Please only submit the documentation relevant to your request.

NB: Effective 1 April 2016 all organisations, institutions and individuals who wish to provide goodsand/or services to Organs of the State must be registered on the National Treasury Central SupplierDatabase (CSD), This needs to be done via their portal at https:/Isecure.csd.gov.za/ beforeapplying to Transnet.

General Terms and Conditions:

Failure to submit the relevant documentation will delay the vendor creation I changeprocess.

Where applicable, the respective Transnet Operating Division processing your application mayrequest further information from you.

The Service Provider warrants that the details of its bank account C'the nominated account'~provided herein, are correct and acknowledges that payments due to the Supplier will be made intothe nominated account. If details of the nominated account should change, the Service Providermust notify Transnet in writing of such change, failing which any payments made by Transnet intothe nominated account will constitute a full discharge of the indebtedness of Transnet to theSupplier in respect of the payment so made. Transnet will incur no liability for any payments madeto the incorrect a=unt or any costs associated therewith. In such event, the Service Providerindemnifies and holds Transnet harmless in respect of any payments made to an incorrect bankaccount and will, on demand, pay Transnet any costs associated herewith.

Transnet expects its suppliers to timeously renew their Tax Clearance and B-BBEE certificates(where applicable, as EMEs and QSEs are only expected to supply an affidavit as per Appendix IIIand IV), as well as all affidavits, annually. Failure to do so may result in the supplier's account beingtemporarily suspended.

Document Name: Supplier Declaration Form

Revision: Version 7.3

Date: 4 April 201650

Page1of5

Page 51: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

lRANSNEr

{SUP~,"IERDEC~RATION I1(JRM., - - _ 'l ~ _ : ~ _ •• "' ::, '~ -_

NB: Effective 1 Apnl 2016 all organisations, institutions and individuals who wish to provide goods and/or services toOrgans of the State must be registered on the National Treasury Central Supplier Database (CSD), This needs to be donevia their ortal at htt s: secure,esc, ov,za before a I in to Transnet,CSDNumber (MAAA )()()()()()()():

Company Trading NameCompany Registered NameCompany Registration No. Or ID No If aSole ProonetorCompany Income Tax Number

CC Trust Ply ltd limited

Non-profit Personal State Owned National GovtForm of Entity liability Co CoEducational Specialised Financial ForeignInstitution Profession Institution International

Did your company previously operate under another name?If YES state the previous details below:Trading NameRegistered NameCompany Registration No Or ID No If aSole ProDnetor

Partnership

Provincial Govt

Foreign BranchOffice

I Yes I

Sole Proprietor

Local Govt

I No I

CC Trust Ply Ltd limited Partnership Sole Proprietor

Non-profit Personal State Owned National Govt Provincial Govt Local GovtForm of Entity Liability Co CoEducational Specialised Financial Foreign Foreign BranchInstitution Profession Institution International Office

Your Current Company's VAT Registration StatusVAT Registration NumberIf Exempted from VAT registration,state reason and submit proof fromSARSin confirming the exemptionstatusIf your business entity is not VAT Registered, please submit a current original sworn affidavit (see example in Appendix I).Your Non VAT ReDistration must be confirmed annually.

Company Banking DetailsUniversal Branch Code

Company Physical Address

Company Postal Address

Company Telephone numberCompany Fax NumberCompany E-Mail AddressCompany Website Address

Company Contact Person NameDesignationTelephoneEmail

IBank NameBank Account Number

I Code I

I Code I

Document Name: Supplier Declaration Fonn

Revision: Version 7.3

Oat.: 4 April 2016

5\Pago 2 of 5

Page 52: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

1RANSNEr

Is your company a Labour Broker? I Yes I I No [Main Product / service Supplied e.g. Stationery / Consulting /Labour etc.How many personnel does the business employ? Full Time I I Part Time IPlease Note: Should your business employ more than 2 full time employees who are not connected persons as defined inthe Income Tax Ad. olease submit a sworn affidavit as oer Aooendix II.

>R50MiIlion>RI0Miliion<R50MiIlion<RIOMiliionMost recent Financial Year's Annual Turnover

Does our com an have a valid BBBEEcertificate?What is your broad based BEEstatus (Levell to 9)Majority Race of Ownership0A BI k 0 rsh' % Black Women % Black Disabledo ac wne 'P ownershi erson S ownershi ownershi

Please Note: Please provide proof of BBBEEstatus as per Appendix V. If you qualify as an EME or QSE then provide anaffidavit following the examples provided in Appendix III and IV respectively. If you have indicated Black Disabledperson(s) ownership, then provide a certified letter signed by a physician, on the physidan's letterhead, confirming thedisabm

