JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD · 2019. 12. 26. · jurunature sdn. bhd. -...

46
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT DATE CURRENT STATUS Dec 26, 2019 - (Track Record Updated) 1. STRUCTURAL, MECHANICAL AND PIPING WORKS FOR BERGADING CPP-MRU HESS / MMHE December 23, 2019 In Progress 2. PASSIVE FIRE PROTECTION (PFP) WORK FOR PEGAGA CPP TOPSIDE MDC OIL & GAS LTD / SAPURA FABRICATION SDN BHD December 18, 2019 In Progress 3. HELIDECK SURFACE COATING REPAIR PV DRILLING & WELL SERVICES CORP / PETRONAS December 13, 2019 In Progress 4. ADDITIONAL SURFACE AREA FOR PFP WORK FIRE WATER TOWER (FABRICATION OF JAMNAGAR BERTH A2 PROJECT) SAPURA FABRICATION SDN BHD December 12, 2019 Completed 5. SUPPLY OF HUMIDUR ME PAINTS FASTART SDN BHD / SHELL December 06, 2019 In Progress 6. SUPPLY OF HUMIDUR PAINTS TO QESS ENERGY SUPPORT SERVICES SDN BHD BSP December 05, 2019 In Progress 7. SUPPLY OF HUMIDUR ME PAINTS TRANSFAME SDN BHD / SHELL December 05, 2019 In Progress 8. SUPPLY OF WELDING ELECTRODE FSO GOLDEN STAR MMHE December 02, 2019 In Progress 9. SUPPLY OF WELDING ELECTRODE PEGAGA CPP TOPSIDE SAPURA FABRICATION SDN BHD November 20, 2019 In Progress 10. SUPPLY AND DELIVERY OF RELIEF VALVE, CAST BRONZE, 6 BAR (KORVAL) DNOW AUSTRALIA PTY LTD / SHELL November 18, 2019 In Progress 11. SUPPLY OF WELDING ELECTRODE YUNLIN OFFSHORE WIND FARM SAPURA OFFSHORE SDN BHD (TAIWAN BRANCH) November 15, 2019 In Progress 12. ADOBE SUBSCRIPTION RENEWAL LICENSE 2019 - 2020 PETRONAS CHEMICALS DERIVATIVES SDN BHD November 12, 2019 Completed

Transcript of JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD · 2019. 12. 26. · jurunature sdn. bhd. -...

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    1. STRUCTURAL, MECHANICAL AND PIPING WORKS FOR BERGADING CPP-MRU HESS / MMHE

    December 23, 2019 In Progress

    2. PASSIVE FIRE PROTECTION (PFP) WORK FOR PEGAGA CPP TOPSIDE MDC OIL & GAS LTD /

    SAPURA FABRICATION SDN BHD

    December 18, 2019 In Progress

    3. HELIDECK SURFACE COATING REPAIR PV DRILLING & WELL

    SERVICES CORP / PETRONAS

    December 13, 2019 In Progress

    4. ADDITIONAL SURFACE AREA FOR PFP WORK – FIRE WATER TOWER (FABRICATION OF JAMNAGAR BERTH A2 PROJECT)

    SAPURA FABRICATION SDN BHD

    December 12, 2019

    Completed

    5. SUPPLY OF HUMIDUR ME PAINTS FASTART SDN BHD /

    SHELL

    December 06, 2019 In Progress

    6. SUPPLY OF HUMIDUR PAINTS TO QESS ENERGY SUPPORT SERVICES SDN BHD

    BSP

    December 05, 2019 In Progress

    7. SUPPLY OF HUMIDUR ME PAINTS TRANSFAME SDN BHD

    / SHELL

    December 05, 2019 In Progress

    8. SUPPLY OF WELDING ELECTRODE – FSO GOLDEN STAR MMHE

    December 02, 2019 In Progress

    9. SUPPLY OF WELDING ELECTRODE – PEGAGA CPP TOPSIDE SAPURA FABRICATION

    SDN BHD

    November 20, 2019 In Progress

    10. SUPPLY AND DELIVERY OF RELIEF VALVE, CAST BRONZE, 6 BAR (KORVAL) DNOW AUSTRALIA PTY LTD / SHELL

    November 18, 2019 In Progress

    11. SUPPLY OF WELDING ELECTRODE – YUNLIN OFFSHORE WIND FARM SAPURA OFFSHORE SDN BHD (TAIWAN

    BRANCH)

