1. PASSIVE FIRE PROTECTION WORK FOR SK310 B15 DEVELOPMENT PETRONAS CARIGALI Sept 28, 2016 In Progress
2. PROVISION VSAT SERVICES SAPURAKENCANA SK GEOTECHNICS Aug 22, 2016 In Progress
3. SUPPLY OF KOBE ELECTRODE FOR SK310 B15 DEVELOPMENT - TOPSIDE PETRONAS CARIGALI Aug 16, 2016 Completed
4. PASSIVE FIRE PROTECTION WORKS FOR BNJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT
PETRONAS CARIGALI June 8, 2016 In Progress
5. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC SHELL Apr 1, 2016 In Progress
6. PROVISION OF VIV STRAKES FOR MALIKAI’S PIPELINE SHELL Mar 16, 2016 Completed
7. PROVISION OF VSAT COMMUNICATION SERVICES & WIRELESS RADIO SERVICES FOR KBM CLUSTER FIELD DEVELOPMENT COASTAL ENERGY Jan 28, 2016 In Progress
8. PROVISION OF NAVAL ARCHITECTURE AND MARINE ENGINEERING FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BOKOR PHASE 3A PROJECT
PETRONAS CARIGALI Nov 2, 2015 Completed
9. PASSIVE FIRE PROTECTION WORKS FOR TTJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT
PETRONAS CARIGALI Oct 23, 2015 Completed
10. PROVISION OF 14” PIPELINE RISER COMPACT FLANGE INSPECTION AND TESTING WORKS FOR KPOC – RM 500,000 KPOC Sept 18, 2015 Completed
11. PROVISION OF FJC SERVICES FOR SHELL MALIKAI PACK B – USD 700,000 SHELL Sept 10, 2015 Completed
12. PASSIVE FIRE PROTECTION WORKS FOR EPCIC OF REMOTE WHPS FOR FULL FIELD DEVELOPMENT, NORTH MALAY BASIN PROJECT HESS Sept 8, 2015 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
13. PROVISION OF VSAT COMMUNICATION SERVICES FOR SKE’S DRILLING RIG SAPURAKENCANA ENERGY Sept 1, 2015 Completed
14. PROVISION OF NAVAL ARCHITECTURE SERVICES FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BARAM HELIDECK PROJECT
PETRONAS CARIGALI Sept 1, 2015 Completed
15. PROVISION AND SUPPLY OF HDPF WITH SEA SLEEVE & INTRAFUSE FOR PROCUREMENT CONSTRUCTION & COMMISSIONING (PCC) OF REGASTIFICATION TERMINAL 2 PIPELINE PROJECT – USD 35,000
CPM GROUP July 28, 2015 In Progress
16. SUPPLY OF STRAKES AND BENDS FOR SHELL GUMUSUT PHASE 2 SHELL July 6, 2015 Completed
17. SUPPLY OF STRAKES AND STRAPS FOR SHELL GUMUSUT PHASE 2 SHELL June 16, 2015 Completed
18. SUPPLY OF PIPELINE FIELD JOINT ANTI-CORROSION COATING SYSTEM FOR BESAR PIPELINE INSTALLATION – PCSB YEAR 2015
PETRONAS CARIGALI May 12, 2015 Completed
19. TO SUPPLY AND DELIVER CORROSION INHIBITOR TOTE TANK (TTJT-A) FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORMS (WHP)
PETRONAS CARIGALI May 6, 2015 Completed
20. TO SUPPLY AND DELIVER WASH WATER STORAGE TANK FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORM
PETRONAS CARIGALI April 29, 2015 Completed
21. PASSIVE FIRE PROTECTION WORKS FOR PCC OF BESAR-A WHP TOPSIDE PETRONAS CARIGALI April 24, 2015 Completed
22. PROVISION OF VSAT COMMUNICATION SERVICES TOTAL E&P MALAYSIA Oct 1, 2014 Completed
23. PROVISION OF WASTE DISPOSAL MANAGEMENT FOR BINTULU OPERATIONS BC PETROLEUM SDN BHD Oct 1, 2014 Completed
24. VSAT SATELITE TELECOMMUNICATION SYSTEM AND SERVICES FOR BOKOR PHASE 3A SCHLUMBERGER Sept 29, 2014 Completed
25. TO SUPPLY AND DELIVER ATMOSPHERIC TANKS FOR EPCIC OF LAYANG DEVELOPMENT FACILITIES JX NIPPON Sept 17, 2014 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
26. SUPPLY OF SERVIWRAP PETRONAS CARIGALI Aug 8, 2014 Completed
27. PROVISION OF PASSIVE FIRE PROTECTION FOR WELLHEAD PLATFORM BLOCK PM 307 BERTAM FILED DEVELOPMENT LUNDIN PETROLEUM July 16, 2014 Completed
28. PROVISION OF COMMUNICATION & ASTRO SERVICE SYSTEM FOR EPV PETRONAS CARIGALI July 7, 2014 Completed
29. ELECTRODE (KOBELCO) FOR WHEATSTONE PROJECT LNG PLANT – MODULE FABRICATION ISBL SAPURAKENCANA July 3, 2014 Completed
30. SUPPLY AND DELIVERY OF CABLES & ACCESSORIES FOR HUC FOR CENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM304
KENCANA PETROLEUM May 28, 2014 Completed
31. VSAT SERVICES FOR TALISMAN MALAYSIA’S OFFSHORE PRODUCTION PLATFORMS
TALISMAN MALAYSIA May 1, 2014 In Progress
32. PROVISION OF 3RD PARTY SERVICES FOR PASSIVE FIRE PROTECTION AT FIREWALL EAST BELUMUT PLATFORM MMC OIL & GAS April 30, 2014 Completed
33. DISPOSAL OF SCRAP METAL ITEMS DUE TO MAINTENANCE, DAMAGE METTALIC PARTS, USED SPARE PARTS, OBSOLETE AND EXPIRED MATERIAL
PETRONAS PENAPISAN
(MELAKA) SDN BHD April 21, 2014 Completed
34. FABRICATION WORKS, SUPPLY OF MATERIAL, EQUIPMENT & MANPOWER AND DELIVERY OF PERMANENT FLANGE PROTECTOR & STUDBOLT FOR SSB PROJECT
TL OFFSHORE SDN BHD April 16, 2014 Completed
35. PROVISION OF FIXED VSAT SERVICES FOR UMW NAGA JACK-UP RIGS FOR UMW OFFSHORE DRILLING SDN BHD
UMW OFFSHORE DRILLING April 1, 2014 In Progress
36. PROVISION OF VSAT SYSTEM SERVICES FOR EVA-NMB GAS PIPELINE INSTALLATION
GOM RESOURCES SDN BHD April 1, 2014 Completed
37. M03PQ-A V-3030 AND 3040 STRUCTURE FRAMING PFP COATING REPAIR (OPTION NO.1) SHELL February 12, 2014 Completed
38. PROVISION OF FIXED VSAT SERVICES FOR COASTAL ENERGY’S MOBILE PRODUCTION UNIT, THE EP5 AND EP6 COASTAL ENERGY January 1, 2014 In Progress
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
39. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM FOR MAIN WORK BARGES / VESSELS 2014 – 2016 – TL OFFSHORE SDN BHD TL OFFSHORE January 1, 2014 In Progress
40. M03PQ-A VESSEL V-6210 PFP COATING SHELL December 27, 2013 Completed
41. PASSIVE FIRE PROTECTION SYSTEM ON DIESEL STORAGE TANK COLUMN T-S16270 AT KIKEH UNITL SCOPE COMPLETE MURPHY November 28, 2013 Completed
42. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG C STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI November 13, 2013 Completed
43. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG B STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI November 13, 2013 Completed
44. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR TABU A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI October 28, 2013 Completed
45. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR PALAS A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI October 28, 2013 Completed
46. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI October 25, 2013 Completed
47. PROVISION FOR REMOVAL AND INSTALLATION OF EPOXY-TYPE PASSIVE FIRE PROTECTION FOR HELANG INTEGRATED PLATFORM (HIP) MMC OIL & GAS October 22, 2013 Completed