Name Designation

Signature Date

~~~~~~~-:~~ ..~

Name Date

Signature Telephone No

Document Name: Supplier Declaration Form

Revision: Version 7.3

Date: 4 April 2D16 Page 3 of 5

Page 53: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

lRANSNEr

Company Trading Name

Company Registered Name

TfRCreate

Extend

Amend

Delete

Block

Undelete

...- -:--'Y---

Please Indicate whether the Su Iier has a contract with sourcin Transnet 00 YesIf es lease submit a co of the ad'udlcation document sl ned-<lff com arative schedule

Transnet B-BBEEDepartment SignatureContact Person

Contact number Email

No

THE FOLLOWING IS TO BE COMPLETED BY THE TRANSNET REQUESTING/SOURCING DEPARTMENT. THEFULL SET OF VENDOR RELATED DOCUMENTS MUST THEN BE FORWARDED TO THE APPROPRIATE VENDORAPPROVAL OFFICIAL FOR APPROVAL

"-."--<.-, . .

i. Products Onl Yes Noii. Services On Yes Noiii. Labour Onl Yes NoIv.Mix of Products and Services Yes Nov. Mix of Services and Labour Yes No

If your answer is YES to any of the questions ii to v above and the applicant supplier has not submitted a sworn affidavitas per Appendix II, the matter should be further investigated in terms of the Tax Withholding Procedures. Wherenecessary you may approach your Operating Division's Procurement Department for guidance in this regard. Detaiis of theappropriate Transnet decision-making body such as a Cross Functional Sourcing Team, should be indicated below. A copyof the signed-off document by the mentioned decision-making body should also be attached.

!

I

Service Provider

Labour broker without IRP30 exemptioncertificateLabour broker with IRP30 exemptioncertificate

Personal Service Provider

Independent Contractor

~

- .

Yes No

Yes No

Yes No

Yes No

Yes No

None of the above apply, state reason

If PAYEis to be deducted, please indicate whether the applicant supplier has indicated in writing that it is prepared tocomply with Transnets PAYEconditions. (Please attached a copy of the written communication)

If he re I is "NO" the vend r a Ii a i will.be arded as cance d nd another service rovlder

Document Name: Supplier Declaration Form

Revision: Version 7.3

db red.

Date: 4 April 2016 Page4of5

Page 54: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

lRANSNEr..•,..CERTIFICATION AND APPROVAL OF PROPOSED VENDOR CREATIONNENDOR DETAILS UPDATE BY TRANSNETOFFICIAL WITH APPROPRIATE DELEGATED AUTHORITY.

I hereby certify that the Transnet Procurement Procedure Manual (PPM) I Procurement Mechanisms have in ALLRESPECTS been adhered to and therefore approve the proposed vendor creation/vendor details update.

Designation

Tel No

e-Mail

Signature

Document Name: Supplier Declaration Form

Revision: Version 7.3

Fax No

Date Y Y Y Y M M D D

Dale: 4 April 2016 S4- Page 5 of 5

Page 55: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-24: Capacity and Ability to meet Delivery Schedule

Note to tenderers:

The Tenderer is required to demonstrate to the Employer that he has sufficient current and future capacity to

carry out the work as detailed in the Works Information and that he has the capacity and plans in place to meet

the required delivery schedule as required, To this end, the following must be provided by the Tenderer:

A schedule detailing the following:

• Maximum quantity of work concurrently performed by the Tenderer in the recent past in order to illustrate his

potential capacity to design, fabricate and/or construct work of a similar nature

• Current and future work on his order book, showing quantity and type of equipment

• Quantity of work for which the Tenderer has tenders in the market or is currently tendering on

• The work as covered in this Works Information, planned and scheduled as per the Tenderer's capacities and

methods but meeting the required delivery schedule,

Index of documentation attached to this schedule:

Signed Date

Name Position

Tenderer

____________ 55March 201S

Page 1 of 1Part T2: Returnable Schedules

T2,2-24: Capability and Ability to meetDelivery Schedule

Page 56: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-43: REQUEST FOR PROPOSAL - BREACH OF LAWNAME OF COMPANY: _

I I We do hereby certify that I/wehave/have not been found guilty during the preceding 5 (five) years of a serious breach of law, including butnot limited to a breach of the Competition Act, 89 of 1998, by a court of law, tribunal or other administrative body.The type of breach that the Respondent is required to disclose excludes relatively minor offences ormisdemeanours, e.g. traffic offences.

Where found guilty of such a serious breach, please disclose:

NATURE OF BREACH:

DATE OF BREACH: _

Furthermore, I/we acknowledge that Transnet 50C Ltd reserves the right to exclude any Respondent from thebidding process, should that person or company have been found guilty of a serious breach of law, tribunal orregulatory obligation.

SIGNED at on this __ day of 20__

SIGNATURE OF WITNESS

March 20155"

Page 1 of 1

SIGNATURE OF RESPONDENT

Part T2: Returnable SchedulesT2.2-43: RFP - Breach of Law

Page 57: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-36: TENDER DECLARATION FORM

NAME OF COMPANY:

We ~do hereby certify that:

1. Transnet has supplied and we have received appropriate tender offers to any/all questions (as applicable)which were submitted by ourselves for tender clarification purposes;

2, we have received all information we deemed necessary for the completion of this Tender;

3, at no stage have we received additional information relating to the subject matter of this tender fromTransnet sources, other than information formally received from the designated Transnet contact(s) asnominated in the tender documents;

4, we are satisfied, insofar as our company is concerned, that the processes and procedures adopted byTransnet in issuing this TENDER and the requirements requested from tenderers in responding to thisTENDER have been conducted in a fair and transparent manner; and

5. furthermore, we acknowledge that a direct relationship exists between a family member and/or an owner /member / director / partner / shareholder (unlisted companies) of our company and an employee or boardmember of the Transnet Group as indicated below: [Respondent to indicate if this section is not applicable]

FULL NAME OF OWNER/MEMBER/DIRECTOR/

PARTNER/SHAREHOLDER:

Indicate nature of relationship with Transnet:

ADDRESS:

[Failure to furnish complete and accurate information in this regard may lead to thedisqualification of your response and may preclude a Respondent from doing future business withTransnet]

We declare, to the extent that we are aware or become aware of any relationship between ourselves andTransnet (other than any existing and appropriate business relationship with Transnet) which could unfairlyadvantage our company in the forthcoming adjudication process, we shall notify Transnet immediately inwriting of such circumstances.

6, We accept that any dispute pertaining to this tender will be resolved through theOmbudsman process and will be subject to the Terms of Reference of the Ombudsman, TheS,

March 2015Page 1 of 2

Part 12: Returnable SchedulesT2,2-36: TENDER Declaration Form

Page 58: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENOUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER, INSTAll. TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Ombudsman process must first be exhausted before judicial review of a decision is sought.(Refer "Important Notice to Tenderers" overleaf).

7. We further accept that Transnet reserves the right to reverse a tender award or decisionbased on the recommendations of the Ombudsman without having to follow a formal courtprocess to have such award or decision set aside.

SIGNED at on this __ day of 20__

For and on behalf of AS WITNESS:

..................... ............ ..... . ........

duly authorised thereto

Name: Name:

Position: Position:

Signature: Signature:

Date:

Place:

58March 2015

Page 2 of 2Part T2: Returnable Schedules

T2.2-36: TENDER Declaration Form

Page 59: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNETFREIGHTRAILENQUIRYNUMBER:BFX/S4139DESCRIPTIONOF TIiE WORKS: FORTIiE SUPPLY,DEUVER, INSTALL, TEST AND COMMISSIONINGOF BBKVSF6PRIMARYORCUIT BREAKERAT SERFONTEINSUBSTATION

T2.2-S0: B-BBEE PREFERENCE POINTS CLAIM FORM

This preference form must form part of all bids invited. It contains general information and serves as a claim forpreference points for Broad-Based Black Economic Empowerment [B-BBEE] Status Level of Contribution.

NB: BEFORECOMPLETING THIS FORM, BIDDERS MUST STUDY THE GENERAL CONDmONS,DEFINmONS AND DIRECTIVES APPUCABLE IN RESPECTOF B-BBEE,AS PRESCRIBED INTHE PREFERENTIAL PROCUREMENTREGULATIONS, 2017.

1. GENERALCONDmONS

1.1 The following preference point systems are applicable to all bids:

the 80/20 system for requirements with a Rand value of up to R50 000 000 (all applicable taxes

included); andthe 90/10 system for requirements with a Rand value above R50 000 000 (all applicable taxes

included).1.2 The value of this bid is estimated to not exceed R50 000 000 (all applicable taxes included) and therefore

the 80/20 preference point system shall be applicable.

1.3 Preference points for this bid shall be awarded for:

(a) Price; and

(b) B-BBEE Status Level of Contribution.

1.4 The maximum points for this bid are allocated as follows:

B-BBEESTATUS LEVELOF CONTRIBUTION

Total points for Price and B-BBEEmust not exceed

1.5 Failure on the part of a bidder to submit a B-BBEE Verification Certificate from a VerificationAgency accredited by the South African Accreditation System [SANAS], or a sworn affidavitconfirming annual turnover and level of black ownership in case of all EMEs and QSEs with51% black ownership or more together with the bid, will be interpreted to mean thatpreference points for B-BBEE status level of contribution are not claimed. Certificates issuedby a Registered Auditor approved by the Independent Board of Auditors [IRBA] to LargeEnterprises or QSEs with less than SI% black ownership have been discontinued but suchvalid certificates that were issued before 1 January 2017 may be used until they phase outcompletely by December 2017.

1.6 The purchaser reserves the right to require of a bidder, either before a bid is adjudicated or at any timesubsequently, to substantiate any claim in regard to preferences, in any manner required by thepurchaser.

2. DEFINmONS

(a) "all applicable taxes" includes value-added tax, pay as you earn, income tax, unemploymentinsurance fund contributions and skills development levies;

(b) "B-BBEE" means broad-based black economic empowerment as defined in section 1 of the Broad-

March 2015 Page 1 of 7

5~Part 12: Returnable Schedule

T2.2-50: BBBEE Preference Points Claim Form

Page 60: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXj54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DEUVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKERAT SERFONTEIN SUBSTATION

Based Black Economic Empowerment Act;

(c) "B-BBEE status level of contributor" means the B-BBEE status received by a measured entitybased on its overall performance using the relevant scorecard contained in the Codes of Good Practiceon Black Economic Empowerment, issued in terms of section 9(1) of the Broad-Based Black EconomicEmpowerment Act;

(d) "bid" means a written offer in a prescribed or stipulated form in response to an invitation by anorgan of state for the provision of services, works or goods, through price quotations, advertisedcompetitive bidding processes or proposals;

(e) "Black designated group" has meaning assigned to it in codes of good practice issued in terms ofsection 9(1) of the Broad-Based Black Economic Empowerment Act.

(f) "Black People" meaning assigned to in Section 1 of Broad-Based Black Economic EmpowermentAct.

(g) "Broad-Based Black Economic Empowerment Act" means the Broad-Based Black EconomicEmpowerment Act, 2003 (Act NO. 53 of 2003);

(h) "CIPC" means the Companies and Intellectual Property Commission, formerly known as CIPRO, theCompanies and Intellectual Property Registration Offce.

(i) "comparative price" means the price after the factors of a non-firm price and all unconditionaldiscounts that can be utilized have been taken into consideration;

U) "consortium or joint venture" means an association of persons for the purpose of combining theirexpertise, property, capital, efforts, skill and knowledge in an activity for the execution of a contract;

(k) "contract" means the agreement that results from the acceptance of a bid by an organ of state;

(I) "co-operative" means a co-operative registered in terms of section 7 of Cooperatives Act, 2005(Act NO. 14 of 2005)

(m) "Designated Group" means - i) Black designated groups; ii) Black People; iii) Women; iv) peoplewith disabilities or v) Small enterprise, as defined in Section 1 of National Small Enterprise Act, (102of 1996)

(n) "Designated Sector" means, sub-sector or industry or product designated in terms of regulation8(1)(a)

(0) "EME" means an Exempted Micro Enterprise as defines by Codes of Good Practice under section 9(1) of the Broad-Based Black Economic Empowerment Act, 2003 (Act No. 53 of 2003);

(p) "firm price" means the price that is only subject to adjustments in accordance with the actualincrease or decrease resulting from the change, imposition, or abolition of customs or excise dutyand any other duty, levy, or tax, which, in terms of the law or regulation, is binding on the contractorand demonstrably has an influence on the price of any supplies, or the rendering costs of any service,for the execution of the contract;

(q) "functionality" means the ability of a bidder to provide goods or services in accordance withspecification as set out in the bid documents;

(r) "Military Veteran" has meaning assigned to it in Section 1 of Military Veterans Act, 2011 (Act No.18 of 2011);

(s) "National Treasury" has meaning assigned to it in Section 1 of Public Finance Management Act,1999 (Act NO.1 of 1999);

(t) "non-firm prices" means all prices other than "firm" prices;

(u) "person" includes a juristic person;

(v) "People with disabilities" meaning assigned to it in terms of Section 1 of Employment Equity Act,

March 2015 Page 2 of 7

bOPart T2: Returnable Schedule

T2.2-50: BBBEE Preference Points Claim Form

Page 61: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNETFREIGHTRAILENQUIRYNUMBER:BFX/54139DESCRIPTIDNOF THE WORKS: FORTHE SUPPLY,DEUVER, INSTALL, TEST AND COMMISSIONINGOF 88KV SF6PRIMARYCIRCUITBREAKERAT SERFONmN SU8STATION

1998 (Act No. 550f 1998);

(w) "Price" includes all applicable taxes less all unconditional discounts.

(x) "Proof of B-BBEEStatus Level of Contributor" i) the B-BBBEE status level cenbficate issued byan unauthorised body or person; Ii) a sworn affidavit as prescribed by the B-BBEE Codes of GoodPractice; or iii) any other requirement prescribed in terms of the Broad- Based Black EconomicEmpowemnent Act.

(y) "Rural Area" i) a sparsely populated area in which people farm or depend on natural resources,including villages and small towns that are dispersed through the area; or ii) an area including a largesettlement which depends on migratory labour and remittances and government social grants forsurvival, and may have traditional land tenure system.

(z) "QSE" means a Qualifying Small EEnterprise as defines by Codes of Good Practice under section 9(1) of the Broad-Based Black Economic Empowerment Act, 2003 (Act No. 53 of 2003);

(aa) "rand value" means the total estimated value of a contract in South African currency, calculated atthe time of bid invitations, and includes all applicable taxes and excise duties;

(bb) "sub-contract" means the primary contractor's assigning, leasing, making out work to, oremploying, another person to support such primary contractor in the execution of part of a projectin temns of the contract;

(cc) "total revenue" bears the same meaning assigned to this expression in the Codes of Good Practiceon Black Economic Empowerment, issued in terms of section 9(1) of the Broad-Based Black EconomicEmpowerment Act and promulgated in the Government Gazette on 9 February 2007;

(dd)"Township" means an urban living area that any time from the late 19th century until 27 April 1994,was reserved for black people, including areas developed for historically disadvantaged individualspost 27 April 1994

(ee)"Treasury" meaning assigned to it in Section 1 of the Public Finance Management Act, 1999 (ActNO.1 of 1999)

(If) "trust" means the arrangement through which the property of one person is made over orbequeathed to a trustee to administer such property for the benefit of another person; and

(gg)"trustee" means any person, including the founder of a trust, to whom property is bequeathed inorder for such property to be administered for the benefit of another person.

(hh)"Youth" meaning assigned to it in terms of Section 1 of National youth Development Agency Act,2008 (Act No. 54 of 2008)

3. ADJUDICATION USING A POINT SYSTEM

3.1 The bidder obtaining the highest number of total points will be awarded the contract.

3.2 Preference points shall be calculated after prices have been brought to a comparative basis taking intoaccount all factors of non-fimn prices and all unconditional discounts.

3.3 Points scored must be rounded off to the nearest 2 decimal places.

3.4 In the event that two or more bids have scored equal total points, the successful bid must be the onescoring the highest number of preference points for B-BBEE.

3.5 However, when functionality is part of the evaluation process and two or more bids have scored equalpoints including equal preference points for B-BBEE, the successful bid must be the one scoring thehighest score for functionality.

3.6 Should two or more bids be equal in all respects, the award shall be decided by the drawing of lots.

4. POINTS AWARDED FOR PRICE

March 2015 Page 3 of 7

(;,1Part T2: Returnable Schedule

T2.2-50: BBBEE Preference Points Claim Fomn

Page 62: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNETFREIGHTRAILENQUIRYNUMBER:BFX/S4139DESCRIPTIONOF THE WORKS: FOR THE SUPPLY,DEUVER, INSTALL, TEST AND COMMISSIONINGOF 88KV SF6PRIMARYCIRCUITBREAKERAT SERFONTEINSUBSTATION

4.1 THE 80/20 OR 90/10 PREFERENCE POINT SYSTEMS

A maximum of 80 or 90 points is allocated for price on the following basis:

80/20

Ps = 80(1 - PI - Pmin JPmm

Where

or

or

90/10

Ps = 90 (I _ PI - P min)Pmin

PsPt

Pmin

=

=

=

Points scored for comparative price of bid under consideration

Comparative price of bid under consideration

Comparative price of lowest acceptable bid

5. POINTS AWARDED FOR B-BBEE STATUS LEVEL OF CONTRIBUTION

5.1 In terms of Regulation 6 (2) and 7 (2) of the Preferential Procurement Regulations, preference pointsmust be awarded to a bidder for attaining the 8-BBEE status level of contribution in accordance with

the table below:

B-BBEE Status Level ofNumber of points Number of points

Contributor(80{20 system)(90/10 system)

1 10 20

2 9 18

3 6 14

4 5 12

5 4 8

6 3 6

7 2 4

8 1 2

Non-compliant contributor 0 0

5.2 A bidder who qualifies as an EME in tenms of the B-BBEE Act must submit a sworn affidavit confirmingAnnuai Total Revenue and Level of Black Ownership. Furthermore EMEs may also obtain a swornaffidavit from OPC (formerly CIPRO) Self Service Terminals when registering a business or filing annualreturns. In these instances Transnet would require proof of turnover as well as proof of ownership.Sworn affidavits must substantially comply with the format that can be obtained on the on's websiteat www.dti.gov.za/economic empowerment/bee codes.jsp.

5.3 QSEs that are at least 51% Black owned or higher are only required to obtain a sworn affidavit on anannual basis confinming that the entity has an Annual Total Revenue of R50 million or less and theentity's Level of Black ownership.

5.4 A Bidder other than EME or a QSE that is at least 51% Black owned must submit their original and validB-BBEE status level verification certificate or a certified copy thereof, substantiating their B-BBEE ratingissued by a Registered Auditor approved by IRBA or a Verification Agency accredited by SANAS.

S.5 A trust, consortium or joint venture (including unincorporated consortia and joint ventures) must submita consolidated B-BBEE Status Level verification certificate for every separate bid.

5.6 Tertiary Institutions and Public Entities will be required to submit their B-BBEE status level certificatesin terms of the specialized scorecard contained in the B-BBEE Codes of Good Practice.

March 2015 Page 4 of 7 Part T2: Returnable ScheduleT2.2-50: BBBEE Preference Points Claim Form

Page 63: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

,------- --------------

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFX/54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DEUVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6PRIMARY ORCUIT BREAKERAT SERFONTEIN SUBSTATION

5.7 A personwill not be awarded points for B-BBEEstatus level if it is indicated in the bid documents thatsuch a bidder intends sub-contracting more than 25% of the value of the contract to any otherenterprise that does not qualify for at least the points that such a bidder qualifies for, unless theintended sub-contractor is an EMEthat has the capability and ability to execute the sub-contract.

5.8 A personawarded a contract may not sub-contract more than 25% of the value of the contract to anyother enterprise that does not have an equal or higher B-BBEEstatus level than the person concerned,unlessthe contract is sub-contracted to an EMEthat has the capability and ability to execute the sub-contract.

5.9 Biddersare to note that the rules pertaining to B-BBEEverification and other B-BBEErequirements maybe changed from time to time by regulatory bodies such as National Treasury or the DTI. It is theBidder's responsibility to ensure that his/her bid complies fully with all B-BBEErequirements at the timeof the submission of the bid.

6. BID DECLARATION

6.1 Bidderswho claim points in respect of B-BBEEStatus Levelof Contribution must complete the following:

7. B-BBEE STATUS LEVELOF CONTRIBUTION CLAIMED IN TERMS OF PARAGRAPHS 1.4 AND5.1

7.1 B-BBEEStatus Level of Contribution: .........(maximum of 10 or 20'points)

(Points claimed in respect of paragraph 7.1 must be in accordancewith the table reflected in paragraph5.1 and must be substantiated by means of a B-BBEEcertificate issued by a Verification Agencyaccredited by SANASor a RegisteredAuditor approved by IRBAor a sworn affidavit.

8. SUB-CONTRACTING

8.1 Will any portion of the contract be sub-contracted?