    November 15, 2019 In Progress

    12. ADOBE SUBSCRIPTION RENEWAL LICENSE 2019 - 2020

    PETRONAS CHEMICALS

    DERIVATIVES SDN BHD

    November 12, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    13. SUPPLY OF WELDING ELECTRODE – ONGC KG-DWN 98-2 CPP & LQ SAPURA FABRICATION

    SDN BHD (INDIA 98/2 PROJECT)

    November 07, 2019

    Completed

    14. SUPPLY OF SANDISK EXTREMEPRO 128GB PENGERANG

    REFINING COMPANY SDN BHD

    October 27, 2019 Completed

    15. SUPPLY OF WELDING ELECTRODE – ONGC KG-DWN 98-2 CPP & LQ SAPURA FABRICATION

    SDN BHD (INDIA PROJECT OFFICE)

    October 25, 2019 Completed

    16. ADDITIONAL SURFACE AREA FOR PFP WORK (FABRICATION OF JAMNAGAR BERTH A2 PROJECT)

    SAPURA FABRICATION SDN BHD

    October 23, 2019

    Completed

    17. SUPPLY OF WELDING ELECTRODE – PEGAGA CPP TOPSIDE SAPURA FABRICATION

    SDN BHD October 18, 2019

    Completed

    18. SUPPLY OF BATTERIES ENQUEST October 17, 2019

    In Progress

    19. PFP MAINTENANCE WORK AT GUMUSUT KAKAP TOPSIDE SABAH SHELL PETROLEUM

    COMPANY LIMITED October 17, 2019

    Completed

    20. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT (ITEM 660-730 ONLY)

    MMHE October 10, 2019

    Completed

    21. SUPPLY AND DELIVER WIRELESS KEYBOARD AND LAPTOP STAND FOR PETRONAS LUBRICANTS MARKETING (M) SDN BHD

    PETRONAS LUBRICANTS

    MARKETING (M) SDN BHD

    October 07, 2019

    Completed

    22. SUPPLY AND DELIVERY OF E&I BULK MTO FOR MEPA INFILL OCTOBER (DELTA WITH AFC) (POWER & INSTRUMENT CABLE) – COST PLUS

    DAYANG ENTERPRISE / MURPHY

    October 4, 2019

    Completed

    23. SUPPLY NU BOLT (GRIP/NON-GRIP) FOR SOGT PRESSURE VESSEL REDUDANCY PROJECT

    EVOLUSI BERSATU SDN BHD / PCSB

    October 4, 2019

    Completed

    24. SUPPLY NU BOLT C/W I-ROD FOR SOGT GTC SEAL GAS LINE EVOLUSI BERSATU

    SDN BHD / PCSB October 3, 2019

    Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    25. STRUCTURAL WORKS FOR BOKOR CPP TOPSIDES – SVOA NO.4 MMHE October 02, 2019