48. MODIFICATION AND FABRICATION OF NEW GRILLAGES / SKID RADOIL ONSHORE SUPPORT SYSTEM FOR J-LAY TOWER - SASB
SAPURA ACERGY SDN BHD September 12, 2013 Completed
49. PROVISION OF FIREWALL UPGRADE (PFP COATING) FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM EMEPMI September 6, 2013 Completed
50. PROVISION OF FIELD JOINT COATING SERVICES FOR EVA PROJECT 2013 HESS August 10, 2013 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
51. PROVISION OF FIXED VSAT SERVICES FOR ATWOOD MANTA AND COASTAL ENERGY ATWOOD August, 2013 Completed
52. SUBCONTRACT WORKS FOR PASSIVE FIRE PROTECTION WORKS FOR DAMAR-A PLATFORM EMEPMI July 29, 2013 Completed
53. PROVISION OF FIELD JOINT COATING SERVICES FOR TUKAU PROJECT 2013 HESS July 18, 2013 Completed
54. PROVISION OF VSAT SERVICES FOR BUMI ARMADA AT-300 VESSEL BUMI ARMADA June, 2013 Completed
55. PROVISION OF STABILIZED VSAT SERVICES FOR PERISAI PETROLEUM ON THE PERISAI KAMELIA PERISAI PETROLEUM June, 2013 In Progress
56. SUPPLY AND DELIVER OF SLIDING PLATE FOR FABRICATION OF KBB TOPSIDES (BOAQ) - MMHE KPOC May 23, 2013 Completed
57. PROVISION OF PASSIVE FIRE PROTECTION FOR SHELL D12 & LAILA FIELD DEVELOPMENT - THHE
SARAWAK SHELL BERHAD May 9, 2013 Completed
58. PROVISION OF SUPPLY & SERVICE OF HBE COATING APPLICATION FOR 16” X 22KM DAMAR-A TO LAWIT-A CRA PIPELINE – TL OFFSHORE SDN BHD EMEPMI May 2, 2013 Completed
59. PROVISION OF RISER CLAMP & FLANGE PROTECTOR FOR 16” X 52KM GAS EXPORT PIPELINE FROM PLEM & LAWIT A PLATFORM – GOM RESOURCES SDN BHD
HESS EXPLORATION & PRODUCTION MALAYSIA B.V
April 29, 2013 Completed
60. PROVISION OF HEAT SHIELD FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM – SHAPADU ENERGY & ENGINEERING EMEPMI April 2013 Completed
61. SUPPLY AND INSTALLATION OF HEAT SHIELD FOR KINABALU KNPG-B - MMHE PETRONAS CARIGALI SDN BHD April 2013 Completed
62. OFFSHORE CARRY OVER WORKS FOR PIPING OF TAPIS-Q TOPSIDES - MMHE EMEPMI April 2013 Completed
63. PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS B WI HTI PIPE SUPPOR TSTOP (AFS003B) – SHAPADU ENERGY & ENGINEERING SDN BHD
EMEPMI April 2013 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
64. PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS C PLATFORM TOPSIDE (EXCLUDE LER) - SHAPADU ENERGY & ENGINEERING SDN BHD
EMEPMI April 2013 Completed
65. PROVISION OF FABRICATION AND DELIVERY OF 16” SE-PA RISER LOAD BEARING CLAMP AND SLIDING CLAMP FOR MOC YEAR 2013 PIPELINES INSTALLATION - SAPURA KENCANA PETROLEUM C/O TL OFFSHORE SDN BHD
MURPHY SARAWAK OIL. CO. LTD April 2013 Completed
66. SUPPLY AND DELIVER OF CEILING FINISHES - SUSPENDED CEILING SYSTEM SOUTH ACIS OIL & GAS DEVELOPMENT PROJECT (REPEAT ORDER) - BROOKE DOCKYARD & ENGINEERING WORKS CORPORATION
BROOKE DOCKYARD & ENGINEERING
WORKS CORPORATION
March 18, 2013 Completed
67.
ENGINEERING,SUPPLY OF MATERIAL, MANUFACTURING, FABRICATION, INSTALLATION AND MODIFICATION OF FIBERGLASS GRATINGS, STAIRTREADS AND GRE HANDRAILS FOR DAMAR A SUBSTRUCTURE PROJECT – MMHE
EMEPMI March 13, 2013 Completed
68. PROVISION OF 3LPE FIELD JOINT COATING ON 12” & 10” LINEPIPE SERVICES FOR SIAKAP NORTH PETAI (SNP) DEVELOPMENT PROJECT MURPHY SNP March 11, 2013 Completed
69. PROVISION OF FIELD JOINT COATING SERVICES FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE EMEPMI March 8, 2013 Completed
70. SUPPLY & DELIVERY OF FIELD JOINT ANTI CORROSION COATING SYSTEM HEAT SHRINK SLEEVE (RAYCHEM WPC100) FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE
EMEPMI March 8, 2013 Completed
71. PROVISION OF PIPELINE FIELD JOINT INFILL MATERIAL FOR TAPIS EOR & DAMAR GAS DEVELOPMENT PROJECT Y2013 EMEPMI March 7, 2013 Completed
72. PROVISION OF FIRE PROTECTION (PFP) AND INSULATION WORK FOR WEST DESARU TOPSIDES - THHE FABRICATORS SDN BHD
AQUATERRA ENERGY LIMITED March 7, 2013 Completed
73. M03 DAMAGED FPF COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed
74. M01 DAMAGED PFP COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed
75.
PROVISION OF SUPPLY AND DELIVERY OF MONEL WELDING INTEGRATED TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR EARLY PRODUCTION SCHEME (EPS), INTEGRATED GAS DEVELOPMENT (IGD) PROJECT, NORTH MALAY BASIN (NMB) FIELD – GOM RESOURCES SDN BHD
HESS EXPLORATION & PRODUCTION
MSIA B.V. March 2013 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
76. PROVISION OF FIELD JOINT COATING SERVICES FOR HESS 2013 PROJECT – GOM RESOURCES HESS February 26, 2013 Completed
77. PROVISION TO SUPPLY AND DELIVER CRUDE OIL WASHING MACHINE (COW MACHINE) SUPPLY FOR BERANTAI OPERATION - PETROFAC PETRONAS January 29, 2013 Completed
78. SUBCONTRACTOR FOR PASSIVE FIRE PROTECTION WORKS FOR KBB TOPSIDES - MMHE KPOC January 21, 2013 Completed
79. ARCHITECTURAL INSULATION PACKAGE SUPPLY OF M90 FIRETEX FOR GREATER EKOFISK AREA 2/4 - SMOE CONOCO PHILIPS January 15, 2013 Completed
80. PROVISION OF 3RD CAMPAIGN SEA-FASTENING WORKS OF J-LAY AND PES TOWER ON BOARD SAPURA 3000 – SAPURA ACERGY SDN BHD
SHELL January 11, 2013 Completed
81. PROVISION OF SUPPLY AND DELIVERY OF CEILING FINISHES – SUSPENDED CEILING FOR SOUTH ACIS PROJECT – BROOKE DOCKYARD AND ENGINEERING WORKS.
MURPHY January 10, 2013 Completed
82. DESIGN, FABRICATION & DELIVERY OF FIREWALL FOR DAMAR-A TOPSIDE MMHE EMEPMI January 08, 2013 Completed
83. SUPPLY OF PAINT EMEPMI December 27, 2012 Completed
84. E & I WORKS-FABRICATION AND INSTALLATION FOR F14DR-A TOPSIDES & F14/F29 PROCESS MODULE – MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.
SHELL December 17, 2012 Completed
85. STRUCTURE WORKS FOR DAMAR-A PLATFORM (TOPSIDE) - MMHE EMEPMI November 12, 2012 Completed
86. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD. KPOC October 18, 2012 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
87.
SUPPLY, DELIVERY, AND INSTALLATION SUPERVISION OF COMPOSITE MATERIALS (FIBERGLASS) & ACCESSORIES FOR WAVE ZONE GRATING FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM, EMEPMI EPCM BROWNFIELD PROJECT.
EMEPMI October 5, 2012 Completed
88. SUPPLY AND DELIVER OF OFFICE EQUIPMENT (HS1146630X FIRE FIGHTING SUIT) HS1146630X FIRE FIGHTING SUIT
UNIVERSITI TELNOLOGI
PETRONAS, TRONOH PERAK
October 2012 Completed
89. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (BOAQ)(5.12M002B) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.
