Withdrawable switchgear

Medium Voltage Distribution

MCset 1-2-3 17.5 kV

Marine applicationCivil engineering - Installation - Instruction of useApril 2012

Page 2: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV
Page 3: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 1

Content

General 3Glossary 3Symbols 3Recommendations 4Standard tightening torques 4List of bags and accessories 5

Civilengineering

Content 6

Dimensionsandweights 7AD, CL-GL, TT cubicles (SF6 technology) 7Cubicle fitted with IPX1/ IPX2 roofs 8Transition enclosure MTP (Motorpact transition enclosure) 8

Spacetobeprovidedaroundaswitchboard 9Middle of the room mounting 9Installation against a wall 9Civil engineering with maintenance space 10Transition enclosure MTP (Motorpact transition enclosure) 10Switchboard location in the installation room 11Position of MV cables 12MOTORPACT cubicle 13

Floorfinishingandsupportmembersfastening 14Floor finishing 14Summary of different mounting methods 14

IncomingconfigurationofMVcables 15General information 15Civil engineering with maintenance space 15

Installation

Content 16

Cubiclepackaging 17Cubicle unit packing 17

Handlinginstructions 18Land packaging 18Ocean shipment packaging 18Handling using a sling 18Handling by rolling 19Storage 19

Installationandoperationrecommendation 20

Installationinstructions 21Unpacking cubicles 21Placing cubicles in a switchboard 21Surface condition 22Floor quality 22Cubicle fastened on rails 22Linking two cubicles 23Assembling a MOTORPACT cubicle / MTP transition enclosure 24Rack-in check 25Removing the mobile part transport fixations 25Installing the electric connections of the busbars and MV cables 26Installing the main earth connection 28

Page 4: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

2 BBV19342.inddversion 02

Content

Installing busbars 29Installing busbars between MTP and the MOTORPACT cubicle 32Placing MV cables on AD cubicle 34MV cable screen earthing 40LV cable routing and connection 41Installing the tunnels 43Installing the end sheets 48

InstallationofaFUequippedwithelectromagneticlockingoptions 51Earthing switch with electromagnetic locking 51Rack-in prevention with electromagnetic locking 52Prior to installing the front panels 52

Stepstobetakenfortestsandinspection 53Power frequency dielectric test 53

Testsonsite 54Checking and cocking the internal arcing detector 54

Instructionofuse

Content 55

Generaldescription 56Warning for readers 56AD cubicle 56TT1, TT2 cubicles 57CL-GL cubicles 57Withdrawable mobile part 58Identification 60Read the inscriptions on the front panel 60

InstructionsforaccesstotheinsideofaADcubicle 62AD cubicle 62Removing front protection cover plates 63Removing the MV compartment separation sheet 64Removing the manhole sheet 65Removing and inserting fixed or withdrawable VTs 65Removing the stop arc sheet in the cable compartment 66Accessing busbars 66Accessing the main contacts 67

Stepsforthetests 68Voltage presence on MV cables 68MV cable tests 68

OperatingInstructions 70Extracting or inserting the mobile part 70Racking-in the mobile part 75Racking-out the mobile part 76Closing the earthing switch 77Opening the earthing switch 79Racking-in VT fuses 81Racking-out VT fuses 82Preventing access using padlocks 83Locking with key locks (option) 85Locking with electromagnet (option) 86

Correctivemaintenance 87Replacement of VT box fuses 87

Index 89

Page 5: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 3

Open earthing switch mechanical indicator.

Operation position.

Rack-in or racked-out position.

Rack-in prevention position. Locking possible.

SMALToperation

Symbols

Note:this document is available for all the MCset 1-2-3 units ordered from the 1st of October 2008.

Glossary

General

Position can be locked using padlocks.

Closed earthing switch mechanical indicator.

MobilepartLF SF6 withdrawable circuit breaker which is used in AD

and CL cubicles

ERT Tool to remove/insert the mobile part from the switchgear. The tool allows to place the mobile part on the floor.

UF FunctionnalUnit(cubicle+mobilepart+Sepam)AD Incoming / feeder cubicle

CL-GL Withdrawable line coupling cubicle

TT Measurement and busbar earthing cubicle

MTP Transition enclosure between an MCset cubicle and a MOTORPACT cubicle

SwitchgearanddefinitionsVT Voltage transformer

CT Current transformer or current sensor

VPIS Voltage Presence Indicating System

LV Low voltage

MV Voltage class, including levels 7.2 - 12 and 17.5 kV

SMALT Earthing switch

Page 6: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

4 BBV19342.inddversion 02

Insertion / extraction position.

“Racked-out” position.

“Racked-in” position.

Operation position.Mobilepartoperation

General

Applicationmethods:

The elastic washers placed on the external sides of the connections and busbars ensure better distribution of stress induced by the screw torque.

Screw TorqueinNmØ 6 13

Ø 8 28

Ø 10 50

Ø 12 75

Ø 14 120

(Nongreasedscrewsandbolts)

Standardtighteningtorques

All installation of equipment, such as lights is forbidden to avoid walking on the switchgears roof to replace them.

Installationabovetheswitchboard

The ceiling must be 2.6 m high for a small tunnel and 2.8 m high for a tall tunnel.

Accordingtoswitchboardconfiguration,externalextractionmayberecommended(consultus).Thefollowingconstraintshavetobeconsidered:-Exhaustductasbigaspossible,-Exhaustductdirectedtowardsthetop.

Height(H)ofceilingforinstallationofananti-arcIPX1orIPX2tunnel

Recommendations

It is compulsory forbidden to remove the parts with this label when the equipment is energised.

It is compulsory forbidden to walk on the parts with this label.

Marking

Page 7: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 5

General

Package(Optional) ContentTestsandinspection - Manual earthing kit

Spareparts - Fuses

Optionalaccessories - 1 busbar earthing truck- 1 phase balance testing device- 1 I and U test bar- 1 tunnel closure kit- 1 mobile part extraction tool (ERT or extraction table)

Package ContentSwitchboardendandfixing - Switchboard end sheets

- Fixing columns- Bag of screws and bolts - Wiring collector external closure

Mobileparttools - 3 cubicle operation cranks- 10 mm2 wire- 1 earth fishplate and seal

Tunnelsforthewholeswitchboard

- Tunnels- Bag of screws and bolts

Cubicleunitpackingorswitchboardassembledwithouttunnels

Listofbagsandaccessories

Packingofassembledswitchboardwithtunnels

Package(Optional) ContentTestsandinspection - Manual earthing kit

Spareparts - Fuses

Optionalaccessories - 1 busbar earthing truck- 1 phase balance testing device- 1 I and U test bar- 1 tunnel closure kit- 1 mobile part extraction tool (ERT or extraction table)

Package ContentSwitchboardendandfixing - Switchboard end sheets

- Fixing columns- Bag of screws and bolts - Wiring collector external closure

Mobileparttools - 3 cubicle operation cranks- 10 mm2 wire- 1 earth fishplate and seal

Page 8: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

6 BBV19342.inddversion 02

CivilengineeringContent

Dimensionsandweights 7AD, CL-GL, TT cubicles (SF6 technology) 7Cubicle fitted with IPX1/ IPX2 roofs 8Transition enclosure MTP (Motorpact transition enclosure) 8

Spacetobeprovidedaroundaswitchboard 9Middle of the room mounting 9Installation against a wall 9Civil engineering with maintenance space 10Transition enclosure MTP (Motorpact transition enclosure) 10Switchboard location in the installation room 11Position of MV cables 12MOTORPACT cubicle 13

Floorfinishingandsupportmembersfastening 14Floor finishing 14Summary of different mounting methods 14

IncomingconfigurationofMVcables 15General information 15Civil engineering with maintenance space 15

Page 9: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 7

DimensionsandweightsCivil engineering

Cubicleswith1or2CTperphase,internalarcingwithstandon4sides

AD,CL-GL,TTcubicles(SF6technology)

Dimensions AD1 AD2 AD3 CL1 CL2 CL3 TT1 TT2(2500A) (3150A) (2500A) (3150A)

Width(mm)L 570 700 900 900 570 x 2 700 x 2 900 x 2 900 x 2 570 570

Cubicleheight*(mm)H1 2300 2300 2300 2300 2300 2300 2300 2300 2300 2300

Totalheight*(mm)H2Smalltunnel 2530 2530 2530 2530 2530 2530 2530 2530 2530 2530

Totalheight*(mm)H2Talltunnel 2732 2732 2732 2732 2732 2732 2732 2732 2732 2732

Depth(mm)P 1725 1725 1725 1725 1725 1725 1725 1725 1725 1725

Weight**(kg) 900 1050 1350 1750 700 x 2 800 x 2 900 x 2 1300 x 2 550 600

Weight(kg)ofVTcompartment 120 130 130 130 120 130 130 130 120 130

* This dimension excludes cable flanges.** Maximum weight fully equipped excluding tunnel.

Page 10: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

8 BBV19342.inddversion 02

Dimensionsandweights

TransitionenclosureMTP(Motorpacttransitionenclosure)

Dimensions MTP1250A 2500A 3150A

Width(mm)L 375 375 375

Cubicleheight(mm)H1 2300 2300 2300

Totalheight(mm)H2Smalltunnel 2530 2530 2530

Totalheight(mm)H2Talltunnel 2732 2732 2732

Depth(mm)P1 1665 1665 1665

Depth(mm)P2 2335 2335 2335

Weight(kg) 240 275 310

Thisgutterisfactory-mountedtotherightorleftofanMCsetcubicle(dependsonswitchboardconfiguration).