    In Progress

    26. SUPPLY OF WELDING ELECTRODE FOR ONGC KG-DWN 98-2 CPP & LQ PROJECT

    SAPURA FABRICATION SDN BHD

    September 25, 2019

    Completed

    27. SUPPLY OF HUMIDUR PAINTS AT MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG September 24, 2019

    Completed

    28. SUPPLY OF WELDING ELECTRODE FOR PEGAGA PROJECT SAPURA FABRICATION

    SDN BHD September 18, 2019

    Completed

    29. PROCUREMENT OF INSTRUMENT CABLE LOC-PETROFAC MALAYSIA MENARA PRESTIGE

    PETROFAC (PM304-MALAYSIA) LIMITED

    August 21, 2019

    Completed

    30. SUPPLY AND DELIVERY OF SURFACE BOOK 2 i7 16GB

    PETRONAS LUBRICANTS

    INTERNATIONAL SDN BHD

    August 21, 2019

    Completed

    31. SUPPLY OF WELDING ELECTRODE FOR JX NIPPON LAYANG DEVELOPMENT PROJECT

    SAPURA OFFSHORE SDN BHD

    August 19, 2019 Completed

    32. SSJ - PROVISION OF DRY ICE MACHINE RENTAL BRUNEI LNG SDN BHD August 7, 2019

    In Progress

    33. SUPPLY OF WELDING ELECTRODE FOR ENI MERAKES DEVELOPMENT PROJECT

    SAPURA OFFSHORE SDN BHD

    August 7, 2019

    Completed

    34. SUPPLY OF WELDING ELECTRODE FOR FABRICATION OF PEGAGA CPP PROJECT

    SAPURA FABRICATION SDN BHD

    August 2, 2019

    Completed

    35. SURFACE PREPARATION USING HiCO2 DRY ICE BLASTING FOR C-6942 EO TANK

    DIALOG / PCOGD July 28, 2019 Completed

    36. PROVISION OF ELECTRODE FOR KINARUT WEST – BASE SCOPE & LABUAN YARD

    SAPURA PINEWELL SDN BHD

    July 11, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    37. PURCHASE OF COMPUTER HARDWARE

    EXXONMOBIL EXPLORATION AND

    PRODUCTION MALAYSIA INC.

    July 11, 2019 Completed

    38. STRUCTURAL WORKS FOR JACKET, BRIDGE AND APPURTENANCES FOR BOKOR CPP-JACKET

    MMHE July 4, 2019 Completed

    39. PROVISION TO SUPPLY MANPOWER, EQUIPMENTS, TOOLS AND CONSUMABLES FOR PFP COATING FOR RSDV (ADDITIONAL WORK)

    SAPURA PINEWELL / KPOC

    July 2, 2019 In Progress

    40. SUPPLY OF WELDING ELECTRODE FOR PEGAGA CPP TOPSIDE PROJECT SAPURA FABRICATION

    SDN BHD June 25, 2019 Completed

    41. SUPPLY OF HUMIDUR FP PLURAL PAINTS TO PT. BREDERO SHAW INDONESIA SHAWCOR

    SINGAPORE PTE LTD June 25, 2019 Completed

    42. SUPPLY AND DELIVERY OF INSTRUMENT BULK MATERIALS FOR MEPA 11 FLOWLINE INTERIM (INSTRUMENT CABLES) – COST PLUS

    DAYANG ENTERPRISE / MURPHY

    June 20, 2019 Completed

    43. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE June 20, 2019 Completed

    44. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE June 20 , 2019 Completed

    45. SUPPLY AND DELIVERY OF KOBE ELECTRODE FOR FSO GOLDEN STAR MMHE June 17, 2019 Completed

    46. SUPPLY OF WELDING ELECTRODE FOR ONGC KG-DWN 98-2 SAPURA FABRICATION

    SDN BHD June 14, 2019 Completed

    47. SUPPLY AND DELIVERY OF GASKET MALAYSIAN REFINING

    COMPANY June 10, 2019 Completed

    48. SUPPLY OF HUMIDUR PAINTS TO QESS ENERGY SUPPORT SERVICES SDN BHD

    BSP May 30, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    49. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG May 30, 2019 Completed

    50. SUPPLY AND DELIVERY OF ELECTRICAL CABLE WOODGROUP /

    EMEPMI May 29, 2019 Completed

    51. SUPPLY OF WELDING ELECTRODE FOR ONGC KG-DWN 98-2 SAPURA FABRICATION

    SDN BHD May 27, 2019 Completed

    52. SUPPLY AND DELIVERY OF MATERIALS FOR WHEATHER SHELTER (INSTRUMENT CABLES) – COST PLUS (GOPA)

    DAYANG ENTERPRISE / MURPHY

    May 24, 2019 Completed

    53. SUPPLY OF HUMIDUR FP BRUSH TRANSFAME SDN BHD May 24, 2019 Completed

    54. REPAIR OF PFP COATING FOR C/01/FB/1039 – EPCC + I FFD HESS PHASE 2 FACILITIES, NMB

    SAPURA FABRICATION SDN BHD / HESS EXPLORATION

    May 24, 2019 Completed

    55. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTIVE COMPOUND FOR SSB/SSPC

    SARAWAK SHELL BERHAD

    May 23, 2019 Completed

    56. FABRICATION AND INSTALLATION OF GRILLAGE, DEAD MAN ANCHOR, LINK BEAMS AND REMOVAL LSF SEAFASTENING AND GRILLAGE FOR BOKOR CPP TOPSIDE