KPOC September 24, 2012 Completed
90. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD. KPOC September 24, 2012 Completed
91. PROVISION OF FABRICATION 18” AND 12” FLEXIJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 13, 2012 Completed
92. PROVISION OF FABRICATION 8” AND 10” STRESSJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 12, 2012 Completed
93. PROVISION OF FIELD JOINT COATING SERVICES FOR 8" AND 10" MALIKAI PIPELINE – GOM RESOURCES SHELL September 11, 2012 Completed
94. PROVISION OF FABRICATE AND SUPPLY OF WS2 UPPER MAST ELEMENT 2 LIFTING PAD EYE FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 5, 2012 Completed
95.
PROVISION OF FABRICATE AND SUPPLY OF NEW 18” ESCALATOR TROLLEY INSERTS, ACCESS TO HPU BOOST PUMPS, WS2 LOWER MAST ELEMENT 2, WS2 HINGE HATCH COVER, WS1 RAIN PROTECTION IMPROVEMENT FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 5, 2012 Completed
96. PROVISION OF STABILIZED VSAT SATELLITE COMMUNICATIONS FOR SAPURAACERGY ON THE SAPURA3000 SAPURAACERGY September, 2012 In Progress
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
97. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL August 30, 2012 Completed
98. PROVISION OF DISPOSAL OF DAMAGED KOSMO, IVECO AND MAN BUSES AND ITS COMPONENTS – SYARIKAT PRASANA NEGARA BERHAD SPNB August 29, 2012 Completed
99. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TAPIS Q TOPSIDE – MMHE SDN BHD EMEPMI August 28, 2012 Completed
100. SUPPLY AND DELIVERY OF HSS (WPC100M) FOR MALIKAI PIPELINE – GOM RESOURCES SHELL August 18, 2012 Completed
101. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TELOK A TOPSIDES – MMHE SDN BHD EMEPMI August 9, 2012 Completed
102. PROVISION OF VSAT SERVICES IN GULF OF MEXICO – SAPURA ACERGY SDN BHD SAPURA ACERGY August 9, 2012 Completed
103. PROVISION OF FIELD JOINT COATING SERVICES AND SUPPLY OF ANTICORROSSION TAPE (SERVIWRAP M30B) FOR 6" X 7.6KM BEKOK-A TO TIONG-A PIPELINE INSTALLATION – GOM RESOURCES
PETRONAS August 2, 2012 Completed
104. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S TABU A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY EMEPMI July 31, 2012 Completed
105. SUPPLY AND DELIVER OF HEAVY DUTY ANTI SLIP STEP COVER – TALISMAN MALAYSIA LIMITED TALISMAN July 12, 2012 Completed
106. PROVISION OF TELECOMMUNICATION SYSTEM FOR TOISA PALADIN – FUGRO GEODETIC (M) SDN BHD FUGRO GEODETIC July 12, 2012 Completed
107. FABRICATION AND INSTALLATION OF STRUCTURE WORKS FOR PACKAGE 1, DECK NORTH AND MISC FOR TAPIR R TOPSIDES PROJECT - MMHE SDN BHD EMEPMI July 10, 2012 Completed
108. SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) AND PACKAGE B: B-193 A-P FOR (PGC & AGRU) – SIME DARBY ENGINEERING SDN BHD
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) July 07, 2012 Completed
109. SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) – SIME DARBY ENGINEERING SDN BHD
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) July 04, 2012 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
110. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S PALAS A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY EMEPMI July 04, 2012 Completed
111. SUPPLY AND DELIVER OFSLIDING PLATE FOR FABRICATION ON KBB TOPSIDES (BOAQ) - MMHE KPOC July 02, 2012 Completed
112. TO SUPPLY MATERIALS, EQUIPMENT, CONSUMABLES, TOOLS AND MANPOWER FOR COOLING MANIFOLD RELOCATION FOR GUMUSUT KAKAP, J LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL June 12, 2012 Completed
113. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF VESSEL DLB264 – GOM RESOURCES GOM RESOURCES June 11, 2012 Completed
114. PROVISION OF PULLING & REMOVE CABLE FOR LNGC SERI ALAM – MMHE SDN. BHD. MISC May 21, 2012 Completed
115. SUPPLY, FABRICATE AND DELIVERY SEA FASTENING FOR CARGO BARGE FOR LAN DO DEVELOPMENT PROJECT – SAPURA ACERGY SDN BHD TNK VIETNAM BV May 17, 2012 Completed
116. PROVISION OF FIELD JOINT COATING SERVICES FOR MOC TRANSPORTATION AND INSTALLATION OF OFFSHORE PIPELINES AND FACILITIES FOR YEAR 2012 – TL OFFSHORE SDN BHD
MURPHY OIL May 9, 2012 Completed
117. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT PM318-PUTERI FWS PIPELINE REPLACEMENT PROJECT - NEWFIELD NEWFIELD April 9, 2012 Completed
118. PROVISION OF VSAT TELECOMMUNICATION AND SERVICES FOR PETRONAS CARIGALI SDN BHD – IPERINTIS SDN BHD IPERINTIS April 6, 2012 Completed
119. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - SCHLUMBERGER GROUP SCHLUMBERGER April 4, 2012 Completed
120. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - HALLIBURTON ENERGY SERVICES (M) SDN BHD HALLIBURTON April 4, 2012 Completed
121. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF HEAVY LIFT PIPE LAY VESSEL LTS3000 L & T SAPURA April 1, 2012 In Progress
122. DESIGN, FABRICATION AND DELIVERY OF FIREWALL FOR TELOK A & B PROJECT – MMHE SDN BHD SHELL March 23, 2012 Completed
123. COMMISSIONING OF STABILISED VSAT SERVICES AND VPN ONBOARD MV. WANGSAMAJU – OCEANTECH GEOMATICS
OCEANTECH GEOMATIC March 14, 2012 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
124. PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION TAPE (SERVIWRAP M30B) FOR KEBABANGAN DEVELOPMENT PROJECT – GLOBAL OFFSHORE MALAYSIA
KPOC March 13, 2012 Completed
125.
SUPPLY AND DELIVERY OF HANGER FLANGE, RISER GUARD AND RISER CLAMP FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR PETRONAS CARIGALI SKO PIPELINE REJUVENATION PROJECT. – CARIMIN ENGINEERING SERVICES
PETRONAS March 12, 2012 Completed
126. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL March 5, 2012 Completed
127. SUPPLY AND DELIVERY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR TCOT PWSU TAIL END & REMEDIAL WORK FOR EMEPMI EPCM BROWNFIELD PROJECT – PERUNDING RANHILL WORLEY
EMEPMI March 1, 2012 Completed
128. PROVISION OF FIELD JOINT COATING FOR SOGT PROJECT – ALAM SWIBER PETRONAS February 27, 2012 Completed
129. PROVISION OF FIELD JOINT COATING AND SUPPLY OF HSS (RAYCHEM WPC100M) FOR EMEMPI’S TAPIS EOR REJUVENATION AND TELOK DEVELOMENT PROJECT. – TL OFFSHORE SDN BHD
EMEPMI February 24, 2012 Completed
130. DESIGN, ENGINEERING, AND DELIVERY OF FAIRINGS & THRUST COLLARS FOR DRILLING RISERS – SONGA OFFSHORE PETRONAS February 22, 2012 Completed
131. PROVIDING STABILISED VSAT SYSTEM FOR SEMI-SUBMERSIBLE RIG, OCEANROVER FOR DEEPWATER PROJECT, KIKEH – DIAMOND OFFSHORE MURPHY OIL February 14, 2012 Completed
132. PROVISION OF VSAT SYSTEM AND PROVIDING VPN RENTAL SERVICES FOR DLB264 – GLOBAL OFFSHORE MALAYSIA GLOBAL OFFSHORE February 09, 2012 Completed
133. PIPELINE AND SPOOLS FIELD JOINT COATING SERVICES FOR LAN DO DEVELOPMENT PROJECT VIETNAM – SAPURA ACERGY SDN BHD TNK VIETNAM BV January 20, 2012 Completed
134.