Dimensions AD1IPX1 AD1IPX2

Width(mm)L 570 570

Cubicleheight*(mm)H1 2300 2300

Totalheight*(mm)H2Smalltunnel 2530 2530

Totalheight*(mm)H2Talltunnel 2732 2732

Depth(mm)P 1815 2485

* This dimension excludes cable flanges.

Cubicle fitted with IPX1/ IPX2 roofs

(e.g.:AD1withinternalarcingwithstandon4sides)

Civil engineering

Page 11: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 9

Civil engineering Spacetobeprovidedaroundaswitchboard

Middleoftheroommounting

A: at least 70 mm space under ceilingB: cubicle height with tunnel: 2530 mm (small tunnel) or 2732 mm (tall tunnel)C: the maximum height of the switchboard support (skids or rails)must be 340 mm to allow the insertion/extraction of the mobile part with the ERT.

A: at least 70 mm space under ceilingB: cubicle height with tunnel: 2530 mm (small tunnel) or 2732 mm (tall tunnel)C: the maximum height of the switchboard support (skids or beams) must be 340 mm to allow the insertion/extraction of the mobile part with the ERT.D: rear space of at least 200 mm.

Installationagainstawall

Page 12: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

10 BBV19342.inddversion 02

Spacetobeprovidedaroundaswitchboard

Civil engineering

AD1,AD2,AD3

Civilengineeringwithmaintenancespace

A: access to roomB: main earth busC: reserved floor space, if necessary, for routing of LV cablesD: reserved floor space for routing of MV cablesE: MV cable clamps.

A: access to roomB: main earth busC: reserved floor space for routing of MOTORPACT(1) MV cablesD: reserved floor space for routing of MCset 1-2-3 MV cables

(1) For more details see the “MOTORPACT civil engineering guide: 46032-700-07A”.

(*)Minimumdimension(inmm): This passageway is necessary to remove a cubicle.The depth of the maintenance space must respect the bending radius of the cables used.

(*)Minimumdimension(inmm): This passageway is necessary to remove a cubicle.The depth of the maintenance space must respect the bending radius of the cables used.

TransitionenclosureMTP(Motorpacttransitionenclosure)

Page 13: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 11

(*): minimum dimension (in mm)(1): AD1, CL1, TT1(2): AD2, TT2, CL2, DI2(3): AD3, CL3.

The L dimension is a function of the functional units making up the switchboard.

Spacetobeprovidedaroundaswitchboard

Civil engineering

A: this dimension must be equal to: - 1600 mm* for operation (extraction and positioning of moving parts)

B: this dimension must be equal to: - 800 mm* for a 900 mm long FU at the end of the switchboard - 500 mm* for all other FUs.

C: this dimension must be equal minimum to 200 mm

D: access to room

E: main earth bus of switchboard

F: closing plates.

Switchboardlocationintheinstallationroom

Page 14: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

12 BBV19342.inddversion 02

Spacetobeprovidedaroundaswitchboard

MaximumØexternalcables:Single-pole Ø 70 mm Three-pole Ø 90 mm.

PositionofMVcables

AD1

AD2

AD3(1250A)

AD3(2500A)

MaximumØexternalcables:Single-pole Ø 70 mm Three-pole Ø 90 mm.

MaximumØexternalcables:Single-pole Ø 70 mm Three-pole Ø 90 mm.

MaximumØexternalcables:Single-pole Ø 70 mm Three-pole Ø 90 mm.

Civil engineering

Page 15: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 13

Spacetobeprovidedaroundaswitchboard

MaximumØexternalcables:Single-pole Ø 70 mm Three-pole Ø 90 mm.

See “MOTORPACT civil engineering guide: 46032-700-07A”.MOTORPACTcubicle

AD3(3150A)

Civil engineering

Page 16: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

14 BBV19342.inddversion 02

Summary of different fixation types

The floor must have a compression withstand u33 MPa to roll the extraction tool on it without any damage.

FloorStrength

Floor flatness is such that a 2 meter rule moved over all surfaces and in all directions, does not display a difference of more than 5 mm.

Surfacecondition

Floor finishing

Civil engineering Floor finishing and support membersfastening

Railsfastenedonthefloor

Skidfastenedonthefloor

By screws. By bolts. By welding.

By screws. By bolts. By welding.

Page 17: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 15

Incoming configuration ofMVcables

Intended for cables up to 240 mm².

Not recommended for 630 mm² cables.

MVcablesincoming

Civilengineeringwithmaintenancespace

Some recommendations are given below.

Other incoming configurations are possible, particularly if there is greater clearance under the FUs.

Note: if the cable box is used, adapt the depth of the maintenance space.

Should you have questions concerning a configuration, contact your nearest SchneiderElectric representative.

The civil engineering execution and the installation of MV cables must take several inputs into account:

- The bending radius of the cables- Cable slack to push and pull them- Cable handling, according to incoming configurations and free cable length from its point of insertion in the maintenance space.

Generalinformation

Civil engineering

Conductorcrosssection Conductordiameter Minimumbendradiusafterassembly

1 x 240 mm² 45 mm 600 mm

3 x 240 mm² 90 mm 1500 mm

1 x 630 mm² 65 mm 1000 mm

Indicativedimensionsofunshieldedmedium-voltage(MV)drycables:

Note: the dimensions indicated can be greater in the case of shielded medium voltage (MV) dry cables.

Page 18: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

16 BBV19342.inddversion 02

Cubiclepackaging 17Cubicle unit packing 17

Handlinginstructions 18Land packaging 18Ocean shipment packaging 18Handling using a sling 18Handling by rolling 19Storage 19

Installationandoperationrecommendation 20

Installationinstructions 21Unpacking cubicles 21Placing cubicles in a switchboard 21Surface condition 22Floor quality 22Cubicle fastened on rails 22Linking two cubicles 23Assembling a MOTORPACT cubicle / MTP transition enclosure 24Rack-in check 25Removing the mobile part transport fixations 25Installing the electric connections of the busbars and MV cables 26Installing the main earth connection 28Installing busbars 29Installing busbars between MTP and the MOTORPACT cubicle 32Placing MV cables on AD cubicle 34MV cable screen earthing 40LV cable routing and connection 41Installing the tunnels 43Installing the end sheets 48

InstallationofaFUequippedwithelectromagneticlockingoptions 51Earthing switch with electromagnetic locking 51Rack-in prevention with electromagnetic locking 52Prior to installing the front panels 52

Stepstobetakenfortestsandinspection 53Power frequency dielectric test 53

Testsonsite 54Checking and cocking the internal arcing detector 54

InstallationContent

Page 19: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 17

Package Content

1 Screwsandboltsfor:- Cubicle fastening on civil engineering works- Busbar fastening- Intercubicle fastening - Coupling gaskets

Package(maybesupplied)- Busbar shims - Lock associated with the cubicle - Lock unit

2 Cablefastening(ADcubicle) - Flange supports - Flanges

Cablefloor- Bottom plates- Bottom closure- Cable support sleeves - Bag of screws and bolts

Package(maybesupplied) - Zero frequence toroids- Locking unit (if it exists) - 3 surge arrester links

3 - Busbars - Cable connection brackets

4 - Busbar covers

CubiclepackagingInstallation

Cubicleunitpacking

Page 20: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

18 BBV19342.inddversion 02

Landpackaging

FunctionalUnit

Oceanshipmentpackaging

Functionalunit

Handlinginstructions

Cubiclespackedbythrees

Handlingusingasling

FUwithcircuit-breaker

Installation

Assembledswitchboard

Page 21: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 19

Storage

Longstorage

Storethedevicesintheiroriginalpackaging,placedondrygroundoronamaterialinsulatingitfromhumidity.

Handlingbyrolling

After long storage, clean insulating parts before operation.

HandlinginstructionsInstallation

Page 22: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

20 BBV19342.inddversion 02

Installationandoperationrecommendation

Operationandmaintenance

Needforgoodimplementationofcable-endrestoration:

New cold retractable or slip-on technology offers ease of installation that favours resistance over time.

Their design allows them to used in polluted environments with harsh climatic conditions.

Impactoftherelativehumidityfactor:

Installing a heating device is essential in climates with high relative humidity levels and major temperature differences.

Theswitchgear’sresistancetoageinginanMVsubstationdependson3mainfactors:

Ensure that draughts and / or thermal shocks are avoided in all cubicle compartments in order to avoid the creation of dew points (sources of partial discharges).The equipment must be installed in conformity with the relevant IEC standard. Outside of these normal usage conditions, we recommend contacting Schneider Electric to determine the operations to be carried out as well as their frequency according to the actual service conditions.

Ventilationcontrol:

Grid size must be suited to the power dissipated in the substation. These grids must be placed exclusively in the vicinity of the transformer, in order to avoid air circulation on the LV switchboard.

Installation

Itisstronglyadvisedtoperiodicallycarryout,afewoperationcyclesonoperatingdevices.

Outsidenormalconditionsofuse,(between-5°Cand40°C,absenceofdust,corrosivegas,etc.),itisrecommendedtoexamine,withourSchneiderElectricservicescenter,thestepstobetaken,inordertoensurecorrectoperationoftheinstallation.

Ourservicecenterisatyourdisposalatanytime:

- To diagnose the installation,

- To offer suitable maintenance operations,

- To offer maintenance contracts,

- To offer adaptations.

See the Maintenance guide (DEAI03).

Page 23: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 21

Installationinstructions

Assembling,adjustingandfastening

Placingcubiclesinaswitchboard

Thepreparationofcubiclesmustbecarriedoutonthepremiseswheretheywillbeinstalled.

Removethe4handlinglugs(1and2).

The circuit-breakers are delivered in cubicles in a racked-out position.

Unpack the functional unit by removing the wooden frame (8 screws), then the plastic cover.

