LNG Tanker Wartsila Engine Repair Final Report

37
LNG tanker Wartsila Engine repair Repair completed by LOCKNSTITCH Inc. July 2012

Transcript of LNG Tanker Wartsila Engine Repair Final Report

Page 1: LNG Tanker Wartsila Engine Repair Final Report

LNG tanker Wartsila Engine repairRepair completed by LOCK‐N‐STITCH Inc.July 2012

Page 2: LNG Tanker Wartsila Engine Repair Final Report

A1A Cam box damage

Damaged cam box area on A side

Page 3: LNG Tanker Wartsila Engine Repair Final Report

Damaged area removed using a handheld grinder

Series of drilled holes to help with removal of the damaged area

Page 4: LNG Tanker Wartsila Engine Repair Final Report

First set of stitching pins installedSecond set of stitching pins installed

Page 5: LNG Tanker Wartsila Engine Repair Final Report

Locks installed completely around entire patch to add additional strength 

Page 6: LNG Tanker Wartsila Engine Repair Final Report

Completed repair on A1A Cam box

Page 7: LNG Tanker Wartsila Engine Repair Final Report

Damaged B1 Cam box

Page 8: LNG Tanker Wartsila Engine Repair Final Report

Damaged area cut out and ready to accept patch

Page 9: LNG Tanker Wartsila Engine Repair Final Report

Large patch fit into place

And a second patch was fitted at a different angle

Page 10: LNG Tanker Wartsila Engine Repair Final Report

Stitching is almost completed and Locks are ready to be installed

Page 11: LNG Tanker Wartsila Engine Repair Final Report

Second patch being stitched 

Locks installed around entire patch to add additional strength 

Page 12: LNG Tanker Wartsila Engine Repair Final Report

Cam box B1 repair completed

Page 13: LNG Tanker Wartsila Engine Repair Final Report

Damaged B1 Inspection door

Page 14: LNG Tanker Wartsila Engine Repair Final Report

Cutting out damaged area to accept new casting around inspection door B side.

Area cut out to accept new casting.

Page 15: LNG Tanker Wartsila Engine Repair Final Report

New casting for inspection door being manufactured  

Page 16: LNG Tanker Wartsila Engine Repair Final Report

New casting being fitted and ready to start metal stitching

Page 17: LNG Tanker Wartsila Engine Repair Final Report

Inspection door metal stitched and ready to have gasket surface machined

Page 18: LNG Tanker Wartsila Engine Repair Final Report

Inspection door metal stitching completed

Page 19: LNG Tanker Wartsila Engine Repair Final Report

Back side of inspection door opening with locks installed to add additional strength along the repair and the milling machine is being mounted

Page 20: LNG Tanker Wartsila Engine Repair Final Report

Inspection door gasket surface being machined with our 7’ bed mill

Page 21: LNG Tanker Wartsila Engine Repair Final Report

Inspection door metal stitching repair completed and the gasket surface has been machined.  

Page 22: LNG Tanker Wartsila Engine Repair Final Report

Damaged A side inspection door

Page 23: LNG Tanker Wartsila Engine Repair Final Report

Removing damaged area by grinding out area to accept new casting

Page 24: LNG Tanker Wartsila Engine Repair Final Report

Damaged area removed and ready to accept new casting

Page 25: LNG Tanker Wartsila Engine Repair Final Report

Metal stitching using our Castmaster stitching pins

Page 26: LNG Tanker Wartsila Engine Repair Final Report

Gasket surface on inspection door repair completed ready to be machined 

Page 27: LNG Tanker Wartsila Engine Repair Final Report

Inspection door A side gasket surface repaired and machined

Page 28: LNG Tanker Wartsila Engine Repair Final Report

Damaged area on the inside of the water channel

Page 29: LNG Tanker Wartsila Engine Repair Final Report

Removing damaged area by drilling holes from the bottom of the water channel

Page 30: LNG Tanker Wartsila Engine Repair Final Report

Water channel damaged removed and ready to accept new casting 

Page 31: LNG Tanker Wartsila Engine Repair Final Report

Making the template for the water channel casting

Page 32: LNG Tanker Wartsila Engine Repair Final Report

New casting metal stitched and ready to be hand finished

Page 33: LNG Tanker Wartsila Engine Repair Final Report

Water channel repair completed 

Page 34: LNG Tanker Wartsila Engine Repair Final Report

CASTMASTERstitching pins havethe unique abilityto draw the sides ofa crack togetherwhen tightenedinto the drilled,Spotfaced andtapped hole.

CASTMASTER® Stitching Pins

Page 35: LNG Tanker Wartsila Engine Repair Final Report

Specifications:

Tensile strength: L20B = 6650 PSI each; L20S = 13,125 PSI eachMaterial: heat‐treated 4130 steel

Page 36: LNG Tanker Wartsila Engine Repair Final Report

Final repair inspection process

Final repair inspection process1. LNS technicians performed in‐process and final inspections of eachrepair site once the metal stitching process for that area wasconcluded.2. The process involved using a magnetic particle inspection processwith either dry powder or wet particle methods.3. The metal stitching locks and stitching pins have magnetic propertiesthat are slightly different from the cast iron so the outline of therepairs attracts the magnetic powder when a special magnet isplaced on the part with the North and south poles spanning therepair.4. This method quickly and easily shows any gaps between the pins orany crack that may have been missed.5. If a gap is detected on either side of the repaired wall, additionalstitching pins could have been added to the repair.6. The final inspection showed no spaces, gaps or cracks at or aroundthe metal stitching repairs that were repaired.

Page 37: LNG Tanker Wartsila Engine Repair Final Report

This repair required eight (8) weeks to complete.