Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated...

40
Master Plan Update Master Plan Update Technical Advisory Committee (TAC) Meeting #1 DECEMBER 14, 2016

Transcript of Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated...

Page 1: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan Update

Master Plan UpdateTechnical Advisory Committee (TAC) Meeting #1

DECEMBER 14, 2016

Page 2: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Welcome!• Airport Team Members

- Rebecca Hupp – Airport Director- Matt Petaja – Deputy Director- Jill Singer – Airport Project Manager

• Airport Consultant Team- Joe Birge – Ricondo & Associates- Damon Smith – Mead & Hunt- Max Braun – Ricondo & Associates- Joe Huy – Ricondo & Associates

2

Page 3: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Agenda• Introductions• TAC Expectations• Master Plan Overview and Schedule• Inventory of Existing Conditions• Aviation Activity Forecast

- Local Trends- Preliminary Forecast

• Comments and Questions• Next Steps• Closing Remarks

3

Page 4: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

TAC MembersAustin Shontz, Western Aircraft Andy Coose, TSA

Blake Martin, Turbo Air General Gary Saylor, IDNG

Jeff Jackson, Jackson Jet Center Kevin Hoffman, UPS

Derick O’Neill, City of Boise, Darrell Wodowski, FedEx

Daren Fluke, City of Boise Howard Harmon, Paradies

Meg Leatherman, Ada County Planning Jeff Friedman, Delaware North

Holly Delay, ATCT Paul Decloux, Enterprise

Scott Eaton, FAA Steve Jones, Hertz

Rachel Rud-Scaraglino, Customs Lauren Mclean, Boise City Council & Public at large

Russ Westerberg, General Aviation Teri Sato, Alaska Airlines

Monica Del Rio, Southwest Airlines Mike Pape, Idaho State Aeronautics

4

Page 5: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

TAC Participation Guidelines

• Be present and participate• Attend four meetings

- Two hours on weekdays• Review materials and be prepared to discuss• Represent interests beyond your own

- Including those of your peers, partners, and industry

- Be respectful and open to differing opinions from fellow TAC members

5

Page 6: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

A Master Plan IS…• A process stipulated in FAA AC 150/5070-6B• A comprehensive study that describes the short,

medium, and long-term airport development plans to meet future aviation demand

• Elements of a Master Plan studies- Public Involvement Program- Environmental Considerations- Inventory of Existing Conditions- Aviation Forecasts- Facility Requirements- Alternatives Development and Evaluation- Airport Layout Plans- Facilities Implementation Plan- Financial Feasibility Analysis

6

Page 7: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

A Master Plan is NOT…

• A business or marketing plan• A policy document

- Informs future policy – does not set it• Rigid and inflexible• An FAA development mandate

- …or a guarantee of FAA funding• A wish list• A Military Aircraft Basing Study

7

Page 8: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Boise Airport Master Plan Update Schedule

8

Page 9: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Inventory ofExisting Conditions

9

Page 10: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Purpose of Identifying Existing Conditions• Inventory BOI’s current state of condition as the basis for potential

future development• Collect data/information needed for technical elements of the

Master Plan Update- Aviation activity forecasts

• Current/historical aircraft operations, passenger counts, and socioeconomic data are important inputs to the forecast process

- Facility requirements• Existing conditions are measured against forecast demand to determine future

facility needs- Alternatives development and evaluation

• Existing operational and environmental issues may restrict or necessitate certain development alternatives

- Implementation/financial planning• Existing conditions can affect how future development is implemented/phased• Historical funding and other financial data serves as the basis for determining

financial feasibility of the development alternatives

10

Page 11: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

• Data/information has been gathered from interviews with and/or data requests made to:

- BOI Finance and Ground Transportation- BOI Security and Operations- BOI Facilities and Engineering- BOI Property and Contracts- Fixed Base Operators (Western Aircraft, Turbo Air, Jackson Jet Center)- Cargo operators (FedEx, UPS)- Military (Air National Guard, Army National Guard)- National Interagency Fire Center (NIFC)- FAA Airport Traffic Control Tower

• Types of data obtained to date include:- Prior Master Plan Update report- Current Airport Layout Plan and CAD drawings- 2015 FAR Part 150 Study- Ground transportation statistics- Airfield pavement condition data- Environmental and sustainability information- Utilities information