Remove the cubicle packaging.

Unpackingcubicles

Note: place switchboard cubicles according to front panel drawings and the single-line diagram.

Start by placing the cubicle located in the middle of the switchboard (except in the case of an extension of the existing switchboard) then place the cubicles on either side of it, according to the Civil Engineering Guide indications.

Note: placing can be carried out by rolling or lifting.

Placingabovethemaintenancespace

Installation

Donotremoveanypartofthecubicle.

ToavoiddamagingtheFUfrontpanelcomponents,leavetheprotectionfoaminplaceuntiltheswitchboardisintheoperationphase.

Page 24: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

22 BBV19342.inddversion 02

InstallationinstructionsInstallation

The floor must have a compression withstand u 33 MPa to roll the extraction tool on it without any damage.

Floorstrength

Floor flatness is such that a 2 meters rule moved over all surfaces and in all directions, does not display a difference of more than 5 mm.

Surfacecondition

Cubiclefastenedonrails

Fixationatthefrontofthecubicle

Fixationattherearofthecubicle

Note: remove the front panel if the cubicle is fitted with VT, it is first necessary to remove them, see the chapter “Instructionsforaccesstotheinteriorofacubicle”.

Place the screws and tighten them.Pick from the two hardware bags B and C.

Pick from the two hardware bags A and B.

Place the screws and tighten them.

Page 25: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 23

Installationinstructions

Place the self-adhesive inter cubicle gasket along the full height of the right side of the cubicle, except on the top wireway of the cubicle.

This operation is not necessary for the cubicle at the right extremity of the switchboard.

Install the second cubicle on the floor as described before.

Assemble the 2 cubicles together (11 fastening points).

Installingtheintercubiclegasket

Linkingtwocubicles

Installation

Accesstothefasteningpoints:See chapter ”Instructionsforaccesstotheinteriorofacubicle” and the chapter ”Removingthemobileparttransportationdevices”.

Assemblingcubicles

C: assembly of HM6 x 16 screws + M6 washers and HM6 nut + M6 washers.

A: assembly of HM8 x 30 screws + M8 washers and HM8 nut.

B:assembly of HM8 x 16 screws + M8 washers and M8 cage nuts.

Theliftingringsanditsassociatedcagenutsmustberemoved.

AFLRInternalArcoption:

D: assembly of 6 screws H M8 + M8 washers + HM8 nuts + M8 washers.

Page 26: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

24 BBV19342.inddversion 02

Installationinstructions

AssemblingaMOTORPACTcubicle/ MTP transition enclosure

Left-handassembly

Right-handassembly

Implementation:

1: disassemble the transition enclosure front Eand rear panel2: open the top and bottom front doors of the Motorpact3: remove the central front cover D of Motorpact by removing the 4 screws4: remove the rear panels of the Motorpact compartments: see manual (46032-700-08), Installationguide5: install screws A, nuts B and washers C as shown opposite.

Installation

Page 27: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 25

InstallationinstructionsInstallation

1: remove the 2 transport fixations(3 screws per fixation)

2: place the 4 screws and washers to fix the CB front cover. Tighteningtorque:8.5Nm.

3: remove the warning label:

To extract the mobile part and to open the door, refer to operating manual in the chapter on “Operatinginstructions”.The operations described here after, must only be carried out once the cubicle has been placed and secured on the floor.

Removingthemobileparttransport fixations

1: remove the 2 transport fixations(3 screws per fixation)

2: place the 4 screws and washers to fix the CB front cover. Tighteningtorque:8.5Nm.

3: remove the warning label:

1: remove the front panel screws2: extract the circuit breaker (out of the cubicle)3: remove the top fixation with access via the LV compartment4: remove the fixation circuit breaker.Tighteningtorque:8.5Nm.5: remove the warning label:

For the insertion and rack-in of the mobile part as well as closing the door, refer to the operating manual (07897302) in the chapter on“Operatinginstructions“.

Each time a cubicle is linked to another one, check that the mobile can beracked-in and locked in position properly.

Rack-incheck

Donotoperatethemobilepartsbeforeremovingthetransportfixations.

OnLFcircuitbreaker

OnaROLLARCcontactor

OnanEVOLIScircuit-breaker

Page 28: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

26 BBV19342.inddversion 02

CubicleADandCLwithoutVT

Note: to carry out the following preliminary switchboard operations see chapter “Instructionsforaccesstotheinteriorofacubicle”.

Connectionmaintenance:

During downtime, check the connection torquewithatorquewrench.

In the case of disassembly, change the elastic washers.

Assemblies with bolts for MV and LV internal equipment.

Screwsandboltstobeused:

Class 8.8 according to standard NF E 27 005, i.e. an elastic limit, Re 630 Mpa.

Generalinformation

InstallingtheelectricconnectionsofthebusbarsandMVcables

Preliminaryoperationstobecarriedout

Placingbusbars

PlacingMVcables

Extraction of the mobile part (Optional)

Close the earthing switch

Remove the front panel protective cover plates

Remove the separation sheet from the MV compartment

(Optional)

Remove the busbar access sheet

Remove the manhole sheet

Preliminaryoperationstobecarriedout

Placingbusbars

PlacingMVcables

Extraction of the mobile part (Optional)

Close the earthing switch

Remove the front panel protective cover plates

Remove the fixed VTs

Remove the separation sheet from the MV compartment

(Optional)Remove the busbar access sheet

Remove the manhole sheet

CubicleADandCLwithfixedVT

InstallationinstructionsInstallation

Page 29: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 27

Installationinstructions

TTcubiclewithwithdrawableVT

TTcubiclewithfixedVTs

CubicleADandCLwithwithdrawableVT Preliminaryoperationstobecarriedout

Placingbusbars

PlacingMVcables

Extraction of the mobile par (Optional)

Withdraw the VT fuses

Close the earthing switch

Remove the front panel protective cover plates

Remove the withdrawable VTs

Remove the separation sheet from the MV compartment

(Optional)

Remove the busbar access sheet

Remove the manhole sheet

Preliminaryoperationstobecarriedout

Placingbusbars

PlacingMVcables

Remove the front panel protective cover plates

Remove the fixed VTs

Remove the separation sheet fromthe MV compartment

(Optional)

Remove the busbar access sheet

Remove the manhole sheet

Preliminaryoperationstobecarriedout

Placingbusbars

PlacingMVcables

Withdraw VT fuses

Close the earthing switch

Remove the front panel protective cover plates

Remove withdrawable VTs

Remove the separation sheet from the MV compartment

(Optional)

Remove the busbar access sheet

Remove the manhole sheet

Installation

Page 30: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

28 BBV19342.inddversion 02

Installationinstructions

Connect the earth bar to the building’s earth at the end of the switchboard, on the right and on the left, place the specific link with the oblong hole inside the cubicle. Tightenwithatorqueof28Nm.

Note: during the installation of the end sheetspunch the knock-outs from the sheets.

For a switchboard with a MOTORPACT cubicle at the end, refer to MOTORPACT installation manual ref. 46032-700-08.

Fromtheswitchboardtothebuilding’searth

Place the bolt and tighten it.UseonlyscrewsHM8x30. 28Nmtighteningtorque.

Stick the gasket onto the cubicle sheet as shown in A.

Install the link by sliding it from cubicle 2 to cubicle 1.

Pick the self adhesive gasket from the hardware bag.

Place this gasket around the link.

A: located at the base of the cubicleB: located in the middle of the cubicle.

Inter-cubicles

Installingthemainearthconnection

Installation

Note: this connection can be done during the installation of each cubicle or at the end of switchboard assembly.

For a switchboard with a MOTORPACT cubicle at the end, refer to MOTORPACT installation manual ref. 46032-700-08.

Page 31: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 29

Installationinstructions

A: top view of busbarsB: 1 x (100 x 8) bar per phase C: nutD: conical contact washerE: flat washer F: M10 x 40 screws.

1250Abusbars

Principleofassemblingbusbars

Installation

Place the busbar between the 2 previously assembled cubicles (refer to chapter on “Principleofassemblingbusbars”).

Tighten the fixation screws from the head side.50Nmtighteningtorque.

Repeattheseoperationseachtimeaswitchboardcubicleisplaced.

This connection is done during the installation of each cubicle.

Access the busbars through the cubicle side. If this is not possible, access through the interior of the cubicle (refer to chapter on “Instructionsforaccesstotheinteriorofacubicle”).

Retrieve; - The main busbar in the cubicle packaging- The busbar shims and hardware bag in the cubicle packaging.

Installingbusbars

Page 32: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

30 BBV19342.inddversion 02

Installationinstructions

3150Abusbars

E: flat washerF: M10 x 55 screwsG: 3 hole shim H: 6 hole shim.

A:top view of busbarssB: 2 x (100 x 8) per phaseC: nut D: conical contact washer

2500Abusbars

E: flat washerF: M10 x 70 screwsG: 3 hole shim H: 6 hole shim.

A:top view of busbarssB: 3 x (100 x 8) per phaseC: nut D: conical contact washer

Installation

Page 33: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 31

Installationinstructions

3600 A / 4000 A busbars

Retrieve: from package 4 of the cubicle packaging, the covers.Coverassemblyprinciple(dependingonneeds)

Close the covers on the bars.Place the half-covers on the main busbar connections.

Close the covers on the bars by tightening the wire ties through the notches.

Assemblingthecoverswithclips

Mountingthecoverswithwireties

Place the half-covers on the busbar connection.

A:top view of busbarsB: 4 x (100 x 8) per phaseC: nut D: conical contact washerE: flat washerF: M10 x 85 screws (special)G: 3 hole shim H: 6 hole shim.