( Tick applicable box)

~_YE~S O No_D8.1.1 If yes, indicate:

i) What percentage of the contract will be subcontracted %ii) The name of the sub-contractor .iii) The B-BBEEstatus level of the sub-contractor .iv) Whether the sub-contractor is an EME.

(Tick applicable box)I YESO--N-O D

v) Specify, by ticking the appropriate box, if subcontractingwith an enterprise in terms of PreferentialProcurement Regulations,201?:

Designated Group: An EMEor QSEwhich is at last 51% owned by: EMEV QSEvBlackpeople

Blackpeople who are youth

Blackpeople who are women

Blackpeople with disabilities

Blackpeople living in rural or underdevelopedareas or townships

March 2015 Page5 of 7

63Part T2: Returnable Schedule

12.2-50: BBBEEPreference PointsClaim Form

Page 64: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

NING OF BBKVSF6

TRANSNETFREIGHTRAILENQUIRYNUMBER:BFX{S4139DESCRIPTIONOF THE WORKS: FORTHE SUPPLY,DEUVER, INSTALL, TEST AND COMMISSIOPRIMARYCIRCUITBREAKERAT SERFONTEINSUBSTATION

Cooperative owned by black people

Black people who are military veterans

OR

Any EME

Any QSE

9. DECLARATION WITH REGARD TO COMPANY/FIRM

9.1 Name of compa ny/firm: ........................................................................ ...............

9.2 VAT registration num ber: .....................................................................................

9.3 Company registration number: ..............................................................................

9.4 TYPE OF COMPANY/ FIRM

Partnership/Joint Venture / Consortium

One person business/sole propriety

o Close corporation

o Company

o (Pty) Limited

[TICK APPUCABLE BOX]

9.5 DESCRIBE PRINCIPAL BUSINESS ACTIVITIES

9.6 COMPANY CLASSIFICATION

Manufacturer

Supplier

8 Professional service provider

8 Other service providers, e.g. transporter, etc.

[ TICK APPUCABLE BOX]

9.7 Total number of years the company/firm has been in business: .

9.8 I/we, the undersigned, who is / are duly authorised to do so on behalf of the company/firm, certify thatthe points claimed, based on the B-BBEE status level of contribution indicated in paragraph 7 of theforegoing certificate, qualifies the company/ firm for the preference(s) shown and 1/ we acknowledgethat:

i) The information furnished is true and correct;

ii) The preference points claimed are in accordance with the General Conditions as indicated inparagraph 1 of this form;

iii) In the event of a contract being awarded as a result of points claimed as shown in paragraph 7,the contractor may be required to furnish documentary proof to the satisfaction of the purchaserthat the claims are correct;

iv) If a bidder submitted false information regarding its B-BBEE status level of contributor, localproduction and content, or any other matter required in terms of the Preferential Procurement

March 2015 Page 6 of 7

"4-Part 12: Returnable Schedule

12.2-50: BBBEE Preference Points Claim Form

Page 65: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFX/S4139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DEUVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6PRIMARYCIRCUIT BREAKERAT SERFONTEIN SUBSTATION

Regulations,2017 which will affect or has affected the evaluation of a bid, or where a bidder hasfailed to declare any subcontracting arrangements or any of the conditions of contract have notbeen fulfilled, the purchaser may, in addition to any other remedy it may have

(a) disqualify the person from the bidding process;

(b) recover costs, lossesor damages it has incurred or suffered as a result of thatperson's conduct;

(c) cancel the contract and claim any damageswhich it has suffered as a result ofhaving to make lessfavourable arrangements due to such cancellation;

(d) if the successful bidder subcontracted a portion of the bid to another personwithout disclosing it, Transnet reserves the right to penalise the bidder up to10 percent of the value of the contract;

(e) recommendthat the bidder or contractor, its shareholdersand directors, or onlythe shareholdersand directors who acted on a fraudulent basis, be restricted bythe National Treasury from obtaining business from any organ of state for aperiod not exceeding 10 years, after the audi alteram partem (hear the otherside) rule has been applied; and

(f) forward the matter for criminal prosecution.

SIGNATURE(S) OF BIDDERS

Signature

Name

Date

Signed at

March 2015 Page7 of 7

'-5

WITNESSES

1. Witness signature

2. Witness signature

PartT2: Returnable ScheduleT2.2-50: BBBEEPreference PointsClaim Form

Page 66: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENOUIRY NUMBER: BFXl54139DESCRIPTION. OF THE WORKS: FOR THE SUPPLY. DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

T2.2-51: Certificate of Acquaintance with Tender Documents

NAMEOFTENDERINGENTITY:

1. I/we do hereby certify that I/we acquainted myself/ourselves with all the documentation comprising this

TENDERand all conditions contained therein, as laid down by Transnet SOCLtd for the carrying out of

the proposed supply/service/works for which I/we submitted my/our Tender.

2. l/we furthermore agree that Transnet SOCLtd shall recognise no claim from me/us for relief based on an

allegation that I/we overlooked any TENDER/contract condition or failed to take it into account for the

purpose of calculating my/our offered prices or otherwise.

3. I/we understand that the accompanying Tender will be disqualified if this Certificate is founa not to be

true and complete in every respect.

4, For the purposes of this Certificate and the accompanying Tender, I/we understand that the word

"competitor" shall include any individual or organisation, other than the Tenderder, whether or not

affiliated with the Tenderder, who:

a) has been requested to submit a Tender in responseto this Tender invitation;

b) could potentially submit a Tender in response to this Tender invitation, based on their

qualifications, abilities or experience; and

c) provides the same Services as the Tenderder and/or is in the same line of business as the

Tenderder

S. The Tenderder has arrived at the accompanying Tender independently from, and without consultation,

communication, agreement or arrangement with any competitor. However communication between

partners in a joint venture or consortium will not be construed as collusive Tenderding.

6. In particular, without limiting the generality of paragraph 5 above, there has been no consultation,

communication, agreement or arrangement with any competitor regarding:

a) prices;

b) geographical area where Serviceswill be rendered [market allocation]

c) methods, factors or formulas used to calculate prices;

d) the intention or decision to submit or not to submit, a Tender;

e) the submission of a Tender which does not meet the specifications and conditions of the

TENDER;or

f) Tenderding with the intention not winning the Tender.

March 2015Page1 of 2

bb

Part T2: Returnable Schedules12.2-51: Certificate of Acquaintancewith

Tender Documents

Page 67: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6PRIMARY CIRCUIT BREAKER AT SERFONTEIN SUBSTATION

7, In addition, there have been no consultations, communications, agreements or arrangements with any

competitor regarding the quality, quantity, specifications and conditions or delivery particulars of the

Servicesto which this TENDERrelates.

8. The terms of the accompanying Tender have not been, and will not be, disclosed by the Tenderder,

directly or indirectly, to any competitor, prior to the date and time of the official Tender opening or of the

awarding of the contract.

9. I/We am/are aware that, in addition and without prejudice to any other remedy provided to combat any

restrictive practices related to Tenders and contracts, Tenders that are suspiciouswill be reported to the

Competition Commission for investigation and possible imposition of administrative penaities in terms of

section 59 of the Competition Act No 89 of 1998 and/or may be reported to the National Prosecuting

Authority [NPA] for criminal investigation. In addition, Tenderders that submit suspiciousTenders may be

restricted from conducting business with the public sector for a period not exceeding 10 [ten] years in

terms of the Prevention and Combating of Corrupt Activities Act No 12 of 2004 or any other applicable

legislation.

SIGNEDat _

SIGNATUREOFWITNESS

March 2015

on this __ day of

Page2 of 2

(,.7

_ ".. ~20_

Part T2: Returnable SchedulesT2.2-51: Certificate of Acquaintance with

Tender Documents

Page 68: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER. INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Ie1.1 Form of Offer & Acceptance

Offer

The Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract forthe supply, deliver, install, test and commissioning of 88kV SF6 Primary Circuit Breaker at SerfonteinSubstation,

The tenderer, identified in the Offer signature block, has examined the documents listed in theTender Data and addenda thereto as listed in the Returnable Schedules, and by submitting thisOffer has accepted the Conditions of Tender,

By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offerand Acceptance the tenderer offers to perform all of the obligations and liabilities of the Contractor under thecontract including compliance with all its terms and conditions according to their true intent and meaning foran amount to be determined in accordance with the conditions of contract identified in the Contract Data,

The offered total of the Prices exclusive of VAT is

(in words)

This Offer may be accepted by the Employer by signing the Acceptance part of this Form of Offer andAcceptance and returning one copy of this document including the Schedule of Deviations (if any) to thetenderer before the end of the period of validity stated in the Tender Data, or other period as agreed,whereupon the tenderer becomes the party named as the Contractor in the conditions of contract identifiedin the Contract Data,

Signature(s)

Name(s)

Capacity

For thetenderer:

Name &signature ofwitnessTenderer's CIDB registration number:

TENDERFORM: PRO-FAT-0203 Rev02

Date•..•.•.•.__ .•.•.•.•. -,L"", _

Page 1 of 3

....., ,., ,J

Part C1C1.1: Form of Offer and Acceptance

Page 69: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BF)(J54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Acceptance

By signing this part of this Form of Offer and Acceptance, the Employer identified below accepts thetenderer's Offer. In consideration thereof, the Employer shall pay the Contractor the amount due inaccordance with the conditions of contract identified in the Contract Data, Acceptance of the tenderer's Offershall form an agreement between the Employer and the tenderer upon the terms and conditions contained inthis agreement and in the contract that is the subject of this agreement.

The'terms of the contract, are contained in:

Part C1

Part C2

Part C3

Agreements and Contract Data, (which includes this Form of Offer and Acceptance)

Pricing Data

Scope of Work: Works Information

and drawings and documents (or parts thereof), which may be incorporated by reference into the abovelisted Parts,

Deviations from and amendments to the documents listed in the Tender Data and any addenda thereto listedin the Returnable Schedules as well as any changes to the terms of the Offer agreed by the tenderer and theEmployer during this process of offer and acceptance, are contained in the Schedule of Deviations attachedto and forming part of this Form of Offer and Acceptance, No amendments to or deviations from saiddocuments are valid unless contained in this Schedule,

The tenderer shall within two weeks of receiving a completed copy of this agreement, including the Scheduleof Deviations (if any), contact the Employer's agent (whose details are given in the Contract Data) to arrangethe delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to beprovided in terms of the conditions of contract identified in the Contract Data at, or just after, the date thisagreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shallconstitute a repudiation of this agreement.

Notwithstanding anything contained herein, this agreement comes into effect on the date when the tendererreceives one fully completed original copy of this document, including the Schedule of Deviations (if any),

Unless the tenderer (now Contractor) within five working days of the date of such receipt notifies theEmployer in writing of any reason why he cannot accept the contents of this agreement, this agreement shallconstitute a binding contract between the Parties,

Signature(s)

Name{s)

Capacity

for theEmployer

Name &signature ofwitness

Transnet SOC Ltd

(Insert name and address of organ;sation)

Date

L

TENDERFORM: PRO-FAT-0203 Rev02 Page 2 of 3

Part C1C1.1: Form of Offer and Acceptance

Page 70: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER: INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

To be completed by the Employer prior to award of contract. This part of the Offer & Acceptance would not-be required if thecontract has been developed by negotiation between the Parties and is not the result of a process of competitive tendering.The extent of deviations from the lender documents issued by the Employer prior to the tender closing date is limited to thosepermitted in terms of the Conditions of Tender.A tenderer's covering letter must not be included in the final contract document. Should any matter in such letter, whichconstitutes a deviation as aforesaid be the subject of agreement reached during the process of Offer and Acceptance, theoutcome of such agreement shall be recorded here and the final draft of the contract documents shall be revised toincorporate the effect of it.

3.

2.

Schedule of DeviationsNote:

1.

No. I Subject I Details

I2

3

4

5

6

7

By the duly authorised representatives signing this Schedule of Deviations below, the Employer and thetenderer agree to and accept this Schedule of Deviations as the only deviations from and amendments to thedocuments listed in the Tender Data and any addenda thereto listed in the Tender Schedules, as well as anyconfirmation, clarification or changes to the terms of the Offer agreed by the tenderer and the Employerduring this process of Offer and Acceptance.

It is expressly agreed that no other matter whether in writing, oral communication or implied during the periodbetween the issue of the tender documents and the receipt by the tenderer of a completed signed copy ofthis Form shall have any meaning or effect in the contract between the parties arising from this Agreement.

For the tenderer: For the Employer

Signature

Name

Capacity

On behalfof

"---{insert narrre--and address of organisationj" --"~_._._._,_._-_.__.Transnet SOC Ltd

Name &signatureof witness

Date

TENDERFORM: PRO-FAT-0203 Rev02 Page 3 of 3

Part C1C1.1: Form of Offer and Acceptance,0

Page 71: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

\;C1.2 Contract DataPart one - Data provided by the Employer

Please read the relevant clauses in the conditions of contract before you enter data. The number of theprincipal clause is shown for each statement however other clauses may also use the same data.

Rows containing the statement and data for options in the core clauses and for the main & secondary optionclauses, according to the options chosen, are identified by shading in the left-hand column.

Completion of this data in full, according to the Options chosen, is essential to create a complete contract.

Clause Statement Data

dispute resolution Option

and secondary Options

1

-General

The conditions of contract are the coreclauses and the clauses for main Option

of the NEC3 Engineering and ConstructionContract June 2005 (with amendments June2006)'

A: Priced contract with activity schedule

W1: Dispute resolution procedure

X7: Delay damages

X16: Retention

z: Additional conditions of contract

1 Available from Engineering Contract Strategies Tel 011 8033008, Fax 011 8033009

ContractFORM: PRO-FAT-0205 Rev02

PAGE 1

-'1Part C1

Part C1: Contract Data

Page 72: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

10.1

10.1

10.1

The Employer is:

Address

Having elected its Contractual Address forthe purposes of this contract as:

Tel No.

Fax No.

The Project Manager is: (Name)

Address

Tel

Fax

e-mail

The Supervisor is: (Name)

Address

Tel No.

Transnet SOC Ltd(Registration No, 1990/00090/06)

Registered address:Carlton Centre150 Commissioner StreetJohannesburg2001

Transnet Freight RailSupply Chain ServicesKimberley

(053) 838 3477

(011) 774 9787

Dineo Kgokong

Infra Electrical Bloemfontein

0836871784

Dineo,Kgokong@tril1;snet,net

Alton Mashibini

Bloe-mfonteiri

1183447 8944

Fax No.

e-mail

11.2(13) The works are

11 .2(15) The boundaries of/he site are

11.2(19) The Works Information is in

12.2 The law of the contract is the law of

13.1 The language of this contract is

13.3 The period for reply is

3 Time

Alton ,mash [email protected]

For the supply, deliver, install, 'test andcommissioning of 88kV SF6 Primary CircuitBreaker at Serfontein Substation

~loemf6ntein

Part C3

the Republic of South Africa subject to thejurisdiction of the Courts of South Africa,

English

2 weeks

31.2

The completion date for the whole of theworks is

The starting date is.

To be advised

To be adliised

ContractFORM: PRO.FAT.020S Rev02

PAGE 2

i;;lPart C1

Part C1: Contract Data

Page 73: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

4 Testing and Defects

42,2

5

50,1

51,1

51,4

7

8

84.2

The defects date is

Payment

The assessment interval is monthly on the

The currency of this contract is the

The period within which payments are madeis

The interest rate is

Title

Risks and insurance

These are additional Employers risks

The minimum limit of indemnity forinsurance in respect of loss of or damage toproperty (except the works, Plant, Materialsand Equipment) and liability for bodily injuryto or death of a person (not an employee ofthe Contractor) caused by activity inconnection with this contract for anyoneevent is

The minimum limit of indemnity forinsurance in respect of death of or bodilyinjury to employees of the Contractor arisingout of and in the course of their employmentin connection with this contract for anyoneevent is

52 (fifty two) weeks after Completion of thewhole of the works,

10th (tenth) day of each successive month,

South African Rand,

Payment will be effected on or before the lastday of the month following the month duringwhich a valid Tax Invoice and Statement werereceived,

The prime lending rate of the Standard Bank ofSouth Africa.

No additional data is required for this sectionof the conditions of contract.

1, None

Whatever the Contractor requires in additionto the amount of insurance taken out by theEmployer for the same risk,

Whatever the Contractor deems desirable inaddition to which is prescribed by theCompensation for Occupational Injuries andDiseases Act No. 130 of 1993 as amended.

The insurance against loss of or damage tothe works, Plant and Materials as stated inthe insurance policy for contract works andpublic liability selected from:Blanket Principal Controlled Insurance(BPCI),Principal Controlled Insurance (PCI),Principal Controlled Contractors LiabilityInsurance,Principal Controlled Insurance One-off; andProject Specific Insurance

The Employer provides these insurancesfrom the Insurance Table

R

IISelect'oneW: .iBPCIPCI X

- -, ,

PCI Liab onlvPCI One OffPSI

ContractFORM: PRO-FAT-0205 Rev02

,3PAGE 3 Part C1

Part C1: Contract Data

Page 74: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENOUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFQNTEIN SUBSTATION

1 Insurance against: Loss of or damage to the works, Plant andMaterials is as stated in the selectedInsurance policy for Contract Works' PublicLiability.

Cover' indemnity: to the extent as stated in the selectedinsurance policy for Contract Works' PublicLiability

The deductibles are: as stated in the selected insurance policy forContract Works' Public Liability(Principal Controlled Insurance)

2 Insurance against: Loss of or damage to property (except theworks, plant, materials & equipment) andliability for bodily injury to or death of aperson (not an employee of the Contractor)arising out of or in connection with theperformance of the Contract as stated in theselected insurance policy for Contract Works'Public Liability

Cover' indemnity Is to the extent as stated in the selectedinsurance policy for Contract Works' PublicLiability

The deductibles are as stated in the selected insurance policy forContract Works' Public Liability

84.1 3 Insurance against: Loss of or damage to Equipment (TemporaryWorks only) as stated in the selectedinsurance policy for contract Works andPublic Liability

Cover' indemnity Is to the extent as stated in the selectedinsurance policy for Contract Works' PublicLiability

Cover' indemnity: Cover' indemnity is to the extent provided bythe SASRIA coupon

The deductibles are: The deductibles are in respect of each andevery theft claim 0,1% of contract valuesubject to a minimum of R2,500 and amaximum of R25,000

84.1 The Contractor provides these additionalinsurances.

1 Where the contract requires that the designof any part of the works shall be providedby the Contractor he shall satisfy theEmployer that professional indemnityinsurance cover in connection therewithhas been affected

ContractFORM: PRO-FAT-0205 Rev02

,4-PAGE 4 Part C1

Part C1: Contract Data

Page 75: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENOUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

2 Where the contract involves manufacture,andlor fabrication of Plant & Materials,components or other goods to beincorporated into the works at premisesother than the site, the Contractor shallsatisfy the Employer that such plant &materials, components or other goods forincorporation in the works are adequatelyinsured during manufacture andlorfabrication and transportation to the site.

3 Should the Employer have an insurableinterest in such items during manufactureof fabrication, such interest shall not benoted by endorsement to the Contractor'spolicies of insurance as well as those ofany subcontractor

4 Motor Vehicle Liability Insurancecomprising (as a minimum) "Balance ofThird Party" Risks including Passenger andUnauthorised Passenger Liability indemnitywith a minimum indemnity limit of

5 Marine Craft Hull insurance in respect of allmarine craft or vessels utilised inperformance of the Works for a sumsufficient to provide for their replacement