- Aircraft gate use data- Runway and taxiway usage- Socioeconomic data and projections- Airport parking analysis report- Airport lease log- Aviation activity data

Approach for Identifying Existing Conditions

11

Page 12: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Existing Conditions Elements• Inventory data is organized into the following categories for

documentation purposes:- Airfield facilities- Passenger terminal facilities- Support/ancillary facilities- Ground access and parking facilities- Utilities and stormwater drainage- Airspace and air traffic control procedures- Environmental inventory- Regional setting and land use- Nonaeronautical land/compatible land use planning- Socioeconomic data- Meteorological data

- Aviation activity statistics (to be included in activity forecasts chapter)- Financial data (to be included in financial feasibility chapter)

12

Page 13: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Aviation Activity Forecast

13

Section One

Local Trends

Page 14: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Despite Industry Consolidation the Air Service Market Continues to be Served by Multiple Airlines

NOTES: 1/ Actual flown departing seats. 2/ Enplaned passengers are passengers boarding an airplane from BOI. 3/ Total operations (arrivals and departures).SOURCE: City of Boise, Aviation Department, Traffic Reports, November 2016; FAA, OPSNET, November 2016; U.S. Department of Transportation (DOT), Form T-100, November 2016.

0

20

40

60

80

100

120

140

160

180

200

0.0

0.5

1.0

1.5

2.0

2.5

3.0

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Annual Aircraft Operations

3/(thousands)An

nual

Dep

artin

g Se

ats1/

and

Pass

enge

rs2/

(mill

ions

)

Calendar Year

Alaska Southwest Delta UnitedAmerican Other Enplaned Passengers Aircraft Operations

14

Page 15: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

The Way Airlines Utilize Capacity at BOI is Changing

NOTES: 1/ Actual flown departing seats. 2/ Enplaned passengers are passengers boarding an airplane from BOI. SOURCES: U.S. DOT, DB1B Survey, November 2016; U.S. DOT, Form T-100, November 2016.

0.0

0.5

1.0

1.5

2.0

2.5

3.0

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Annu

al D

epar

ting

Seat

s1/an

d Pa

ssen

gers

2/

(mill

ions

)

Calendar Year

O&D Connecting Through Empty Seats Total Seats

15

Page 16: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Non Stop DestinationsAugust 2006• 28 Destinations Served by Scheduled Airlines• 89 Average Daily Flights• 7,247 Average Daily Departing Seats• 4,385 Average Daily Departing Seats to Major

Airline Hubs1/

August 2016• 20 Destinations with Scheduled Service1/

• 64 Average Daily Flights• 5,999 Average Daily Departing Seats• 3,967 Average Daily Departing Seats to Major

Airline Hubs2/

NOTE: 1/ As published in Innovata schedule data as of August 2016. 2/ Major airline hubs are Atlanta (ATL), Denver (DEN), Dallas-Ft. Worth (DFW), Houston–Intercontinental (IAH), Los Angeles (LAX), Chicago–Midway (MDW), Minneapolis/St. Paul (MSP), Chicago–O’Hare (ORD), Phoenix (PHX), Seattle (SEA), San Francisco (SFO), and Salt Lake City (SLC).SOURCE: Innovata, November 2016.

16

Page 17: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Local Socioeconomic Conditions Have Stabilized in Recent Years

NOTES: Socioeconomic variables are for the BOI Air Trade Area, which includes Ada, Adams, Boise, Canyon, Elmore, Gem, Owyhee, Payette, Valley, and Washington counties. Economic data are inflation-adjusted.SOURCE: Woods & Poole Economics, Inc., November 2016.

(30%)

(20%)

(10%)

0%

10%

20%

30%

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Cha

nge

From

200

6

Calendar Year

Population Employment Total EarningsPersonal Income Personal Income per Capita Gross Regional Product

17

Page 18: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Both Passenger Volumes and Revenues Are Growing

NOTES: Includes passengers terminating at U.S. destinations only. 1/ O&D – Origin and Destination, passengers not connecting at the Airport.SOURCE: U.S. DOT, DB1B Survey, November 2016.

