Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership...
Transcript of Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership...
![Page 1: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/1.jpg)
Lean in
“Non-Transactional” Work
Craig Szelestowski
Canadian Lean Summit
April 24, 2019Copyright of this material is owned by Lean Agility Inc. Not for duplication or distribution without prior written consent.
![Page 2: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/2.jpg)
Creation of Spring project update (intranet article)
2
DM
ADM ADM EA
Project
DG
Project
DG EA
Project
Director
Project
Liaison
Project
Manager
Comms.
Liaison
DG
CommsCIO CFO CHRO COO
DM EA
Subject
Matter
Expert
Subject
Matter
Expert
Subject
Matter
Expert
Subject
Matter
Expert
Subject
Matter
Expert
Article
approved
Article
posted
on
Intranet
Fall
Two-page intranet article
Handoffs 97
Elapsed Time 9 months
Effort Time >100 hours
Organizational
Learning
?
![Page 3: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/3.jpg)
3
Why are the successes in Lean Government overwhelmingly in high-volume, transactional processes?
![Page 4: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/4.jpg)
What about the rest of us who don’t work in high-volume, transactional processes?
We deliver value by creating
• direction
• strategies
• policies, guidance
• analysis
• research
How can Lean help us deliver these things?
4
![Page 5: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/5.jpg)
A lack of progress in non-transactional processes
perpetuates a lack of credibility with leaders.
“Lean is only for operational people, not strategic
or leadership people”
“I don’t do process work”
Applying “transactional” Lean approaches to deep-
thinking, non-transactional, work may result in
Doing the wrong thing faster
5
![Page 6: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/6.jpg)
Mass Processing
• Continuous flow
• Concrete –ALGORITHMIC
• Mostly known information
• Output: forms, templates, data
• Critical Competency: quick, consistent decision-making and repeatability
The Rest of Us
6
• “Project” based
• Abstract / ambiguous -HEURISTIC
• Usually missing information
• Output: policy, briefing, business case, communications documents
• Critical Competency: deep thinking and analysis
![Page 7: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/7.jpg)
Applying Lean to a document creation / review process
7
Creation and Approval of a submission to
Minister for a new Collector coin design:
Creation and Approval of a submission to
Minister for a new Collector coin design:
12 months → 6 months → 90 days
Creation and Approval of a submission to
Minister for a new Collector coin design:
12 months → 6 months → 90 days
Minister’s Office Turnaround time:
Creation and Approval of a submission to
Minister for a new Collector coin design:
12 months → 6 months → 90 days
Minister’s Office Turnaround time:
60-90 days → 4-5 days
![Page 8: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/8.jpg)
8
Issues in “Non-Transactional Development” Work
![Page 9: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/9.jpg)
Initial Analysis
Tasking
Research/ Consultation
9
Re-Tasking
Clien
tL
ead
ers
hip
Dra
fter
Unclear:• Voice of client and
“job” of the document unclear
• All requests go through same complex process
• Unclear requests proceed• Workload not assessed –
creating overwhelm• Clock ticking – takes too
long to get to drafter?
• Investing effort without clear question(s) so analysis, research and consultation broader than required
![Page 10: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/10.jpg)
Write 1st Draft
Review & Request Changes
10
Make Changes
• Unaware of review criteria, “what success looks like”
• Drafting without “signals check” creates false starts = low quality 1st draft
• Little knowledge of VOC• Changes not logged, no learning• Sequential, not concurrent reviews add
time and effort• “Review” can take 75% of lead time
• Changes go back up the “ladder”
![Page 11: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/11.jpg)
11
Approve Document
Consume Document
• Examples of “best in class documents” and approval criteria not shared with drafter – so chronic rework, not learning
• After 17 previous reviews, the most senior reviewer still identifies rework!
• Invisible process, not managed or improved
• No “owner”• No measures
![Page 12: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/12.jpg)
Five issues
in
“non-transactional”
or development
work
12
Many review
“loops”
Too much
work in
progress
Unclear “job
to be done”
Preventable
work / 8 Lean
wastes
Workflow is
invisible
![Page 13: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/13.jpg)
13
Unclear
“job to be
done”
![Page 14: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/14.jpg)
14
OutputProcess
Client /
End
User
Outcomecreates
an
for
the
to reach
an
Intranet
document
(article)
Document
creation
process
EmployeesUnderstand
workplace
changes
creates
anfor to
![Page 15: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/15.jpg)
Understand “The Job” of a Milkshake
15
![Page 16: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/16.jpg)
The less clear “the job” is…
The more review loops and preventable effort you will face
Create clarity early.
16
![Page 17: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/17.jpg)
17
Review
“loops”
![Page 18: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/18.jpg)
18
Element Question Notes
1. Decision
▪ What is the decision that was taken?
▪ What business problem is it designed to fix?
Insert bullet point answers to the
questionshere
2. Options
▪ What options were considered?
3. Rationale
▪ Why the selected option was chosen over the others
▪ Who was consulted in arriving at the decision?