    MMHE May 15, 2019 In Progress

    57. SUPPLY AND APPLY OF PFP WORKS FOR BOKOR CPP TOPSIDE MMHE May 15, 2019 In Progress

    58. SUPPLY OF HUMIDUR PAINTS TO QET BSP May 14, 2019 Completed

    59. SUPPLY OF HUMIDUR FP COATING BLACK FOR SS PUTERI INTAN EAGLESTAR

    SHIPMANAGEMENT (L) PTE LTD

    May 7, 2019 Completed

    60. PROVISION TO SUPPLY MANPOWER, EQUIPMENTS, TOOLS AND CONSUMABLES FOR PFP COATING FOR RSDV

    SAPURA PINEWELL / KPOC

    April 29, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    61. PASSIVE FIRE PROTECTION WORK FOR CONSTRUCTION OF BERTH A2 AT MARINE TERMINAL, JAMNAGAR, INDIA

    SAPURA FABRICATION SDN BHD

    April 22, 2019 Completed

    62. SUPPLY AND DELIVERY OF CABLE SARAWAK SHELL

    BERHAD April 25, 2019 Completed

    63. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE April 23, 2019 Completed

    64. FABRICATION AND INSTALLATION SEAFASTENING AND LOADOUT ACTIVITIES FOR GK PHASE 2

    MMHE April 18, 2019 Completed

    65. SUPPLY OF HUMICLEAN TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG April 16, 2019 Completed

    66. STRUCTURAL WORKS FOR JACKET, BRIDGE AND APPURTENANCES FOR BOKOR CPP-JACKET

    MMHE April 12, 2019 Completed

    67. SUPPLY OF HUMIDUR FP QR SARAWAK SHELL

    BERHAD April 5, 2019 Completed

    68. SUPPLY OF HUMIDUR ME BRUSH SARAWAK SHELL

    BERHAD April 5, 2019 Completed

    69. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE OTHERS)

    CARIMIN / PETRONAS CARIGALI

    April 4, 2019 Completed

    70. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE FLOWLINE/WELLHEAD)

    CARIMIN / PETRONAS CARIGALI

    April 3, 2019 Completed

    71. SUPPLY OF HUMIDUR FP PAINTS TO QET BSP April 1, 2019 Completed

    72. MANPOWER SUPPLY (44 PAX) FOR JACKET BOKOR PROJECT MMHE March 29, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    73. PURCHASE OF COMPUTER HARDWARE

    EXXONMOBIL EXPLORATION AND

    PRODUCTION MALAYSIA INC.

    March 29, 2019 Completed

    74. PROVISION OF TENSILE TEST ON HELIDECK NETTING TRANSFAME SDN BHD March 29,2019 Completed

    75. PRIMAVERA LICENSE RENEWAL PETRONAS

    TECHNICAL SERVICES SDN BHD

    March 26, 2019 Completed

    76. PAN MALAYSIA FIELD JOINT COATING SERVICES SARAWAK SHELL BERHAD / SAPURA

    ENERGY March 21, 2019 Completed

    77. SUPPLY OF WELDING ELECTRODE FOR BOKOR CPP PROJECT SAPURA OFFSHORE

    SDN BHD March 22, 2019 Completed

    78. CABLING & TV INSTALLATION FOR FGVT WAR ROOMS FELDA GLOBAL

    VENTURES HOLDINGS BERHAD

    March 20, 2019 Completed

    79. SUPPLY OF HUMIDUR TC PAINTS TO QET BSP March 20, 2019 Completed

    80. SUPPLY OF HUMIDUR FP PAINTS AND HUMICLEAN TO QET BSP March 20, 2019 Completed

    81. SUPPLY AND DELIVERY OF STICKER / STENCIL FOR VESSEL (STATIC PTS-34) PETRONAS CARIGALI March 19, 2019 Completed

    82. PROVISION OF SUPPLY, COMMISSIONING OF HEAT SHIELD AND ROOF SHIELD FOR LIFEBOAT-D

    CARIGALI HESS March 7, 2019 Completed

    83. SUPPLY AND DELIVERY OF ELECTRICAL CABLE SARAWAK SHELL

    BERHAD March 5, 2019 Completed

    84. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD

    BLNG March 5, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    85. SUPPLY OF HUMIDUR PAINTS TO TRANSFAME SDN BHD SARAWAK SHELL

    BERHAD March 4, 2019 Completed

    86. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD

    BLNG February 28, 2019 Completed

    87. SUPPLY AND DELIVERY OF WATER SHUT OFF VALVE 5K 125A (KORVAL) CHEE FATT CO. PTE

    LTD February 22, 2019 Completed

    88. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG February 22, 2019 Completed