(50%)

(40%)

(30%)

(20%)

(10%)

0%

10%

20%

30%

40%

50%

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Cha

nge

From

200

6

Calendar Year

O&D Passengers O&D Revenue Average Fare1/

18

Page 19: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Aviation Activity Forecast

19

Section Two

Preliminary Forecast

Page 20: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Enplaned Passenger Forecast Methodology• Short-Term (2016): Conducted analysis of published schedules, carrier

announcements, and recent performance of carriers serving the Airport. Incorporated socioeconomic analysis to project underlying demand.

• Medium- to Long-Term (2017-2035): Conducted various socioeconomic analyses at the local and national levels to identify longer-term demand growth at the Airport. Resulting demand growth estimates were applied to estimate enplaned passengers.

• Overall: Assumed no additional industry “shocks”- Airline consolidation- Fuel spikes- Economic recession

• Forecast Scenarios- In addition to the baseline forecast, high and low growth scenario forecasts will

be developed

20

Page 21: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

0.0

0.5

1.0

1.5

2.0

2.5

3.0

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

Annu

al E

npla

ned

Pass

enge

rs (m

illio

ns)

Calendar Year

O&D Passengers Connecting Passengers

O&D and Connecting Enplaned Passenger Forecast

CAGR1/ = 2.4%8.6% from 2015 to 2016

NOTE: 1/ CAGR – Compound Annual Growth Rate, the average annual growth.SOURCES: City of Boise, Aviation Department, Traffic Reports, November 2016; U.S. DOT, DB1B Survey, November 2016; Ricondo & Associates, Inc., November 2016 (forecast).

Actual Forecast

Preliminary Draft Forecast for Review

Purposes Only

21

Page 22: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Passenger Aircraft Operations Methodology• Average seats per departure changed according to

fleet mix projections- Aircraft orders- Operating characteristics of airlines serving the Airport- National trends favoring larger aircraft

• Used historical trends to estimate completion factor of scheduled operations

• Assumed average load factor would remain relatively consistent throughout the forecast period

22

Page 23: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

0

10,000

20,000

30,000

40,000

50,000

60,000

70,00020

0620

0720

0820

0920

1020

1120

1220

1320

1420

1520

1620

1720

1820

1920

2020

2120

2220

2320

2420

2520

2620

2720

2820

2920

3020

3120

3220

3320

3420

35

Annu

al P

asse

nger

Airc

raft

Ope

ratio

ns

Calendar Year

Passenger Airline Operations Forecast

CAGR = 1.5%

SOURCES: City of Boise, Aviation Department, Traffic Reports, November 2016; U.S. DOT, Form T-100, November 2016; Innovata, November 2016; Ricondo & Associates, Inc., November 2016 (forecast).

Actual Forecast

Preliminary Draft Forecast for Review

Purposes Only

23

Page 24: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Load Factor and Seats per Departure Forecast

NOTE: 1/ Average number of enplaned passengers divided by total departing seats.SOURCES: City of Boise, Aviation Department, Traffic Reports, November 2016; U.S. DOT, Form T-100, November 2016; Federal Aviation Administration (FAA), OPSNET, November 2016; Innovata, November 2016; Ricondo & Associates, Inc., November 2016 (forecast).

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0

20

40

60

80

100

120

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

Average Load FactorAv

erag

e Se

ats

per D

epar

ture

Calendar Year

Seats per Departure Average Load Factor

Actual Forecast

Preliminary Draft Forecast for Review

Purposes Only

24

Page 25: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Cargo Volumes and Operations Forecast Methodology• Conducted socioeconomic regression analysis at the

local and national levels to identify relationships between socioeconomic variable and total cargo volumes

• Used forecast socioeconomic variables and their relationship with total cargo volumes to project cargo volumes

• Used the historical relationship between total cargo volumes and all-cargo operations to forecast all-cargo operations

25

Page 26: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

0

20

40

60

80

100

120

140

160

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035An

nual

Car

go V

olum

es (m

illio

ns o

f pou

nds)

1/

Calendar YearAll-Cargo Carrier Volumes Belly Cargo Volumes

Cargo Volume Forecast

CAGR = 2.2%

NOTES: 1/ Total volume, departing and arriving. 2/ All-cargo carriers do not transport passengers (e.g., FedEx, UPS). 3/ Belly cargo is cargo transported on passenger aircraft.SOURCES: City of Boise, Aviation Department, Traffic Reports, November 2016; U.S. DOT, Form T-100, November 2016; Ricondo & Associates, Inc., November 2016 (forecast).