PROVISION FOR DETAILED DESIGN ENGINEERING SERVICES FOR PACKAGE THIRD PARTY VERIFICATION OF GUE H RATED FIREWALL TO WITH STAND 30-MINUTES JET FIRE FOR TELOK GAS DEVELOPMENT PROJECT – PERUNDING RANHILL WORLEY SDN BHD
EMEPMI December 29, 2011 Completed
135. PROVISION OF INSTALLATION AND MAINTENANCE OF VPN INTERNET SERVICES – ASIAN SUPPLY BASE SDN BHD
ASIAN SUPPLY BINTULU December 21, 2011 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
136. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT M01 AND E11 FOR TI-FIX AND IR PROJECT - SHELL SHELL December 21, 2011 Completed
137. SUPPLY MANPOWER, EQUIPMENTS AND MATERIALS FOR PM329 EAST PIATU TOPSIDES – KENCANA HL SDN BHD NEWFIELD December 1, 2011 Completed
138. E & I FABRICATION, INSTALLATION, TESTING, PRE-COMMISSIONING WORK, FOR TAPIS EOR PROJECT (PACKAGE B AND PACKAGE C) – MMHE SDN BHD EMEPMI December, 2011 Completed
139. PIPING FABRICATION AND INSTALLATION FOR TAPIS Q LIVING QUARTERS – MMHE SDN BHD EMEPMI November, 2011 Completed
140. SUPPLY OF H120 FIRE/BLAST WALL FOR KEBABANGAN TOPSIDES – SIME DARBY ENGINEERING SDN BHD KPOC November 25, 2011 Completed
141. PROVISION OF FIELD JOINT COATING FOR BCOT PROJECT – ALAM SWIBER PETRONAS October 10, 2011 Completed
142. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION CASTING FOR SDV ON BUNGA RAYA-B – APEX ENERGY SDN. BHD.
TALISMAN September 27, 2011 Completed
143. PROVISION OF PASSIVE FIRE PROTECTION (PFP) SERVICES FOR PCC OF TOPSIDES AND PIPELINE FOR PM318 PUTERI PIPELINE RESTORATION PROJECT – KENCANA HL SDN BHD
NEWFIELD September 15, 2011 Completed
144.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIAL (SERVIWRAP) FOR 14” AND 24” EXPORT PIPELINE SHORE APPROACH INSTALLATION FOR KEBABANGAN NORTHERN HUB DEVELOPMENT – PBJV GROUP SDN BHD
PETRONAS CARIGALI SDN BHD September 15, 2011 Completed
145.
PROVISION OF PASSIVE FIRE PROTECTION (PFP), TOOLS/ EQUIPMENT & MATERIALS TO REMOVE THE DEGRADED PFP & APPLICATION OF NEW PFP AT M3PQ-A LIVING QUARTER WEST WALL – SARKU ENGINEERING SERVICES SDN. BHD.
SHELL September 15, 2011 Completed
146. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR HELANG TOPSIDES (E-9550 & E-9650) – MONT TRINITY
NIPPON OIL September 12, 2011 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
147.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR INTRAGRATED TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES (TIONG A) PROJECT – GLOBAL OFFSHORE MALAYSIA SDN BHD
NEWFIELD August 17, 2011 Completed
148. PROVISION OF REMOVAL, REPAIR & REINSTATEMENT OF BLASTWALL ON M3P-Q PLATFORM – DAYANG ENTERPRISE & SSB SHELL August 5, 2011 Completed
149. DESIGN, MANUFACTURE AND SUPPLY OF VIV SUSPRESSION STRAKES FOR BLOCK 06.1 PHASE III PROJECT – LAN DO DEVELOPMENT PROJECT – RANHILL WORLEYPARSONS SDN BHD
BP EXPLORATION OPERATING CO. LTD August 3, 2011 Completed
150.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR SKO PIPELINE REPLACEMENT PROJECT – TARGET ENERGY CO. (M) SDN. BHD.
PETRONAS CARIGALI SDN BHD July 25, 2011 Completed
151. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH) TAPIS-R DECK (SOUTH), TAPIS-R LIVING QUARTERS & BRIDGES SKID BEAM AND TAPIS-Q DECK – MMHE SDN. BHD.
EMEPMI July 15, 2011 Completed
152. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH), TAPIS-Q DECK, MISCELLANEOUS WORKS TAPIS-Q – MMHE SDN. BHD. EMEPMI July 3, 2011 Completed
153. SUPPLY, DELIVERY AND INSTALLATION OF STRAKES FOR GUMUSUT KAKAP JUMPERS - FMC SHELL June 17,2011 Completed
154. PROVISION OF PIPELINE FIELD JOINT COATING WORKS FOR THE FABRICATION SERVICES OF FLOWLINE JUMPER – LABUAN SHIPYARD
SAPURA ACERGY/ SHELL April 14, 2011 Completed
155. PROVISION OF PIPELINE INFIELD FIELD JOINT COATING FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD
PETRONAS CARIGALI SDN BHD April 12, 2011 Completed
156.
PROVISION OF PIPELINE ANTI CORROSION MATERIAL (SERVIWRAP) FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD
PETRONAS CARIGALI SDN BHD March 31, 2011 Completed
157. PROVISION OF FIELD JOINT COATING SERVICES FOR F28DR-A/F6K-A PIPELINE PROJECT – TL OFFSHORE SDN BHD SHELL March 18, 2011 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
158.
FABRICATION AND INSTALLATION OF STRUCTURAL WORKS FOR TOPSIDES A-Q COMPRISING PART OF SURVEY, DESIGN, ENGINEERING, PROCUREMENT, FABRICATION, LOAD OUT, TIE-DOWN/SEAFASTENING, TRANSPORTATION, INSTALLATION, HOOK-UP, TESTING, COMMISSIONING (EPCIC) OF PROCESS PLATFORM FOR B-193 PROJECT – SIME DARBY ENGINEERING
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) February 25, 2011 Completed
159. PROVISION OF PIPELINE MATERIALS WITH SEA SLEEVES C/W EQUIPMENT FOR NEWFIELD’S EAST PIATU INSTALLATION – TL OFFSHORE SDN BHD NEWFIELD February 24, 2011 Completed
160. PROVISION OF PASSIVE FIRE PROTECTION SERVICES) FOR NEWFIELD'S EAST PIATU'S JACKET & TOPSIDES - KENCANA HL NEWFIELD February 11, 2011 Completed
161. PROVISION OF FIELD JOINT COATING AND INFILL MATERIALS FOR PUTERI PIPELINE RESTORATION PROJECT – TL OFFSHORE SDN BHD NEWFIELD February 11, 2011 Completed
162. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR CAKERWALLA OFFSHORE - SHAPADU ENERGY & ENGINEERING SDN BHD
CARIGALI HESS February 1, 2011 Completed
163. PROVISION OF FIELD JOINT COATING, SUPPLY AND INSTALLATION OF CANUSA GTS-PP WRAPID SLEEVE FOR CILIPADI PIPELINE PROJECT – TL OFFSHORE SDN BHD
SHELL January 17, 2011 Completed
164. REPAIR WORKS OF BLASTWALL AND FIREWALL FOR MODULE 3 KUMANG TOPSIDE - OFFSHORE WORKS
PETRONAS CARIGALI SDN BHD December 13, 2010 Completed
165. DESIGN, CONSTRUCT, SUPPLY AND DELIVERY OF NOISE ATTENUATORS AND EXPANSION SPOOLS FOR F13 PROCESSING MODULE GLYCOL REBOILER SKID AT E11P-B PLATFORM
SARAWAK SHELL BERHAD November 24, 2010 Completed
166.