Installation

Page 34: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

32 BBV19342.inddversion 02

InstallingbusbarsbetweenMTPandtheMOTORPACTcubicle

1250Abusbars

2500Abusbars

A: nutB: contact washerC: flat washerD: M10 x 40 screwsE: 1 x (76 x 9,5) per phaseF: 2 holes shimG: M10 x 60 screwsH: 1 hole shim.

Note: for phase 3, the connection bar on the transition enclosure side is fastened to an insulator support.

Installationinstructions

A: nutB: contact washerC: flat washerD: M10 x 55 screwsE: 2 x (76 x 9,5) per phaseF: 1 hole shimG: M10 x 70 screws.

Note: for phase 3, the connection bar on the transition enclosure side is fastened to an insulator support.

MOTORPACTtotheright

MOTORPACTtotheleft

MOTORPACTtotheright

MOTORPACTtotheleft

Installation

Page 35: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 33

Installationinstructions

3150Abusbars

A: nutB: contact washerC: flat washerD: M10 x 70 screwsE: 3 x (76 x 9,5) per phaseF: 1 hole shimG: M10 x 80 screws.

Note: for phase 3, the connection bar on the transition enclosure side is fastened to an insulator support.

Optionalinsulatedbusbars

For cover assembly, refer to the chapter“Covermountingprinciple”.

MTP-Topviews

Assemblingthecovers:

A: install a wire tie around the busbar, inside the cover (used to block the cover in position)

B: close the cover with wire ties

C: close the cover with the clips

D: fit the entire cover assembly with clips.

MOTORPACTtotheright

MOTORPACTtotheleft

Installation

Page 36: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

34 BBV19342.inddversion 02

Successively assemble, after having installed a row of cables:

- Cable support

- Flanges

- Floor plates.

MVcablemaintenance

An explanation is given for all types of cables.

Retrieve: from package 2 of the cubicle packaging, floor plates, cable support and hardware bag.

A: 3 single-pole cablesB: 1 tri-pole cable.

To access the interior of a cubicle (see chapter “Instructionsforaccesstotheinteriorofacubicle ”)

Generalinformation

PlacingMVcablesonADcubicle

Reassemble bottom plates.

Fill in the openings that have not been used with uncut cable glands.

Fix the flange support under the cubicle floor and block the cables with half-flanges.

Makesurethatthecabledielectricinsulationdoesnotcontactanygroundedmetalpartsorotherphases.

Thegroundedmetallicsupportmustbeincontactwiththeexternalprotectivecablesheath.

Refertomanufacturerinstructionsforcabletermination.

Install them around the cables.Cut cable glands according to the number and diameter of cables.

Installationinstructions

Cableterminationheight Typeofcubicle Configuration H(mm)

AD1-AD2 630 A LV toroids 621

1 set of 3 CTs 540

2 sets of 3 CTs 507

1250 A LV toroids 621

1 set of 3 CTs 525

2 sets of 3 CTs 507

AD3 1250 A 1 set of 3 CTs 525

2 sets of 3 CTs 507

2500 A 1 set of 3 CTs 405

2 sets of 3 CTs 405

3150 A 1 set of 3 CTs 383

Installation

Fixtheflangesupportunderthefloor,afterplacingthecablesverticaltotheirattachmentbracket.

Onlyqualifiedpersonnelaretoperformcableterminationsandcableinstallation.Workersmustbeawareandunderstandthehazardsinvolvedinworkingwithmediumvoltagecircuits.Neglectingfundamentalinstallationrequirementsmayleadtopersonalinjury,aswellasdamagetoelectricalequipmentorotherproperty.

Page 37: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 35

Installationinstructions

TighteningtorqueB:50NmE:20Nm.

Carry out the operations in the reverse order of removal.

1: remove the busbar surge arrester connection2: remove the insulator support.

Removing

Surgearrester

Installing

Installation

Thisoperationmustonlybecarriedoutafterdielectrictests,andbeforetheconnectionofmediumvoltagecablestotheFU.

Seechapter“PlacingMVcablesonADcubicle”.

InthecaseofanAD1orAD2cubiclefittedwithasurgearrester,accesstothecablecompartmentthroughthefrontrequiresremovalofthesurgearresterassembly.

Page 38: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

36 BBV19342.inddversion 02

InstallationinstructionsInstallation

Drill a hole in the bars according to the cable heads to be connected.

Remove the bars.

AD3,1to4cablesperphase

B:50Nmtighteningtorque.

Note: assembly sequence of the bolts for the bracket: 1: M10 x 30 screws2: M10 washer 3: M10 nuts.

Drill a hole in bracket A according to the cable head to be connected.

Place and fix bracket A.

An explanation is given for one phase.

Do the same for the two other phases.

Retrieve: in the cubicle packaging, the bracket and the hardware.

Connect the cables.Applystandardtighteningtorquedependingonthediameterofthebolt.

The cable support is installed after the row of cable is installed (see chapter on “MVcablemaintenanceonADcubicle”).

Dielectrictestsmustbecarriedoutbeforeconnectingthesurgearresters.

For the connection of surge arresters, refer to chapter on “Surgearresters”.

Place and fix brackets A,CandD.

B:50Nmtighteningtorque.

Connect the cables.Applystandardtighteningtorquedependingonthediameterofthebolt.

The cable support is installed after the row of cable is installed (see chapter on “MVcablemaintenanceonADcubicle”).

Dielectrictestsmustbecarriedoutbeforeconnectingthesurgearresters.

For the connection of surge arresters, refer to chapter on “Surgearresters”.

AD1andAD2,1,2or3cablesperphase

Single-poleorthree-polecablewithouttoroidTC

Page 39: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 37

InstallationinstructionsInstallation

Put back the bars with new washers. Installthecablelugsinsidethebarsandplacethescrewheadoutsidethebars.Applystandardtighteningtorquedependingonthediameterofthebolt.

A: screwB: washerC: nutD: lug.

Dielectrictestsmustbecarriedoutbeforeconnectingthesurgearresters.

For the connection of surge arresters, refer to chapter on “Surgearresters”.Tighteningtorque:B:50NmE:20Nm.

Put back the bars with new washers. Installthecablelugsinsidethebarsandplacethescrewheadoutsidethebars.Applystandardtighteningtorquedependingonthediameterofthebolt.

A: screwB: washerC: nutD: lug.

Dielectrictestsmustbecarriedoutbeforeconnectingthesurgearresters.

For the connection of surge arresters, refer to chapter on “Surgearresters”.

Tighteningtorque:B:50NmE:20Nm.

Drill a hole in the bars according to the cable heads to be connected.

Remove the bars.

AD3 3150 A/ 4000 A up to 8 cables perphase

Page 40: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

38 BBV19342.inddversion 02

InstallationinstructionsInstallation

Connect the cables on the link.

Applystandardtighteningtorquedependingonthediameterofthebolt.

The cable support is installed after the row of cable is installed (see chapter on “MVcablemaintenanceonADcubicle”).

Note:assembly sequence of the bolts for the cable heads:

1: M10 x 30 screws2: M10 washers3: M10 nuts.

Place phase 2 cable in the toroid.

The explanation is given for one phase.

Do the same for the two other phases.

AD11cableperphase

Place and fix link A. 50Nmtighteningtorque.

Note: assembly sequence of the bolts for the link:1: M10 x 30 screws2: M10 washers3: M10 nuts.

Drill a hole in link A according to the cable head to be connected.

The explanation is given for one phase.

Do the same for the two other phases.

Retrieve: in package of the cubicle packaging,links A and hardware.

AD1andAD2,1or2cablesperphase

Single-polecablewithtoroidCToncubicleAD1andAD2

Page 41: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 39

Place the cables through the toroids.AD21cableperphase

Installationinstructions

Note: assembly sequence of the bolts for the cable heads:1: M10 x 30 screws2: M10 washer3: M10 nuts.

Connect the cables.

Applystandardtighteningtorquedependingonthediameterofthebolt.

After having installed a row of cables, then assemble the support flange (see chapter on “MVcablemaintenanceonADcubicle”).

Place the cables through the toroids.AD22cablesperphaseAD32cablesperphase

Note: assembly sequence of the bolts for the cable heads:1: M10 x 30 screws2: M10 washer3: M10 nuts.

Connect the cables.

Applystandardtighteningtorquedependingonthediameterofthebolt.

Dielectrictestsmustbecarriedoutbeforeconnectingthesurgearresters.

After having installed a row of cables, then assemble the support flange (see chapter on “MVcablemaintenanceonADcubicle”).

Page 42: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

40 BBV19342.inddversion 02

The braid earth connection is done on the switchboard earth bars inside the maintenance space.Example: one cable per phase, 3 braids to be connected. Two cables per phase,6 braids to be connected.

In all cases, the MV cable screen braids must be insulated and go through the zero frequence toroid before connection to the switchboard’s earth.

Exampleofcableinstallation:A: 1 three-pole cable 1 cable per phase 3 earthing braids

B: 2 three-pole cables 2 cables per phase 6 earthing braids

C: 3 single-pole cables 1 cable per phase 3 earthing braids D: 6 single-pole cables 2 cables per phase 6 earthing braids.

Forzerofrequencetoroid

In all cases, the insulated MV cable screen braids must go through the toroids before connection to the switchboard main earth bar.

The braid connection is done inside the cubicle.

Forsingle-poleortwo-poletoroidCT

MVcablescreenearthing

InstallationinstructionsInstallation

Page 43: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 41

2versionsoftopwireway:StandardheightLVbox

LVcableroutingandconnection

InstallationinstructionsInstallation

Connect the wiring to the terminal blocks.

Reassemble the roofing sheets (6 screws per sheet).

