Multi-criteria analysis and ranking of potential landfill sites in Morocco
Friday 19 June 2009
Prof. M. Loizidou and D. Malamis emails: [email protected]&[email protected]
website: www.uest.gr
Areas Examined for the allocation of a landfill site in Morocco
Area Name of Site
Area 1 Azemmour
Area 2 Oulad Rahmoune
Area 3 Moulay Abdellah
Area 4 Haouzia 1
Area 5 Haouzia 2
Area 6 Haouzia 3
Area 7 Haouzia 4
MULTICRITERIA ANALYSIS
RANKING potential landfill sites (7)using an appropriate software (Decision Lab)
EVALUATION of potential landfill sites based on the Criteria set
Calculation of the Q/P/W multicriteria matrix
Optimum site for landfill construction
(IIa)
(IIb)
(IIc)
(II)
(III)
Landfill Allocation Process
Criteria WEIGHTING
Setting Exclusion Criteria(I)
I. Exclusion Criteria
• These exclusion criteria are minimum distance limits from specific land uses and places of interest
• Potential landfill sites should comply with all the exclusion criteria in order to proceed to the multi-criteria analysis otherwise they are excluded
• The software provides a list of 15 exclusion criteria but the user can add or remove one or more criteria
The limit distance below which the examined area is excluded
Criterion ID from X1 – X15
Exclusion criteria are distances from specific land use or place of interest
VIEW EXCLUSION CRITERIA
Selection of the examined area
Inserting data for each examined area
15 Exclusion Criteria
INSERTING DATA FOR EACH EXAMINED AREA
Shows only the examined areas that comply with the exclusion criteria
Exclusion Criteria
X1 to X15
CHECKING THE AREAS THAT COMPLY WITH THE EXCLUSION CRITERIA
Data for each exclusion criterion of the examined
areas that comply with the criteria
Setting the criterion ID e.g. X16, X17… X20 etc
Setting the criterion Name e.g. The land use or place of interest that we want
The limit distance below which the examined area is excluded
ADDING A NEW CRITERION
DELETING CRITERION & EXAMINED AREA
Choosing which CRITERION to delete
Choosing which examined AREA to delete
MULTICRITERIA ANALYSIS
RANKING potential landfill sites (7)using an appropriate software (Decision Lab)
EVALUATION of potential landfill sites based on the Criteria set
Calculation of the Q/P/W of the multicriteria matrix
Optimum site for landfill construction
(IIa)
(IIb)
(IIc)
(II)
(III)
Landfill Allocation Process
WEIGHTING the Criteria
Setting Exclusion Criteria(I)
II. Multi-criteria Analysis• 5 Group criteria with the corresponding sub-criteria (48 in total)
• Weighting of Group and sub-criteria - determining the importance of each group and each sub-criterion (through the use of questionaire to ++) Weighting factors are the same for all examined areas.
• The evaluation of the examined areas is based on a 1 to 10 scale (10 being the maximum value) of the predetermined sub-criteria
• Calculation of the Q/P/W values
Group Criteria (5) Sub-criteria (48)
Hydrogeological criteria (Group A) 15 sub-criteria A1 to A15
Land - Planning criteria (Group B) 16 sub-criteria B1 to B16
Environmental criteria (Group C) 4 sub-criteria C1 to C4
Operational-General criteria (Group D) 9 sub-criteria D1 to D9
Financial- Economic criteria (Group E) 5 sub-criteria E1 to E5
GROUP CRITERIA WEIGHTING
GROUP A
GROUP B
GROUP C
GROUP D
GROUP E
30%
25%
20%
15%
10%
TOTAL 100%
Weights of Group Criteria
SUB-CRITERIA WEIGHTING – GROUP A
CHOOSE EACH GROUP CRITERION TO
• SET THEIR SUB-CRITERIA WEIGHTS AND
• TO EVALUATE EACH EXAMINED AREA
A1 to A15 sub-criteria weighting (Group A – Hydrogeological criteria)
The sub-criteria of Group A criteria A1 to A15
Entering the weight factors for each sub-criterion (A1 to A15) of Group A criteria
Total = 100%
6
7
9
5
8
10
8
10
6
5
8
5
5
5
3
Group A Sub-criteria
Evaluation of the examined areas on a 1 to 10 scale (A1 to A15 sub-criteria)
List of available options for evaluating each examined area based on Group A criteria
Evaluation on a scale of 1 to 10
Selection of examined area
SUB-CRITERIA WEIGHTING – GROUP B
CHOOSE EACH GROUP CRITERION TO
• SET THEIR SUB-CRITERIA WEIGHTS AND
• TO EVALUATE EACH EXAMINED AREA
The sub-criteria of Group B criteria
B1 to B16 sub-criteria weighting (Group B – Land-planning Criteria)
Entering the weight factors for each sub-criterion (B1 to B16) of Group B criteria
Total = 100%
Evaluation of the examined areas on a 1 to 10 scale (B1 to B16 sub-criteria)
Group B Sub-criteria Evaluation on a scale of 1 to 10
Selection of examined areaOptions for evaluating each
examined Area
SUB-CRITERIA WEIGHTINGSUB-CRITERIA WEIGHTING – GROUP C
CHOOSE EACH GROUP CRITERION TO
• SET THEIR SUB-CRITERIA WEIGHTS AND
• TO EVALUATE EACH EXAMINED AREA
The sub-criteria of Group C criterion (C1 to C4)
C1 to C4 sub-criteria weighting (Group C – Environmental Criteria)