    89. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG February 20, 2019 Completed

    90. SUPPLY OF WELDING ELECTRODE FOR EPCI OF GALLAF SAPURA FABRICATION

    SDN BHD February 20, 2019

    Completed

    91. SUPPLY OF WELDING ELECTRODE FOR BOKOR TOPSIDE MMHE February 14, 2019 Completed

    92. SUPPLY OF HUMIDUR ME COATING FOR SS PUTERI ZAMRUD EAGLESTAR

    SHIPMANAGEMENT February 14, 2019 Completed

    93. SUPPLY OF HUMIDUR FP COATING FOR SS PUTERI ZAMRUD EAGLESTAR

    SHIPMANAGEMENT February 14, 2019 Completed

    94. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) February 11, 2019 Completed

    95. PASSIVE FIRE PROTECTION RECTIFICATION WORK FOR MALIKAI SABAH SHELL PETROLEUM

    COMPANY LIMITED February 11, 2019 Completed

    96. PASSIVE FIRE PROTECTION TEST PANEL (EARLY MOB) FOR HESS PHASE 2 PROJECT

    SAPURA FABRICATION SDN BHD / HESS EXPLORATION

    February 7, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    97. SUPPLY OF HUMIDUR TC PAINTS AND TO QET BSP February 7, 2019 Completed

    98. PASSIVE FIRE PROTECTION TEST PANEL (EARLY MOB) HESS / SAPURA February 7, 2019 Completed

    99. SUPPLY OF IT HARDWARE & CONSUMABLES HESS February 1, 2019 In Progress

    100. PROVISION OF ASSAI ONSITE SOFTWARE MAINTENANCE RENEWAL (JANUARY-DECEMBER 2019)

    SAPURA EXPLORATION &

    PRODUCTION (SARAWAK) INC.

    January 31, 2019 In Progress

    101. SUPPLY OF WELDING ELECTRODE FOR EPC OF GOREK SAPURA FABRICATION

    SDN BHD January 28, 2019 Completed

    102. SUPPLY OF WELDING ELECTRODE FOR EPC OF LARAK SAPURA FABRICATION

    SDN BHD January 28, 2019 Completed

    103. SUPPLY OF WELDING ELECTRODE FOR EPC OF BAKONG SAPURA FABRICATION

    SDN BHD January 28, 2019 Completed

    104. SUPPLY OF WELDING ELECTRODE FOR HESS PHASE 2 SAPURA FABRICATION

    SDN BHD January 25, 2019 Completed

    105. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE January 25, 2019 Completed

    106. SUPLLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE January 22, 2019 Completed

    107. SUPPLY AND DELIVERY OF INSTRUMENT CABLES – COST PLUS (GOPA) DAYANG ENTERPRISE

    / MURPHY January 16, 2019 Completed

    108. SUPPLY OF WELDING ELECTRODE – PEGAGA PROJECT SAPURA FABRICATION

    SDN BHD January 15, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    109. SUPPLY OF FOXIT PHANTOM PDF BUSINESS ADDITION FELDA GLOBAL

    VENTURES HOLDINGS BERHAD

    January 11, 2019 Completed

    110. SUPPLY OF HUMIDUR PAINTS FOR DARAT PROJECT E38 AND E15 TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG December 28, 2018 Completed

    111. SUPPLY OF WELDING ELECTRODE FOR JAMNAGAR PROJECT SAPURA FABRICATION

    SDN BHD December 26, 2018 Completed

    112. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) December 24, 2018 Completed

    113. SUPPLY OF WELDING ELECTRODE FOR PEGAGA JACKET SAPURA FABRICATION

    SDN BHD

    November 23, 2018 Completed

    114. SUPPLY AND DELIVERY OF CABLE INSTRUMENT (ADDITIONAL) FOR HUC MODIFICATION AT D18MP-A FOR D28 PHASE 1 PROJECT

    PETRONAS CARIGALI December 17, 2018 Completed

    115. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD

    BLNG December 6, 2018 Completed

    116. PROVISION OF CISCO HARDWARE & SUPPORT SERVICES TO REFRESH NETWORK SYSTEM

    HESS December 6, 2018 In Progress

    117. PROVISION OF SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION WORK FOR ZETUNG TOPSIDE – HESS PHASE 2 PROJECT