Place the power supply lead cable inside the trough. Connect the wiring from the power supply lead cable for each cubicle through the cable glands.Place back the trough.

Remove the cubicle cable troughs.Remove the roof on each cubicle (6 screws).

Connect the wires to the terminal blocks.Place the power supply lead cable at the top of the LV boxes of the switchboard.

HighLVbox

Page 44: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

42 BBV19342.inddversion 02

InstallationinstructionsInstallation

Thread the wiring as well as feeder cables up to the LV compartment.

Place the wires on the terminal blocks.

(maximum 5 diameters 20 mm) at the base of the cable trough.

Remove the cable trough.Cut according to the number and the diameter of the cables.

Incomingcablesfrombelow,cubiclebycubicle

Page 45: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 43

Installationinstructions

4sideantiarctunnelIPX1HighLVbox

Installingthetunnels

Installation

A: front of the cubicleB: HM6 screws + M6 washersC: HM6 screws + M6 washers and HM6 nuts.D: HM6 screws + M6 sealing washers and HM6 nuts.

1/ First fix the supports (1) (with bottom holes), (2 and 3) (without bottom holes) onto the cubicle using the screws (B).

2/ Fix the roof (4)to the support (1, 2 and 3) with the bolts (D) (the sealing washers are placed outside to avoid leakage).

3/ Fix the tunnels of each cubicle together with the bolts (C).

A: front of the cubicleB: HM6 screws + M6 washersC: HM6 screws + M6 washers and HM6 nuts.D: HM6 screws + M6 sealing washers and HM6 nuts.

1/ First fix the supports (1) (with bottom holes), (2 and 3) (without bottom holes) onto the cubicle using the screws (B).

2/ Fix the roof (4)to the support (1, 2 and 3) with the bolts (D) (the sealing washers are placed outside to avoid leakage).

3/ Fix the tunnels of each cubicle together with the bolts (C).

4sideantiarctunnelIPX2HighLVbox

Page 46: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

44 BBV19342.inddversion 02

InstallationinstructionsInstallation

A: front of the cubicleB: HM6 screwsC: HM6 screws + M6 washers and HM6 nuts.D: HM6 screws + M6 sealing washers and HM6 nuts.

1/ First fix the sheets (1) without bottom hole at the back and the sheets (3) with bottom hole at the front onto the cubicle using four screws (B) for MCset 1 and six screws (B) for MCset 2 and MCset 3 for each sheet.

2/ Fix the roof (2) onto the sheet (1 and 3) using two screws (D) for MCset 1 and three screws (D) for MCset 2 and MCset 3.

3/ Fix the tunnels of each cubicle together using 5 screws according to the vue (C).

4sidesantiarctunnelIPX1StandardHeightLVbox

4sidesantiarctunnelIPX2StandardHeightLVbox

A: front of the cubicleB: HM6 screwsC: HM6 screws + M6 washers and HM6 nuts.D: HM6 screws + M6 sealing washers and HM6 nuts.

1/ First fix the sheet (1) without bottom hole at the back and the sheet (3) with bottom hole at the front onto the cubicle using four screws (B) for MCset 1 and six screws (B) for MCset 2 and MCset 3 for each sheet.

2/ Fix the feet (4) onto the cubicle using two screws (B).

3/ Fix the roof (2) onto the sheet (1) and (3) using two screws (D) for MCset 1 and three screws (D) for MCset 2 and MCset 3.

4/ Fix the roof (2) on the feet (4) using two screws (D).

5/ Fix the tunnel of each cubicle together using 5 screws according to the vue (C).

Page 47: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 45

4 sides anti arc tunnel end IPX1/ IPX2HighLVbox

InstallationinstructionsInstallation

A: rear of the cubicleB: front of the cubicleC: HM6 screwsD: HM6 screws + M6 washers and HM6 nuts.

1/ Fix the sheets (1and2) onto the cubicle using the screws (C).

2/ Fixing the sheet (1) onto the tunnel and on the sheet (2) with the screws (D).

3/ Fixing the sheet (2) onto the tunnel with the screws (D).

A: front of the cubicleB: rear of the cubicle

The sheets are fixed with HM6 screws + M6 washersand HM6 nuts.

1/ Fix the sheet (1) onto the cubicle and onto the tunnel.

2/ Fix the sheet (2) onto the tunnel feet at the front.

3/ Fix the sheet (3) onto the cubicle, the tunnel and the sheet (1).

4/ Fix the sheet (4) onto the sheet (1).

4 sides anti arc tunnel end IPX1/ IPX2StandardHeightLVbox

Page 48: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

46 BBV19342.inddversion 02

InstallationinstructionsInstallation

InstallingatunnelonaMTPtransitionenclosure

Next to a MCset with the High LV Box for IPX1/IPX2

A: HM6 screws + M6 washers and HM6 nuts.B: HM6 screws + M6 sealing washers and HM6 nuts.

1/ Mount the support sheets (1) first.

2/ Mount the side panel (2).

3/ Fasten together the support sheets of each cubicle.

4/ Mount the roof (3).

5/ Mount the tunnel closing sheets in the front and rear (4).

6/ Fasten together the tunnel roofs of each cubicle

NexttoaMCsetwiththestandardheightLVBoxforIPx1

The sheets are fixed with HM6 screws + M6 sealing washers and HM6 nuts (A):

1/ Mount the support sheets (1) first.

2/ Mount the side panel (2).

3/ Fasten the support sheets of each cubicle together.

4/ Mount the roof (3).

5/ Mount the tunnel closing sheets to the front and rear (4).

6/ Fasten the tunnel roof of each cubicle together.

Page 49: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 47

InstallationinstructionsInstallation

NexttoaMCsetwiththestandardheightLVBoxforIPx2

The sheets are fixed by HM6 screws + M6 sealing washers and HM6 nuts (A):

1/ Mount the support sheets (1) first and the feet (5).

2/ Mount the side panel (2).

3/ Fasten the support sheet of each cubicle together.

4/ Mount the roof (3).

5/ Mount the tunnel closing sheets at the front and rear (4).

6/ Fasten the tunnel roof of each cubicle together.

Page 50: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

48 BBV19342.inddversion 02

Installationinstructions

Punch the knock-out at the panel bottom to let the earth bus to go through it (1 per panel).

Assemblingcoverpanelsofcubicleends

On the left and right end cubicles, place and screw (M8 screw) the end sheet support beams.

Installation

Installingtheendsheets

On the left end cubicle, place the cage nuts on the sides.

For internal arc switchboards, stick the self adhesive gasket (A) along the front of the switchgear for both end sheets

Note: operations are identical for the right or left ends of the switchboard.

Makesurethatthebusbarendcoverisassembledbeforemounting

theswitchboard’sendcovers.

Page 51: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 49

InstallationinstructionsInstallation

Assemble the end cover panels 1 and 2 (right and left end of the switchboard).

A: HM8 screws+ M8 washersB: HM6 screws+ M6 washers D: assembly of HM8 x 30 screws + M8 washers and HM8 nut + M8 washers.

Note: operations are identical for the right or left ends of the switchboard.

On the right end panel, place the cage nuts at the front line.

Page 52: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

50 BBV19342.inddversion 02

InstallationinstructionsInstallation

D: assembly of HM8 x 30 screws + M8 washers + HM8 nut + M8 washers.

E: assembly of HM8 x 6 screws + M8 washers + HM8 nuts + M8 washers.

StandardheightLVBox(Topwirewayclosingsheet)

Place the top wireway closing sheet 4.

Place the two screws to fix the top wireway closing sheet.

Pop the 2 rivets to fix the operating handle support at the front of the end sheets.

Store the operating handle in the front end panel.

Page 53: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 51

InstallationofaFUequippedwithelectromagneticlockingoptions

Installation

FUdeliveredwiththeearthingswitchclosed

Earthingswitchwithelectromagneticlocking

Openingtheearthingswitchwithoutauxiliarysupply

To rack-in and rack-out the circuit breaker, the earthing switch must be operated.

At the installation of the FU, the electromagnetic locking is not yet enegised, it must be manually released in order to operate the earthing switch.

Initialstatus: - The earthing switch is closed,- Selector 4 is in the locked closed position.

Insert a screwdriver via the box hole.Disassemble the VPIS without disconnecting the wiring.

Open the earthing switch, inserting the crank in reference 5 until the mechanical indicator light changes status.

Push back and hold in place the electromagnet (A) using the screwdriver, then pull towards you and turn the selector to the right in the operation position.

Put back the VPIS.Position selector 4 in the locked open position.

Page 54: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

52 BBV19342.inddversion 02

InstallationofaFUequippedwithelectromagneticlockingoptions

Initialstatus:- The circuit-breaker is in the racked-out position.- The earthing switch is closed.- The front panel is disassembled to access cable connections.

Rack-inpreventionwithelectromagneticlocking

Installation

Priortoinstallingthefrontpanels

If lever (A) is positioned as per figure1, locking is active and prevents installation of the front panel.

To desactivate the locking, insert a tool (screwdriver) into the hole placed under the box support and push the electromagnet rod (B).Push the lever (A) to position it as per figure2.The system is released and the front panel can be placed back.

Figure1

Figure2

The locking system is accessible as per the arrow in the drawing opposite.

To access the cable connection compartment, circuit-breaker rack-in must be prevented.

At the installation of the FU, the electromagnetic lock is not energised, it must be manually released in order to place the front panel when the operations are complete.

Page 55: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 53

Stepstobetakenfortestsandinspection

Installation

Surgearresterconnection

Press the pushbutton ”I” to close the circuit-breaker

Rack-in the circuit breaker(refer to the operating manual).