6 Protection and Indemnity Insurance inrespect of all marine craft or vesselsutilised in performance of the Worksextended for Specialist Operations with aminimum indemnity limit of R ( to bedetermined by risk assessment of thepotential risk exposure)

7 The insurance coverage referred to in 1, 2,3, 4, 5 and 6 above shall be obtained froman insurer(s) in terms of an insurancepolicy approved by the Employer. TheContractor shall arrange with the insurer tosubmit to the Project Manager the originaland the duplicate original of the policy orpolicies of insurance and the receipts forpayment of current premiums, togetherwith a certificate from the insurer orinsurance broker concerned, confirmingthat the policy or policies provide the fullcoverage as required. The original policywill be returned to the Contractor

9 Termination There is no Contract Data required for thissection of the conditions of contract.

10 Data for main Option clause

ContractFORM: PRO-FAT-0205 Rev02

-,SPAGE 5 Part C1

Part C1: Contract Data

Page 76: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Priced contract with activity schedule No additional data is required for this Option

11 Data for Option W1

Delay damages for Completion of the wholeof the works are 'R 2 000,00

W1,1

W1.2(3)

W1.4(2)

The Adjudicator is

The Adjudicator nominating body is:

If no Adjudicator nominating body isentered, it is:

The tribuna/ is:

The arbitration procedure is

The place where arbitration is to be held is

The person or organisation who will choosean arbitrator

if the Parties cannot agree a choice orif the arbitration procedure does notstate who selects an arbitrator, is

Delay damages (but not if Option X5 isalso used)

Retention (not used with Option F)

The retention free amount is

The reten/ion percentage is

Both parties will agree as and when a disputearises, If the parties cannot reach anagreement on the Adjudicator, the chairman ofthe Association of Arbitrators will appoint anAdjudicator.

The Chairman of the Association of Arbitrators(Southern Africa)

the Association of Arbitrators (SouthernAfrica)

Arbitration

The Rules for the Conduct of Arbitrations ofthe Association of Arbitrators (SouthernAfrica)

Bloemfontein

The Chairman of the Association of Arbitrators(Southern Africa)

per day

N/A

10%

ContractFORM: PRO-FAT-0205 Rev02

,6PAGE 6 Part C1

Part C1: Contract Data

Page 77: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

I ,C1.2 Contract DataPart two - Data provided by the Contractor

The tendering contractor is advised to read both the NEC3 Engineering and Construction Contract - June2005 (with amendments June 2006) and the relevant parts of its Guidance Notes (ECC3-GN)' in order tounderstand the implications of this Data which the tenderer is required to complete. An example of thecompleted Data is provided on pages 152 to 154 of the ECC3 Guidance Notes.

Completion of the data in full, according to Options chosen, is essential to create a complete contract.

Clause I Statement10.1 The Contractor is (Name):

Address

Tel No.

Fax No.

I Data

11.2(8) The direct fee percentage is

The subcontracted fee percentage is

-_%

-_%

11.2(18) The working areas are the Site

24.1 The Contractor's key persons are:

1 Name:

Job:

Responsibilities:

Qualifications:

Experience:

2 Name:

Job

Responsibilities:

Qualifications:

Experience~

CV's (and further key persons data includingCVs) are in T2.2-7

The completion date for the whole of theworks is To be advised

11.2(14) The following matters will be included inthe Risk Register T2.2-3

, Available from Engineering Contract Strategies Tel 011 8033008, Fax 011 8033009

ContractFORM: PRO-FAT-0205 Rev02

PAGE 1

11Part C1

Part C1: Contract Data

Page 78: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

The programme identified in the ContractData is To be supplied within 7 (seven) days

The Works Information for the Contractor'sdesign is in: C3

Priced contract with activity schedule

The activity schedule is in

The tendered total of the Prices is

Data for Schedules of CostComponents

Priced contract with activity schedule

C3

(in words), excluding VAT

Note "SCC" means Schedule of Cost Componentsstarting on page 56 of ECC3, and "sscc" meansShorter Schedule of Cost Components starting onpage 59 of ECC3.

Data for the Shorter Schedule of CostComponents

78ContractFORM: PRO-FAT-0205 Rev02

PAGE 2 Part C1Part C1: Contract Data

Page 79: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

lRANSNEr

[[C2 Pricing DataC2.1 Pricing Instructions

Entries in the first four columns in the Price List are made either by the Employer or the tenderer.

If the Contractor is to be paid an amount for the item which is not adjusted if the quantity of work in the itemchanges, the tenderer enters the amount in the Price column only; the Unit, Quantity and Rate columnsbeing left blank.

If the Contractor is to be paid an amount for the item of work which is the rate for the work multiplied by thequantity completed, the tenderer enters the rate which is then multiplied by the expected quantity to producethe Price, which is also entered.

All Prices are to be shown excluding VAT unless instructed otherwise by the Employer in Tender Data or inan instruction the Employer has given before the tenderer enters his Prices.

If there is insufficient space in the Price List which follows, state in which document the Price List iscontained.

C2.1: Pricing Instructions1. The Tenderer is deemed to have satisfied himself before tendering as to the correctness and

sufficiency of his tender for the works and of the rates and prices stated in the priced Price List in theworks information. The rates and prices (except in so far as otherwise provided in the Tender)collectively cover full payment for the discharge of all his obligations under the Contract and allmatters and things necessary for the proper completion of the works.

2. Any additional costs foreseen by the Tenderer for items not included in the Price List shall beincluded in the List to be submitted, under the item "P's & G's". These items must be specified.

3. It will be assumed that prices included in the Price List are based on Acts, Ordinances, Regulations,Bylaws, International Standards and National Standards that were published 28 days before theclosing date for tenders.

4. Reference to any particular trademark, name, patent, design, type, specific origin or producer ispurely to establish a standard for requirements. Products or articles of an equivalent standard maybe substituted but will be subject to approval by the Employer.

5. The amount of the Preliminaries to be included in each monthly payment certificate shall beassessed as an amount prorated to the value of the work duly executed in the same ratio as the

19ContractPart C2: Pricing Data

PAGE 1 C2.2Price List

Page 80: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

preliminaries bears to the total of prices excluding any contingency sum, the amount of thePreliminaries and any amount in respect of contract price adjustment provided for in the contract.

6. The following abbreviations are used in the Price List: Ea = Each

7. The prices and rates in this Price List are fully inclusive prices for the work described under theitems. Such prices and rates cover all costs and expenses that may be required in and for theexecution of the work described in accordance with the provisions of the scope of work and shallcover liabilities and obligations set forth or implied in the Contract data, as well as profit.

8. Where the Works Information requires detailed drawings and designs or other information to beprovided, all costs associated therewith are deemed to have been provided for and included in theunit rates and sum amount tendered for such items.

9. Where no quantity has been provided against an item in the Price List, the Contractor shall use theirdiscretion and provide the quantity.

10. The short descriptions of the items of payment given in this Price List are only for purposes ofidentifying the items. More details regarding the extent of the work entailed under each item appearin the Works information.

11. For each item I the Price List, including Preliminaries, the Contractor shall provide in the appropriatecolumn the portion of the tendered sum (inclusive of labour and material).

12. The total in the Price List shall be exclusive of VAT, and shall be transferred to Contractor's Offer.

13. Additional work not covered in the Price List shall be listed and quoted for by the tenderers in aseparate sheet.

14. Payment Certificates - On or after the assessment date, the Supervisor and the Contractor willtogether assess the quantities of the progress on each item in the Price List and complete theProgress Assessment Detail Form, where after the Progress Assessment Certificate will be issued.

15. The Contractor shall then submit a VAT invoice and attach the Progress Certificate mentioned inclause 14 of this section for payment by the Employer.

16. Contractor shall provide the Employer with the necessary details and documentation as required inorder to enable the Employer to make electronic payments.

80ContractPart C2: Pricing Data

PAGE 2 C2.2Price List

Page 81: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

C2.2 Price List

Supply, deliver, install, test and commissioning of 88kV SF6 gas filled outdoor Primary CircuitBreakers at Serfontein 3kV DC Traction Substation

PRICE LIST

Item Description Unit Qty Rate Price

A Serfontein 3 kV DC Traction Substation

1Dismantle and remove old primary circuit Set 1breaker and transport to Kroonstad depot.

2 Supply and install new SF6 gas filled circuit Set 1breaker.

3 Cabling and wiring Ea 1

4Modification of existing steel work Ea 1structures

5 Testing and commissioning Ea 1

6 Security Ea 1

7 P's & G's (Labour, transport, site Ea 1establishment, civil works, etc)

8 Cost of SHE (Safety, health & environment) Ea 1

A TOTAL PRICE = R

B VAT (14% of A) = R

C GROSS TOTAL (A+B) = R

ContractPart C2: Pricing Data

"g"1PAGE 3 C2.2

Price List

Page 82: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

I [C3: Scope of Work

C3.1 Works Information

1. Contractual Obligations

1.1 This project specification covers Transnet Freight Rail's requirements, Supply, install, test and

commission 88kV SF6 gas filled outdoor primary circuit breakers at Serfontein 3kV DC traction

substations under the control of the Depot Engineer, Bloemfontein.

1.2 The Contractor shall not make use of any sub-Contractor to perform the works or parts thereof

without prior permission from the Project Manager.

1.3 The Contractor shall ensure that a safety representative is at site at all times.

1.4 The Contractor shall comply with all applicable legislation and Transnet safety Requirements

adopted from time to time and instructed by the Project Manager / Supervisor. Such compliance

shall be entirely at his own cost, and shall be deemed to have been allowed for in the rates and

prices in the contract.

1.5 The Contractor shall, in particular, comply with the following Acts and Transnet Specifications:-

1.5.1 The Compensation for Occupational Injuries and Diseases Act, No. 130 of 1993. The

Contractor shall produce proof of his registration and good standing with the Compensation

Commissioner in terms of the Act.

1.5.2 The Occupational health and Safety Act (Act 85 of 1993).

1.5.3 The Contractor shall comply with the current Transnet Specification E.4E, Safety

Arrangements and Procedural Compliance with the Occupational Health and Safety Act, Act

85 of 1993 and Regulations and shall before commencement with the execution of the

contract, which shall include site establishment and delivery of plant, equipment or materials,

submit to the Project Manager / Supervisor.

Page 1'g;;2

Page 83: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

1.5.4 The Contractor shall comply with the current Specification of Works On, Over, Under or

Adjacent to Railway Lines and near High Voltage Equipment - E7/1, if applicable, and shall

take particular care of the safety of his employees on or in close proximity to a railway line

during track occupations as well as under normal operational conditions,

1.6 The contractor's Health and Safety Programme shall be subject to agreement by the Project

Manager / Supervisor, who may, in consultation with the Contractor, order supplementary and/or

additional safety arrangements and/or different safe working methods to ensure full compliance

by the Contractor with his obligations as an employer in terms of the Act,

1.7 In addition to compliance with clause 1.5 hereof, the Contractor shall report all incidents in

writing to the Project Manager / Supervisor. Any incident resulting in the death of or injury to

any person on the works shall be reported within 24 hours of its occurrence and any other

incident shall be reported within 48 hours of its occurrence,

1.8 The Contractor shall make necessary arrangements for sanitation, water and electricity at these

relevant sites during the installation of the equipment.

1.9 A penalty charge of R2 000.00 per day will be levied for late completion,

1.10 The Contractor shall supply a site diary (with triplicate pages). This book shall be used to

record any unusual events during the period of the work, Any delays to the work shall also be

recorded such as delays caused by poor weather conditions, delays caused by permits being

cancelled etc. The appointed Project Manager or Supervisor must countersign such delays,

Other delays such as non-availability of equipment from 3,d party suppliers must be

communicated to the Project manager or Supervisor in writing.

1.11 The Contractor shall supply a site instruction book (with triplicate pages), This book shall be

used to record any instructions to the Contractor regarding problems encountered on site - for

example the quality of work or the placement of equipment. This book shall be filled in by the

Project Manager or Supervisor and must be countersigned by the Contractor.

1.12 Both books mentioned in 1.10 and 1.11 shall be the property of Transnet Freight Rail and shall be

handed over to the Project Manager or Supervisor on the day of energising or handing over,

Page 2

'g3

Page 84: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFX!54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

2. Descriptionof work

2,1 This project specification covers the requirements for the Supply, install, test and commissioning

of SF6 gas filled outdoor primary circuit breakers (tripie pole gang operated with a motor would

spring operating mechanism) at Serfontein 3kV DC traction Substation.

2,2 The Contractor shall disconnect, dismantie and remove the existing Primary Circuit Breaker from

site and transport it to the Kroonstad depot. The Contractor shall further ensure that the removed

circuit breaker is intact and any damages incurred shall be at the cost of the Contractor.

2.3 The Contractor shall modify the existing steel support structure to ensure that the new PCB is

adequately and safely placed on the steelworks frame,

2.4 The Contractor shall supply trenching services where deemed necessary for laying of control cables

and wiring,

2,5 The Contractor shall supply, deliver, install and connect the new high voltage SDF6 gas filled

outdoor primary circuit breaker with its associated operating mechanism box,

2.6 The front of the operating mechanism box shall face the main transformer.

2,7 The Contractor shall electrically connect the new installed equipment to the existing earth system.

2.8 The Contractor shall test, commission and hand over the equipment to the Electrical Project

Manager.

3. The Site

3.1 Access to the site will be via the Transnet service roads. Gates have to be kept closed at all

times. No vehicle will be allowed to cross the railway line at any place except at level crossings,

3,2 No Transnet property like sleepers, rails, fencing, cables and ballast stone are to be removed

from the site, Where fencing must be removed to get access to wooden pole sites, the fence

must be repaired the same day.

Page 3

Page 85: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAILENQUIRY NUMBER: BFX/54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

3.3 The repairs for any damages to the Transnet fencing/railway lines, Eskom power lines, Farmers

and Telkom will be for the Contractor's account. The repair of damage should be arranged to be

completed within one day, Alternatively these costs will be deducted from the tendered amount,

and Transnet will arrange for the repair of the damage.

3.4 The Contractor will work under a work permit which will be issued out by a Transnet

representative on daily basis. The waiting time on site before occupations are granted shall not

be considered a basis for a claim for Standing Time.

3.S Work will be carried at Serfontein 3kV DC Traction Substations

4. Primary Circuit Breaker

4.1 The SF6 Circuit Breaker shall comply with SABS IEC 56 and Transnet specification BBB 1267.

4.2 The circuit breaker shall have a motor would spring operating mechanism.

4.3 A visual mechanical indicating device shall be provided to indicate the state of the spring and

shall be inscribed "Spring Charged" when the mechanism is in the condition to close the circuit

breaker and "Spring Free" when it is in any other condition.

4.4 The Operating springs shall recharge automatically after the completion of a closing operation,

4.5 The low gas protection shall be wired into the existing control circuitry.

4.6 The contractor shall ensure that the circuit breaker trips under the following condition;

• Main transformer over-temperature

• Main transformer overload

• Rectifier over-temperature

• Rectifier fan failure

• Auxiliary transformer overload

4.7 The Circuit breaker shall trip and lockout in the open position under the following conditions;

• Main transformer Buchholz operation

Page 4

Page 86: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFX/54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

• Auxiliary transformer Buchholz operation

• Attenuation failure

• AC earth leakage

• DC earth leakage

• 110 DC failure

• Low SF6 gas pressure

5. Test and Commissioning

5.1 Commissioning shall include the energising of installed ecuipment. The Contractor shall prove

the satisfactory and safe operation of all the equipment under "live" conditions.

5.2 All pre-commissioning tests shall be performed by the contractor. The contractor should inform

Transnet Freight Rail's Project Manager or Technical Officer about dates of such tests should the

technical officer deem it necessary to witness such tests.

5.3 The Contractor shall supply all test equipment and instruments required for commissioning.

5.4 Transnet shall perform the final commissioning tests. The Contractor shall be present during the

testing and commissioning to rectify any faults found.

5.5 On completion of the tests and commissioning, the contractor will hand over the

substation/installed equipment to Transnet Freight Rail's Project Manager.

5.6 Acceptance by the technical officer of satisfactory completion of on-site tests is no way relives the

contractor of his obligation to rectify defects which may have been overlooked or become evident

at a later stage.

6. Guarantee and Defects

6.1 The Contractor shall guarantee the satisfactory operation of the complete electrical installation

supplied and erected by him and accept liability for maker's defects that may appear in design,

materials and workmanship.

Page 5

'86

Page 87: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

6.2 The guarantee period for these standby plants shall expire after a period of 12 months

commencing on the date of completion of the contract or the date the standby plant was handed

over to Transnet Freight Rail.

6.3 The Contractor shall undertake to attend to any defects during the guarantee period within 7

(seven) days after commissioning. Any defect identified during the 12 months guarantee period

shall be rectified to the satisfaction of Transnet Freight Rail and the contractor shall incur

associated cost on his own account.

6.4 Should the Contractor fail to comply with the requirements stipulated above, Transnet Freight

Rail shall be entitled to undertake the necessary repair work or effect replacement of defective

apparatus or materials, and the Contractor shall reimburse Transnet Freight Rail the total cost of

such repair or replacements, including the labour costs incurred in replacing defective material.

6.5 Any specific type of fault occurring three times within the guarantee period and which cannot be

proven to be due to other faulty equipment not forming part of this contract e.g., faulty

locomotive or overhead track equipment, etc., shall automatically be deemed an inherent defect.

Such inherent defect shall be fully rectified to the satisfaction of the Project Manager or

Supervisor and at the cost of the Contractor.

6,6 If urgent repairs have to be carried out by Transnet Freight Rail staff to maintain supply during

the guarantee period, the Contractor shall inspect such repairs to ensure that the guarantee

period is not affected and should they be covered by the guarantee, reimburse Transnet Freight

Rail the cost of material and labour.

7. To be supplied by Transnet Freight Rail

7.1 Transnet Freight Rail will supply a co-ordinator who will issue a work permit on a daily basis.

7.2 Transnet will also arrange a work permit for 6 hours per day (on average).

8. To be supplied by the contractor

8.1 The Contractor is responsible to supply his own equipment, tools, transport and labour for the

work to be done.

Page 6

Page 88: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

8.2 Contractor must supply his own security, Transnet Freight Rail Security reserves the right to

patrol high security areas wherein the contractor might work.

8.3 The Contractor is responsible to sue all necessary PPEand must adhere to the safety rules and

regulations of Act 8S.

8,4 Together with the tendering documents, contractors shall provide a provisional Gantt or similar

charts showing a detailed project plan, A final detailed project plan shall be submitted to the

Transnet project manager or technical officer within 7 days after the successful contractor has

been awarded,

8.S The contractor must supply a valid and certified (supply proof of a valid calibration certificate)

SABS/SANAS approved breathalyser. The contractor must conduct breathalyser tests on his/her

employees before and after every shift.

9. safety