FABRICATION AND INSTALLATION OF THE MOORING PORCHES, CHAIN JACK GANTRIES AND ASSOCIATED PLATFORMS, AND INSTALLATION OF FAIRLEAD FOUNDATIONS FOR GUMUSUT KAKAP FPS HULL (36010863) AT MALAYSIA MARINE AND HEAVY ENGINEERING
SHELL / MISC November 12, 2010 Completed
167. SUBCONTRACT FOR STRUCTURAL WORKS FOR PROCESS PLATFORM FOR B -193 PROJECT AT SIME DARBY ENGINEERING
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) October 22, 2010 Completed
168. DESIGN, FABRICATE AND SUPPLY FIRE RATED ROLLER SHUTTER FOR KINABALU NAG DEVELOPMENT PROJECT (KNPG-B) - MMHE
PETRONAS CARIGALI SDN BHD October 21, 2010 Completed
169. SUPPLY AND DELIVERY OF SAFETY EQUIPMENTS FOR SAMARANG (PHASE 1 – ACCELERATED DRILLING) DEVELOPMENT PROJECT – KENCANA PETROLUEM
PETRONAS CARIGALI SDN BHD October 6, 2010 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
170. PROVISION OF BR-B REPLACEMENT – RISER PIPE, CLAMP AND I-TUBE – FIELD JOINT COATING TALISMAN September 20, 2010 Completed
171. DESIGN, FABRICATE AND SUPPLY OF BLASTWALL FOR LIVING QUARTERS FOR JACKETS OF PM329 EAST PIATU DEVELOPMENT PROJECT – KENCANA HL
NEWFIELD September 17, 2010 Completed
172. PROVISION OF PIPELINE FIELD JOINT COATING SERVICES AND INFILL MATERIALS FOR PETRONAS CARIGALI’S SKO PIPELINE PROJECT – TL OFFSHORE
PETRONAS CARIGALI SDN BHD September 7, 2010 Completed
173. PROVISION OF FLOWLINE AND RISER FIELD JOINT COATING SERVICES FOR GUMUSUT KAKAP PROJECT – SAPURA ACERGY SHELL August 6, 2010 Completed
174. UMBRELLA CONTRACTS FOR SALE OF SSB/SSPC SCRAP METAL (600865) SARAWAK SHELL BERHAD August 3, 2010 Completed
175. PROVISION OF THE SERVICE FOR DISPOSAL OF SURPLUS MATERIALS FOR PETRONAS GROUP OF COMPANIES FOR YEAR 2010-2013 (UMBRELLA CONTRACT)
PETROLIAM NASIONAL BERHAD July 28, 2010 Completed
176. SUPPLY AND DELIVERY OF INSTRUMENT FIRE & GAS CABLES FOR MRU - BUNGA ORKID DEV. PROJECT FOR SDE
TALISMAN MALAYSIA LIMITED July 23, 2010 Completed
177. PROVISION OF PIPELINE FIELD JOINT COATING AND INFILL MATERIAL FOR ST. JOSEPH PIPELINE INSTALLATION ON E3 – TL OFFSHORE
SABAH SHELL PETROLUEM CO. LTD July 22, 2010 Completed
178. SUPPLY AND DELIVER OF INSTRUMENT CABLES & GLANDS FOR EMEMPI’S SELIGI AND SEMANGKUK PIPELINE REPLACEMENT PROJECT
RANHILL WORLEY PARSONS June 29, 2010 Completed
179. STRUCTURAL WORK ~(5-TOPSIDES) - EPCIC OF (5) WELLHEAD PLATFORM FOR B-193 PROJECT – SDE
OIL AND NATURAL GAS CORP. LTD
(ONGC) June 12, 2010 Completed
180. SUPPLY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR GUNTONG E AIR UTILITY SYSTEM UPGRADE PROJECT
RANHILL WORLEY PARSONS May 27, 2010 Completed
181. SUPPLY OF CABLES FOR INTERGRATED PROCUREMENT AND CONSTRUCTION DEVELOPMENT PROJECT (PHASE 1) SIME DARBY May 18, 2010 Completed
182. PROVISION OF FIELD JOINT COATING SERVICES FOR DEVIL’S CREEK DEVELOPMENT PROJECT SAPURA ACERGY May 15, 2010 Completed
183. SUPPLY OF SERVI-WRAP ANTI-CORROSION MATERIALS SARAWAK SHELL May 13, 2010 Completed
184. SUPPLY OF INSTRUMENT CABLES & CABLE GLANDS FOR TAPIS PUMP FIRE AND GAS SYSTEM UPGRADE PROJECT - EMEPMI
RANHILL WORLEY PARSONS May 4, 2010 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
185. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM INCLUDING LAN/WAN – TL OFFSHORE SDN BHD TL OFFSHORE May 1, 2010 Completed
186. SUPPLY, FABRICATE, INSTALL AND PRE-COMMISSION ONE UNIT OF GYM ROOM FOR BRE
TALISMAN MALAYSIA LIMITED April 29, 2010 Completed
187. DESIGN, SUPPLY, APPLICATION AND INSTALLATION OF PASSIVE FIRE PROTECTION (PACKAGE NO.SF03) FOR GUMUSUT KAKAP SEMI-FPS PROJECT MMHE April 21, 2010 Completed
188. APPLICATION OF FOAM INSULATION FOR CAMERON INTERNATIONAL (M) SYSTEM SDN BHD
CAMERON INTERNATIONAL (M)
SDN BHD April 10, 2010 Completed
189. FIELD JOINT COATING WORK AT TLO FOR 2010 MURPHY PIPELINE PROJECT MURPHY OIL CORP March 16, 2010 Completed
190. FIELD JOINT COATING WORK AT GLOBAL OFFSHORE MALAYSIA FOR 2010 PETRONAS PIPELINES PROJECT
PETRONAS CARIGALI March 16, 2010 Completed
191. SUPPLY OF CABLES FOR F23R-A CILIPADI GAS FIELD DEVELOPMENT PROJECT PFCE March 15, 2010 Completed
192. PASSIVE FIRE PROTECTION FOR SARAWAK SHELL E-8 PLATFORM SARAWAK SHELL March 15, 2010 Completed
193. DISPOSAL & REMOVAL OF SCRAP MATERIALS FROM MMHE SARAWAK SHELL March 15, 2010 Completed
194. SALE OF USED/SCRAP MATERIALS AND EQUIPMENT MLNG March 10, 2010 Completed
195. THERMOCOUPLE CABLE FOR BUNGA ORCHID-A TALISMAN MALAYSIA March 9, 2010 Completed
196. HEAT SHIELD PANELS FOR ABU FIELD PETRONAS CARIGALI March 3, 2010 Completed
197. SUPPLY AND APPLICATION OF PFP FOR F23DR-A CILIPADI PROJECT AT RFSB FOR PFCE
SARAWAK SHELL BERHAD February 28, 2010 Completed
198. J-LAY TOWER REFURBISHMENT PROJECT (STRUCTURAL WORKS) FOR SAPURA ACERGY SHELL / MISC February 25, 2010 Completed
199. SUPPLY OF LIGHT WATER STATION PETRONAS CARIGALI February 5, 2010 Completed
200. BLASTING AND PAINTING FOR JLT STRUCTURE SERVICES FOR GUMUSUT AT SAPURA ACERGY SHELL/ MISC January 28 2010 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
201. SUPPLY OF HEATSHIELDS TO CILIPADI PROJECT AT RFSB FOR PFCE SARAWAK SHELL December 28 2009 Completed
202. DISPOSAL OF EXXON MOBIL OBSOLETE, PROJECT SURPLUS, AND USED MATERIALS EMEMPI December 8, 2009 Completed
203. S-LAY FIELD JOINT COATING CONTRACT FOR GUMUSUT PIPELINE AT SAPURA ACERGY SHELL / MISC November 26, 2009 Completed
204. SUPPLY AND APPLICATION OF PFP FOR TANGGA BARAT CPP TOPSIDE @ MMHE
PETRONAS CARIGALI November 3, 2009 Completed
205. DISPOSAL OF TML SLOW MOVING AND OBSOLETE GOODS AT KSB (SCRAP METAL) TALISMAN October 30, 2009 Completed
206. SUPPLY OF BLASTWALL FOR F23 (CILIPADI) AT RAMUNIA YARD @ PFCE SARAWAK SHELL October 21, 2009 Completed
207. SUPPLY OF BLASTWALL TO J.R MCDERMOTT FOR THE KIPPER TUNA PROJECT ESSO AUSTRALIA August 25, 2009 Completed
208. SUPPLY OF INSTRUMENT, FIRE & GAS, ELECTRICAL AND TELECOM CABLES TO PFCE AT RAMUNIA FABRICATION YARD FOR 23 TOPSIDE PROJECT SARAWAK SHELL August 24, 2009 Completed