    SAPURA FABRICATION SDN BHD / HESS EXPLORATION

    December 5, 2018 Completed

    118. SUPPLY OF WELDING ELECTRODE FOR PEGAGA JACKET SAPURA FABRICATION

    SDN BHD November 23, 2018 Completed

    119. PROVISION OF SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION WORK FOR ZETUNG TOPSIDE

    HESS / SAPURA November 22, 2018 Completed

    120. PROVISION OF SERVER SOFTWARE, LICENSES AND SERVICES FOR MURPHY’S OPERATIONS

    MURPHY November 22, 2018 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    121. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) November 11, 2018 Completed

    122. SUPPLY OF HUMIDUR PAINT FOR MESPLT GUMUSUT DEVELOPMENT AND MALIKAI STORE

    SABAH SHELL PETROLEUM

    November 9, 2018 Completed

    123. SUPPLY OF WELDING ELECTRODE FOR BOBE PROJECT SAPURA PINEWELL

    SDN BHD October 18, 2018 Completed

    124. SUPPLY OF WELDING ELECTRODE FOR NOC GALLAF PROJECT SAPURA FABRICATION

    SDN BHD October 17, 2018 Completed

    125. MATERIAL FRO TELCO SATELLITE ANTENNA PEDESTAL AT WPPA – COST PLUS (ANTI-SLIP)

    DAYANG ENTERPRISE / MURPHY

    October 17, 2018 Completed

    126. PFP RECTIFICATION WORK FOR ST. JOSEPH SEA HIBISCUS SDN

    BHD October 16, 2018 Completed

    127. PROVISION OF ELECTRONIC OFFICE APPLICATION LEAVE FOR PTTEP HK OFFSHORE LIMITED

    PTTEP HK OFFSHORE LIMITED

    October 12, 2018 Completed

    128. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE October 12, 2018 Completed

    129. SUPPLY OF WELDING ELECTRODE FOR EPC OF GOREK SAPURA FABRICATION

    SDN BHD October 9, 2018 Completed

    130. SUPPLY OF PRIMARY UNIT REGULATOR VALVE 20K 50A WITH GAUGE (KORVAL)

    PFLNG October 4, 2018 Completed

    131. SUPPLY OF WELDING ELECTRODE FOR EPC OF BAKONG SAPURA FABRICATION

    SDN BHD September 25, 2018 Completed

    132. SUPPLY AND DELIVERY ELECTRICAL MATERIAL FOR DULANG V-507 SEPARATOR CONTROL UPGRADE

    PETRONAS CARIGALI September 23, 2018 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    133. SUPPLY AND DELIVERY OF CABLE AND ACCESSORIES FOR DULANG WELL FLOW MEASUREMENT B23SL DULANG B PLATFORM

    PETRONAS CARIGALI September 21, 2018 Completed

    134. SUPPLY OF SWA CABLE DAYANG ENTERPRISE September 14, 2018 Completed

    135. SUPPLY OF HUMIDUR PAINTS FOR MESPLT GUMUSUT DEVELOPMENT SABAH SELL PETROLEUM

    August 30, 2018 Completed

    136. SUPPLY & DELIVERY OF TOOLS AND CONSUMABLE (WELDING ELECTRODE) FOR MAINTENANCE, CONSTRUCTION AND MODIFICATION (MCM)

    (SKG) SAPURA FAB-BORNEO

    SEAOFFSHORE JV / PETRONAS CARIGALI

    August 28, 2018 Completed

    137. SUPPLY OF HUMIDUR PAINTS FOR BLNG CSIP USAGE BLNG August 20, 2018 Completed

    138. SUPPLY OF INSTRUMENT CABLE FOR SAPA INFILL E & I BULK MATERIAL – COST PLUS

    DAYANG ENTERPRISE August 2, 2018 Completed

    139. SUPPLY OF 3M 8515 N95 DISPOSABLE RESPIRATOR PETRONAS GAS

    BERHAD July 31, 2018 Completed

    140. SUPPLY OF HUMIDUR FP COATING FOR LNG PUTERI NILAM EAGLESTAR

    SHIPMANAGEMENT July 27, 2018 Completed

    141. RENTAL OF DRY-ICE BLASTING SYSTEM FOR 3 MONTHS EVERSOLVE July 23, 2018 Completed

    142. SUPPLY OF HUMIDUR PAINTS FOR U7200 TRESTLE STRUCTURE B/P ACTIVITIES

    EVERSOLVE July 23, 2018 Completed

    143. SUPPLY & DELIVERY OF KOBE ELECTRODE FOR INVENTORY STOCK MMHE July 20, 2018 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    144. PROVISION OF PASSIVE FIRE PROTECTIONS (PFP) FOR BR-A PLATFORM REPSOL

