Date: 22-Dec-12
Time : 00.00 - 24.00
TOTAL PRODUCTION STATUS
UF Unit
Feed Flow Daily Average 0 l/sec
Hour of Operation 0:00 Hour
Total Production UF 0 m3
WATER QUALITY DAILY AVERAGE
Raw Water UF Unit
pH 0.00 0.00 -
Turbidity 0.00 0.00 0.00 #DIV/0! NTU
Free Cl2 - - mg/l
TOTAL SALES STATUS UF Water Meter Reading
Start End
Total Sales from
Total Sales 22-Dec-125-Nov-12
Untill
5-Nov-12 22-Dec-12
UF Output Discharge 10,930 - (10,930) 0
GENERAL PARAMETER STATUSPower consumption
Time/Date Start KWH End KWH Consumption (KWH)
00.00 - 24.00 0 0 0 #DIV/0!
Chemical Consumption
IPA BAJA 230 LPS UF
Chemical Dosage
ChemicalDosage
(mg/l) (kg) (mg/l) (kg)
PAC 0.00 0.00 HCl
NaOH
Soda Ash
REMARKS
UF sytem already operating
Daily Report MOYA Bekasi for Water Treatment Using UF
IPA BAJA 230 lps
Efficiency of Water Treatment
(%)
(m3) (m3) (m3) (m3)
KWH / m3
Consumption Chemical
Consumption
Chemical
NaOCl
00.00 - 24.00
DAILY MONITORING LOGSHEET UF INSTALATIONPT.MOYA BEKASI JAYA IPA TEGAL GEDE
Tanggal : 22-Dec-12
Jam
Feed Pump UF A UF B UF C UF D UF E BY PASS Water Quality UF Out put TOTAL
A B P. In P. Conc Flow Totalizer P. In P. Conc Flow Totalizer P. In P. Conc Flow Totalizer P. In P. Conc Flow Totalizer P. In P. Conc Flow Totalizer Flow Totalizer
pH
TBDFlow Totalizer
Out let UF
(%) (Bar) (l/s) (Bar) (l/s) (Bar) (l/s) (Bar) (l/s) (Bar) (l/s) (l/s) (NTU) (l/s) ISOLV
0:00
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
24.00
No RemarkMengetahui :
1 Shift I
2 Shift II3 Shift III ( )
In Put AMIAD
Out let AMIAD
(m3) (m3) (m3) (m3) (m3) (m3) (m3)
Jam Start Produksi
Jam Reservoir Over Flow/Stop Produksi
Lama Produksi (jam)
45
Total production hour per day
15724.8
Jumlah Produksi/jam
(m3)
DAILY MONITORING LOG SHEET IPA BAJA 2 (Cap. 230 LPS)
PT.MOYA BEKASI JAYA IPA TEGAL GEDE
Date :
Jam
IPA BAJA 2 (Capacity 230 LPS)
RAW WATER PAC NaOCl (Natrium Hypho Chloride) Soda AshWATER QUALITY
BREAK TANK After AMIAD
TBD pH
Dosis Dosis Dosis TBD pH
TBD pH
TBD pH
(NTU) (l/det) (PPM) (Hz) (%) (PPM) (kg/hari) (PPM) (%) (kg/hari) (PPM) (%) (kg/hari) (NTU) (minute) (NTU) (NTU) (Hour)
00.00
02.00
04.00
06.00
08.00
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
Total/Day
Average
Debit air baku
Hour of Operation
BAK SUPERNATAN SEDIMENTASI
Konsen- trasi
Inverter Dosing
Pump 230 l/d
Struk Pompa Dosing
Chemical Usage
Konsen- trasi
Struk Pompa Dosing
Chemical Usage
Konsen- trasi
Struk Pompa Dosing
Chemical Usage
Sludge Drainage
(PPM) (PPM)
DAILY MONITORING LOG SHEET POWER UF SYSTEM PT.MOYA BEKASI JAYA IPA TEGAL GEDE
Date :
JAM
AMR UF AMR PLN
E-Total Total E-Total Total
(KWh) (KWh) (KVArh) (KVArh) (KWh) (KWh) (KVArh) (KVArh)
00.00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
24:00
Average
Tot/Day
Jumlah Pemakaian/jam
Jumlah Pemakaian/jam
Jumlah Pemakaian/jam
Jumlah Pemakaian/jam
DAILY LOGSHEET RECORDING FLOW METERPT.MOYA BEKASI JAYA IPA TEGAL GEDE
Date :
JamRaw Water Intake Kedasih Raw Water IPA BAJA 230 l/det Raw Water IPA BAJA 125 l/det Outlet IPA BAJA 125 l/det Kedasih (2) 60 LPS Outlet IPA BAJA 230 l/det Distribusi R2 (Selatan)
Flow Totalizer Flow Totalizer Flow Totalizer Flow Totalizer Flow Totalizer Flow Totalizer Flow Totalizer(l/s) (l) (l/s) (l/s) (l/s) (l) (l/s) (l) (l/s) (l/s) (l)
00.00
01.00
02.00
03.00
04.00
05.00
06.00
07.00
08.00
09.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
Average
Tot/Day :
Shift 1
Shift 2
Shift 3
(m3) (m3) (m3)
DAILY MONITORING LOG SHEET IPA BAJA 1 (Cap. 125 LPS)PT.MOYA BEKASI JAYA IPA TEGAL GEDE
Date :
Jam
IPA BAJA 1 (Capacity 125 LPS)
RAW WATER ALUM POLYMERWATER QUALITY
Bak Supernatan Sedimentasi Sand Filter
TBD pH
Dosis Dosis TBD pH
TBD pH
Backwash
(NTU) (l/det) (%) (%) (PPM) (kg/hari) (%) (%) (PPM) (kg/hari) (NTU) (detik) (NTU) (Hour)
00.00
02.00
04.00
06.00
08.00
10.00
12.00
14.01
16.00
18.00
20.00
22.00
24.00
Tot/Day
Average
Debit Air Baku
Hour of OperationKonsen-
trasi Struk
Pompa Dosing
Chemical Usage
Konsen- trasi
Struk Pompa Dosing
Chemical Usage
Sludge Drainage
(M3)
DAILY MONITORING LOG SHEET POWER & DISTRIBUTIONPT.MOYA BEKASI JAYA IPA TEGAL GEDE
Date :
JAM
RESERVOAR UTARA (R-1) RESERVOAR SELATAN (R-2)
DISTRIBUSIPOST CHLORINASI - NaOCl CLEAN WATER QUALITY
DISTRIBUSILEVEL
POST CHLORINASI - NaOCl CLEAN WATER
Dosis TBD pH
Dosis TBD pHFlow Meter Totalizer Flow Meter Totalizer
(l/det) (m) (BAR) (%) (ppm) (kg/hari) (NTU) (mg/l) (l/det) (m) (BAR) (ppm) (ppm) (kg/hari) (NTU) (mg/l)
00.00
02.00
04.00
06.00
08.00
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
Tot/day
LEVEL AIR
PRESSURE GAUGE
PRESSURE GAUGEKonsen-
trasi Chemical
UsageFree
ChlorineKonsen-
trasi Chemical
UsageFree
Chlorine
(m3) (m3)
Average