Remove the shim.

Raise and block the door lock rod using a 55 mm U shim.

OnFUsnotconnectedtothegenerator

Place the circuit-breaker in the test position, with the door open.

DefeatingInterlocks

This procedure requires to defeat the interlocks.

It is essential to follow the sequences here after.

The insulation level of the switchgear can be tested on site. The test voltage shall be 80 % of the rated short-duration power-frequency withstand voltage of the switchgear as specified in clause 7.105 of IEC 62271-200.

This test can be carried out in one single operation.

All circuit-breakers must be racked-in, closed, with FU doors open.

All the VT’s and surge arresters must be disconnected during this test.

More over, one of the FU feeder must have its lower panel open to connect the test cable.

Powerfrequencydielectrictest

Thistestmustbeperformedbytrained&authorizedpeople.

Thisoperationmustonlybecarriedoutafterdielectrictests,andbeforetheconnectionofmediumvoltagecablestotheFU.

Placeandfixtheconnectionofeachsurgearrester.RefertothechapteronMVcableconnection.

Page 56: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

54 BBV19342.inddversion 02

TestsonsiteInstallation

Checkingandsettinguptheinternalarcingdetector(1)

This operation has to be made during assembly of the tunnels (option) or during operation on the roof of the cubicle.

The internal arcing detector is located on the roof of the cubicle.To be operational, it must be in spring loaded position.

Setting up the internal arcing detector:

- Push the metal rod (1) toward the back of the cubicle,

- Hook the rod (1) on the support (2).

1: metal rod,2: support.

(1) The internal arcing detector is mounted according to the internal arcing withstand characteristics of the cubicle.

Page 57: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 55

Generaldescription 56Warning for readers 56AD cubicle 56TT1, TT2 cubicles 57CL-GL cubicles 57Withdrawable mobile part 58Identification 60Read the inscriptions on the front panel 60

InstructionsforaccesstotheinsideofaADcubicle 62AD cubicle 62Removing front protection cover plates 63Removing the MV compartment separation sheet 64Removing the manhole sheet 65Removing and inserting fixed or withdrawable VTs 65Removing the stop arc sheet in the cable compartment 66Accessing busbars 66Accessing the main contacts 67

Stepsforthetests 68Voltage presence on MV cables 68MV cable tests 68

OperatingInstructions 70Extracting or inserting the mobile part 70Racking-in the mobile part 75Racking-out the mobile part 76Closing the earthing switch 77Opening the earthing switch 79Racking-in VT fuses 81Racking-out VT fuses 82Preventing access using padlocks 83Locking with key locks (option) 85Locking with electromagnet (option) 86

Correctivemaintenance 87Replacement of VT box fuses 87

InstructionofuseContent

Page 58: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

56 BBV19342.inddversion 02

ADcubicle

As the MCset range is very extensive and presents a vast number of front panel options, we have decided to present a Functional Unit presentation equipped with the maximum switchgear.

Warningforreaders

Generaldescription

Incomer/Feeder withwithdrawableVTfuses

Incomer/FeederwithoutVTorwithfixedVT

A: access to inter-cubicle wiring for High LV box switchgearsB: LV compartment doorC: protection, monitoring, control by Sepam D: compartment door mobile partE: position inspection windows of the mobile partF: handrailG: operation plate and padlocking of the mobile partH: voltage indicatorsI: earthing switch operation and locking plate and padlocking of the mobile part J: access panel to connection compartment of MV cables or withdrawable VT fusesK: operation and padlocking plate of withdrawable VT fuses. L: visualisation windows of cables or of VT fuse position.

AD1 630/1250 AAD2 630/1250/1600 AAD3 2500/3150 A

Instruction of use

Page 59: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 57

WithupstreamordownstreamVTwithwithdrawablefuses

CL-GLcubicles

TT1,TT2cubicles

GeneraldescriptionInstruction of use

VoltagetransformerswithoutVTorwithfixedVT

Voltagetransformerswithwithdrawablefuses

A: access to inter-cubicle wiring for High LV box switchgearsB: LV compartment doorC: fixed busbar bridge compartment door D: visualisation windowsE: handrailF: voltage indicatorsG: earthing switch operation and locking plate and padlocking of the mobile partH: operation and padlocking plate of withdrawable VT fusesI: visualisation windows of cables or of VT fuse position J: access panel to connection compartment of MV cables or withdrawable VT fuses.

BusrisercubicleCircuit-breakercouplingcubicle

A: access to inter-cubicle wiring for High LV box switchgearsB: LV compartment doorC: protection, monitoring, control by Sepam D: compartment door mobile partE: position inspection windows of the mobile partF: handrailG: operation plate and padlocking of the mobile partH: voltage indicatorsI: earthing switch operation and locking plate and padlocking of the mobile part J: operation and padlocking plate of withdrawable VT fusesK: visualisation windows of cables or of VT fuse position L: access panel to withdrawable VT fuses and to the lower busbar compartmentsM: fixed busbar bridge compartment door.

Page 60: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

58 BBV19342.inddversion 02

Generaldescription

Withdrawablemobilepart

LF1

LF2

LF3

Instruction of use

Note: available in 3 widths.

DisconnectortruckLF

Page 61: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 59

ROLLARC400

Note: available in 3 widths.

Evolis

GeneraldescriptionInstruction of use

Note: option available in 3 widths.

BusbarearthingtruckLF

Page 62: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

60 BBV19342.inddversion 02

GeneraldescriptionInstruction of use

A: procedure pictogramB: withdrawable mobile partC: earthing switch plateD: withdrawable fuse voltage transformer plate.

Readtheinscriptionsonthefrontpanel

Ex:ADfunctionalunit

A: name of the cubicleB: manufacturer’s labelC: characteristics, designations and serial number.

LFwithdrawablemobilepart

D: characteristics, designations and serial number.

Rollarcwithdrawablemobilepart

E: characteristics, designations and serial number.

Evoliswithdrawablemobilepart

F: characteristics, designations and serial numberG: location of operating instructions (behind the cover).

Identification

Page 63: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 61

Earthingswitch,voltagepresenceandrack-inprevention

4 : earthing switch position selector5 : opening for the insertion of the earthing switch operating handleG : voltage presence H : rack-in prevention selector switchL : mechanical indicator of earthing switch statusM : location for rack-in prevention lockN : location for earthing switch locks.

Cubicle

1: mechanical opening push-button2: mobile part position selector 3: opening for inserting mobile part operating handle E: mechanical indicator for indication of the mobile part positionF: location for disconnector truck lock (optional).

Mobilepart

1: mobile part operation2: earthing switch operation.

Procedurepictogram

6 : position selector for voltage transformer withdrawable fuses7 : opening for the insertion of the voltage transformer withdrawable fuse operating handle.

Withdrawablevoltagetransformer

GeneraldescriptionInstruction of use

Page 64: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

62 BBV19342.inddversion 02

InstructionsforaccesstotheinsideofaADcubicle

ADcubicle

Instruction of use

Markingsabove

Access

1 To the lower compartment via the maintenance space or gutter(access to CT’s also).

2 Rear (removal is optional and is not secured by interlocks).

3 Facilitates access to cables (AD cubicle ), through the front(access to Ct’s also).

4 To the busbars (not possible for TT cubicle).

4and5 To the rear inter cubicle fastening screws.This sheet must be reassembled before installation of busbars.

6 To the lower compartment through the front (access to CT’s and VT’s also).

7 To the mobile part.

8 To low voltage box.

Alloperationsdescribedhereaftermustbecarriedoutincompliancewiththesafetystandardsinforce,undertheresponsibilityofacompetentperson.

Page 65: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 63

InstructionsforaccesstotheinsideofaADcubicle

Instruction of use

Cubicleequippedwithvoltagetransformerwithwithdrawablefuses

Cubiclewithorwithoutfixedvoltagetransformer(VT)

Removingfrontprotectioncoverpanels

Close earthing switch (see chapter “Closingtheearthingswitch”).

It is recommended to padlock it in this position (see chapter “Padlockingandpreventingaccesswithpadlocks”).

Withdraw VT fuses (see chapter “Racked-outVTfuses”).

InthecaseofacubicleequippedwithafixedVT.

Open the protection switch of the VT secondaries which is located in the troughs or in the LV box.

Close earthing switch (see chapter “Closingtheearthingswitch”).

It is recommended to padlock it in this position (see chapter “Padlockingandpreventingaccessusingpadlocks”).

Remove the panel (10 screws).

Closure

To put back into operation, carry out operations in the reverse order of removal (closed earthing switch).

IncaseupstreamVT,presenceofvoltageinthecablescompartmentevenifthecircuit-breakeroftheswitchgearisracked-out.

IncaseupstreamVT,presenceofvoltageinthecablescompartmentevenifthecircuit-breakeroftheswitchgearisracked-out.

Page 66: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

64 BBV19342.inddversion 02

InstructionsforaccesstotheinsideofaADcubicle

Instruction of use

To put back into operation, carry out operations in the reverse order of the removal.Closure

Remove the circuit-breaker (see chapter “Removingandinsertingthemobilepart”).

RemovingtheMVcompartmentseparationsheet

Remove the access panel to the Vt’s fuses (6 screws).

Open the protection switch of the VT secondaries which is located in the troughs or in the LV compartment.

Remove screws A and remove the separation sheet from the MV compartment.

To put back into operation, carry out operations in the reverse order of removal (closed earthing switch).

Closure

Remove the access panel to the connection compartment of MV cables (4 screws).

Remove the L bracket at the front of the cubicle (4 screws and 2 nuts).