209. SUPPLY OF AIMS RFP MUDMAT SYSTEM FOR NEWFIELD’S WEST BELUMUT WELLHEAD JACKET AT KENCANA HL NEWFIELD July 31, 2009 Completed
210. SUPPLY OF CHEMICALS – TRIETHYLENE GLYCOL – 99.9%, 235 KGS DRUM UNDER PRICE AGREEMENT WITH PETRONAS CARIGALI
PETRONAS CARIGALI July 15, 2009 Completed
211. ELECTRICAL AND INSTRUMENTATION FABRICATION & HOST TIE & HOOK-UP COMMISSIONING OF GUA FLAREBOOM REPLACEMENT AT BOUSTEAD PENANG SHIPYARD S/B
EXXON MOBIL June 22, 2009 Completed
212. FABRICATION OF INSTRUMENT GAS SKID FOR KUMANG PROJECT AT SDE PETRONAS CARIGALI June 15, 2009 Completed
213. FIELD JOINT COATING WORK AT TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI June 8, 2009 Completed
214. SUPPLY OF SERVIWRAP TO TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI May 15 , 2009 Completed
215. FIELD JOINT COATING WORK AT TLO FOR BEKOK-DULANG PROJECT FOR PETRONAS PIPELINE PROJECT
PETRONAS CARIGALI April 17, 2009 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
216. FIELD JOINT COATING WORK AT TLO FOR WEST LUTONG PROJECT FOR PETRONAS PIPELINE PROJECT
PETRONAS CARIGALI March 6, 2009 Completed
217. FIELD JOINT COATING WORK AT TLO FOR BETTY BAKAU PROJECT FOR PETRONAS PIPELINE PROJECT
PETRONAS CARIGALI
February 12, 2009 Completed
218. PASSIVE FIRE PROTECTION FOR B11 LQ & HELIDECK AT BDEWC, SARAWAK SARAWAK SHELL BERHAD February 11, 2009 Completed
219. PASSIVE FIRE PROTECTION FOR PC-4 RISER AT BD11 DR-A PLATFORM FOR MMHE
PETRONAS CARIGALI January 19, 2009 Completed
220. SUPPLY OF ELECTRICAL AND INSTRUMENTATION CABLES FOR F23 VLAP COMPRESSION AT SDE
SARAWAK SHELL BERHAD January 5, 2009 Completed
221. MARK AND CUT STEEL STRUCTURAL WORKS FOR MCR-A PROJECT AT MMHE MMHE JV WITH TECHNIP January 2, 2009 Completed
222. FABRICATION OF STRUCTURAL WORKS FOR EAST MODULE TOPSIDES OF GUMUSUT KAPAP AT MMHE SHELL AND MISC Dec 31, 2008 Completed
223. E & I AND PIPING WORK AT MMHE FOR TANGGA BARAT CPP TOPSIDES PETRONAS CARIGALI Dec 24, 2008 Completed
224. PASSIVE FIRE PROTECTION FOR B-11 TOPSIDES AT BROOKE DOCK YARD SARAWAK SHELL BERHAD Dec 19, 2008 Completed
225. SUPPLY OF KOBE ELECTRODES FOR F23-RA TOPSIDES AT RFSB SARAWAK SHELL BERHAD Dec 19, 2008 Completed
226. INSTRUMENTATION & FGS & TELECON JUNCTION BOX – DULANG B AT KENCANA HL
PETRONAS CARIGALI November 4, 2008 Completed
227. SUPPLY OF TOTE TANKS PETRONAS CARIGALI October 29, 2008 Completed
228. SUPPLY OF FIRE RATED WINDOWS FOR KUMANG AND TANGGA BARAT AT SDE
PETRONAS CARIGALI October 21, 2008 Completed
229. SUPPLY OF INSTRUMENT CABLES FOR FPSO RUBY AT MMHE MISC October 15, 2008 Completed
230. STRUCTURAL FABRICATION WORK FOR TANGGA BARAT AT MMHE PETRONAS CARIGALI October 13, 2008 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
231. SUPPLY AND INSTALL KUMANG BLASTWALL/ FIREWALL COMPLETE SYSTEM INCLUDING PFP AT SDE TO MEET FIRE RATINGS
PETRONAS CARIGALI October 10, 2008 Completed
232. SUPPLY OF ELECTRICAL AND INSTRUMENTATION (E&I) CABLES FOR KUMANG AND TANGGA BARAT AT SDE
PETRONAS CARIGALI Sept 27, 2008 Completed
233. PIPING FABRICATION WORK FOR B11 KA TOPSIDE @ MMHE SARAWAK SHELL BERHAD Sept 16, 2008 Completed
234. SUPPLY OF PERSONNEL TRANSFER BASKET AND CABLE GLAND / FITTINGS TO MURPHY OIL
MURPHY SARAWAK OIL CO. LTD Sept 15, 2008 Completed
235. FIELD JOINT COATING WORK FOR CPOC PIPELINES AT TLO PETRONAS CARIGALI Sept 10, 2008 Completed
236. PASSIVE FIRE PROTECTION FOR PLUTO PROJECT @ RFSB WOODSIDE ENERGY August 15, 2008 Completed
237. FIELD JOINT COATING WORK AT TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT
SARAWAK SHELL BERHAD August 1, 2008 Completed
238. SUPPLY OF CANUSA HSS TO TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT
SARAWAK SHELL BERHAD July 22, 2008 Completed
239. SUPPLY OF DOUBLE SKIN HEAT SHIELDS FOR B11 KA PROJECT AT MMHE SARAWAK SHELL BERHAD June 30, 2008 Completed
240. PASSIVE FIRE PROTECTION OF ANDP-D AT RFSB PETRONAS CARIGALI June 30, 2008 Completed
241. SUPPLY OF SERVIWRAP FOR CPOC PIPELINE TO TLO PETRONAS CARIGALI June 26, 2008 Completed
242. E&I, PIPING, MECHANICAL & STRUCTURAL FABRICATION FOR KUMANG CLUSTER DEVELOPMENT / TANGGA BARAT PROJECT @ SDE
PETRONAS CARIGALI June 11, 2008 Completed
243. DESIGN, SUPPLY, FABRICATION AND INSTALL NEW FIRE AND BLASWALL FOR BR-A
TALISMAN MALAYSIA LIMITED May 23, 2008 Completed
244. PASSIVE FIRE PROTECTION OF GOPA-GOPB AT KHL MURPHY SARAWAK OIL CO. LTD May 8, 2008 Completed
245. SUPPLY AND DELIVERY OF CONCRETE MATRESSES, SLEEPERS, LIFTING FRAME FOR 24” ANDR-A/TCOT PIPELINE FOR TLO
PETRONAS CARIGALI April 30, 2008 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
246. ELECTRICAL AND INSTRUMENTATION FABRICATION WORK AT RFSB ON ANGSI –D PLATFORM
PETRONAS CARIGALI April 24, 2008 Completed
247. PFP for F23 AND F6 AT BROOKE DOCKYARD, KUCHING, SARAWAK SARAWAK SHELL BERHAD April 11, 2008 Completed
248. SUPPLY OF POWER & INSTRUMENTATION CABLES MURPHY SARAWAK OIL CO. LTD April 10, 2008 Completed
249. SUPPLY OF HEATSHIELDS TO CLOUGH FOR MONTARA PROJECT IN THAILAND CLOUGH (THAILAND) CO. LTD April 10, 2008 Completed
250. FIELD JOINT COATING SERVICES FOR TALISMAN PIPELINE INSTALLATION TALIMAN MALAYSIA LIMITED April 10, 2008 Completed
251. FIELD JOINT COATING FOR PETRONAS CARIGALI 2008 PIPELINE INSTALLATION AT TLO FOR 5 PIPELINES
PETRONAS CARIGALI April 10, 2008 Completed
252. SUPPLY AND APPLICATION OF WET AND CASTING PFP FOR TALISMAN RISERSAND ESDVS
TALIMAN MALAYSIA LIMITED April 8, 2008 Completed
253. SUPPLY OF FIRE RATED DOORS TO MMHE PETRONAS CARIGALI April 5, 2008 Completed
254. SUPPLY OF RADIANT HEATSHIELD, LOUVERS AND MISC ITEMS FOR PC 4 @ MMHE
PETRONAS CARIGALI March 31, 2008 Completed
255. FIELD JOINT COATING FOR KEA- TIA @ PBJV
PETRONAS CARIGALI March 7, 2008 Completed
256. SUPPLY OF ELECTRICAL OPERATED MONORAIL TROLLEY HOIST, 5 MT – MMHE MMHE March 7, 2008 Completed
257. SUPPLY OF MANUAL OPERATED GANTRY CRANE TO MMHE MMHE March 7, 2008 Completed
