My Profile
• Recently joined project… …..But picking it up quickly!
• Professional Mechanical Engineer in CCLRC Technology
– 20 years experience @ RAL
• Worked in all major Engineering areas; – ISIS :MARI spectrometer, experience of beamline design
– Space Science :Thermal & Structural Analysis, Project management
Particle physics : ATLAS Detector, Project Management,
procurement of high stability CF cylindrical structure
![Page 3: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/3.jpg)
3
Contents
• My responsibilities• Current hall tasks: Stairs/shield/platform Trench strengthening• Imminent hall tasks: Wall holes• Magnetic modelling• Fire Safety Approval• Decay Solenoid transport• Central Drawing database• Conclusions
![Page 4: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/4.jpg)
4
Responsibilities
My MICE job• Responsible for Hall Infrastructure
– Mechanical/Civil work• + Associated underlying work e.g. Magnetic
analysis
– Health & Safety e.g. Fire Safety Approval– Provision of Services – water, electric, ventilation
• Responsible for Setting up and monitoring central drawing database at RAL
• Part of Target engineering team (design & test)• Technical Board Secretary
![Page 5: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/5.jpg)
5
Current Hall tasks
• 1) Modifying (Linac side) stairs to reduce width– Drgs out for pricing
• 2) Re-Engineering (control room side) stairs/shield/platform– New set design drgs – awaiting magnetic performance
confirmation
![Page 6: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/6.jpg)
6
Current Hall tasks
• Linac side stairs –Drgs out
![Page 7: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/7.jpg)
7
Current Hall tasks
• Shield Wall (Currently 25mm steel/100mm gap/25mm steel)
Awaiting magnetic confirmation
![Page 8: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/8.jpg)
8
Current Hall tasks
• Trench strengthening– Drgs being prepared– Non-magnetic Al used (supports + covers) near
tracker along to access covers.– Decision to strengthen whole trench since layout still
subject to change• About to tackle:
– Wall holes for cables to MICE LCR– Wall holes for hydrogen area ventilation– Ceiling holes for emergency H2 ventilation
![Page 9: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/9.jpg)
9
Magnetic Modelling
• New magnetic model produced– More user-friendly, Easier to quickly iterate if reqd.– Need to prove shield designs will be effective
– Requirements– Shield ISIS control room– Reduce to safe personnel levels (pacemakers)
• Currently making predictions
![Page 10: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/10.jpg)
10
Magnetic Modelling cont.
![Page 11: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/11.jpg)
11
Magnetic Modelling cont.
![Page 12: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/12.jpg)
12
Magnetic Modelling cont.
![Page 13: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/13.jpg)
13
Fire safety• Fire safety: Discussions started towards getting
approval. – Fire exits defined, checking correct door types– Access routes being checked (minimum width,
hazards)
![Page 14: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/14.jpg)
14
Fire safety 2
• Gap between magnets to be used as emergency access route – signs
• Small/hidden areas of hall to be fenced off• Trench – blocked off with access cover and fixed steel
ladder
![Page 15: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/15.jpg)
15
Decay Solenoid transport
• Current situation: Solenoid on PSI trolley (~14.6 tonnes)
![Page 16: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/16.jpg)
16
Decay Solenoid transport
• Solenoid assy in R55 & very unmanagable
• Need to test solenoid in MICE hall
• Need to work on trolley (wheels etc.)– Temporary Transport frame designed and
almost ready to go out for manufacture.– Mass < 10 tonnes incl lifting frame– Can therefore be moved within MICE hall with
a tandem lift (15 tonnes SWL)
![Page 17: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/17.jpg)
17Decay Solenoid :Temporary transport frame
![Page 18: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/18.jpg)
18
Decay Solenoid:Disassembly and transport
• In-situ disassembly and transport procedure• 1) Tighten centralising cold-mass supports x6• 2) Grind off tack welds, remove end supports• 3) Lead shielding assy off nose• 4) Fit yellow cradles• 5) Fit orange beams• 6) Connect blue lifting beam• 7) Unbolt feet (keep shims)• 8) Lift onto green frame, bolt down re-using shims• 9) Refit lead shield onto nose• 10) Refit modified end supports (bolt holes)• 11) lift onto transport trailer• 12) Take to MICE Hall
![Page 19: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/19.jpg)
19
Drawing database
• Drawing database– Initial discussions started, established some parameters– Need to maintain central database of drawings @ RAL (local to
experiment)– Vital to maintain latest set of drawings (drawing control)– Need for Read access by institutes e.g. Oxford group, Imperial,
etc.
– Proprietary database e.g Intralink probably not suitable
– I’m likely to use FTP site
![Page 20: MICE: Hall Infrastructure](https://reader035.fdocuments.net/reader035/viewer/2022062519/56814e8c550346895dbc2b32/html5/thumbnails/20.jpg)
20
• Conclusions• Mechanical/Civil items moving forward
- Need to maintain momentum• A good scheme for disassembly/transport of decay