Making Waste Productive. Creating Energy from Waste.
-
Upload
nickolas-newman -
Category
Documents
-
view
226 -
download
2
Transcript of Making Waste Productive. Creating Energy from Waste.
![Page 1: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/1.jpg)
Making Waste
Productive
![Page 2: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/2.jpg)
Creating Energy from Waste
![Page 3: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/3.jpg)
Creating Energy Inputs from Current Waste Outputs
► Organic material (waste) can be converted into energy (methane) through a process called anaerobic digestion
► Applications where waste disposal costs $100,000s/year can be turned into energy worth $100,000s/year
![Page 4: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/4.jpg)
Creating Energy Inputs from Current Waste Outputs
► Two industries suitable to making energy from waste outputs● Food industry
Cheese/Dairy plants
Snack Food plants
Prepared Food plants
● Biofuels industry
![Page 5: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/5.jpg)
Converting Biomass to Energy ► The energy value of a waste stream is measured in pounds of
chemical oxygen demand (COD)
► Every pound of COD digested results in 5.6 cubic feet of methane
► An effective anaerobic digester usually converts 95+% of the available COD into methane
► Every cubic foot of methane produces around 1,000 BTU’s of energy
● Approximately 5,600 BTUs in a pound of COD
► A pound of organic solids will contain around a pound of COD
► A truck load of solids can contain around 50,000 pounds of COD● Energy potential to power a 1 MW generator on a continuous basis
![Page 6: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/6.jpg)
Segregating Biomass Streams
► Process and environmental technologies segregate the insoluble fraction of a biomass stream from the soluble ● Isolate the energy potential material within a
facility
Clarifiers
Screens
All types of filtration and dissolved air flotation devices
● The isolated insoluble high energy potential stream usually ends up on a truck…
![Page 7: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/7.jpg)
Types of Biomass Streams to Consider
► Hauled material
► Unsalable product
► Isolated streams
► Wastewater
In most applications a significant portion of the energy is contained in a small portion of the waste
![Page 8: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/8.jpg)
Three Most Common Disposal Methods
►Land application
►Landfill
►Animal feed
![Page 9: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/9.jpg)
Paying others to haul and dispose of biomass. . . Is the waste of a valuable asset
Stop feeding your cash to cows!
![Page 10: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/10.jpg)
How the Anaerobic Process Works to Create Energy
![Page 11: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/11.jpg)
Creating Energy Using the Anaerobic Process
Conversion of organic material
Raw input material:Fats, Oils, proteins, starches, carbohydrates, sugars
Digester
Acetogenic bacteria break complex food molecules down to
produce Carbon dioxide and Acetic Acid
Methanogenic bacteria break acetic acid down
to produce Methane
Acetic Acid
Carbon Dioxide Methane: 5.6 ft3/ lb COD
Discharge:
>95% COD Removal
99% BOD Removal
Biomass accumulation: ~1% of Aerobic rate
• Air is not used so process proceeds at a much lower energy input than Aerobic treatment
pH Adjustment
Temperature Control
![Page 12: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/12.jpg)
Factors in Renewable Energy Plant Design
►Material handling
►Solids retention
►Good contact
►pH control
►Temperature control
►Nutrients
►Gas utilization
![Page 13: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/13.jpg)
The Economics of Making Waste Productive
![Page 14: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/14.jpg)
Factors that Weigh in an Economic Decision
►Avoided disposal cost
►Energy value
►Green value—Some options have significant federal/state taxes and other credits ● Renewable energy credits
● Emissions trading credits
![Page 15: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/15.jpg)
Identifying and Evaluating Energy
Potential
![Page 16: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/16.jpg)
Identifying Energy Potential
►There is a potential project if…● Gas costs greater than $7 per MM BTU
● Electricity costs greater than 7.5¢ per KWh
● The plant produces 20,000 lbs. or more COD per day
● The plant is situated where there is a Renewable Portfolio Standard (RPS) in place
● Significant avoided cost
![Page 17: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/17.jpg)
Identifying Energy Potential
►By geographic area, in cooperation with regional facility (power plant, research facility, cooperative)
►By individual plant
![Page 18: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/18.jpg)
Identifying Energy Potential
► By individual plant: 3-step process ● STEP ONE: Data evaluation, using existing plant data
Estimate the effectiveness technology to generate energy in the form of methane gas
● STEP TWO: Lab evaluation, using actual samples of plant residuals and organic waste
Determine parameters, limits and potential quantities of methane gas generation