9.1 It will be expected of the Contractor to inform the Technical Officer about his daily activities.

This information is required in order to .inform the Train personnel of activities adjacent to railway

lines and is important for the safety of the Contractor and his personnel.

9.2 The Contractor is reminded that working in the HT yard is hazardous and has to be treated as

such. The Contractor must ensure that no workers and equipment are on or within 3 meters of

live high voltage eiectrical equipment/power cables. The Contractor must ensure that all

employees are equipped with luminous vests or jackets. Open fires are not allowed on site. Any

claims due to fires caused by the Contractor will be for his account.

9.3 The Contractor is not allowed to perform any work without a member of the Electrical

Department of Transnet Freight Rail present. All material, which exceeds 2 meters in length, shall

at all-time be carried below head height near live high-voltage equipment. The utmost care must

be taken to ensure that no part of material comes within 3 meters of any live high voltage

equipment. The Contractor must also inform the people under his control not to use objects like

sticks, poles, etc. to remove nests or any other objects from high-voltage equipment. No water

shall be used in the form of a jet if it can make contact with any high-voitage equipment.

Page 7

<gg

Page 89: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

9.4 It is required from the Contractor to submit to the Project Manager a Safety Plan covering all the

aspects of safety on site and safe working methods,

9.5 The Contractor shall comply with requirements of safety legislation and regulations in all

respects.

9.6 Security <if all the Contractor's staff, vehicles, machinery, equipment and materials shall remain

the responsibility of the Contractor. The Contractor may use Transnet Freight Rail premises from

time to time but the responsibility and cost to provide security, which may be required, shall be

for the Contractor's account. No separate payment shall be made and the cost thereof shall be

deemed to be included in the rates tendered. Transnet Freight Rail shall entertain no claims

whatsoever in this regards.

9.7 The method of work shall at all times with Transnet Freight Rail specification E7/1.

9.8 No other separate payment shall be made for the safety measures and the costs hereof will be to

have been included in the rates tendered (Price List),

9.9 The Contractor shall prepare and submit to Transnet Freight Rail before commencement of the

work, a comprehensive safety plan which shall also cover the following headings:

• Fire prevention and firefighting plan,

• Risk assessment imd Safety procedures for staff when working on DC tractionsubstations,

• Safe working procedure for all aspects of the operation, inclusive of all moving ofmachinery by rail if required by the Contractor.

10. Quality Inspection and Payments

10.1 The Contractor shall take every precaution to protect the work against damage of any kind and

not to cause damage to property or injury to any person as a result of his execution of the work.

10.2 The Contractor shall, in his interests, obtain insurance of his own site establishment, materials,

plant, equipment and tools as well as insurance for his motor vehicles and the common law

liabilities of the contractor as an employer,

Page 8

'69

Page 90: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER. INSTAll. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

10.3 Transnet Freight Rail will arrange Public Liability Insurance were deemed necessary.

10.4 Transnet Freight Rail shall, where necessary, inspect the equipment under the contract at the

premises of the manufacturer or successful contractor prior to the equipment being delivered on

site. It is the contractor's responsibility to notify Transnet Freight Rail's project Manager 7 days

in advance of the inspection date.

10.5 Final Inspection of the work will be done after the Contractor has notified the Project Manager in

charge of the project that the work has been completed. If the work is found to be satisfactory

and Transnet Freight Rail's site is left in the same condition as found, a Certificate of Completion

will be issued and the contract will be considered completed.

10.6 The Contractor shall be responsible for issuing of a compliance certificate in terms of SANS 0142

before energizing of the equipment shall take place.

11. Camp Sites

No temporary camp sites will be made available. All contractors on Transnet Freight Rail property are to

comply with Act 85 and Nosa standards as well as Municipal by-laws.

12. Pollution prevention

According to the Environmental management System of the Bloemfontein Depot, pollution must be

prevented as far as possible and where pollution occurs due to the negligence of the contractor, he/she

will be responsible for corrective actions or he/she will be held liable for corrective actions required.

13. Penalties

Penalties of R2 000.00 per calendar day will be applicable for every day after completion date of contract.

14. Standard Specifications

The conditions contained in the following documents / Publications (latest edition) shall also apply:

• E4B (July 2015) Minimum Communal health Requirements in areas outside the jurisdiction of a

local Authority.

Page 9

90

Page 91: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

• E4E Transnet (July 2015) Safety Arrangements and procedural Compliance with the Occupational

health and Safety Act.

• Specification E7/1 (July 2015) Specification for works on, over, under, or adjacent to railway lines

and near high voltage equipment.

• Transnet Specifications:

BBB 1267

SABSIEC 56

SABS703

SANS 606911

CEE.0045

CEE.0224

Specification for outdoor high voltage alternating current circuitbreakers in accordance with SABSIEC 56:1987

High Voltage Alternating Current Circuit Breakers

Hot Dip Galvanised Zinc Coatings

Common specification for high voltage switchgear and control-gear standards

Painting of steel components of Electrical Equipment

Drawings, catalogues, instruction manuals and spares

All Transnet Freight Rail E1ectrical5afety instrudionsof 2012

Drawings

15. Finances

15,1 Penalty for late completion:

If the Contractor does not meet the stipulated completion time a penalty of R2 000,00 per day

shall be imposed for every day or part thereof for late completion,

15.2 Value Added Tax:

The tendered rates in the schedule of quantities and prices must exclude VAT. VAT will be

calculated and added to the total at the bottom of the schedule of Quantities and Prices.

15.3 The Contractor must submit his tax invoice once a month for the work done to date. The

deadline date of submission will be communicated to the contractor and the contractor must

ensure that these timelines are adhered to.

Page 10

Page 92: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER. INSTAll. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

15.4 The Technical Officer shall conduct a quality inspection before the tax invoice has been

submitted. The technical officer reserves the right to withhold payments if the works done are

below standards stipulated in this specification.

16. Site Conditions and Requirements

16.1 Offices, Workshops and campsites

The Contractors shall allow for making of his own arrangements for housing, security, water,

communications, electricity, sanitary, refuse removal and all other services to these sites. On

vacating these sites the Contractor shall clean the sites of all rubbish and reinstate the sites to

the satisfaction of the Technical Officer.

16.2 Access to Work Site, Office, Workshops and Camps

The Contractor may make use of existing roads to gain access to site.

Transnet Freight Rail will however not be responsible for ensuring all weather passage to

the Contractor.

Transnet Freight Rail will entertain no claims from the Contractor for production delays,

work done or expenditure incurred in gaining access to the work sites, offices, workshops

or campsites.

16.3 The Contractor shall allow that weather conditions may adversely affect his rate of progress and

plan his progress as well as labour capacity accordingly.

16.4 The risk of loss in production due to abnormal weather prevailing for the area shall be on the

Contractor. 1n the event of abnormal weather conditions prevailing, the onus for proof shall be

on the Contractor and Transnet Freight Rail shall consider a claim upon written proof submitted

by the Contractor.

17. Site Books

The Contractor shall record in the Site Diary:-

17.1 Planned working times and Actual Working times.

Page 11

Page 93: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

17,2 Daily progress report of works done, Any deviations must be recorded,

17,3 Safety talk and risk assessment must be done and recorded on a daily basis.

17.4 The Contractor shall supply a site instruction book (with triplicate pages), This book shall be

used to record any instructions to the Contractor regarding problems encountered on site - for

example the quality of work or the placement of equipment This book shall be filled in by the

Project Manager or Technical Officer and must be countersigned by the Contractor.

17.5 Both books (Site Diary and Site instruction Book) shall be the property of Transnet Freight Rail

and shall be handed over to the Project Manager or Supervisor on the day of handing over.

18. Site Meetings

The Contractor shall attend meetings at dates and times convened by the Technical Officer (normally

once a week). Such meetings shall be for the purpose of discussing actual progress versus construction

programme, delays, conditions and specifications, occupations, material truck requirements etc. The

meeting will be held under the chairmanship of the Technical Officer and the proceedings will be

minuted,

Page 12

Page 94: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFX/54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

lRANSNEr

OCCUPATIONAL HEALTH AND SAFETY ACT 85 Of 1993 (AS AMENDED)

AGREEMENT WITH MANDATORYIn terms of Section 37(1) & (2)

WRITTEN AGREEMENT ENTERED INTO AND BETWEEN

Transnet Freight Rail(Hereinafter referred to as the Employer)

AND

------------------------------------------

(Hereinafter referred to as Mandatory (Principal Contractor)

Compensation Fund Number

NOTE, AGREEMENT WITH THE MANDATORY TO BE COMPLETED IN BLACK INK AND EACH PAGE ANDCHANGE TO BE INTIATED,

Page 13 ------------------

Page 95: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

TABLE OF CONTENTS

1. DEFINITIONS2. INTERPRETATION

3. REPORTING

4. WARRANTY OF COMPLIANCE

5. APPOINTMENTS AND TRAINING

6. SUPERVISION, DISCIPLINE AND REPORTING

7. ACCESS TO THE OHS ACT

8. COOPERATION

9. WORK PROCEDURES

10. HEALTH AND SAFETY MEETINGS

11. COMPENSATION REGISTRATION

12. MEDICAL EXAMINATIONS

13. INCIDENT REPORTING AND INVESTIGATION

14. SUBCONTRACTORS

15. SECURITY AND ACCESS

16. FIRE PRECAUTIONS AND FACILITIES

17. ABLUTION FACILITIES

18. HYGIENE AND CLEANLINESS

19. NO NUISANCE

20. INTOXICATION NOT ALLOWED

21. PERSONAL PROTECTIVE EQUIPMENT

22. PLANT, MACHINERY AND EQUIPMENT

23. NO USAGE OF EMPLOYER'S EQUIPMENT

24. TRANSPORT

25. CLARIFICATION

Page 14

Page 96: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER. INSTAll. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

26. DURATION OF AGREEMENT

27. NON COMPLINCE

28. HEADING

PREAMBLE

WHEREAS section 37(1) & (2) of the Occupational Health and Safety Act No. 85 of 1993 ("the Act")requires that parties have an agreement in writin9 to ensure compliance by a mandatory in line with theprovisions of the Act.

AND WHEREAS Transnet Freight Rail ("TFR") requires the services of the Contractors to execute certainprojects within its workshops.

AND WHEREAS TFR can be belter served by Contractors who have the infrastructure, specialistemployees and expertise to execute such projects at the highest level of efficiency on short notice.

NOW THEREFORE the parties agree as follows;

1. DEFINITIONS

For the purpose of this agreement, unless the context indicates otherwise, the followin9 definitions are setout for the terms indicated:

1.1 "Act" means the Occupational Health and Safety Act No 85 of 1993;

1.2 "Agreement" means this Mandatary agreement;

1.3 "Contractor" means the Mandatory;

1.4 "COlD Act" means the Compensation for Occupational Injuries and Diseases Act No 130 of 1993.

1.5 "Effective Date" means the date of signature of this Agreement by the last party signing hereto;

1.6 "Employer" refers to TFR;

1.7 "Main Contract" means the main contract whereby the supplier has to provide services to TFR.

1.8 "Mandatary" means an agent, Contractor or sub-contractor for work, but without derogating from thestatus in his own right as an employer or user;

1.9 "Parties" means TFR and the Contractor, and "Party" shall mean either one of them, as the contextindicates;

1.10 "Regulations" means regulations promulgated in terms of the relevant legislation.

Page 15 ------------------

9b

Page 97: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

1,11 "Section" means the relevant section of the Occupational Health and Safety Act No 85 of 1993

1,12 "Services" means the services to be provided by the Contractor to TFR.

1,13 "TFR" means Transnet Frei9ht Rail, a division of Transnet SOC Limited (Registration No,1990/000900/06), a public company incorporated in accordance with the company laws of theRepublic of South Africa;

2. INTERPRETATION

2,1 Clause headings in this Agreement are included for ease of reference only and do not form part ofthis Agreement for the purposes of interpretation or for any other purpose. No provision shall beconstrued against or interpreted to the disadvantage of either Party hereto by reason of suchParty having or being deemed to have structured or drafted such provision.

2,2 Any term, word or phrase used in this Agreement, other than those defined under the clauseheading "Definitions" shall be given its plain English meaning, and those terms, words, acronyms,and phrases used in this Agreement will be interpreted in accordance with the generally acceptedmeanings accorded thereto,

2.3 A reference to the singular incorporates a reference to the plural and vice versa,

2.4 A reference to natural persons incorporates a reference to legal persons and vice versa.

2.5 A reference to a particular gender incorporates a reference to the other gender,

3. REPORTING

3,1 The Mandatary and/or his designated person appointed in terms of Section 16(2) of theOccupational Health and Safety Act 85 of 1993 ("the OHS Act") shall report to the Risk Managerand/or a Project Manager and/or a representative designated by the Employer prior tocommencing the work at the premises of the Employer,

4. WARRANTY OF COMPLIANCE

4,1 In terms of this Agreement the Mandatary warrants that he agrees to any of the arrangementsand procedures as prescribed by the Employer and as provided for in terms of Section 37(2) ofthe OHS Act for the purposes of compliance with the OHS Act.

4.2 The Mandatary further warrants that he and/or his employees undertake to maintain suchcompliance with the OHS Act. Without derogating from the generality of the above, nor from theprovisions of the said Agreement, the Mandatary shall ensure that the clauses as hereunderdescribed are at all times adhered to by himself and his employees.

4,3 The Mandatary hereby undertakes to ensure that the health and safety of any other person on thepremises is not endangered by the conduct of his activities and that of his employees,

Page 16

Cit

Page 98: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

5, APPOINTMENTS AND TRAINING

5,1 The Mandatary shall appoint competent persons as per Section 16(2) of the OHS Act. Any suchappointed person shall be trained on any occupational health and safety matter and the OHS Actprovisions pertinent to the work is to be performed under his responsibility, Copies of anyappointments made by the Mandatary shall immediately be provided to the Employer,

5.2 The Mandatary shall further ensure that all his employees are trained on the health and safetyaspects relating to the work to be done on the premises of the Employer and that they understandthe hazards associated with such work being carried out on the premises. Without derogatingfrom the foregoing, the Mandatary shall, in particular, ensure that all his users or operators of anymaterials, machinery or equipment are properly trained in the use of such materials, machinery orequipment.

5.3 Notwithstanding the provisions of the above, the Mandatary shall ensure that he, his appointedresponsible persons and his employees are at all times familiar with the provisions of the OHSAct, and that they comply with the provisions of the Act.

6. SUPERVISION, DISCIPLINE AND REPORTING

6.1 The Mandatary shall ensure that all work performed on the Employer's a premise is done understrict supervision and that no unsafe or unhealthy work practices are permitted. Disciplineregarding health and safety matters shall be strictly enforced against any of his employeesregarding non-compliance by such employee with any health and safety matters.

6.2 The Mandatary shall further ensure that his employees report to him all unsafe or unhealthy worksituations immediately after they become aware of such conditions and that he in turnimmediately reports these to the Employer and/or his representative.

7. ACCESS TO THE OHS ACT

7.1 The Mandatary shall ensure that he has an updated copy of the OHS Act on site at all times andthat this is accessible to his appointed responsible persons and employees, save that the partiesmay make arrangements for the Mandatary and his appointed responsible persons andemployees to have access to the Employer's updated copy/copies of the Act.

8. COOPERATION

8.1 The Mandatary and/or his responsible persons and employees shall provide full co-operation andinformation if and when the Employer or his representative enquires into any occupational healthand safety issues concerning the Mandatary. It is hereby recorded that the Employer and hisrepresentative shall at all times be entitled to make such inquiry.

8.2 Without derogating from the generality of the above, the Mandatary and his responsible personsshall make available to the Employer and his representative, on request, all and/or any checklistsand inspection registers required to be kept by him in respect of any of his materials, machineryor equipment.

Page 17

Page 99: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER, INSTAll. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

9. WORK PROCEDURES

9.1 The Mandatary shall, after having established the dangers associated with the work performed,develop and implement mitigation measures to minimize or eliminate such dangers for thepurpose of ensuring a healthy and safe working environment. The Mandatary shall then ensurethat his responsible persons and employees are familiar with such mitigation measures.

9.2 The Mandatary shall implement any other safe work practices as prescribed by the Employer andshall ensure that his responsible persons and employees are made conversant with such othersafe work practices as prescribed by the Employer and that his responsible persons andemployees adhere to such safe work practices.

9.3 The Mandatary shall ensure that work for which any permit is required by the Employer is notperformed by his employees prior to the Employer obtaining such permit from the Mandatary.

10, HEALTH AND SAFETY MEETINGS

10.1 If required in terms of the OHS Act, the Mandatary shall establish his own health and safetycommittee(s) and ensure that his employees, being the committee members, provide health andsafety representatives to attend the Employer's health and safety committee meetings.

11. COMPENSATION REGISTRATION

11.1 The Mandatary shall ensure that he has a valid proof of registration with the CompensationCommissioner, as required in terms of COlD Act, and that all payments owing to theCommissioner are discharged. The Mandatary shall further ensure that the cover remain in forcewhile any such employee is present on the premises.

12. MEDICAL EXAMINATIONS

12.1 The Mandatary shall ensure that all his employees undergo routine medical examinations andthat they are medically fit for the purposes of the work they are to perform.

13. INCIDENT REPORTtNG AND INVESTIGATION

13.1 All incidents referred to in Section 24 of the OHS Act shall be reported by the Mandatary to theDepartment of Labour and to the Employer. The Employer shall further be provided with copiesof any written documentation relating to any incident.

13.2 The Employer retains an interest in the reporting of any incident as described above as well as inany formal investigation and/or inquiry conducted in terms of section 32 of the OHS-Act into suchincident.

14. SUBCONTRACTORS

------------------ Page 18

Page 100: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFX/54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

14.1 The Mandatary shall notify the Employer of any subcontractor he may wish to perform work onhis behalf on the Employer's premises. It is hereby recorded that all the terms and provisionscontained in this clause shall be equally binding upon the subcontractor prior to the subcontractorcommencing with the work. Without derogating from the generality of this paragraph:

14.1.1

14.1.2

14.1.3

14.1.4

The Mandatary shall ensure that training as discussed under appointments andtraining, is provided prior to the subcontractor commencing work on the Employer'spremises.

The Mandatary shall ensure that work performed by the subcontractor is done underhis strict supervision, discipline and reporting.

The Mandatary shall inform the Employer of any health and safety hazards and/orissue that the subcontractor may have brought to his attention.

The Mandatary shall inform the Employer of any difficulty encountered regardingcompliance by the subcontractor with any health and safety instruction, procedureand/or legal provision applicable to the work the subcontractor performs on theEmployer's premises.

15. SECURITY AND ACCESS

15.1 The Mandatary and his employees shall enter and leave the premises only through the maingate(s) and/or checkpoint(s) designated by the Employer. The Mandatary shall ensure thatemployees observe the security rules of the Employer at all times and shall not permit any personwho is not directly associated with the work from entering the premises.