258. ENGINEERING, DESIGN, FABRICATION AND INSTALLATION OF SHELTER CABIN FOR PC4 AT MMHE
PETRONAS CARIGALI Feb 28, 2008 Completed
259. SUPPLY OF LINE PIPES SMLS API TYPE OF VARIOUS SIZES TO MMHE PETRONAS CARIGALI Jan 17, 2008 Completed
260. SUPPLY OF FIRE RATED DOORS TO TURKMENISTAN GAS DEVELOPMENT PROJECT
MITCO JAPAN SDN BHD Jan 11, 2008 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
261. PASSIVE FIRE PROTECTION FOR BUNGA ORKID @ SDE TALISMAN MALAYSIA LIMITED Jan 3, 2008 Completed
262. FABRICATION OF GUMUSUT-KAKAP SEMISUBMERSIBLE HULL (PACKAGE 2) SHELL AND MISC December 5, 2007 Completed
263. STRUCTURAL FABRICATION FOR CPOC PROJECT AT MMHE PETRONAS CARGALI SDN BHD Nov 30, 2007 Completed
264. SUPPLY OF FIRE RATED WINDOWS FOR BUNGA ORKID PROJECT AT SDE TALISMAN MALAYSIA LIMITED October 23, 2007 Completed
265. SUPPLY OF TOTE TANKS TO EMEPMI EXXON MOBIL Sept 30, 2007 Completed
266. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E& I AND BLASTING/ PAINTING FOR PC 4 TOPSIDE WORK @ MMHE
PETRONAS CARGALI SDN BHD July 26, 2007 Completed
267. FIELD JOINT COATINGS FOR VASAI EAST DEVELOPMENT PROJECT AT RAMUNIA FABRICATORS SDN BHD
OIL & NATURAL GAS CORPORATION,
INDIA August 27, 2007 Completed
268. SUPPLY & APPLICATION OF PASSIVE FIRE PROTECTION -TALISMAN NORTHERN FIELD
TALISMAN MALAYSIA LIMITED
August 23, 2007
Completed
269. FIELD JOINT COATINGS FOR JERNEH PIPELINES AT TLO EXXONMOBIL August 8, 2007 Completed
270. FABRICATE BEAM HAUNCH, CROSS OVER SPOOL FOR HIGH PRESSURE MUD LINE AND CRANE BEAM
SAAG DRILLING & WELL SERVICES SDN
BHD August 7, 2007 Completed
271. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR BELUMUT AT RAMUNIA FABRICATORS SDN BHD
PETRONAS CARIGALI SDN BHD August 5, 2007 Completed
272. FIELD JOINT COATINGS FOR SEMARANG PIPELINES AT TLO PETRONAS CARGALI SDN BHD July 28, 2007 Completed
273. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR INTRALINE RESOURCES
TALISMAN MALAYSIA LIMITED July 16, 2007 Completed
274. FIELD JOINT COATINGS FOR ANDR-A PIPELINES AT TLO PETRONAS CARIGALI SDN BHD June 25, 2007 Completed
275. FIELD JOINT COATINGS FOR 18 “ GUE PIPELINE AT TLO EXXONMOBIL June 20, 2007 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
276. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SUMANDAK TOPSIDES
PETRONAS CARIGALI June 13, 2007 Completed
277. SUPPLY OF SPARES FOR CLOSURE DOOR TO MMHE SARAWAK SHELL BERHAD June 6, 2007 Completed
278. FIELD JOINT COATINGS FOR BETTY– BORONIA 18” P/L SARAWAK SHELL BERHAD June 1, 2007 Completed
279. ENGINEERING, PROC, CONSTRUCTION & COMMISSIONING OF FIRE PROTECTION SYSTEM
PETRONAS DAGANGAN BERHAD May 28, 2007 Completed
280. FIELD JOINT COATING FOR TAPM-3 CAA NORTHEN FIELD DEVELOPMENT TALISMAN MALAYSIA LIMITED May 22, 2007 Completed
281. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SCDR-A TOPSIDES
SARAWAK SHELL BERHAD May 4, 2007 Completed
282. SUPPLY OF SAFETY EQUIPMENT AND LIFE RAFT TO MDFT FOR KIKEH PROJECT M.D.F.T (KIKEH) LTD May 2, 2007
Completed
283. FIELD JOINT COATINGS FOR ALL SUMANDAK PIPELINES AND SUPPLY OF SERVIWRAP TO TL OFFSHORE
PETRONAS CARIGALI
(PETRONAS CARIGALI)
April 6, 2007 Completed
284. 2007-2009 OFFSHORE FACILITIES TRANSPORT AND INSTALLATION OF FIELD JOINT COATINGS FOR MCDERMOTT
SARAWAK SHELL BERHAD March 27, 2007 Completed
285. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR PETRONAS CARIGALI’S BELUMUT PROJECT AT RFSB
PETRONAS CARIGALI
(PETRONAS CARIGALI)
March 19, 2007 Completed
286. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR ANGEL GAS TOPSIDE PROJECT AT MMHE WOODSIDE ENERGY March 15, 2007 Completed
287. FIELD JOINT COATING OF 10” BAP-AA TO BADP-G PIPELINE FOR TL OFFSHORE
PETRONAS CARIGALI
(PETRONAS CARIGALI)
March 1, 2007 Completed
288. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR SHELL’S SCDR-A AT MMHE SARAWAK SHELL March 1, 2007 Completed
289. FABRICATION, INSTALLATION, TESTING AND PRE-COMMISSIONING OF PIPINGAND MECHANICAL WORKS FOR SCDR-A TOPSIDES AT MMHE SARAWAK SHELL February 14, 2007 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
290. DESIGN, ENGINEERING AND FABRICATION OF END CLOSURE FOR SHELL’S SCDR-A PROJECT AT MMHE SARAWAK SHELL February 6, 2007 Completed
291. ENGINEERING, DESIGN & FABRICATION OF PFP CASTINGS FOR METERING RUN - BR-B PLATFORM OFFSHORE
TALISMAN MALAYSIA LIMITED January 29, 2007 Completed
292. FABRICATE GUMUSUT-KAKAP SEMI-SUBMERSIBLE HULL SHELL January 25, 2007 Completed
293. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E&I AND BLASTING/PAINTING FOR F6 REJUVENATION WORKS SARAWAK SHELL January 23, 2007
Completed
294. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR MAARI FIELD DEVELOPMENT AT KENCANA HL ENGINEERING
CLOUGH PROJECT INTERNATIONAL PTY
LTD, AUSTRALIA January 17, 2007 Completed
295. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR ANGEL GAS PROJECT AT MMHE
WOODSIDE ENERGY LTD, AUSTRALIA January 15, 2007 Completed
296. SUPPLY OF ANTI-SKID BRE STAIRWAYS TALISMAN MALAYSIA LIMITED January 4, 2007 Completed
297. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR SCDR-A PROJECT AT MMHE SARAWAK SHELL Dec 27, 2006 Completed
298. SUPPLY OF INSTR. CABLE CONNECTING BRA AND BRE PAGA SYSTEM TALISMAN MALAYSIA LIMITED Nov 15, 2006 Completed
299. FIELD JOINT COATING FOR PBJV GROUP SDN BHD FOR WEST LUTONG PROJECT
PETRONAS CARIGALI Nov 11, 2006 Completed
300. CONTRACT FOR CIVIL WORKS PACKAGE FOR KUANTAN – KERTEH RAILWAY PROJEC, INCL. VEHICULAR, DRAINAGE & UTILITY BOX CULVERTS
PERCON BABENA JOINT VENTURE October 15, 2006 Completed
301. STRUCTURAL STEEL FABRICATION FOR SUMANDAK SELATAN TOPSIDES AND HOST
PETRONAS CARIGALI Sept 27, 2006 Completed
302. FJ COATING FOR TLO PETRONAS
CARIGALI AND SHELL
August 10, 2006 Completed
303. PIPING WORKS FOR KIKEH FPSO AT MMHE MURPHY OIL August 2, 2006 Completed