Entering the weight factors for each sub-criterion
(C1 to C4) of Group C criteria
Total = 100%
Evaluation of the examined areas on a 1 to 10 scale (C1 to C4 sub-criteria)
Group C Sub-criteria and the options for evaluating the examined Areas
Evaluation on a scale of 1 to 10
Selection of examined area
SUB-CRITERIA WEIGHTINGSUB-CRITERIA WEIGHTING – GROUP D
CHOOSE EACH GROUP CRITERION TO
• SET THEIR SUB-CRITERIA WEIGHTS AND
• TO EVALUATE EACH EXAMINED AREA
D1 to D9 sub-criteria weighting (Group D – Operational – General selection criteria Criteria)
Entering the weight factors for each sub-criterion
(D1 to D9) of Group D criteria
The sub-criteria of Group D criteria (D1 to D9)
Total = 100%
Evaluation of the examined areas on a 1 to 10 scale (D1 to D9 sub-criteria)
Evaluation of the examined area based on a scale of 1 to 10
Group D subcriteria (D1 to D9) and the available options for evaluating each examined area based on these criteria
Selection of examined area
SUB-CRITERIA WEIGHTING – GROUP E
CHOOSE EACH GROUP CRITERION TO
• SET THEIR SUB-CRITERIA WEIGHTS AND
• TO EVALUATE EACH EXAMINED AREA
The sub-criteria of Group E criteria (E1 to E5)
Entering the weight factors for each sub-criterion
(E1 to E5) of Group E criteria
Total = 100%
E1 to E5 sub-criteria weighting (Group E – Financial Criteria)
Total = 100%
Evaluation of the examined areas on a 1 to 10 scale (E1 to E5 sub-criteria)
The sub-criteria of Group E criteria
(E1 to E5)
List of available options for evaluating each examined area based on Group E criteria
1 to 10 scale evaluation of the examined area based on Group E criteria
Selection of examined area
W(ij)= [%weight of Group criterion (i) * weight of Sub-criterion(ij)]/10000
Q(ij) = {max[subcriterion (ij)] – min[subcriterion (ij)] }/10,
Where (i) is the chosen group criterion and (j) is the chosen subcriterion
P(ij) = 3 * Q(ij)
Multi-criteria Matrix of Group A criterion
Q/W/P values for group criterion A – More info later on …
Equation for calculating Q/P/W
Examined Areas (Area 1 - Area 7)
Subcriteria of Group A criterion
1 to 10 scale evaluation of the Subcriteria
Graphical illustration of the evaluation of the examined areas for each subcriterion of Group A criterion
Deleting an examined area (Area1 to Area 7)
Deleting the weights (W) of a group criterion
Deleting an examined Area (Area1 to Area7)
Multi-criteria Matrixna to peis me logia sthn epomenh
diafaneia• Group and sub-criteria weighting - determining
the importance of each group and each sub-criterion - DONE
• Evaluation of the examined areas based on a 1 to 10 scale (10 being the maximum value) of the sub-criteria of all Group criteria– Group A (A1 – A15)– Group B (B1 – B16)– Group C (C1 to C4)– Group D (D1 to D9)– Group E (E1 to E5)DONE
MULTICRITERIA ANALYSIS
RANKING potential landfill sites (7)using an appropriate software (Decision Lab)
EVALUATION of potential landfill sites based on the Criteria
Calculation of the Q/P/W multicriteria matrix
Optimum site for landfill construction
(IIa)
(IIb)
(IIc)
(II)
(III)
Landfill Allocation Process
SETTING and WEIGHTING of Criteria
Setting Exclusion Criteria(I)
Multi-criteria Matrix of all criteria (Groups A, B, C, D & E)
Evaluation of the examined areas - 1 to 10 scale for each subcriterion
Multi-criteria Matrix
W(ij)= [%weight of Group criterion (i) * weight of Sub-criterion(ij)]/10000
P(A4) = 3 * Q(A4) = 3 * 0,7 = 2,1
Q(A4) = {max[subcriterion (A4)] – min[subcriterion (A4)] }/10, = (10 – 3)/10 = 0,7
Q/P/W values
Example of W(A4) calculation
Weight of Group A criterion = 30%
Weight of Sub-criterion A4 = 5%
W(A4)= { 30%* 5% } / 10000=0.015
MULTICRITERIA ANALYSIS
RANKING potential landfill sites (7)using an appropriate software (Decision Lab)
EVALUATION of potential landfill sites based on the Criteria set on previous step
Calculation of the Q/P/W multicriteria matrix
Optimum site for landfill construction
(IIa)
(IIb)
(IIc)
(II)
(III)
Landfill Allocation Process
SETTING and WEIGHTING of Criteria
Setting Exclusion Criteria(I)
Setting the Multi-criteria Matrix in the Decision Lab software
Potential Landfill Sites – Areas 1 to 7
Subcriteria
Q/P/W values
MULTICRITERIA ANALYSIS
RANKING potential landfill sites (7)using an appropriate software (Decision Lab)
EVALUATION of potential landfill sites based on the Criteria
Calculation of the Q/P/W multicriteria matrix
Optimum site for landfill construction
(IIa)
(IIb)
(IIc)
(II)
(III)
Landfill Allocation Process
SETTING and WEIGHTING of Criteria
Setting Exclusion Criteria(I)
(IV)
Ranking of potential landfill sites
Ranking Name of Site
Area 2 Oulad Rahmoune
Area 4 Haouzia 1
Area 5 Haouzia 2
Area 6 Haouzia 3
Area 7 Haouzia 4
Area 3 Moulay Abdellah
Area 1 Azemmour