15.2 The Mandatary and his employees shall not enter any area of the premises that is not directlyassociated with their work.

15.3 The Mandatary shall ensure that all materials, machinery or equipment brought by himonto the premises are recorded at the main gate(s) and/or checkpoint(s). Failure to do thismay result in a refusal by the Employer to allow the materials, machinery or equipment tobe removed from the Employer's premises.

16. FIRE PRECAUTIONS AND FACILITIES

16.1 The Mandatary shall ensure that an adequate supply of fire-protection and first-aid facilities areprovided for the work to be performed on the Employer's premises, save that the Parties maymutually make arrangements for the provision of such facilities.

Page 19

laO

Page 101: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXI54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER. INSTALL. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

16.2 The Mandatary shall further ensure that all his employees are familiar with fire precautions at thepremises, which includes fire-alarm signals and emergency exits, and that such precautions areadhered to.

17. ABLUTION FACILITIES

17.1 The Mandatary shall ensure that an adequate supply of ablution facilities are provided for hisemployees performing work' on the Employer's premises, save that the parties may mutuallymake arrangements for the provision of such facilities.

18. HYGIENE AND CLEANLINESS

18.1 The Mandatary shall ensure that the work site and surround area is at all times maintained to thereasonably practicable level of hygiene and cleanliness. In this regard, no loose materials shall beleft lying about unnecessarily and the work site shall be cleared of waste material regularly andon completion of the work.

19. NO NUISANCE

19.1 The Mandatary shall ensure that neither he nor his employees undertake any activity that maycause environmental impairment or constitute any form of nuisance to the Employer and/or hissurroundings.

19.2 The Mandatary shall ensure that no hindrance, hazard, annoyance or inconvenience is inflictedon the Employer, another Mandatary or any tenants. Where such situations are unavoidable, theMandatary shall give prior notice to the Employer.

20. INTOXICATION NOT ALLOWED

20.1 No intoxicating substance of any form shall be allowed on site. Any person suspected ofbeing intoxicated shall not be allowed on the site .. Any person required to take medicationshall notify the relevant responsible person thereof, as well as the potential side effects ofthe medication.

21. PERSONAL PROTECTIVE EQUIPMENT

21.1 The Mandatary shall ensure that his responsible persons and employees are provided withadequate personal protective equipment (PPE) for the work they may perform and in accordancewith the requirements of General Safety Regulation 2 (1) of the OHS Act. The Mandatary shall

Page 20 -----------------

\0\

Page 102: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFX/54139DESCRIPTIDN OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

further ensure that his responsible persons and employees wear the PPE issued to them at allmaterial times,

22, PLANT, MACHINERY AND EQUIPMENT

22,1 The Mandatary shall ensure that all the plant, machinery, equipment and/or vehicles he may wishto utilize on the Employer's premises is/are at all times of sound order and fit for the purpose forwhich iVthey is/are attended to, and that iVthey complies/comply with the requirements of Section10 of the OHS Act

22,2 In accordance with the provisions of Section 10(4) of the OHS Act, the Mandatary herebyassumes the liability for taking the necessary steps to ensure that any article or substance that iterects or installs at the premises, or manufactures, sells or supplies to or for the Employer,complies with all the prescribed requirements and will be safe and without risks in terms of healthand safety when properly used,

23. NO USAGE OF THE EMPLOYER'S EQUIPMENT

23,1 The Mandatary hereby acknowledges that his employees are not permitted to use any materials,machinery or equipment of the Employer unless the prior written consent of the Employer hasbeen obtained, in which case. the Mandatary shall ensure that only those persons authorized tomake use of such materials, machinery or equipment, have access thereto.

24, TRANSPORT

24.1 The Mandatary shall ensure that all road vehicles used on the premises are in a roadworthycondition and are licensed and insured. The Mandatary shall ensure that all drivers shall haverelevant and valid driving licenses and the Mandatary shall ensure that no vehicle/s shall carrypassengers unless it is specifically designed to do and that all drivers shall adhere to the speedlimits and road signs on the premises at all times.

24.2 In the event that any hazardous substances are to be transported on the premises, theMandatary shall ensure that the requirements of the Hazardous Substances Act 15 of 1973 arecomplied with fully all times.

25, CLARIFICATION

25.1 In the event that the Mandatary requires clarification of any of the terms or provisions of thisAgreement, he should take the necessary steps to contact the Risk Manager of the Employer toobtain such clarification.

26. DURATION OF AGREEMENT

26.1 This Agreement shall remain in force for the duration of the work to be performed by theMandatary and/or while any of the Mandatary's employees are present on the Employer'spremises.

Page 21 ~-----------------

IO~

Page 103: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

27, NON COMPLIANCE WITH THE AGREEMENT

27,1 If the Mandatory fails to comply with any provisions of this Agreement, the Employer shall beentitled to give the mandatory 7 (seven) days written notice to remedy such non-compliance andif the Mandatory fails to comply with such notice, then the Employer shall forthwith be entitled butnot obliged, without prejudice to any other rights or remedies which the mandatory may have inlaw,

27,1,1

27,1,2

to suspend the main Agreement; or

To claim immediate performance and/or payment of such obligations,

27,2 Should mandatory continue to breach the contract on three occasions, then the Employer isauthorised to suspend the main contract without complying with the condition stated in the clauseabove,

28, HEADINGS

The headings as contained in this Agreement are for reference purposes only and shall not be construedas having any interpretative value in them or as giving any indication as to the meaning of the contents ofthe paragraphs contained in this Agreement.

Page 22 ------------------

103,

Page 104: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Thus done and signed

at on the __ day of 20_

For and on behalf of the Employer

Witnesses:

1.

2,

at on the __ day of 20_

for and on behalf of the Mandatary

Witnesses:

3.

4.

Page 23

l()~

Page 105: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFX/54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

8681267 Version 10

1RANSNErfreight roil

TECHNOLOGY MANAGEMENT.

SPECIFICATION.

REQUIREMENTS FOR OUTDOORALTERNATING-CURRENT CIRCUIT BREAKERS FORTRACTION AND DISTRIBUTION SUBSTATIONS

Author:

Approved:

Authorised:

Chief Engineering Technician

Technology Management

Senior Engineer

Technology Management

Principal Engineer

Technology Management

D.D.Schulz

L.G.Borchard

W.A.Coetzee

Date: 21 it September 2009

Circulation Restricted To:

Transnet Freight Rail - Chief Engineer Infrastructure

- Technology Management

@Thisdocumentas a whole is protected by copyright. The information herein Is the sole property of Trans netLtd. It may not be used, disclosed or reproduced in part or in whole In any manner whatsoever, except with

the written permission of and in a manner permitted by the proprietors.

A Division of Tr~nsnet LImited Registration Number 1990/00900/06

Page 24

lOS

Page 1 of 10

Page 106: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNETFREIGHTRAilENQUIRYNUMBER: BFXl54139DESCRIPTIQNQF THEWQRKS: FORTHE SUPPLY, DELIVER, INSTAll, TESTAND COMMISSIONINGOF 88KV SF6 PRIMARYCIRCUITBREAKERAT SERFONTEINSUBSTATION

6661267 Version 10

INDEX

SECTION

1,0

2,0

3,0

4,0

5,0

6,0

7,0

8,0

9,0

10,0

11,0

12,0

CONTENTS PAGE NO

SCOPE, 3

STANDARDS, 3

TENDERING PROCEDURES 3

APPENDICES 4

SERVICE CONDITIONS 4

REQUIREMENTS FOR ALTERNATING CURRENT CIRCUIT 4BREAKERS,

SPECIAL TOOLS, SERVICING AIDS AND MANUALS 8AND SPARES LISTS,

TRAINING, 8

TEST CERTIFICATES, 8

GUARANTEE AND DEFECTS, 8

INSPECTION, 8

PACKAGING AND TRANSPORT 8

APPENDIX 1

APPENDIX 2

A Division of Transnet limited Registration Number 1990/00900/05

Page 25

10(;:,

9

10

Page 2 of 10

Page 107: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

88B1267 Version 10

1,0 SCOPE

1.1 This specification covers Transnet freight rail requirements for the design. manufacture, testing andsupply of outdoor Alternating Current (AG) circuil breakers in accordance to SANS 62271-100.

1.2 The alternating current circuit breakers shall be suitable rated for nominal phase to phase r.m.svoltages ranging from 22 kV to 220 kV.

2,0 STANDARDS, PUBLICATIONS AND DRAWINGS

2.1 Unless otherwise specified all materials and equipment supplied shall comply with the applicableand latest editions of SANS or Transnet freight rail publication.

2.2 The following publications are referred to in this specification:

2,2,1 SOUTH AFRICAN NATIONAL STANDARDS

SANS i21:

SANS 1431:

SANS 60529:

SANS 60694:

SANS 60815

SANS 62271-100,

HOI-dip Galvanized coatings fOf fabricated iron or steel articles.

Weldable structural steels.

Degrees of protection provided by enclosures (lP code).

Common Specifications for high-voltage switchgear andcontrolgear standards.

Guide for the selection of insulalors in respect of pollutedconditions

High Voltage Alternating Current Circuit Breakers.

2,2.2 TRANSNET FREIGHT RAIL SPECIFICATIONS,

CEE0045:

CEE,0224:

Painting of Steel Components of Electrical Equipment.

Drawings, Catalogues, Instruction Manuals and Spares.

2.2.3 Occupational Health and Safety Act No 85 of 1993.

2.2.4 TRANSNET FREIGHT RAIL DRAWINGS

CEE-TBK-D027: Control circuit diagram. No.volt coil protection.

2.3 Any items offered in accordance with other standards will be considered at the sole discretion ofTransnet freight rail. The tenderer shall supply full details stating where the item differs from thesespecifications as well as supplying a copy (in English) of the recognised standard speciflC8tion(s)with which it complies.

3.0 TENDERING PRQCEDURE

3.1 Tenderers shall indicate clause-by-c1ause compliance with this specification as well as the relevantequipment specifications. This shall take the form of a separate document listing all thespecifications clause numbers .indicating on individual statement of compliance ornon-eompliance.

3.2 The tenderer shall motivate a statement of non-compliance.

3.3 Tenderers shall complete Appendix 2. ,. Information to be provided by tenderers".

3.4 Tenderers shall submit detailed technical literature of the current transformers offered together •••lithdrawings showing, general constructional details and principal dimensions.

3,5 Any items offered in accordance with other standards will be considered at the sole discretion ofTransnet freight rail. The tenderer shall supply full details stating where the item differs from thesespecifications as well as supplying a copy (in English) of the recognised speclfication(s) with which itcomplies.

A Division of Transnet Limited Registration Number 1990/00900/06

Page 26

lol

Page 3 of 10

Page 108: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

6661267 Version 10

3.6 Failure to comply with clauses 3.1. 3.2, 3.3, 3.4 and 3.5 could preclude a tenderer fremconsideration_

4.0 APPENDICES

The following appendices form an integral part of this specification and shaH be read in conjunctionwith it.

4.1 Appendix1~'Scheduleof Requirements".

This appendix details the specific requirements for this application.

4.2 Appendix 2 •• Information to be provided by tenderers".

This appendix calls for specific technical information to be furnished by tenderers.

5.0 SERVICE CONDITIONS.

The current circuit breaker shall be designed to operate under the following conditions.

5.1 ATMOSPHERIC CONDITIONS

5.1.1 Altitude:

Ambient temperature:

Relative humidity:

Lightning Conditions:

Pollution:

010 1800m above sea level.

~5°C to +45 DC.

10% to 90%

12 grou);Ldflashes per square kilometre per annum.

Heavily salt laden or polluted with smoke from industrialsources.

5.2 ELECTRICAL CONDITIONS

5.2.1

5.2.2

Supply voltage:

Frequency:

The incoming AC voltage can vary :!: 5% of the nominal systemr.m.s voltage. .

Frequency of the supply voltage is 50 :!: 2.5 Hz.

6.0 REQUIREMENTS FOR ALTERNATING CURRENT CIRCUIT BREAKERS.

6.1 The AC circuit breakers shall be designed, manufactured and tested in accordance with therequirements of specifications SANS 62271-100 and SANS 60694.

6.2 The circuit breakers shall be of the outdoor type suitable for operation under the nominal phase tophase voltages or phase to neutral voltages specified in Appendix 1.

6.3 The insulating medium of the primary circuit breakers shall be SF6 gas or vacuum, depending on thesupply voltage. (Refer to Appendix 1)

6.3.1 Vacuum circuit breakers may be used for voltages ranging from 22 kV up to 33 kV

6.4 The AC circuit breakers used on Transnet freight rail may the single, double or triple pole type.

6.4.1 Double or triple pole type circuit breakers shall be gange::! operated.

6.5 The circuit breakers shall be rated at the highest r.m.s. lIoltage for equipment operating at thenominal system voltage specified in Appendix 1.

6.6 The minimum rupturing capacities for the respective voltages and current ratings for the circuitbreakers shall be in accordance to the SANS 62271-100. The rated short-circuit breaking currentshall be at least 20kA.

6.7 The circuit breakers shall be rated for a continuous current of at least 1250 Ampere

6.8 The circuit breakers shall have a first pole to clear factor of 1.5.

6.9 The circuit breakers shall have a making time not greater than 1 second.

6.10 The circuit breakers shall be capable of twice rupturing the specified fault current at the specifiedvoltages, with a one minute interval between operations and then shall be in a condilion to be closedand carry the rated current without it being necessary 10inspect or make adjustments.

A Division of Trans net Limited Registration Number 1990/00900/06

Page 27

109

Page 4 of 10

Page 109: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENOUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

6.11

6.12

6.13

6.14

6.15

616

6.17

6,18

6,19

6.20

6.20,1

6.21

6.22

6.23

6.23.1

6.24

6.25

6.25.1

6.26

6.27

6.28

6.29

6.30

6.31

8881267 Version 10

The circuit breaker shaHbe electrically operated from a nominal 110 Volt DC control voltage unlessotherwise specified in Appendix 1.

[t shaH be possible to close the circuit breaker only when the control voltage is above 85% of thenominal voltage. The circuit breaker shall trip automatically when the control voltage falls below 70%of the nominal voltage.

The circuit breaker shall have a motor wound spring operating mechanism.

The operating mechanism shall be provided with shunt release for both opening and closing.

Pneumatic, hydraulic or gas control for tripping and closing the primary circuit breakers are notacceptable.

The operc:ting mechanism shall be so designed so that the breaker may be closed manually fromground level by means of a suitable detachable handle.

The operating mechanism shall be constructed of non-ferrous material.

The operating springs shall recharge automatically after the completion of a closing operation.

The circuit breaker shall be of the trip-free type.

A visual mechanical indicating device shall be provided to indicate the state of the spring and shallbe inscribed "Spring Charged" when the mechanism is in the condition to close the circuit breakerand .Spring Free- when it is in any olher condition.

One pair of normally open and normally clQSedcontacts shall be provided for the indication circuitryto the substation control panel for indication of the ~Sprjng Charged- and "Spring Discharged"conditions.

Auxiliary contacts shall be provided for operation in conjunction with the protection and otherauxiliary circuits specified. At least one spare pair of normally open and one spare pair of normallyclosed contacts shall be provided.

Circuit breaker control switches shall be provided on the circuit breaker mechanism. They shallreturn automatically to the neutral position when the handle is released after being turned to eitherthe "close" or "trip" positions.

Local/Remote selector switches shall be provided on the circuit breaker mechanism and shaH be ofthe two.position type. The switch shall have no .off' or tineutral" position.

Provision shall be made that when the circuit breaker is switched to the local position, the protectionand trip circuitry to the circuit breaker shall not in any way be by-passed.

Mechanical operation shall be provided on the circuit breaker for any closing or trip release, which isnormally electrically operated.

The circuit breaker shall be provided with a no volt coil with a mechanical latching mechanism, whichwill trip, lockout and inhibit the circuit breaker from closing when the no volt coil is de-energised.Refer to Transnet Freight Rail's drawing No. CEE-TBK-27 which forms part of this specification, fordetails of the control circuitry for the no volt protection.

The no volt coil circuitry with its associated mechanical latching mechanism shall operate separatelyfrom the trip coil circuitry.

A counter shall be provided on the circuit breaker to indicate the total number of operations of thebreaker.

Tenderers shall advise the number of circuit breaker operations under full load and fault conditions,after which maintenance and/or measurement of contact wear is recommended.

The circuit breaker operating mechanism including its controls and relays shall be housed in a metalenclosure.

The enclosure housing shall be manufactured from stainless steel or hot dipped galvanised steel.

The coating of the enclosure if galvanised shall comply with the requirements of Transnet freightrail's specification CEE.0045.

The degree of protection of the enclosure shall be in accordance with SANS 60529 and shall beIP 55.

A Division of Transnet Limited Registration Number 1990100900/06

Page 28

109

Page 5 of 10

Page 110: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFX/54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

BBB1267 Version 10

6,32

6,33

6,34

6,34,1

6,34,2

6,34.3

6,35

5.35.1

6.35.2

6.35.3

6.35.4

6.35.5

6.35.6

6,36

6,36.1

6.36.1.1

Provision shall be made for the enclosure to be pad-lockable.

The enclosure shall be provided with a gland plate for boltom entry of the control cables.

VACUUM CIRCUIT BREAKERS,

Vacuum switching devices shall be evacuated and sealed in accordance with the latest technologyand accepted practice.

The pre striking and chopping current shalf be kept below 5 amperes. Tenderers shall give fulldetails regarding these characteristics.

Where vacuum circuit breakers are specified in Appendix 1 they shall be either of the motor woundspring operating mechanism or magnetic actuator operating mechanism type.

SULPHUR HEXAFLOURIDE CIRCUIT BREAKERS. (SF6)

The SF6 circuit breaker shall be fitted with a pressure gauge/densiometer to monitor thegas pressure.

The pressure gaugeJdenslcmeter circuit shall be provided with a minimum of two sets of contacts foralarm and indication for the substation's annunciator or flag circuit.

The supplier shall wire the SF6 circuit breaker local control circuit, such that in the event of a gasleakage or drop in gas pressure, the SF6 circuit breaker will trip and lockout.

A sel of normally closed contacts shall be provided in the circuit breaker mechanism control box forthe low gas trip circuitry, r

The SF6 circuit breaker shall trip and lockout before the minimum safe SF6 gas pressure is reached.

In terms of the Occupational Health and Safety Act No 85 of 1993. Code 1704 (pressure vessels)the successful tenderer shall furnish a certificate of manufacture complying with the terms of the Actfor the circuit breakers

INSULATION LEVELS, CREEPAGE DISTANCES AND CLEARANCES

INSULATION LEVELS

The rated insulation levels of the AC circuit breakers shall comply with the requirements specified inTable 1.

Table 1 lists the nominal system voltages present on Transnet freight rail and the required insulationlevels as specified in accordance with SANS 1019.

Highestphase-to-phase Nominal system I Rated lightning Rated short durationr.m.svoltagefor phase.to.phase impulse withstand power~ frequencyequipment.(Urn) r.m.s. voltage voltage peak. withstand r.rn.s voltage.

24 kV 22 kV 150kV 50 kV

36 kV I 33 kV 200 kV 70 kV

52 kV 44 kV 250 kV 95 kV

72,5 kV 66 kV 350 kV 140 kV

100 kV 88kV 380 kV 150 kV450 kV 185 kV

145 kV 132 kV 550 kV 230 kV .650kV 275 kV

245 kV 220 kV 850 kV 360 kV950 kV 395 kV

Insulation levels for highest voltage for equipment Urn < 100 kV are based on an earth fault factorequal to "3 and for Um> 100 kV an earth fault factor equal to 0,8" 3,Where more than one insulation level is given per voltage system, the higher level is appropriatefor eouinment where the earth fault factor is nreater than 1,4

TABLE 1: Standard Voltages and insulation levels in accordance with SANS 1019:2008 [1]

A Division of Transnet Limited Registration Number 1990{00900{06

Page 29

110

Page 6 of 10

Page 111: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER. INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

6.3612.

6.36.2

6.36.2.1

6.36.2.2

6.36.2.3

6.36.3

6.36.3.1

6.36.3.2

8881267 Version 10

For the 25 kV and 50kV single phase ac traction systems the ac high voltage circuit breakers shallbe designed 10the following nominal system phase to phase r.m.s voltages and withstand insulationlevels:

For the 25 kV (phase 10earth) ac traction systems the ao high voltage circuit breakers currenttransformer shall be rated for a nominal system phase to phase r.m.s voltage of at least 44 kVand designed to withstand the required insulation level for that nominal system voltage.

For the 50 kV (phase to earth) ae traction systems the ao high voltage circuit breakers shall berated for a nominal system phase to phase r.m,s voltage of at least 88 kY and designed towithstand the required insulation level for that nominal system voltage.

CREEPAGE DISTANCES

The standard creepage distance between phase and earth shall be in accordance with table ii ofSANS 60815.