Page 67: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 65

InstructionsforaccesstotheinsideofaADcubicle

ClosingtheMVconnectioncompartment

SimilaroperationwhatevertypeofVT

Removing and inserting fixed orwithdrawableVTs

Closure

Removingthemanholesheet

ForfixedVTs:tighteningtorqueonVT:30Nm.

To put back into operation, carry out operations in the reverse order of removal.

On each VT, disconnect the connection bar, by unscrewing the screw and lift the connection bar.

To put back into operation, carry out operations in the reverse order of removal.

On a cubicle equipped with VTs, remove them.

Remove the screws and remove manhole sheet.

Access to the connection compartment of MV cables is possible via the maintenance space at the cubicle manhole level.

Likewise, it is possible to access the maintenance space or gutter through the inside of the cubicle.

See chapter “Instructionsforaccesstotheinsideofacubicle”.

FixedVTs

Remove the VTs using the handle.Disconnect the VT low voltage connector.

Instruction of use

Page 68: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

66 BBV19342.inddversion 02

InstructionsforaccesstotheinsideofaADcubicle

Instruction of use

Access to lower busbars is possible through the maintenance space by removing the cubicle manhole sheet.

See chapter “Instructionsforaccesstotheinsideofthecubicle”.

Lower

For access to busbars, see chapter “Instructionsforaccesstotheinsideofthecubicle”.

Upper

Safetyrules

Accessingbusbars

Removingthestoparcsheetinthecablecompartment

Connect the VT low voltage connector.DuringthefirstVTinsertion,cutandremovethewiretiesontheconnector.

Alloperationsdescribedhereaftermustbecarriedoutincompliancewiththesafetystandardsinforce,undertheresponsibilityofacompetentperson.

ThissheetMUSTbereassembledbeforethecubicleisre-energized.

Remove the 6 fixation screws (A)in order to take off the sheet.

Page 69: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 67

InstructionsforaccesstotheinsideofaADcubicle

Instruction of use

The shutters will fall and will lock in the down position.To close, pull the the shutters up until they lock.

Using a screwdriver, raise the flat spring to release the lock.Push the ball into the link axis.

Openingandclosinguppershutters

The shutters will fall and will lock in the down position.To close, pull the the shutters up until they lock.

Using a screwdriver, raise the flat spring to release the lock.Push the ball into the link axis.

Openingandclosinglowershutters

Safetyrules

Accessingthemaincontacts

Alloperationsdescribedhereaftermustbecarriedoutincompliancewiththesafetystandardsinforce,undertheresponsibilityofacompetentperson.

Beforeracking-inthemobilepart,ensurethattheshuttersmechanismshavebeenputbackintotheirinitialposition(lockedclosed).Failuretocomplywiththisinstructionmayresultindamagetotheequipment.

Page 70: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

68 BBV19342.inddversion 02

StepsforthetestsInstruction of use

Close the earthing switch.

See chapter “Closingtheearthingswitch”.

Check voltage absence.

Voltage indicator lights are not lit.

Onfeedercables(withoutVT)

VoltageinjectionsonMVcableheads

Open earthing switch.Cables connected to injection tools.

Testcondition

MVcabletests

A: voltage presence indicator light (1 for each phase)B: connection outlets for the phase concordance unit.

Once the cables are energised, the voltage indicator lights should light up.

TheindicationofaVPISaloneisnotenoughtoensurethatthesystemisde-energised:

iftheoperationrulesrequirethis,thensuitablevoltagedetectorsincompliancewithIEC61243mustbeused.

Instructionforuse

VPIS:Voltage Presence Indicator System, a box with 3 integrated lamps.

Characteristics:The “voltage presence” indication is only ensured on the voltage range stipulated by IEC 61958.

CubicleequippedwithVPISvoltageindicator

VoltagepresenceonMVcables

VPISmustnotbeusedasaVDS(VoltageDetectingSystems).

Itismandatorytorack-outthecircuit-breaker of the switchgear or/and open thecircuit-breakeroftheupstreamfeeder.

When the ambient light is bright, it may be necessary to improve visibility by protecting the indication lights.

Page 71: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 69

StepsforthetestsInstruction of use

Open the earthing switch. See chapter “Openingtheearthingswitch”, then carry out the tests.

Attheendofthetests:

- Close the earthing switch- Remove the accessories of the cable injection.- Install the front panels.

Connect the voltage injection circuit to cable lugs.

Remove the front panels.

See chapter “Instructionsforaccesstotheinsideofacubicle”.

Page 72: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

70 BBV19342.inddversion 02

OperatingInstructions

BringtheERTintoposition(thepinsshouldbeinsertedinsidethecubicleholes).

Disconnect the LV auxiliary plug by pressing on the red button and by pulling the plug lock (circuit-breaker or contactor).

Open the access door to the mobile part by pulling then turning the handle towards the right.

Extraction

Note: the following operations are described using the ERT (tool to remove/insert the mobile part from the switchgear that also allows to place the mobile part on the floor).

Cubicle + mobile part in a disconnected /test position.

Start

Extractingorinsertingthemobilepart

Instruction of use

Operate the door sufficiently to ensure that it is completely locked.

Page 73: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 71

Lock the ERT by pushing in and then turning towards the right the two latches. Check that the ERT is locked.

Secure the 2 ERT castors.

OperatingInstructions

Unblock the ERT castors.Back up a little and slowly the ERT from the switchgear. Take down the mobile part by turning the ERT operating handle.

UnlocktheERTbyturningtowardtheleftandpullingoutthelatches.

Change the position of the selector

2 to pull out the mobile part using

the handles A until it bottoms the ERT.Change the position of selector switch 2 back to .

Note: the travel of the CB on the ERT must be done with the CB close to the ground.

Instruction of use

Page 74: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

72 BBV19342.inddversion 02

Close the access door to the mobile part by turning the handle towards the left, then pushing it.

Before closing the cubicle door, pull down the black cover.

OperatingInstructionsInstruction of use

Remove the ERT.

To release the blocking system door by moving the stop rod.

Page 75: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 73

OperatingInstructions

Change the position of the selector

2 to . Push the mobile part into the cubicle until it bottoms it and change the position of the selector 2 back to .

LocktheERTbypushinginandthenturningtowardstherightthetwolatches.CheckthattheERTislocked.

Bring the ERT in position (the pins should be inserted inside the cubicle holes).Secure the 2 ERT castors.

Open the access door to the mobile part by pulling then turning the handle towards the right.

Insertion

Instruction of use

Operate the door sufficiently to ensure that it is completely locked.

Page 76: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

74 BBV19342.inddversion 02

OperatingInstructions

Close the access door to the mobile part by turning the handle to the left then pushing it.

Before closing the cubicle door, lift the black cover and latch it up. Ensure that it well latched up.

To connect the LV plug, push the red button and hold in position. Connect the LV plug and secure it by latching it.

Unlock the ERT by turning toward the left and pulling out the latches.

Unblock the 2 ERT castors and remove it.

Instruction of use

To release the blocking system door by moving the stop rod.

Page 77: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 75

OperatingInstructionsInstruction of use

Change the position of selector 2

to .

Insert the operating handle into opening 3.

Rack-in the mobile part by turning the operating handle (45 turns) clockwise until the position indicator changes its status.

Lower the protective flap of push-button 1. Press push-button 1, and while keeping it pushed down. Change the position of selector 2

to .

Operation

Door closed Selector 4 to (open earthing switch)

Selector H in racked-in or racked-out

position to

Start

Racking-inthemobilepart

The pictogram with a black background at the front is a reminder of the operations.

The circuit-breaker or contactors are electrically operationnal to energise the downstream circuit.

Page 78: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

76 BBV19342.inddversion 02

OperatingInstructionsInstruction of use

The mobile part is racked-out, disconnected or in test position.

Change the position of selector 2

to .

Insert the operating handle into opening 3. Rack-out the mobile part by turning the crank (45 turns) anti-clockwise until the position indicator changes its status.

Press push-button 1 (which sends an order for the mechanical opening of the circuit-breaker). While keeping it pushed down, change the position

of selector 2 to .

Operation

The mobile part in the racked-in.Start

Racking-outthemobilepart

The pictogram with a black background at the front is a reminder of the operations.

Page 79: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 77

OperatingInstructionsInstruction of use

Insert the operating handle into the hole 5, and turn it clockwise until the position indicator changes status.

The closing is quick and makes a noise.

Change the position of selector 4

to , by pulling it and turning

it towards the right.

Operation

The mobile part is racked-out or ready to be extracted or out of the switchgear.

Checkthatthevoltagepresencelightsarenotlit.

The safety key locks are in a state that allows the following operations.

Start

Closingtheearthingswitch

Page 80: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

78 BBV19342.inddversion 02

OperatingInstructions

The pictogram with a yellow background at the front, is a reminder of the operations.

The earthing switch closed.

The MV cable heads are short-circuited and earthed.

Change the position of selector switch 4

to , by pulling it and turning it towards the right.

Instruction of use

Page 81: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 79

OperatingInstructionsInstruction of use

Closedearthingswitch

The safety key locks are in a state that allows the following operations.

Start

Openingtheearthingswitch

Change the position of selector

4 to by pulling it and turning it towards the left.

Insert the operating handle into the hole 5, and turn it anti-clockwise until position indicator changes status.

The opening makes a noise.

Change the position of selector 4

to , by pulling it and turning

it towards the left.

Operation

Page 82: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

80 BBV19342.inddversion 02

OperatingInstructionsInstruction of use

The earthing switch is open.

The pictogram with a yellow background at the front,is a reminder of the operations.

Page 83: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 81

OperatingInstructionsInstruction of use

Change the position of selector 6

to , by pulling it and turning it

towards the right.