4. Steps taken to mitigate human impact
▪ What is the human impact of the decision (What does this mean for me? Impact on jobs, roles, work methods, etc.)
▪ What steps are being taken to minimize the human impact of the decision?
5. Next Steps ▪ List the elements of the decision that remain to be decided.
▪ What is the next decision to be taken on this subject?
▪ When will the next decision be taken? When are remaining decisions to be taken (when will “loose ends” be tied up?)
6. Feedback
▪ To whom should the reader turn for more information or to give feedback?
Use document
templates to
simplify and
clarify content
early – to reduce
rework later!
![Page 19: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/19.jpg)
Give feedback by Email
Effort: 2 hours
Elapsed Time: 4 weeks
Paper trail
Slow
High effort
Misunderstanding
Perpetuates low trust
Give feedback Face-to-Face
Effort: 5 minutes
Elapsed time: 5 minutes
Fast
Low effort
Better understanding and learning
Builds trust
Paper trail
19
![Page 20: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/20.jpg)
20
Workflow
is
invisible
![Page 21: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/21.jpg)
Difficult to manage
what you cannot see
21
![Page 22: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/22.jpg)
22
Corporate Communications Officer
(Michael Toope)
![Page 23: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/23.jpg)
23
Video
Production
Unit
(Dany Therrien)
![Page 24: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/24.jpg)
To Do Doing Waiting(internal)
Waiting(external) Done!
TeamAvailability
Since Last MeetingWWW:WDW:WDD:
NotesExperiments
Majo
r P
rod
ucts
Oth
er
127
24
![Page 25: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/25.jpg)
25
Too much
work in
progress
![Page 26: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/26.jpg)
Too many tasks at same time…
When we “multi-task*”, we get less done.*actually, “switch-task”
26
![Page 27: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/27.jpg)
Time Yourself
Scenario 1 (Focus-Tasking)
1. Write:
Multitasking eats time
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
2. Note how long that took.
27
![Page 28: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/28.jpg)
Time Yourself
Scenario 2 (Context Switching)
1. Write one letter, then one number, one letter, one number, etc:
28
2. Write down how long that took.
Multitasking eats time
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
![Page 29: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/29.jpg)
Cost of Context Switching#
simultaneousprojects
% of time available for each project
% time lost to context switching
Hours per week lost
(per person)
29From: Weinberg, Gerald M. Quality Software Management (New York: Dorset House, 1991)
1 100% 0% 0 hours
2 40% 20% 6 hours
3 20% 40% 12 hours
4 10% 60% 18 hours
5 5% 75% 22.5 hours
![Page 30: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/30.jpg)
Yerkes-Dodson Curve
30
LO STRESS HI
LO
P
ER
FO
RM
AN
CE
HI
Under-
stimulation-boredom
-fatigue
-frustration
-dissatisfaction
Optimum Stimulation-creativity
-rational problem solving
-progress
-change
-satisfaction
Overstimulation-reduced creativity
-ineffective problem solving
-difficult to focus
-reduced efficiency
-illness
Yerkes RM, Dodson JD . "The relation of strength of stimulus to rapidity
of habit-formation". Journal of Comparative Neurology and Psychology
18: 459–482
![Page 31: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/31.jpg)
I said my name was “Marc” with a “C”
31 ©HRSG
![Page 32: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/32.jpg)
32
![Page 33: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/33.jpg)
Objective
Provide more uninterrupted deep-thinking and analysis time to create better products.
33
![Page 34: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/34.jpg)
Managing Interruptions
34
![Page 35: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/35.jpg)
35
![Page 36: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/36.jpg)
Eight Lean “Wastes”
1. Defects / Errors
2. Overproduction
3. Waiting
4. Not fully utilizing people
5. Transport
6. Inventory
7. Motion
8. Excessive processing
36
…consume
capacity or
interrupt flow, but
do not add value.
![Page 37: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/37.jpg)
37
Wrap Up
![Page 38: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/38.jpg)
A better way
38
Provide detailed
tasking incl job
to be done
Verify outline
Create
prototype
outline
Huddle with
key
stakeholders
Write
document
Provide
feedback
face-to-face
Finalize
documentSend to client
![Page 39: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/39.jpg)
Results
39
Create a complex survey 50% faster
Create a complex research report 60% faster
Create a briefing note to Minister 80% faster
Create a business case 80% faster
Create a job classification 98% faster
![Page 40: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/40.jpg)
Three things you can do when you get back to the office
1. Map and make the workflow visual, identify cost of status quo
2. Create more clarity early – “job to be done”
3. Limit your work in progress
40
![Page 41: Lean in · 2019-05-23 · “Lean is only for operational people, not strategic or leadership people” “I don’t do process work” Applying “transactional” Lean approaches](https://reader034.fdocuments.net/reader034/viewer/2022050118/5f4eee1ed1eee376cd2830eb/html5/thumbnails/41.jpg)
• Training
• Facilitating improvement projects
leanagility.com
613 266 4653
Better, faster, more efficient government and inspired people.
Introduction to Lean for non-transactional processes
1 day workshop
Available on demand
41