    REPSOL July 19, 2018 Completed

    145. STRUCTURAL WORKS FOR BOKOR CPP TOPSIDES PETRONAS CARIGALI July 18, 2018 Completed

    146. PROVISION OF SUPPLY OF MANPOWER, MATERIALS AND EQUIPMENT FOR INSTALLATION OF A60 RATED FIRE INSULATION WORK AT SELIGI

    ENQUEST July 18, 2018 Completed

    147. SUPPLY AND DELIVERY OF CABLES FOR SUMANDAK SELATAN INFILL PROJECT

    PETRONAS CARIGALI July 13, 2018 Completed

    148. SUPPLY OF DISPOSABLE RESPIRATOR (REPEAT ORDER) MALAYSIAN REFINING

    COMPANY July 13, 2018 Completed

    149. SUPPLY AND DELIVERY OF CABLE INSTRUMENTATION FOR HUC MODIFICATION AT D18MP-A FOR HOST TIE IN DE-BOTTLENECKING FOR D18 PHASE 2 PROJECT

    PETRONAS CARIGALI July 12, 2018 Completed

    150. SUPPLY OF SWA CABLE TAI CREST

    RESOURCES July 11, 2018 Completed

    151. PROVISION OF SUPPLY INSTRUMENT CONTROL CABLE FOR TIONG-A ICP 2.0 PROJECT AT TIONG-A PLATFORM

    PETRONAS CARIGALI July 10, 2018 Completed

    152. SUPPLY OF ELECTRODE FOR BOKOR-BETTY – BASE SCOPE SAPURA PINEWELL

    SDN BHD / PETRONAS CARIGALI

    July 4, 2018 Completed

    153. SUPPLY OF DISPOSABLE RESPIRATOR MALAYSIAN REFINING

    COMPANY July 3, 2018 Completed

    154. PROVISION OF MOXA DEVICES PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) July 2, 2018 Completed

    155. PROVISION OF SUPPLY FIBRE OPTIC CABLE FOR TIONG-A ICP 2.0 PROJECT AT TIONG-A PLATFORM

    PCSB June 26, 2018 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    156. SUPPLY OF ELECTRODE NC36L FOR BOKOR BETTY – BASE SCOPE SAPURA PINEWELL

    SDN BHD / PETRONAS CARIGALI

    June 13, 2018 Completed

    157. PASSIVE FIRE PROTECTION WORKS FOR ANJUNG BDEWC May 30, 2018 Completed

    158. SUPPLY OF DRAKA CABLE PETRONAS CHEMICALS ETHYLENE

    May 22, 2018 Completed

    159. SUPPLY OF HEAT BARRIER PANEL FOR AHU AND VSAT ANTENNA HEAT PROTECTION AT EAST BELUMUT PLATFORM

    NEWFIELD May 17, 2018 Completed

    160. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) May 15, 2018 Completed

    161. SUPPLY AND RENTAL OF ADDITIONAL DMR HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) May 15, 2018 Completed

    162. PURCHASE ADOBE CREATIVE CLOUD PETRONAS GAS

    BERHAD May 2, 2018 Completed

    163. SUPPLY & DELIVERY OF DRAKA CABLE FOR FSU NAUTICA MUAR (BENTARA) EPOMS April 27, 2018 Completed

    164. SUPPLY OF SPARE PART FOR 2WAY CONTROL VALVE (KORVAL) PFLNG April 26, 2018 Completed

    165. SUPPLY OF KOBE ELECTRODE FOR HESS PHRASE II HESS April 17, 2018 Completed

    166. PROVISION FOR RENEWAL OF ANNUAL SUBSCRIPTION FOR AUTOCAD COMMERCIAL

    PETRONAS TECHNICAL SERVICES

    SDN BHD April 23, 2018 Completed

    167. SUPPLY OF BREAKING LOAD TENSILE TEST FOR HELIDECK NETTING GK MALIKAI – COST PLUS

    PETRA RESOURCES April 12, 2018 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    168. CONFIGURATION OF ADDITIONAL CHANNEL AND FREQUENCY FOR LEASING PORTABLE RADIOS

    PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) April 11, 2018 Completed

    169. PROVISION OF MAINTENANCE RENEWAL (SOLARWINDS AND VEEAM)

    EXXONMOBIL EXPLORATION AND

    PRODUCTION MALAYSIA INC.