Insert the operating handle into the hole 7, and turn it clockwise until it is racked-in.Rack-in is completed when resistance can be felt (stop).

Change the position of selector 6

to , by pulling it and turning

it towards the right.

Operation

Selector 6 to

Thelowerfrontpanelsareinstalledonthecubicle

Start

Racking-inVTfuses

The pictogram with a blue background at the front, is a reminder of the operations.

Page 84: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

82 BBV19342.inddversion 02

OperatingInstructionsInstruction of use

Change the position of selector 6

to , by pulling it and turning

it towards the left (the front panel to access the fuses can now be removed).

Insert the operating handle into the hole 7 and turn it anti-clockwise until racked-out.

Change the position of selector 6

to , by pulling it and turning it

towards the left.

Operation

Selector 6 to

Thelowerfrontpanelsareinstalledonthecubicle

Start

Racking-outVTfuses

The pictogram at the front, is a reminder of the operations.

Page 85: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 83

OperatingInstructionsInstruction of use

Press on the shutter guide, place the slides (1 and 2, 1 or 2) and insert the padlocks in the holes.

The shutter operating mechanism is located inside the cubicle, on the right side.

Forbidtheopeningwithpadlock

On the operating mechanism of the shutters, when they are closed.

Preventingtheopeningoftheshutters(option)

Place1to3padlocksontherack-inpreventionselectorH.

Rack-in forbidden if in

Preventingtherack-inofamobilepart

3 padlocks on the earthing selector in open or closed position.

3 padlocks on the selector the VT’s box with withdrawable fuses for either rack-in or rack-out position.

3 padlocks on the rack-in prevention selector.

1 padlock on the operating mechanism of either the top or bottom shutters.

1 padlock on the protective flap of the mechanical opening push-button of the mobile part.

Nota:usedpadlocksØ6to8mmtobeused.

Numberofpossiblepadlockspercubicletype

Preventingaccessusingpadlocks

Foru 31 kA/1s internal arc switchgears:the shutter operating mechanism is accessible after removing the right side sheetmetal (2 screws A).

Themetalsheetmustbere-installedbeforeinsertingthemobilepartinsidetheswitchgear.

1: top shutters lock 2: bottom shutters lock.

Page 86: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

84 BBV19342.inddversion 02

OperatingInstructionsInstruction of use

Racked-out fuses: place 1 to 3 padlocks on selector 6 to prevent rack-in.

Racked-in fuses: place 1 to 3 padlocks on selector 6 to prevent rack-out.This also prevents removalof the front panel.

PreventingtheoperationofVTfuses

Closedearthingswitch: place 1 to 3 padlocks on selector 4 to prevent the opening.This also prevents the rack-in of the mobile part.

Openearthingswitch: place 1 to 3 padlocks on selector 4 to prevent the closure.

Preventingtheoperationoftheearthingswitch

Place 1 padlock on the push-button protective flap 1.

It can also be used as an additional lock to prevent rack-in and rack-out.

Preventingthemechanicalopeningofthemobilepartduringoperation

Page 87: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 85

OperatingInstructionsInstruction of use

Lockingtheearthingswitchwithtwolocks

Lockingtheearthingswitchwithonekeylock

Closed disconnector

Racked-in disconnector truck

Lockingthedisconnectortruckintheracked-inposition

The mobile part is racked-out.The selector is pulled out.

Lockingtoforbidtherack-inofthemobilepart.

Numberofpossiblelocks

Lockingwithkeylocks(option)

(2 O) or (2 F) or (1 O et 1 F) or (1 O) or (1 F).

1 lock in open position1 lock in closed position

The key is only released when the rack-in prevention is locked.

Disconnector truck (withdrawable busbar bridge): 1 lock in the racked-in position (on the disconnector).

Mobile part in a racked-out position: 1 lock on the cubicle (2 O) or (2 C) or (1 O and 1 C) or (1 O) or (1 C): on earthing switch.

The key is only released when the disconnector is racked-in and locked in this position with the selector.

Page 88: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

86 BBV19342.inddversion 02

OperatingInstructionsInstruction of use

The electromagnet automatically locks the selector when it is pulled out.

A push-button located on the low voltage compartment will allow to unlock if the switchgear is in the proper state.

Electromagnetic lock prevents the rack-in of the mobile part.

Lockingtoforbidtherack-inofthemobilepart.

Theelectromagnetautomaticallylockstheearthingswitchinthe“open”and“closed”position.

Apush-buttonlocatedonthelowvoltagecompartmentwillallowtheoperationofselectorswitch4,iftheswitchgearisintheproperstate.

Lockingtheearthingswitch

Lockingwithelectromagnet(option)

Preventiveandcorrectivemaintenance

An MCset 17.5 kV Maintenance and Services guide is available. It gives practical information on:

b maintaining the equipment in good operation,b ensuring that the equipment is safe during all installation, repair and service operations.

DEAI03EN/ART833121DEAI03FR/ART833120.

Page 89: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

A

B

D

E

F

E

version 02BBV19342.indd 87

CorrectivemaintenanceInstruction of use

Removing

Remove the front panel (see chapter “Instructionsforaccesstotheinsideofacubicle”).

Racked-out fuses and VT’s LV plug unplugged (see chapter “Operatinginstructions”).

Start

ReplacementofVTboxfuses

Lift holder A. Disconnect the small vertical rod B.

Pivot the striker pads C into a horizontal position.

Carefully remove the pin from the striker pads D.

Push the plug E and turn towardsthe left and release. The fuse is unlocked.

Remove the plug and the fuse.

Page 90: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

C

88 BBV19342.inddversion 02

CorrectivemaintenanceInstruction of use

Insert the fuses, with the strikers facing the front.Place the plugs on the fuses (spring towards the bottom).

Place the spring on the plug and check that it is flush against the bottom of the plug and placed between the two clips indicated by the arrows.

Installing

Connect the small vertical rod B and ensure free operation of the link A.

Turn it towards the right and release. The fuse is locked, check that the plug is well locked.

Push the plug E.

Carefully insert the pin on the striker pin C.

Snap the link A et lift it to place the striker pads C in a vertical position.

Page 91: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

version 02BBV19342.indd 89

Index

AAccessing busbars 66Accessing the main contacts 67 AD, CL-GL, TT cubicles (SF6 technology) 7-56-57-62Assembling a MOTORPACT cubicle / MTP transition enclosure 24

CChecking and cocking the internal arcing detector 54Civil engineering with maintenance space 10-15Closing the earthing switch 77Cubicle fastened on rails 22Cubicle fitted with IPX1/ IPX2 roofs 8Cubicle unit packing 17

EEarthing switch with electromagnetic locking 51Extracting or inserting the mobile part 70

FFloor finishing 14Floor quality 22

GGeneral information 15Glossary 3

HHandling by rolling 19 Handling using a sling 18

IIdentification 9-60Installation against a wall 9Installing busbars 29Installing busbars between MTP and the MOTORPACT cubicle 32 Installing the electric connections of the busbars and MV cables 26Installing the end sheets 48 Installing the main earth connection 28Installing the tunnels 43

LLand packaging 18 Linking two cubicles 23 List of bags and accessories 5Locking with electromagnet (option) 86 Locking with key locks (option) 85LV cable routing and connection 41

MMiddle of the room mounting 9MOTORPACT cubicle 13MV cable screen earthing 40MV cable tests 68

OOcean shipment packaging 18Opening the earthing switch 79

Page 92: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

90 BBV19342.inddversion 02

PPlacing cubicles in a switchboard 21 Placing MV cables on AD cubicle 34Position of MV cables 12Power frequency dielectric test 53Preventing access using padlocks 83Prior to installing the front panels 52

RRack-in check 25Rack-in prevention with electromagnetic locking 52Racking-in the mobile part 75Racking-out the mobile part 76 Read the inscriptions on the front panel 60 Recommendations 4Removing and inserting fixed or withdrawable VTs 65Removing front protection cover plates 63Removing the manhole sheet 65Removing the mobile part transport fixations 25Removing the MV compartment separation sheet 64Removing the stop arc sheet in the cable compartment 66Replacement of VT box fuses 87

SStandard tightening torques 4Storage 19Summary of different mounting methods 14Surface condition 22Switchboard location in the installation room 11Symbols 3

TTransition enclosure MTP (Motorpact transition enclosure) 8-10

UUnpacking cubicles 21

VVoltage presence on MV cables 68

WWarning for readers 56Withdrawable mobile part 58

Index

Page 93: MCset 1-2-3 17.5 kV - Schneider Electricmt.schneider-electric.be/Main/MCset_Fluair400/instructions/bbv... · Withdrawable switchgear Medium Voltage Distribution MCset 1-2-3 17.5 kV

BBV19342 - REV. 02 04/2012

BB

V19

342

- RE

V. 0

2 a

S

chne

ider

Ele

ctric

Indu

strie

s S

AS

– A

ll rig

hts

rese

rved

.

As standards, specifications and designs change from time to time, please ask for confirmation of the information given in this publication. This document has been printed on ecological paper.

Publishing: Schneider Electric Industries SAS.Design: Profil.Printing:

SchneiderElectricgroupservicecentersaretheretoprovide:- engineering and technical assistance,- commissioning,- training,- preventive and corrective maintenance,- adaptation work,- spare parts.

CallyoursalesrepresentativewhowillputyouintouchwithyournearestSchneiderElectricgroupservicecenterordirectlycallthefollowingtelephonenumber:+33(0)476576060GrenobleFrance.

SchneiderElectricIndustriesS.A.S35 rue Joseph MonierCS 30323 92506 Rueil Malmaison Cedexwww.schneider-electric.com

954 503 439 RCS NanterreCapital social : 896 313 776 €