● STEP THREE: Demonstration project
Test the design parameters on waste residuals to finalize the optimum factors for a full-scale plant
![Page 19: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/19.jpg)
Evaluating Energy Potential
► Demonstration project (pilot) can be an important step to developing design
► Material handling, gas storage, waste blending
![Page 20: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/20.jpg)
Demonstration Project: Cheese Plant
► Project timeline: 9-29-05 to 5-25-06
► Waste source● Permeate stream
COD concentration averaged 52,000 mg/l
► Existing disposal methods ● Recovery of whey protein concentrate
● Recovery of lactose
● Treatment of 350,000 gallons per day of waste in plant-owned treatment plant
Trucked 6,000 gallon of waste from WPC and lactose recovery process
![Page 21: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/21.jpg)
Demonstration Project: Cheese Plant
► Demonstration project goals● Replicate a full-scale loading rate
50 lbs of feed COD/1000 gallons of digester liquid volume
● Determine COD Removal Efficiency
● Evaluate Gas Quality
● Evaluate Material handling needs
● Determine optimum factors for a full-scale plant
![Page 22: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/22.jpg)
Demonstration Project: Cheese Plant
► Test history● Permeate (whey filtered to remove protein) fed
to digester (1-18-06―5-25-06)
Average COD strength of 53,000 mg/l
Ramped up until the target feed rate of 300 lbs COD/day (50 lbs/1000 gallons of digester volume)
![Page 23: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/23.jpg)
Demonstration Project: Cheese Plant
► Test history: COD
● Operating at design capacity on permeate
![Page 24: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/24.jpg)
Demonstration Project: Cheese Plant
► Test history: methane production
● Relatively steady
Flow dropped when the gas flow was shut down to clean the gas discharge line of accumulated moisture
![Page 25: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/25.jpg)
Demonstration Project: Cheese Plant
► Test history: methane flow per unit of COD removed
● Consistently within the projected flow rate of 5.6 cubic feet of methane/lb of COD
![Page 26: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/26.jpg)
Demonstration Project: Cheese Plant
► Test history: BOD
● Virtually the entire BOD available has been consumed in the digester
![Page 27: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/27.jpg)
Demonstration Project: Cheese Plant
► Test history: alkalinity
● Stable; most of the alkalinity is retained in the digester, conserving chemical
![Page 28: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/28.jpg)
Demonstration Project: Cheese Plant
► Test history: calcium (needed for growth)
● Sufficient quantities; supplemental calcium is not required
![Page 29: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/29.jpg)
Demonstration Project: Cheese Plant
► Test history: hydrogen sulfide
● A contaminant in the gas could cause operational difficulties in high concentrations; data inconclusive
![Page 30: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/30.jpg)
Demonstration Project: Cheese Plant
► Test history: solids—TS, VS, TSS, VSS ● TSS-No accumulation of total suspended solids
![Page 31: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/31.jpg)
Demonstration Project: Cheese Plant
► Test history: Methane and CO2 Production ● Bag samples were collected to verify the accuracy of the on-line instruments
that measure COD and methane (two manufacturers = 4 instruments)
![Page 32: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/32.jpg)
Demonstration Project: Cheese Plant
► Test history ― summary
● Conversion of the dairy permeate to energy is straight forward and achievable
Digester operated in a stable fashionNo accumulation of COD in the digesterConverted 98 percent of the COD (>99% of the BOD) to energyGas production met the design value of 5.6 cubic feet of methane/lb of COD removed
► Energy breakdown● 80% to 100% of gas demand
● 1 MW power output plus heat recovery
► Status● Demonstration project completed
● Final plant design
![Page 33: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/33.jpg)
Demonstration Project: Cheese Plant
► Projected ROI—Assumes output of gas to be burned in boilers or fed into a co-generation facility to generate electricity and waste heat● Option A assumes the addition of a co-generation unit and the
recovery of heat from that unit
● Option B assumes that the biogas is only burned in existing boilers
● Both options assume the biogas plant is NewBio’s property and the biogas utilization equipment is the client’s property
► Calculations based on 120 months contract term● No “Green Credits” included
![Page 34: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/34.jpg)
Demonstration Project: Cheese Plant
► Projected ROI
![Page 35: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/35.jpg)
Demonstration Project: Cheese Plant
► Projected ROI
![Page 36: Making Waste Productive. Creating Energy from Waste.](https://reader035.fdocuments.net/reader035/viewer/2022062308/56649dd45503460f94accd8f/html5/thumbnails/36.jpg)
More Information
►Contact NewBio● www.newbio.com
● 952-476-6194