MPWSP Overview Schedule & Update
Presented to: MPWSP Governance CommitteePresented by: Cal AmDate: August 24, 2015
1
3
MW1
MW3
MW4
4
ShallowMedium
Deep
-1’-1.5’
-4’
MPWSP Conveyance Facilities RFQ Results & RFP Schedule
5
6
Conveyance Facilities RFQ Summary• Seven SOQ’s received on July 2 from:
Garney ConstructionGranite Construction Mountain CascadeMonterey Peninsula EngineeringSteve P. RadosRanger PipelinesW.A. Rasic Construction
• CAW Selection Committee evaluated and scored the SOQ’s based on the technical (70%) and financial criteria (30%) identified in the RFQ.
7
Conveyance Facilities RFQ/RFP
• All seven contractors qualified for RFP stage
• Experienced contractors
• RFP distributed on August 17
• Proposals due October 16
MPWSP Conveyance Facilities Procurement Schedule
8
MPWSP Anticipated Schedule
Updated August 18, 2015
June July August Sept Oct Nov DecGC Meeting Dates#
CANRFP
22
RFQ ReleasedSOQ’s
dueJuly 2
SOQ’sEvaluation
&Qualified
Firms Listed
1724 27 24 16 21 18
9
27
8/17
RFP & Draft ContractReleased
RFP docs, draft contracts, technical specs & drawings finalized
RFP
9/3
Pre-proposalMeeting
9/15
Proposer Comments
Due on Draft
Contract
9/30
Revised ContractIssued
10/16
ProposalsDue
10/30
Notificationof Preferred Proposer
CANContract
13
11/13 2016
23
Contract Executed
Late 2015/Early
2016VE Session 2016
RFQ
CANDraft
Contract
GC Input on Draft
Contract
GC Input onContract
MPWSP Production WellsProcurement Schedule
10
MPWSP Anticipated Schedule
Updated August 18, 2015
July Aug Sept Oct Nov Dec JanGC Meeting Dates#
24 16 21 18
11
11
9/25
RFP & Draft ContractReleased
RFP docs, draft contracts, technical specs & drawings
finalized10/23
ProposalsDue
Notificationof Preferred Proposer
11/13 2016
Contract Executed Early Jan
2016
Input onDraft
Contract
2116
8
GCInput oncontract
CAN RFP CAN Contract
18
MPWSP Alternate Pipeline Overview
12
MPWSP Anticipated Schedule
Blue dots are demand centers.
DEIR Proposed mains each end at Eardley Pump Sta. in PG and use existing main to route to ex. 15 MG storage tanks at Forest Lake in PB.
Alternate Main proceeds over Crest and proceeds to existing main in Carmel Valley and also ends at 15 MG storage tanks at Forest Lake in PB.
MPWSP Anticipated Schedule
0
100
200
300
400
500
600
0 2 4 6 8 10 12 14 16 18 20 22 24
Elevation (feet)
Length (miles)
Profiles of Various MPWSP Pipeline Alignments
DEIR Org. Proposed DEIR Alt Route Alternate Route
HGL‐DEIR Alt HGL‐Alternate Route HGL Org. Proposed
15
Pipe Profile Summary
• Existing Pipe (Age, Hydraulics)
• Power Increase
• Leakage
• ASR Injection