304. SUPPLY OF HEATSHIELDS FOR F13W PROJECT AT RAMUNIA FABRICATORS SARAWAK SHELL June 15, 2006 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
305. SUPPLY OF END CLOSURE DOORS- F13W AT RFSB SARAWAK SHELL June 09, 2006 Completed
306. PASSIVE FIRE PROTECTION FOR KIKEH DTU TOPSIDES MURPHY OIL May 3, 2006 Completed
307. FIELD JOINT COATINGS AT BARMADA MCDERMOTT TALISMAN MALAYSIA LIMITED March 14, 2006 Completed
308. FIELD JOINT COATINGS FOR BARMADA MCDERMOTT S/B EXXON MOBIL March 14, 2006 Completed
309. PASSIVE FIRE PROTECTION FOR ARTHIT PFP AT Mc DERMOTT YARD IN BATAM INDONESIA PTTEP and KBR February 27, 2006 Completed
310. PIPING WORKS FABRICATION FOR MURPHY KIKEH PROJECT @ MMHE MURPHY OIL January 14, 2006 Completed
311. ELECTRICAL AND INSTRUMENTATION FOR MODEC RJS-409 MODULE FABRICATION @ SDE PETROBRAS December 1, 2005 Completed
312. PIPELINE FIELD JOINT COATING FOR BARAM (MCOT) 16” AND 10” PETRONAS CARIGALI – TLO Nov 30, 2005 Completed
313. STRUCTURAL FABRICATION FOR MODEC RJS-409 ESPADARTE MODULE FABRICATION @ SDE PETROBRAS November 1, 2005 Completed
314. SPECIAL STRUCTURAL SPECIAL FABRICATION FOR MURPHY KIKEH PROJECT MURPHY OIL September 9, 2005 Completed
315. SUPPLY AND INSTALL OF FIRESEAL FOR AMENAM KPONO PROJECT TOTAL ELF September 9, 2005 Completed
316. ARCHITECTURAL FITTINGS FOR CLIFF HEAD A PLATFORM AT HL ENGINEERING ROC OIL, AUSTRALIA August 6, 2005 Completed
317. PFP FOR SHELL E11 –PB SARAWAK SHELL August 3 2005 Completed
318. SUPPLY OF BARUNIA PROTECTIVE RELAYS PETRONAS CARIGALI SDN BHD August 3, 2005 Completed
319. MAJOR STRUCTURAL FABRICATION FOR MURPHY KIKEH DTU SPAR HULL MURPHY OIL May 3, 2005 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
320. PFP FOR BARAM TOPSIDE AT BDEWC PETRONAS CARIGALI SDN BHD April 2005 Completed
321. DESIGN, ENGINEERING AND FABRICATION OF BARAM HEATSHIELD AT BDEWC
PETRONAS CARIGALI SDN BHD April 2005 Completed
322. BLASTING AND PAINTING WORKS AT SSE FOR GUE EXXONMOBIL March 2005 Completed
323. DESIGN, ENGINEERING AND FABRICATION OF E11 P-B BLASTWALL AT MSE SARAWAK SHELL BERHAD March 2005 Completed
324. PFP FOR SHELL’S E8-DR-A AT RAMUNIA FABRICATORS SARAWAK SHELL BERHAD March 2005 Completed
325. PFP FOR SHELL’S F13 SARAWAK SHELL February 2005 Completed
326. PFP FOR BR-E JACKET AND TRIPOD PROJECT AT MSE TALISMAN ENERGY February 2005 Completed
327. PFP FOR BR-E CO2 REMOVAL PROJECT AT SSE TALISMAN ENERGY February 2005 Completed
328. PFP FOR GUNTONG E PROJECT AT SIME SEMBCORP ENGINEERING EXXONMOBIL
EXPLORATION & PRODUCTION INC
January 2005 Completed
329. DESIGN, ENGINEERING AND FABRICATION OF SCKA & SF 13 HEATSHIELDS SARAWAK SHELL BERHAD October 2004 Completed
330. DESIGN, ENGINEERING AND FABRICATION OF GUNTONG- E BLASTWALL EXXONMOBIL
EXPLORATION & PRODUCTION INC
July 2004 Completed
331. STRUCTURAL STEEL FABRICATION & WELDING AT MSE FOR MOAB TALISMAN ENERGY July 22, 2004 Completed
332. BLASTWALL REINSTAMENT TO H60 RATING – PFP TALISMAN ENERGY July 5, 2004 Completed
333. SUPPLY OF VESSELS UNDER MASTER SPOPT CHARTER PARTY FCF653 EXXONMOBIL
EXPLORATION & PRODUCTION INC
June 26, 2004 Completed
334. VE FIRE PROTECTION SUPPLY AND APPLY FOR AMENAM PROJECT AT SSE TOTAL ELF FINA @ NIGERIA June 2004 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
335. SUPPLY OF PRODUCTION & TEG CHEMICALS - 3 YEARS SARAWAK SHELL/
PETRONAS CARIGALI / NIPPON
June 23, 2004 Completed
336. CASTINGS FOR BUNGA RAYA-A PLATFORM TALISMAN ENERGY March 3, 2004 Completed
337. PFP FOR YOHO PROJECT PROTECTION EXXON MOBIL NIGERIA March 2004 Completed
338. CASTINGS FOR SDV on BUNGA RAYA-A TALISMAN ENERGY December 2003 Completed
339. PFP FOR SERAI PROJECT SARAWAK SHELL September 2003 Completed
340. PFP FOR JINTAN PROJECT PROTECTION SARAWAK SHELL BERHAD July 2003 Completed
341. INFIELD JOINT COATING FOR NIPPON STEEL (NSC) PETRONAS CARIGALI May 8, 2003 Completed
342. YOHO PLATFORM ELECTRODE EXXON MOBIL NIGERIA February 2003 Completed
343. BUNGA RAYA 24” Riser PFP PETRONAS CARIGALI/TALISMAN February 2003 Completed
344. SHELL M3 BLASTWALL SARAWAK SHELL January 11, 2003 Completed
345. HELANG’s RISER / SDV/ FLANGE / VALVE PFP CASTING NIPPON OIL EXPLORATION January 2003 Completed
346. MLNG SPHERE PFP MLNG SDN BHD December 2002 Completed
347. LUNDIN RISER / SDV PFP TALISMAN December 2002 Completed
348. HALFDAN HEATSHIELDS ENGINEERING DESIGN SEMBCORP ENGRG SINGAPORE September 6, 2002 Completed
349. SHELL M1 BLASTWALL ENGINEERING DESIGN SARAWAK SHELL BERHAD September 2002 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Oct 4, 2016 - (Track Record Updated)
350. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP NIPPON OIL (HELANG) AT MSE July 15, 2002 Completed
351. MODIFICATION & INSTALL ELECTRICAL WORK FOR SWITCHGEARS (KNDP-A) SARAWAK SHELL BERHAD Nov 18, 2001 Completed
352. PASSIVE FIRE PROTECTION FOR MLNG3 SLUGCATCHER PETRONAS CARIGALI October 29, 2001 Completed
353. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP MALAYSIA LNG SDN BHD October 20, 2001 Completed
354. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP PETRONAS CARIGALI October 15, 2001 Completed
355. SUPPLY/ INSTALL E & I SWITCHGEAR SARAWAK SHELL BERHAD August 20, 2001 Completed
356. INSULATION CONTRACT WITH PETRA RESOURCES ESSO PRODUCTION MALAYSIA INC. July 6, 2001 Completed
357. SUPPLY OF ELECTRODES DOTANAH ENGRG & CONSTRUCTORS July 2, 2001 Completed
358. ELECTRODE SUPPLY FOR NIPPON OIL (HELANG) MALAYSIA SHIPYARD (MSE) June 15, 2001 Completed
359. ELECTRODE SUPPLY FOR PETRONAS CARIGALI (ANGSI-A) SIME SEMBCORP ENGINEERING June 15, 2001 Completed
360. ELECTRODE SUPPLY FOR ESSO (SATELIT) AND LARUT MSE February 2001 Completed
361. SUPPLY OF ELECTRODES FOR ESSO (LARUT-A) SIME SEMBCORP ENGINEERING July 6, 2000 Completed
362. SUPPLY OF ELECTRODES PETRONAS FERTILIZER TENDER Completed
363. SUPPLY OF CONSUMABLES FOR PETRONAS PETRONAS AMMONIA SDN BHD TENDER TENDER
364. SUPPLY OF CONSUMABLES FOR PETRONAS CARIGALI PETRONAS CARIGALI TENDER TENDER