2/ 3/

Actual Forecast

Preliminary Draft Forecast for Review

Purposes Only

26

Page 27: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

Annu

al A

ll-C

argo

Airc

raft

Ope

ratio

ns

Calendar Year

All-Cargo Aircraft Operations Forecast

CAGR = 1.8%

SOURCES: City of Boise, Aviation Department, Traffic Reports, November 2016; U.S. DOT, Form T-100, November 2016; Ricondo & Associates, Inc., November 2016 (forecast).

Actual Forecast

Preliminary Draft Forecast for Review

Purposes Only

27

Page 28: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

General Aviation/Other Air Taxi Aircraft Forecast Methodology• Analyzed historical relationship between

national and local general aviation activity• Used the historical relationship and projected

growth in general aviation hours flown in the FAA Aerospace Forecast to forecast operationsby aircraft type

- Piston- Turbine- Jet- Other

28

Page 29: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

0

20,000

40,000

60,000

80,000

100,000

120,00020

0620

0720

0820

0920

1020

1120

1220

1320

1420

1520

1620

1720

1820

1920

2020

2120

2220

2320

2420

2520

2620

2720

2820

2920

3020

3120

3220

3320

3420

35

Annu

al G

ener

al A

viat

ion

Airc

raft

Ope

ratio

ns

Calendar YearItinerant Local

General Aviation/Other Air Taxi Aircraft Operations Forecast

CAGR = 1.5%

SOURCES: FAA, OPSNET, November 2016; FAA, Traffic Flow Management System Counts (TFMSC), November 2016; FAA, FAA Aerospace Forecast: Fiscal Years 2016-2036, November 2016; Ricondo & Associates, Inc., November 2016 (forecast).

1/

NOTE: 1/ Local operations are aircraft operating only in the local traffic pattern of the Airport. All other operations are itinerant.

Actual Forecast

Preliminary Draft Forecast for Review

Purposes Only

29

Page 30: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,00020

0620

0720

0820

0920

1020

1120

1220

1320

1420

1520

1620

1720

1820

1920

2020

2120

2220

2320

2420

2520

2620

2720

2820

2920

3020

3120

3220

3320

3420

35

Annu

al M

ilita

ry A

ircra

ft O

pera

tions

Military Aircraft Operations

Military Aircraft Operations Forecast

Held constant based on the FAA TAF

SOURCES: FAA OPSNET, November 2016; Ricondo & Associates, Inc., November 2016 (forecast).

NOTE: Forecast military operations are held constant at 2015 levels, consistent with the approach in the FAA Terminal Area Forecast (TAF) for the Airport. Military operations are mission specific and have the potential for high variability depending on military needs.

Actual Forecast

Preliminary Draft Forecast for Review

Purposes Only

30

Page 31: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Aircraft Fleet Mix Methodology Forecast• Passenger airline fleet mix projections were based on:

- Aircraft orders- Operating characteristics of airlines serving the Airport- National trends favoring larger aircraft

• Cargo fleet mix was projected to remain at 2015 levels• General aviation fleet mix was based on forecast

operations by aircraft type

31

Page 32: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Passenger Fleet Mix Forecast

SOURCES: City of Boise, Aviation Department, Traffic Reports, November 2016; U.S. DOT, Form T-100, November 2016; FAA, OPSNET, November 2016; Ricondo & Associates, Inc., November 2016 (forecast).

NOTE: The representative aircraft indicated are not exhaustive and do not imply any particular aircraft will operate at the Airport in the future. They are provided as a comparison to aircraft seen operating at BOI in 2015.

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2015 2016 2020 2025 2035

Perc

ent o

f Pas

seng

er O

pera

tions

Calendar Year

Fewer than 51 Seats (CRJ2) 77–100 Seats (E190) 101–130 Seats (A319)151 Seats or More (MD83, B739) 131–150 Seats (B737, A320) 51–76 Seats (DH8D, E170, CRJ7)

Actual

Preliminary Draft Forecast for Review

Purposes Only

32

Page 33: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Airport Total Fleet Mix Forecast

SOURCES: City of Boise, Aviation Department, Traffic Reports, November 2016; U.S. DOT, Form T-100, November 2016; FAA, OPSNET, November 2016; Ricondo & Associates, Inc., November 2016 (forecast).

