Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

33
Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013

Transcript of Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

Page 1: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

Linac BPM Electronics Upgrade

PIP Status reportElliott McCroryMarch 6, 2013

Page 2: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 2

Outline The good parts

All modules are installed All positions have been verified as reasonable ACNET Devices read correctly OAC is running and doing many of the specified

actions New Java applications are loaded

The not-so-good part Continue to have commissioning problems with

modules OAC response is not great Java applications need work

Measurements Software Status

3/5/2013

Page 3: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 3

Personnel Review Instrumentation

EMNathan EddyTechnicians as needed

LinacMatt GardnerTechnicians as needed

PPDSten HansenTerry Kiper

3/5/2013

Page 4: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

The Good Parts

Page 5: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 5

Installations 15 “Masters” in 15 crates are online.

Some BPM Pickups are faulty BPV5OT: Is beam hitting the pickup?

Decimal Name1 Tank 2 131.225.131.199 LNBP01 LEL 2 Out 33 0 0 0 0 0 0 0 0 0 02 Tank 3 131.225.131.205 LNBP02 LEL 3 In 19 LEL 3 Out 12 0 0 0 0 0 0 0 03 Tank 4 131.225.131.207 LNBP03 LEL 4 In 14 0 0 0 0 0 0 0 0 0 04 Tank 5 131.225.131.209 LNBP04 LEL 5 In 43 LEL 5 Out 57 0 0 0 0 0 0 0 05 LDR-0 131.225.131.249 LNBP05 HEL 0-2 23 HEL 0-3 54 HEL 0-4 30 HEL 1-1 39 HEL 1-2 21 HEL 1-3 13

6 LDR-0 131.225.131.218 LNBP06 HEL 2-1 31 HEL 2-2 34 HEL 2-3 48 HEL 3-1 59 HEL 3-2 44 BP201 27

7 LDR-0 131.225.131.242 LNBP07 HEL 3-4 28 HEL 4-1 53 HEL 4-2 45 HEL 4-3 52 HEL 4-4 56 HEL-3-3 17

8 LDR-1 131.225.131.243 LNBP08 HEL 5-1 22 HEL 5-2 60 HEL 5-3 49 HEL 5-4 35 HEL 6-1 29 HEL 6-2 2

9 LDR-1 131.225.131.248 LNBP09 HEL 6-3 40 HEL 6-4 6 HEL 7-1 58 HEL 7-2 26 HEL 7-3 36 HEL 7-4 55

10 LG1-RR2-3 131.225.138.107 MTABP7 BP204 38 BP203 5 BP202 25 ?? 16 0 0 0 0

11 LG1-RR4-1 131.225.138.108 MTABP8 Q1 15 Q2 10 LAM 41 Q3 89 Q4 63 Q5 70

12 GR24-RR6-1 131.225.138.109 MTABP9 Q6 73 Q7 71 Q8 68 Q9 51 0 0 0 0

13 GR24-RR6-3 131.225.138.110 MTABP10 Q10 90 V-Q11 11 Q12 18 DEB 42 Q13 24 0 0

14 GR24-RR6-3 131.225.138.111 MTABP11 Q15 3 Q16 69 Q14 8 Q17 92 SEPU 86 HSEPD 0

15 GR24-RR6-3 131.225.138.025 MTABP12 PFOIL 9 L1D 67 S01 64 L1U 66 S24 72 0 0

IP Address BPM NamesMaster Slave 1 Slave 2 Slave 3 Slave 4 Slave 5

Low

-Ene

rgy

Linac

Diag

nosti

cs

Room

400

MeV

Line

LocationCrate

#

3/5/2013

Page 6: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 6

Modules on hand These 71 modules exist

S/N 3, 4, 6, 7, 9-20, 22-37, 39-61, 64, 65, 67-74, 87, 90, 91, 93

Photos – Tank 5 (Typical of LEL)

3/5/2013

Page 7: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

Diagnostics Room

Page 8: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

Linac 400 MeV

3/5/2013

Page 9: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

Booster 400 MeV

3/5/2013

Page 10: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

Booster Rack 2

3/5/2013

Page 11: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

Booster Rack 3

3/5/2013

Page 12: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

Measurements

BPM Status 123/5/2013

Page 13: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 13

Simple Phase Correlation

L:D52BF

L:D

74

BF

3/5/2013

Page 14: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 143/5/2013

SVD for Phases0: D42BF

1, 2: D7TOR

SV 3

Page 15: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 15

Simple Position Correlation

L:D22BPH

L:D

23

BPH

3/5/2013

Page 16: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 16

Simple Position Correlation

B:HPLAM

B:H

PQ

2

3/5/2013

Page 17: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 17

SVD: First singular value

3/5/2013

D12BPV

D34BPV

D54BPV

D62BPVD64BPV

D72BPV

D22BPVD23BPV

D31BPV D43BPV VPQ2

Page 18: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 18

Second singular value

3/5/2013

D13BPH

D21BPH D23BPH

D31BPH

D41BPH

D51BPH

D61BPH

D71BPH

D74BPH

HPQ2

Page 19: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 19

7th & 9th singular value: Noisy?

3/5/2013

D13BPV

D44BPH

Page 20: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

Controls Software

BPM Status 203/5/2013

Page 21: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 21

Java Applications: Screen Shots

3/5/2013

Page 22: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 22

Linac BPM Expert

3/5/2013

Page 23: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 23

Access to internal registers

3/5/2013

Page 24: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 24

Calibration with CalTone

3/5/2013

Page 25: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 25

Synchronous DAQ Waveforms

3/5/2013

Page 26: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 26

Sync. DAQ Waveforms

3/5/2013

Page 27: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 27

Multiplexed Waveforms

3/5/2013

Page 28: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 28

Register Summaries

3/5/2013

Page 29: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

Ongoing work

Page 30: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 30

List of commissioning problems

Several one-offs that have been fixed E.g., forgetting to “save” registers properly so that

they come up in the correct configuration. Simple problems with modules (e.g., loose

connection, S/W bugs)• Easily repaired by Hansen/Kiper

NIM Power supply failure

805 MHz input signal problem Each module requires 805 MHz at ~ -10 dBm When it goes away, FPGA enters undefined state Kiper & Hansen understand the problem; developing

a work-around This seems to manifest itself only in the 400 MeV

BPMs• Source: Debuncher room

3/5/2013

Page 31: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 31

Controls Software TO DO Booster 400 MeV line steering

Bill Marsh & Mike Sliczniak are on it

Problems in OAC/Module communicationsLeads to slow response

• taking fraction minute to see resultGives impression that Java apps are

unreliable

More bells & whistles?

3/5/2013

Page 32: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 32

Other TO DO Calibration Better data analysis

3/5/2013

Page 33: Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.

BPM Status 33

Summary Installation is complete Still seeing startup problems Java/expert apps need work

3/5/2013