For coastal areas and very heavy polluted inland areas the standard creepage distance shall bethe very heavy polluted level, I.e. 31mm/kV of the highest r.m.s phase to phase voltage Urnforequipment.

For inland areas the standard creepage distance shall be the heavy polluted level, i.e. 25mmlkV ofthe highest r.m.s phase to phase voltage Urnfor equipment.

CLEARANCES

The following minimum safety outdoor earth clearances shall be maintained between any liveconductor or metal and earthed metal: -

Highest phase to 24kV 36kV 48kV 72kV 100kV 145kV I 245kVphase r.rn_svoltage for iequipment.

I Outdoor dislance 320mm I 430mm I 540mm I 770mm 1000mm 1450mm I 1850rnm

The following minimum safety clearances shall be maintained between any live conductor or metaland ground surface level: -

Highest phase 24kV 36kV I 48kV 72.5kV 100kV 145kV 245kVto phase r.m.s

Ivoltage forequipment.

Nominal phase 22kV 33W 44kV 66kV 88K\,' 132kV 220kVto phase r.m.Ssystem ..••oltage

Wrthin security 2820tnm 2930mm 3040mm 3270mm 3500mm 3950mm 4350mmfence.(Restrictedaccess way)

Outside security 5200mm 5300mm 5400mm 5700mm 5900mm 6300mm 6700mmfence but withinTransnet frei9htrail's reserve I

Outside 5500mm 5500mm 5500mm 5700:nm 590Dmm 6300mm 6700mmTransnet freightrail's reserve .

A Division ofT,gnsnet Limited Registration Number 1990/00900/06

Page 30

I\\

Page 7 of 10

Page 112: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

6661267 Version 10

6,37

6.37.1

6.37.2

7,0

7.1

7.2

8,0

8.1

SUPPORT STEELWORK.

The circuit breaker shall be provided with ils own support steelwork, which shall be hot- dipgalvanised in accordance with specification SANS 121 and shall comply to requirements ofSANS 1431: forweJdable structural steets,

Support steelwork exposed to a high pol1utionfcorrosive atmosphere shall be painted jn accordancewith specification CEE,0045.

SPECIAL TOOLS, SERVICING AIDS AND MANUALS AND SPARES LISTS.

The tenderers shall submit a separate offer for special tools and servicing aids necessary for theserviclng and maintenance of SF6 cirCuit breakers.

Three copies of instruction/maintenance manuals, spares list's and wiring diagrams of the circuitbreakers in accordance with Transnel freight fairs specification CEE.0224. shall be supplied upondelivery.

TRAINING.

The tenderer shall submit details with the tender of the training courses, which will be conducted bythe supplier for the training of Transnet freight rail maintenance staff in tr,e operation andmaintenance of the circuit breaker. The courses shall include theoretical as well as practical tuition.The date and venue of this training course shall be arranged with the maintenance manager of thedepot. The cost of the training shall be quoted for separately.

9.0 TEST CERTIFICATES.,.

9.1 The manufacture shall make available type test certificates for the equipment {as specified inSANS 62271-100 when required. Routine test certificates shall be supplied with each circuit breaker.

10,0 GUARANTEE AND DEFECTS,

10.1 The contractor shall guarantee the satisfactory operation of the circuit breaker supplied and acceptliability for maker's defects, which may appear in design, materials and workmanship.

10.2 The guarantee period shall expire after:-

A period of 12 months commencing on the date of energising of the circuit breaker.

10.3 Any specific type of fauli occurring three times within the guarantee period and which cannot beproven to be due to other faulty equipment not forming part of this contract, shall automatically bedeemed an inherent defect. Such inherent defect shall be fully rectified to the satisfaction of themaintenance manager of the depot -and at the cost of the Supplier.lf urgent repairs have to becarried out by Transnet freight rail staff to maintain supply during the guarantee period the suppliershall inspect such repairs to ensure that the guarantee period is not affected and should they becovered by the guarantee, reimburse Transnet freight rail the cost of material and labour.

11,0 INSPECTION,

11.1 Transnel freight rail reselVes the right to carry out inspection and any tesls on the equipment at theworks of the supplierl manufacture.

11.2 Arrangements must be made timeously for such inspections to be carried out before delivery of theequipment to the client.

12,0 PACKAGING AND TRANSPORT.

12.1 The tenderer shall ensure that the equipment be packed in such a manner that it will be protectedduring handling and transport.

12.2 The tenderer shall provide transport for the delivery of the equipment to the site where requ}red.

13,0 BIBLIOGRAPHY

(1) SANS 1019: 2008. Edition 2.5

ENDA Division of Transnet limited Registration Number 1990/00900106

Page 31

I \.;l.

Page B of 10

Page 113: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENOUIRY NUMBER: BFX/54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

----~---------~-----------~------------------------

6881267 Version 10

APPENDIX 1

SCHEDULE OF REQUIREMENTS(To be completed by client)

1,0 SYSTEM DETAIL

1,1

1.2

AC Circuit Breakers: ~~~~ ~~~_sub5tationJlocation.

Pollution level: Heavy Very Heavy _

1.2 Quantity of AC Circuit Breakers. _

1,1

1.2

1,3

1.4

Nominal phase to phase voltage for 3 phase system: kV,

Nominal phase to neutral voltage for single phase systems: kV,

Frequency: ~ Hz

Circuit breaker control DC voltage: . __ ~~~V

1.5 Circuit breakers to be used for the following:

• 3 kV DC Traction substations.

• Distribution substations.

• 25 kV AC Traction substations.

• 50 kV AC Traction substation.

DETAIL OF AC CIRCUIT BREAKERS.

2.0 Type of circuit breakers required:

Vacuum: Yes I No

Gas (SF6): Yes I No _

YeslNo

Yes/No

YeslNo

Yes/No

2.2 Number of circuit breakers required:

2.3 Number of poles: _

2.4

2.5

2.6

Rated Voltage: kV

Rated short-circuit breaking current: ._kA

Rated normal current: Ampere.

END

A Division of Transnet Limited Registration Number 1990{00900{06

Page 32

I\~

Page 9 of 10

Page 114: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

1.3

1.2

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER, INSTAll. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

B881267 Version 10

APPENDIX 2

TECHNICAL DATA SHEET(To be completed by tenderer)

DETAIL OF CIRCUIT BREAKER

1.1 Make and manufacturer _

Rated Voltage kV.(Highest rated vollage for equipment)

Rated Insulation level kV.(Rated lightning withstand Voltage)

1.4 Number of Poles: _

1,6

1,7

Rated short circuit breaking current kA.

Rated normal current: Ampere.

1.6 Breaker operating time:

1,6.1

1.6.2

Closing: ms.

Opening: ms.

1.7 Number of operations after which breaker contact maintenance I measurement is required:

1.7.1 Under full load conditions _

1.7.2 Underfault conditions _

1.8 First Pole to Clear Factor _

1.9 DC control voltage: V

A Division of Transnet Limited Registration Number 1990/00900106

Page 33

I'4-

Page 10 of 10

Page 115: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

E7/1 (July 1998)

SPECIFICATION FOR WORKS ON, OVER, UNDER OR ADJACENT TO RAILWAY LINES AND NEARHIGH VOLTAGE EQUIPMENT

(This Specification shall be used in Transnet Contracts)

CONTENTS

CLAUSENO'S

DESCRIPTION

1.

23.4.5.6.7.8.9.10.11.12.13.14.15.16.

DEFINITIONS

PART A - GENERAL SPECIFICATION

Authority of officers of TransnetContractor's representativesOccupations and work permitsSpeed restrictions and protectionRoads on Transnet propertyClearancesStacking of materialExcavation, shoring, dewatering and drainageFalse work for structuresPiling 6Underground servicesBlasting 6Rail trolleysSignal track circuitsPenalty for delays to trains

3

444555556

6

777

PART B - ADDITIONAL SPECIFICATION FOR WORK NEAR HIGH-VOLTAGE ELECTRICALEQUIPMENT

17.18.19.20.21.22.

General 8Work on buildings of fixed structuresWork done on or outside of rolling stock, including loading and unloadingUse of equipmentCarrying and handling material and equipmentPrecautions to be taken when erecting or removingpoles, antennae and trees

Page 34

\\~

8899

10

Page 116: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENOUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER. INSTAll. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

23.24.25.

26.27.28.

Use of waterUse of construction plantWork performed under dead conditions under coverof a work permitTraction return circuits in railsBlasting 11High-voltage electrical equipment not maintainedand/or operated by Transnet

1010

1011

11

ANNEXES

1. Horizontal clearances 1 065 mm gauge2. Vertical clearances 1 065 mm gauge3. Clearances 610 mm gauge4. Platform clearances

1 DEFINITIONS

The following definitions shall apply:

Authorised Person. A person whether an employee of Transnet or not, who has been specially authorised toundertake specific duties in terms of Transnet's publication SAFETY INSTRUCTIONS: HIGH-VOLTAGEELECTRICAL EQUIPMENT, and who holds a certificate or letter of authority to that effect.

Barrier. Any device designed to restrict access to "live" high-voltage electrical equipment.

Bond. A short conductor installed to provide electrical continuity.

Contractor. Any person or organisation appointed by Transnet to carry out work on its behalf.

Dead. Isolated and earthed.

Electrical Officer (Contracts). The person appointed in writing by the responsible Electrical Engineer in Transnetas the person who shall be consulted by the Contractor in all electrical matters to ensure that adequatesafety precautions are taken by the Contractor.

Executive Officer. The person appointed by Transnet from time to time as the Executive Officer to act accordingto the rights and powers held by and obligations placed upon him in terms of the Contract.

High-Voltage. A voltage normally exceeding 1 000 volts.

Live. A conductor is said to be "live" when it is at a potential different from that of the earth or any otherconductor of the system of which it forms a part.

Near. To be in such a position that a person's body or the tools he is using or any equipment he is handling maycome within 3 metres of live exposed high-voltage electrical equipment.

Occupation. An authorisation granted by Transnet for work to be carried out under specified conditions on, overunder or adjacent to railway lines.

Occupation Between Trains. An occupation during an interval between successive trains.

Page 35

116

Page 117: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENOUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

Project Manager. The person or juristic person appointed by Transnet from time to time as the Project Manager,to administer the Contract according to the powers and rights held by and obligations placed upon him interms of the Contract.

Responsible Representative. The responsible person in charge, appointed by a contractor, who has undergonespecific training (and holds a certificate) to supervise staff under his control to work on, over, under oradjacent to railway lines and in the vicinity of high-voltage electrical equipment.

Technical Officer. The person or juristic person appointed by Transnet from time to time as the TechnicalOfficer, to administer the Contractor's performance and execution of the Works according to the powers andrights held by and obligations placed upon the Technical Officer in terms of the Contract.

Total Occupation. An occupation for a period when trains are not to traverse the section of line covered by theoccupation.

Work on. Work undertaken on or so close to the equipment that the specified working clearances to the liveequipment cannot be maintained.

Work Permit. A combined written application and authority to proceed with work on or. near dead electricalequipment.

Page 36

\II

Page 118: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

PART A - GENERAL SPECIFICATION

2, AUTHORITY OF OFFICERS OF TRANSNET

2,1 The Contractor shall co-operate with the officers of Transnet and shall comply with all instructionsissued and restrictions imposed with respect to the Works which bear on the existence andoperation of Transnet's railway lines and high-voltage equipment

2.2 Without limiting the generality of the provisions of 2,1, any duly authorised representative of Transnet,having identified himself, may stop the work if, in his opinion, the safe passage of trains or thesafety of Transnet assets Or any person is affected, CONSIDERATIONS OF SAFETY SHALLTAKE PRECEDENCE OVER ALL OTHER CONSIDERATIONS,

3, CONTRACTOR'S REPRESENTATIVES

3,1 The Contractor shall nominate Responsible Representatives of whom at least one shall be availableat any hour for call-out in cases of emergency, The Contractor shall provide the Technical Officerwith the names, addresses and telephone numbers of the representatives,

3.2 The Contractor guarantees that he has satisfied himself that the Responsible Representative is fullyconversant with this specification and that he shall comply with all his obligations in respectthereof.

4. OCCUPATIONS AND WORK PERMITS

4.1 Work to be done during total occupation or during an occupation between trains or under a workpermit shall be done in a manner decided by the Technical Officer and at times to suit Transnetrequirements.

4.2 The Contractor shall organise the Works in a manner, which will minimise the number and duration ofoccupations and work penmits required.

4.3 Transnet will not be liable for any financial or other loss suffered by the Contractor arising from hisfailure to complete any work scheduled during the period of an occupation or work penmit

4.4 The Contractor shall submit to the Technical Officer, in writing, requests for occupations or workpermits together with details of the work to be undertaken, at least 14 days before they arerequired. Transnet does not undertake to grant an occupation or work penmit for any particulardate, time or duration.

4.5 Transnet reserves the right to cancel any occupation or work penmit at any time before or during theperiod of occupation or work permit If, due to cancellation or change in date or time, theContractor is not penmitted to start work under conditions of total occupation or work permit at thetime arranged, all costs caused by the cancellation shall be born by the Contractor except asprovided for in clauses 4.6 to 4.8.

Page 37

1\ g

Page 119: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFX/54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

4,6 When the Contractor is notified less than 2 hours before the scheduled starting time that theoccupation or work permit is cancelled, he may claim reimbursement of his direct financial lossescaused by the loss of working time up to the time his labour and plant are employed on otherwork, but not exceeding the period of the cancelled occupation or work permit.

4,7 When the Contractor is notified less than 2 hours before the schedule starting time, or during anoccupation or work permit, that the duration of the occupation or work permit is reduced, he mayclaim reimbursement of his direct financial losses caused by the loss of working time due to thereduced duration of the occupation or work penmit.

4,8 Reimbursement the Contractor for any loss of working time in tenms of 4,6 and 4,7, shall be subject tohis claims being submitted within 14 days of the event with full details of labour and plant involved,and provided that the Technical Officer certifies that no other work on which the labour and plantcould be employed was immediately available,

4,9 Before starting any work for which an occupation has been arranged, the Contractor shall obtain fromthe Technical Officer written confirmation of the date, time and duration of the occupation,

4,10 Before starting any work for which a work permit has been arranged, the ResponsibleRepresentative shall read and sign portion C of form No, T,1276 signifying that he is aware of thelimits within which work may be undertaken, After the work for which the permit was granted hasbeen completed, or when the work penmit is due to be terminated, or if the penmit is cancelledafter the start, the same person who signed portion C shall sign portion D of the 1.1276 fonm,thereby acknowledging that he is aware that the electrical equipment is to be made "live", TheContractor shall advise all his workmen accordingly,

5, SPEED RESTRICTIONS AND PROTECTION

5,1 When speed restrictions are imposed by Transnet because of the Contractor's activities, theContractor shall organise and carry out his work so as to penmit the removal of the restrictions assoon as possible,

5.2 When the Technical Officer considers protection to be necessary the Contractor shall, unlessotherwise agreed, provide all protection including flagmen, other personnel and all equipment forthe protection of Transnet's and the Contractor's personnel and assets, the public and includingtrains, Transnet will provide training free of charge of the Contractor's flagmen and otherpersonnel perfonming protection duties, The Contractor shall consult with the Technical Officer,whenever he considers that protection will be necessary, taking into account the minimumpenmissible clearances set out in appendixes 1 to 4,

5,3 The Contractor shall appoint a Responsible Representative to receive and transmit any instruction,which may be given by Transnet personnel providing protection,

Page 38

Page 120: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENOUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

6. ROADS ON TRANSNET PROPERTY

The provision of clause 25 of the E.5, General Conditions of Contract, or clause 23 of the E.5 (MW),General Conditions of Contract for Maintenance Works, shall apply to the use of existing roads onTransnet's property.

7. CLEARANCES

7.1 No temporary works shall encroach on the appropriate minimum clearances set out in Annexure 1BE97-01 Sheets 1,2,3 and 5 of 5.

8. STACKING OF MATERIAL

8.1 The Contractor shall not stack any material closer than 3 m from the centre line of any railway linewithout prior approval of the Technical Officer.

9, EXCAVATION, SHORING, DEWATERING AND DRAINAGE

9.1 Unless otherwise approved by the Technical Officer any excavation adjacent to a railway line shall notencroach on the hatched area shown in Figure 1.

jl. TUU:

tf{~»:;/,:;i',~::l~~F;, t

9.2 The Contractor shall provide at his own cost any shoring, dewatering or drainage of any excavationunless otherwise stipulated elsewhere in the Contract.

9.3 Where required by the Technical Officer, drawings of shoring for any excavation under or adjacent toa railway line shall be submitted and permission to proceed obtained, before the excavation iscommenced.

9.4 The Contractor shall prevent ingress of water to the excavation but where water does enter, he shalldispose of it as directed by the Technical Officer.

9.5 The Contractor shall not block, obstruct or damage any existing drains either above or below groundlevel unless he has made adequate prior arrangements to deal with drainage.

10, FALSEWORK FOR STRUCTURES

10.1 Drawings of falsework for the construction of any structure over, under or adjacent to any railwayline shall be submitted to the Technical Officer and his permission to proceed obtained before thefalsework is erected. Each drawing shall be given a title and a distinguishing number and shall be

Page 39

\:l.a

Page 121: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER. INSTALL. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

signed by a registered professional engineer certifying that he has checked the design of thefalsework and that the drawings are correct and in accordance with the design.

10.2 After the falsework has been erected and before any load is applied, the Contractor shall submit tothe Technical Officer a certificate signed by a registered professional engineer certifying that hehas checked the falsework and that it has been erected in accordance with the drawings. Titlesand numbers of the drawings shall be stated in the certificate. Notwithstanding permission givenby the Technical Officer to proceed, the Contractor shall be entirely responsible for the safety andadequacy of the falsework.

11. PILING

11.1 The Technical Officer will specify the conditions under which piles may be installed on Transnetproperty.

12. UNDERGROUND SERVICES

12.1 No pegs or stakes shall be driven or any excavation made before the Contractor has establishedthat there are no underground services, which may be damaged thereby.

12.2 Any damage shall be reported immediately to the Technical Officer, or to the official in charge atthe nearest station, or to the traffic controller in the case of centralised traffic control.

13. BLASTING

13.1 The provisions of clause 23 of the E.5, General Conditions of Contract or clause 21 of the E.5(MW), General Conditions of Contract for Maintenance Work, shall apply to all blasting operationsundertaken in terms of the Contract.

13.2 The Contractor shall provide proof that he has complied with the provisions of clauses 10.17.1 to10.17.4 of the Explosives Regulations (Act 26 of 1956 as amended).

13.3 Blasting within 500m of a railway line will only be permitted during intervals between trains. Aperson appointed by the Technical Officer, assisted by flagmen with the necessary protectiveequipment, will be in communication with the controlling railway station.

Only this person will be authorised to give the Contractor permission to blast, and the Contractor shallobey his instructions implicitly regarding the time during which blasting may take place.

13.4 The flagmen described in 13.3, where provided by Transnet, are for the protection of trains andTransnet property only, and their presence does not relieve the Contractor in any manner of hisresponsibilities in tenms of Explosives Act or Regulations, or any obligation in terms of thisContract.

13.5 The person described in 13.3 will record in a book provided and retained by Transnet thedates and times -

I~(Page 40

Page 122: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXJ54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY. DELIVER, INSTAll. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

(i) when each request is made by him to the controlling station for pemnission to blast;

(ii) when blasting may take place;

(iii) when blasting actually takes place; and

(iv) when he advises the controlling station that the line is safe for the passage of trains.

13,6 Before each blast the Contractor shall record in the same book, the details of the blast to becarried out The person appointed by the Technical Officer and the person who will do theblasting shall both sign the book whenever an entry described in 13.5 is made.

13.7 The temns of clause 27 hereof shall be strictly adhered to.