NOTE: The representative aircraft indicated are not exhaustive and do not imply any particular aircraft will operate at the Airport in the future. They are provided as a comparison to aircraft seen operating at BOI in 2015.

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2015 2016 2020 2025 2035

Perc

ent o

f Airp

ort O

pera

tions

Calendar Year

GA/Small (C206, CRJ2, DH8D, E170, UH1) Narrowbody (A320, B737, B752)Widebody (A306, A310, B763) Military (A-10, UH-60, C-130, F-15)

Actual

Preliminary Draft Forecast for Review

Purposes Only

33

Page 34: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

(20%)

(15%)

(10%)

(5%)

0%

5%

10%

15%

20%

2006

2008

2010

2012

2014

2016

2018

2020

2022

2024

2026

2028

2030

2032

2034

Fore

cast

Var

ianc

e Fr

om T

AFCalendar Year

Variance from TAF

Variance from TAF

0.0

0.5

1.0

1.5

2.0

2.5

2006

2008

2010

2012

2014

2016

2018

2020

2022

2024

2026

2028

2030

2032

2034

Annu

al E

npla

ned

Pass

enge

rs (m

illio

ns)

Calendar Year

Comparison of Enplaned Passenger Forecasts

SOURCES: City of Boise, Aviation Department, Traffic Reports, November 2016; U.S. DOT, Form T-100, November 2016; FAA, 2015 Terminal Area Forecast, November 2016; Ricondo & Associates, Inc., November 2016 (forecast).

NOTES: 1/ Adjusted to calendar year for comparison. 2/ Variance tolerance levels are 10% within 5 years and 15% within 10 years (FAA AC 150/5070-6B).

FAA Variance Tolerance Range2/

Historical 2016 BOI Master Plan Forecast 2015 FAA TAF1/

34

Preliminary Draft Forecast for Review

Purposes Only

Page 35: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Historical 2016 BOI Master Plan Forecast 2015 FAA TAF1/

Comparison of Aircraft Operations Forecasts

NOTES: 1/ Adjusted to calendar year for comparison. 2/ Variance tolerance levels are 10% within 5 years and 15% within 10 years (FAA AC 150/5070-6B).SOURCES: City of Boise, Aviation Department, Traffic Reports, November 2016; U.S. DOT, Form T-100, November 2016; FAA, OPSNET, November 2016; FAA, FAA Aerospace Forecast: FY 2016-2036, November 2016; FAA, 2015 Terminal Area Forecast, November 2016 ; Ricondo & Associates, Inc., November 2016 (forecast).

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

2006

2008

2010

2012

2014

2016

2018

2020

2022

2024

2026

2028

2030

2032

2034

Annu

al A

ircra

ft O

pera

tions

(tho

usan

ds)

Calendar Year

(20%)

(15%)

(10%)

(5%)

0%

5%

10%

15%

20%

2006

2008

2010

2012

2014

2016

2018

2020

2022

2024

2026

2028

2030

2032

2034

Fore

cast

Var

ianc

e Fr

om T

AFCalendar Year

Variance from TAF

Variance from TAF

FAA Variance Tolerance Range2/

35

Preliminary Draft Forecast for Review

Purposes Only

Page 36: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Comments and Questions

36

Page 37: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Next Steps

• Finalize forecast numbers and documentation• Submit draft forecast to FAA for review/

approval• Begin analysis of facility requirements

• Next TAC meeting: May 2017, to be determined in February

- Topics: Facility requirements and initiation of alternatives development

37

Page 38: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Master Plan Update Information and Master Plan CommentsMaster Plan Update Website:http://www.iflyboise.com/about-boi/master-plan/

38

Page 39: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Public Involvement Program

Public Open House – Tonight• Boise River Room

- Third Floor of Airport• Two Sessions

- 5 p.m. – 6 p.m.- 7 p.m. – 8 p.m.

Parking will be validated

39

Page 40: Master Plan Update - Boise Airport...Master Plan Update A Master Plan IS… • A process stipulated in FAA AC 150/5070- 6B • A comprehensive study that describes the short, medium,

Master Plan UpdateMaster Plan Update

Thank you!

40