14, RAIL TROLLEYS

14.1 The use of rail trolleys or trestle trolleys on a railway line for working on high voltage equipmentwill be permitted only if approved by the Technical Officer and under the conditions stipulatedby him.

14.2 All costs in connection with such trolley working requested by the Contractor shall, unlessotherwise agreed, be borne by the Contractor, excluding the costs of any train protectionservices nomnally provided free of charge by Transnet

15, SIGNAL TRACK CIRCUITS

15.1 Where signal track circuits are installed, the Contractor shall ensure that no material capable ofconducting an electrical current makes contact between rails of a railway line/lines.

15.2 No signal connections on track-circuited tracks shall be severed without the Technical Officer'sknowledge and consent

16 PENAL TV FOR DELAYS TO TRAINS

16.1 If any trains are delayed by the Contractor and the Technical Officer is satisfied that the delaywas avoidable, a penalty will be imposed on the Contractor of R5 000 per hour or part thereoffor the period of delay, irrespective of the number of trains delayed.

I ';;l.;;;lPage 41

Page 123: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENOUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

PART B - ADDITIONAL SPECIFICATION FOR WORK NEAR HIGH-VOLTAGE ELECTRICALEQUIPMENT

17. GENERAL

17.1 This specification is based on the contents of Transnet's publication SAFETYINSTRUCTIONS, HIGH-VOLTAGE ELECTRICAL EQUIPMENT, as amended, a copy ofwhich will be made available on loan to the Contractor for the duration of the contract.These instructions apply to all work near live high-voltage equipment maintained and/oroperated by Transnet, and the onus rests on the Contractor to ensure that he obtains acopy.

17.2 The Contractor's attention is drawn in particular to the contents of Part I, Sections 1 and 2of the Safety Instructions: High-Voltage Electrical Equipment.

17.3 The Safety Instructions: High-Voltage Electrical Equipment cover the minimum safetyprecautions which must be taken to ensure safe working on or near high-voltage electricalequipment, and must be observed at all times. Should additional safety measures beconsidered necessary because of peculiar local conditions, these may be ordered by andat the discretion of the Electrical Officer (Contracts).

17.4 This specification must be read in conjunction with and not in lieu of the SafetyInstructions: High-Voltage Electrical Equipment.

17.5 The Contractor shall obtain the approval of the Electrical Officer (Contracts) before anywork is done which causes or could cause any portion of a person's body or the tools he isusing or any equipment he is handling, to come within 3 metres of any live high-voltageequipment.

17.6 The Contractor shall regard all high-voltage equipment as live unless a work permit is inforce.

17.7 Safety precautions taken or barriers erected shall comply with the requirements of theElectrical Officer (Contracts), and shall be approved by him before the work to beprotected is undertaken by the Contractor. The Contractor shall, unless otherwise agreed,bear the cost of the provision of the barriers and other safety precautions required,including the attendance of Transnet staff where this is necessary.

17.8 No barrier shall be removed unless authorised by the Electrical Officer (Contracts).

18.WORK ON BUILDINGS OR FIXED STRUCTURES

Before any work is carried out or measurements are taken on any part of a building, fixedstructure or earthworks of any kind above ground level situated within 3 metres of livehigh-voltage equipment, the Electrical Officer (Contracts) shall be consulted to ascertainthe conditions under which the work may be.carried out.

18.2 No barrier erected to comply with the requirements of the Electrical Officer (Contracts)shall be used as temporary staging or shuttering for any part of the Works.

18.3 The shuttering for bridge piers, abutments, retaining walls or parapets adjacent to or overany track may be permitted to serve as a barrier, provided that it extends at least2,5 metres above any working level in the case of piers, abutments and retaining walls and1,5 metres above any working level in the case of parapets.

ContractPart C3: Scope of Works

PAGE 42

I-;;(~C3.1

Scope of Works

Page 124: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFX/54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

19, WORK DONE ON OR OUTSIDE OF ROLLING STOCK, INCLUDING LOADING ORUNLOADING

19,1 No person shall stand, climb or work whilst on any platform, surface or foothold higherthan the normal unrestricted places of access, namely -

(i) the floor level of trucks;

(ii) external walkways on diesel, steam and electric locomotives, steam heat vans, etc, and

(iii) walkways between coaches and locomotives,

When in these positions, no person may raise his hands or any equipment or material he ishandling above his head,

19.2 In cases where the Contractor operates his own rail mounted equipment, he shall arrangefor the walkways on this plant to be inspected by the Electrical Officer (Contracts) andapproved, before commencement of work,

19.3 The handling of long lengths of material such as metal pipes, reinforcing bars, etc. shouldbe avoided, but if essential they shall be handled as nearly as possible in a horizontalposition below head height.

19.4 The Responsible Representative shall warn all persons under his control of the danger ofbeing near live high-voltage equipment, and shall ensure that the warning is fullyunderstood.

19.5 Where the conditions in 19.1 to 19.3 cannot be observed the Electrical Officer (Contracts),shall be notified. He will arrange for suitable Safety measures to be taken. The ElectricalOfficer (Contracts), may in his discretion and in appropriate circumstances, arrange for asuitable employee of the Contractor to be specially trained by Transnet and at its costs, asan Authorised Person to work closer than 3 metres from live overhead conductors andunder such conditions as may be imposed by the Senior responsible Electrical Engineer inTransnet.

20. USE OF EQUIPMENT

20.1

20.1.1

20.1.2

20.1.3

20.1.4

Measuring Tapes and Devices

Measuring tapes may be used near live high-voltage equipment provided that no part ofany tape or a person's body comes within 3 metres of the live equipment.

In windy conditions the distance shall be increased to ensure that if the tape should fall itwill not be blown nearer than 3 metres from the live high-voltage equipment.

Special measuring devices longer than 2 metres such as survey staves and rods may beused if these are of non-conducting material and approved by the responsible ElectricalEngineer in Transnet, but these devices must not be used within 3 metres of live high-voltage equipment in rainy or wet conditions.

The assistance of the Electrical Officer (Contracts) shall be requested whenmeasurements within the limits defined in 20.1.1 to 20.1.3 are required.

ContractPart C3: Scope of Works

\~4-PAGE 43 C3.1

Scope of Works

Page 125: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll. TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

20,1.5

20.2

20.2.1

The restrictions described in 20.1,1 to 20.1.3 do not apply on a bridge deck betweenpermanent parapets nor in other situations where a barrier effectively prevents contactwith the live high-voltage equipment.

Portable ladders

Any type of portable ladder longer than 2 metres may only be used near live high-voltageequipment under the direct supervision of the Responsible Representative. He shallensure that the ladder is always used in such a manner that the distance from the base ofthe ladder to any live high-voltage equipment is greater than the fully extended length ofthe ladder plus 3 metres. Where these conditions cannot be observed, the ElectricalOfficer (Contracts) shall be advised, and he will arrange for suitable safety measures to betaken.

21. CARRYING AND HANDLING MATERIAL AND EQUIPMENT

21.1 Pipes, scaffolding, iron sheets, reinforcing bars and other material, which exceeds 2metres in length, shall be carried completely below head height near live high-voltageequipment. For maximum safety two or more persons so as to maintain it as nearly aspossible in a horizontal position should carry such material. The utmost care must betaken to ensure that no part of the material comes within 3 metres of any live high-voltageequipment.

21.2 long lengths of wire or cable shall never be run out in conditions where a part of a wire orcable can come within 3 metres of any live high-voltage equipment unless the ElectricalOfficer (Contracts) has been advised and has approved appropriate safety precautions.

21.3 The presence of overhead power lines shall always be taken account of especially whencommunications lines or cables or aerial cables, stay wires, etc. are being erected aboveground level.

22. PRECAUTIONS TO BE TAKEN WHEN ERECTING OR REMOVING POLES, ANTENNAE,TREES ETC.

22.1 A pole may be handled for the purpose of erection or removal near high-voltageequipment under the following conditions:

(i) If the distance between the point at which the pole is to be erected or removed and thenearest live high-voltage equipment is more than the length of the pole plus 3 metres,the work shall be supervised by the Responsible Representative.

(ii) If the distance described in (i) is less than the length of the pole plus 3 metres, theElectrical Officer (Contracts) shall be consulted to arrange for an Authorised Person tosupervise the work and to ensure that the pole is earthed where possible. The pole shall bekept in contact with the point of erection, and adequate precautions shall be taken to preventcontact with live high-voltage equipment.

22.2 The cost of supervision by an Authorised Person and the provision of earthing shall,unless otherwise agreed, be borne by the Contractor.

22.3 The provisions of clauses 22,1 and 22.2 shall also apply to the erection or removal ofcolumns, antennae, trees, posts, etc.

ContractPart C3: Scope of Works

\~5PAGE 44 C3.1

Scope of Works

Page 126: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

23. USE OF WATER

23.1 No water shall be used in the form of a jet if it can make contact with any live high-voltageequipment or with any person working on such equipment.

24, USE OF CONSTRUCTION PLANT

24,1 "Construction plant" entails all types of plant including cranes, piling frames, boringmachines, excavators, draglines, dewatering equipment and road vehicles with or withoutlifting equipment.

24.2 When work is being undertaken in such a position that it is possible for construction plantor its load to come within 3 metres of live high-voltage equipment, the Electrical Officer(Contracts) shall be consulted. He will arrange for an Authorised Person to supervise thework and to ensure that the plant is adequately earthed. The Electrical Officer (Contracts)will decide whether further safety measures are necessary.

24.3 The cost of any supervision by an Authorised Person and the provision of earthing shall,unless otherwise agreed, be borne by the Contractor.

24.4 When loads are handled by cranes, non-metallic rope hand lines shall be used, affixed tosuch loads so as to prevent their swinging and coming within 3 metres of live high-voltageequipment.

24.5 Clauses 24,1 to 24.4 shall apply mutatis mutandis to the use of maintenance machines ofany nature.

25. WORK PERFORMED UNDER DEAD CONDITIONS UNDER COVER OF A WORK PERMIT

25.1 If the Responsible Representative finds that the work cannot be done in safety with

the high-voltage electrical equipment live, he shall consult the Electrical Officer (Contracts) who

will decide on the action to be taken.

25.2 If a work permit is issued the Responsible Representative shall -

(i) before commencement of work ensure that the limits within which work may becarried out have been explained to him by the Authorised Person who issued the permit to him,and that he fully understands these limits.

(ii) sign portion C of the permit before commencement of work;

(iii) explain to all persons under his control the limits within which work may be carried out,and ensure that they fully understand these limits;

(iv) care for the safety of all persons under his control whilst work is in progress; and

(v) withdraw all personnel under his control from the equipment on completion of the workbefore he signs portion D of the work permit.

26. TRACTION RETURN CIRCUITS IN RAILS

ContractPart C3: Scope of Works

\~bPAGE 45 C3.1

Scope of Works

Page 127: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

261 DANGEROUS CONDITIONS CAN BE CREATED BY REMOVING OR SEVERING ANYBOND,

26,2 Broken rails with an air gap between the ends, and joints, at which fishplates are removedunder "broken bond" conditions, are potentially lethal. The rails on either side of an air gapbetween rail ends on electrified lines shall not be touched simultaneously until renderedsafe by Transnet personnel.

26,3 The Contractor shall not break any permanent bonds between rails or between rails andany structure, He shall give the Technical Officer at least 7 days written notice whenremoval of such bonds is necessary,

26.4 No work on the track which involves interference with the traction return rail circuit eitherby cutting or removing the rails, or by removal of bonds shall be done unless the ElectricalOfficer (Contracts) is consulted, He will take such precautions as may be necessary toensure continuity of the return circuit before permitting the work to be commenced.

27. BLASTING

27.1 The Contractor shall obtain the permission of the Electrical Officer (Contracts) beforeblasting, and shall give at least 14 days' notice of his intention to blast.

27.2 No blasting shall be done in the vicinity of electrified lines unless a member of Transnet'selectrical personnel is present.

27.3 The terms of clause 13 hereof shall be strictly adhered to.

28. HIGH-VOLTAGE ELECTRICAL EQUIPMENT NOT MAINTAINED AND/OR OPERATED BYTRANSNET

Where the work is undertaken on or near high-voltage electrical equipment which is notmaintained and/or operated by Transnet, the Occupational Health and Safety Act No, 85of 1993, and Regulations and instructions, or the Mines Health and Safety Act (Act 29 of1996), shall apply.

Such equipment includes: -

(i) Eskom and municipal equipment;

(ii) the Contractor's own power supplies; and

(iii) electrical equipment being installed but not yet taken over from the Contractor.

\:l"lContractPart C3: Scope of Works

PAGE 46 C3.1Scope of Works

Page 128: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

z

~r--;m~,.zo()os:s:(Ii(j)

iszZClo'n

'"'":2(j)'nCD

"'"~;0-<

...• <,0 fTl(J) ~013 (')»3 r.,(')~ r(') ~A ~G)Z» (')

, C ITIG) (j)

ITI ..

ElECTRlfiCAnON ZONESEE ANNEXURE 1 Sht 1

I""7--..- ) I~ [?,-r-----.! \-~-. '~ ~ /

/ ~ - _ •• ' FOR FOULING POINTSo • - / <l!. . ---'~ BELOW THIS LEVEL,I;! R \'6 \, \ SEE NOTE 7

VS., / I I

l[ ..~I L ''/ WORKSHOP AREAS AND 'r--L-.t ~ i I t 1'ROF'II.£! J TEMPORARY WORK-"---J :!.,... 1,50;)-lll r ,RAIL lEVEL~ LEG . ..( -u

6 000

5 050 54005 020 5 3705000 5 3504 990 5 3404 960 5 3104 940 5 290

4 930 5 280

5 650

4 270

4 4104 3704 3504 310

4 290

ELECTRIFIEDNOT (PR£SEN1' OR FU1IJflE)

EL£CJRflID3kV '" 25kV 50kV

S V V(mm) (mm) (mm)

4 470

2000

RADIUS(mm)

100

300600

10001 500

>3 000

LOCAnON

REMARKS:

1. V IS THE REQUIREO VERnCAL CLEARANCE EXCEPT WHERE, REDUCED CLEARANCE S APPLIES,2. S IS THE MINIMUM VERnCAL 'CLEARANCE fOR STRUCTURES AND TEMPORARY WORK OVER NON-ELECTRIfiED LINES.

3. INTERMEOIATEVALUES MAY BE INTERPOLATED BY THE ENGINEER IN CH1ARGE.

4. fOR APPLICAnON AT CURVES

4.1 APPLY INCREASEO CLEARANCES fOR CURVES TO POINTS 3m BEYOND THE ENDS Of THE CIRCUlAR CURVE.4,2 REDUCE CLEARANCES AT A UNifORM RATE OVER THE REMAINDER Of THE TRANsmON CURVE.4.3 fOR NON-TRANSmONED CURVES REDUCE AT A UNifORM RATE OVER A LENGTH Of 15m ALONG STRAIGHTS.

5. NEW STRUCTURES, SEE BRIDGE CODE.6. TUNNELS, SEE DRAWING BE 82-35.7. fOULING POINTS, SEE CLAUSE 8.1.8. CLEARANCES ARE BASED ON 15m BOGIE CENTRES AND 21.2m VECHILE BODY LENGTH.

9: ~ SEE ANNEXURE 1 SHEET 3 fOR PLATfORM CLEARANCES,

• OVER OR NEAR POINTSANO CROSSING If REQUIREDBY ElECTRICALIRRESPECTIVE Of RAOIUS

"'0(')., 0 ~;+:>~ '"(')~ '"w".. g. '"(Jl ...0 I0 e"C

'" '"0 "- "::E !l,0~'",..

'"~..~cz'"~00

Page 129: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

I...•.0::0NoZ

~r

(Jl

'\, .,»Ul »~IZJTlJTIZZJTIJTIO-lX,~ C~;o,JTI JTIZo-l....,- ~

\.

:0:Ol(Jl33

!

1 200~ '200

'~,~(~fJ~ ~l -----, )-

//f - I SSTRUClURE GAUGES.......... / ' ' • ~ , -/ -

""'{/ ,-- \FOR NON-, ' I" ',.\ElECTRIFICATION / I I ' ~()\WORKSHOPARrAS AND I , \TEMPORARYWORK -:-1

1I 1 I

FOR FOUUNG I It TRACK_;- 200POINTS INSIDE ' I ~ p ,DASHED UNE ~.'SO 1/0FiLF:I ISEE NOTE 7 L "ANNEXURE 1 SfIT 2 H , / 0

( 1:50. 8RAIL LEVEL-LOW LEG ~ --r- ..,

SZ I 1- -do ---j1-0+0- ~~

ELECTRIFICATIONZONE

WITH CANT

B (mm) C (mm)1 130 2 100

1 140 2 050

1 160 2 010

1 175 1 990

1 190 1 970

1 205 1 950

1 230 1 920

1 250 1 900

1 270 1 890

1 290 1 875

1 320 1 850

1 340 1 830

1 365 1 790

1 380 1 760

1 200 1 730

t 415 1 700

1 440 1 660

1 500 1 600

1 600 1 600

NO CANT

H " L2 780

2 750

2 700

2 660

2 830

2 600

2 580

2 560

2 540

2530

2 520

2 5,10

2 500

2 490

2 490

2 480

2 480

2 470

2 460

REMARKS:1. H AND B IS THE REQUIRED HORIZONTALCLEARANCE ON THE OUTSIDE Of THE CURVE BASED ON MINIMUM CANT.2. LAND C IS THE REQUIRED HORIZONTALCLEARANCE ON THE INSIDE Of THE CURVE BASED ON MAXIMUM CANT.3. INTERMEOIATEVALUES MAY BE INTERPOLATEOBY TIlE ENGINEER IN CHARGE.4. FOR WORKSHOP AREAS AND TEMPORARYWORK. CLEARANCES H AND L MAY BE REDUCED BY 300mm.5. 0 SEE ANNEXURE 1 SHEET 3 fOR PLATFORM CLEARANqES.6. ALSO REFER TO REMARKS 4 TO 8 Of ANNEXURE 1 SHEtr 2.

RADIUS WITH CANT

(m) H (mm) L (mm)90 2 730 3 090

100 2 700 3 030

120 2 650 2 970

140 2 620 2 920

170 2 590 2 870

200 2 570 2 820

250 2 550 2 790

300 ,2 540 2 760

350 2 530 2 730

400 2 520 2 710

500 2 510 2 680

600 2 500 2 660

800 2 490 2 820

1 000 2 480 2 600

1 200 ,2 480 2 580

1 500 2 480 2 550

2 000 2 480 2 500

3 000 2 470 2 470

>5 000 2 460 2 460

'-cz'"~

1II;l:

,..,m

'"'""Io~

Page 130: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANSNET FREIGHT RAILENQUIRY NUMBER: BFX/54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER. INSTALL, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

ANNEXURE 1SHEET 3 of 5AMENDMENT ( CLEARANCES : PLATFORMS J

PLAlFORt.CS : TRACK GAUGE 1 065mm

PASSENGERS GOODS 0

I A I B

II:SO i. 1:50 MAx. I E ! E

IMAx. iHIGH ::J I i 1:50 M/>Y-. '\~50MAX.- 11i

1:50 MAx. i r to HIGH r0 i~ C'" LOW ::J 0 1:50 ~LOW ito ~1. :ox:

•••••• ..~ (NO CANl1

lWlIUS A B C D E(m) (mm) (mm) (mm) (mm) (mm)

90 '\ 69.0 1 820 890 810 1 840 REMARKS:

100 1 650 '\ 790 890 810 '\ a10 '\. NO CANT TO BE APPUEDEXCEPT WHEN THE GOODS

120 '\ 610 I 740 890 810 1 760 PLATFORM lS -ON A

140 1 580 1700 890 810 '\ 720 RUNNING UNE."

'\ 690 2. INTERMEDiATE VALUES MAY .170 1 550 1 660 890 810

BE INTERPOLATED BY THE200 1 530 '\ 630 890 820 '\ 670 ENGINEER IN' CHARGE.

250 '\ 520 1 600 890 820 1 640 3. s- 8m TO MAIN STATlON-

300 '\ 520 1 580 890 830 '\ 620 BUILDINGS AND 3m TOALL OTHER STRUCTURES. ,-~ -

350 '\ 520 I 580 880 830 1 600'\ 520 1 550 880 840 '\ 590

••.. TOLERANCES : SEE400 CLAUSE 8.0.10.•500 '\ 520 1 540 880 850 1 580soo '\ 520 1 530 870 850 1 570

800 1 520 1 520 860 860 1 560I 200 1 520 '\ 520 860 8SO 1 5502 000 '\ 520 '\ 520 860 860 1 5403000 1 520 '\ 520 8SO' 8SO 1 530

STRAIGHT '\ 520 '\ 520 860 8SO '\ 520

STRUCTURES ON PlATFORMS : '\ 065mm NlIO 61 Dmm 'TRACK GAUQE

EDGE OF PLATFORM

L:BUILOING/STRUCTURE~;;JW"

(BE 97-01 Sht 3 of 5 DATE: JUNE 2000 )

ContractPart C3: Scope of Works

\30PAGE 49 C3.1

Scope of Works

Page 131: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

~mvJ'"o

'""o"0

"So::Eoc);.~•. -

...., -ill WITH c.INT NO c.INT.' . STRUCTUREGAUGE »'1Jl »

'" ~r H L ~':i C","ml

3::Cz...I (mml (mm) !,It TRACK \ _________ f'1f'1Zg Z~f'1

50 2 370 2 490 2400 4 320 o X'" ! I ~ ']- 3:(}\C~

70 2 310 2 420 2 3JO 4 310f'1 ;:u

'" I I' ___ ' ZOf'1

S, 100 . 2 260 2 370 2 280 4 310H i i/-......t PROFILE ,.

--i •.••~

'"V ()\ '.

140 2 220 2340 2 250 4 310 'Qi '~0

~ 200 2 200 2 300 2 220 4 300 8 RI.. JOO 2 190 2 270 2 200 4 300Q 9 Ii .' \:50 '"~ "'c "z 500 2 180 2 230 2 190 4 290

'"'" 700 2 170 2200 2 180 4 270 - - :zs- I --:t-...80 1000 2 170 2 170 2 170 4 270 RAIL LEVEL-LOW LEG

~F+F-~

()r

>2 000 2 160 2 160 2 160 4 270 ~'-'

1:50 MAX. I F I F

IClEAlIANCES IIAIliUS

1':"\::u

(m) ~

~-=] I1:50 tAAX. - 50 1 550 ()

, r::----------~ fT1I 60 1 510 Vl,

! GOODS :8 . 80 1 460 ..100 1 430 Ol

X'X ~120 1 410 0

(NO CANT) PlAlfORMS 3140 1 390 3REMARKS:1. H IS THE MINiMUM HORIZONTALCLEARANCEON THE OUTSIDEOF THE CURVE BASED ON MINIMUM CANT. 170 I 380

2. L is THE MINiMUM HORIZONTALCLEARANCEON THE INSIDE OF THE CURVE BASED ON MAXIMUMCANT. 200 1 370~3, V IS THE MiNIMUMVERTICALCLEARANCE.

4. FOR APPUCATlONAT CURVES: 250 " 360 ()

4.1 APPLY INCREASEDCLEARANCESFOR CURVESTOPOINTS 2m BEYONDTHE ENDS OF THE CIRCULARCURVE. A300 1 350

4.2 REDUCE CLEARANCESAT A UNIFORM RATE OVER.THE REMAINDEROF THE TRANSmON CURVE.~4.3 FOR NON-TRANSmONEDCURVESREOUCEAT A UNIFORM RATE OVER A LENIlTH OF 18m ALONG STRAIGHTS. 600 I 330

5. INTERMEOIATEVALUES MAY BE INTERPOLATEDBY THE ENGINEERIN CHARGE. e, 000 I 320 C)

6. ALSO REFER 19 REMARKS5, 6 AND 7 OF ANNEXURE 1 SHEET 2. fT1• >2 000 1 3207. CLEARANCESARE BASEOON 9 700mm BOGIE CENTRESAmi 13 700mm VEHICLE BOOY LENGTH.B. SEE ANNEXURE1 SHEET 3 FOR STRUCTURESON PLATFORMS. STRAIGHT 1 310

Page 132: NEC3Engineering andConstruction ShortContract (ECSC) · PDF fileNEC3Engineering andConstruction ShortContract (ECSC) ... OF 88KV SF6 PRIMARY CIRCUIT BREAKER AT SERFONTEIN ... Statement

TRANS NET FREIGHT RAilENQUIRY NUMBER: BFXl54139DESCRIPTION OF THE WORKS: FOR THE SUPPLY, DELIVER, INSTAll, TEST AND COMMISSIONING OF 88KV SF6 PRIMARYCIRCUIT BREAKER AT SERFONTEIN SUBSTATION

PART 4: SITE INFORMATION

1. Description of the Site and its surroundings

1.1. General descriptionThe work is to be carried out at Transnet Freight Rail, Serfontein

1.2. Access LimitationsThe areas are restricted and the contractor must ensure he complies with the regulations of Transnetin every way. The Contractor and/or any Sub-Contractors shall be required to arrange with TransnetFreight Rail Real Estate Project Manager, Mr Alton Mashibini, contact number: 083 447 8944, forpermission to enter the restricted area.

1.3. Ground conditions in areas affected by work in this contractNone

1.4. Hidden and other services within siteNo hidden services

ContractPRO-FAT-0226 Rev02

PAGE 1 Part C4C4. Site Information