    April 11, 2018 Completed

    170. SUPPLY OF ID CARD PRINTER FOR HSE SAPURA

    EXPLORATION AND PRODUCTION

    April 10, 2018 Completed

    171. SUPPLY OF KOBE ELECTRODE FOR HESS PHRASE II HESS April 10, 2018 Completed

    172. PROVISION OF MAINTENANCE RENEWAL (PRIMAVERA P6 ENTERPRISE) PETRONAS

    TECHNICAL SERVICES March 28, 2018 Completed

    173. PROVISION OF LCV ACTUATOR AND PLC NETWORK PETROFAC (PM304-MALAYSIA) LIMITED

    March 27, 2018 Completed

    174. SUPPLY OF INSTRUMENT CABLE (REPEAT ORDER) AFS-887 – SATELLITES TURNAROUND (SATURN) PROJECT - GuF

    EMEPMI March 23, 2018 Completed

    175. PROVISION OF IT PERIPHERALS PETRONAS TECH

    TRAINING March 19, 2018 Completed

    176. SUPPLY OF HUMIDUR FP PAINTS TO QET BSP March 14, 2018 Completed

    177. SUPPLY MATERIALS AND APPLICATION FIRE PROOFING MATERIALS ON NEW LOADING PLATFORM STRICTURES FOR SPR 2 PROJECT FIRE PROOFING APPLICATION ON NEW JETTY PLATFORM STRUCTURES

    BLNG March 7, 2018 In Progress

    178. SUPPLY OF HUMIDUR PAINTS FOR UNIT 7200 LNG RUNDOWN LINE (GRE CLADDING) PAINTING WORK

    BLNG February 26, 2018 Completed

    179. PROVISION TO SUPPLY IT HARDWARE & CONSUMABLES HESS EXPLORATION &

    PRODUCTION MALAYSIA B.V

    February 21, 2018 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    180. PROVISION OF ADOBE SOFTWARE PETRONAS

    CHEMICALS GROUP BERHAD

    February 20, 2018 Completed

    181. SUPPLY OF WELDING ELECTRODE FOR STRUCTURAL INSTALLATION FOR SSB PAN MALAYSIA 2018

    SSB February 12, 2018 Completed

    182. SUPPLY OF INSTRUMENT CABLE (REPEAT ORDER) GUNTONG PRODUCTION OPTIMIZATION - GuD

    EMEPMI February 9, 2018 Completed

    183. SUPPLY OF HUMIDUR PAINTS - WESCO SHELL PHILIPPINES EXPLORATION B.V

    February 5, 2018 Completed

    184. PROVISION OF MOXA DEVICES PETRONAS GAS

    BERHAD January 30, 2018 Completed

    185. SUPPLY OF HEAT SHIELD PANEL FOR BLUE BRUSKER AT DUYONG LQ PETRONAS CARIGALI January 24, 2018 Completed

    186. PROVISION TO SUPPLY & DELIVER OF PIPELINE TAPE FOR PCSB-SBO PETRONAS CARIGALI

    SDN BHD January 23, 2018 Completed

    187. ASSAI CALL-OFF MAITENANCE AND SUPPORT SERVICES SAPURA

    EXPLORATION & PRODUCTION

    January 12, 2018 Completed

    188. PROVISION OF DESIGN, SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION FOR BOD HTI – PROVISION BUNGA PAKMA ACCOMODATION WORK BOAT GANGWAY PROJECT

    REPSOL December 12, 2017 Completed

    189. SUPPLY OF HUMIDUR PAINTS FOR U7200 TRESTLE STRUCTURE B/P ACTIVITIES

    BLNG November 29, 2017 Completed

    190. SUPPLY OF HUMIDUR FP PAINTS TO MGC BSP November 17, 2017 Completed

    191. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) November 11, 2017 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    192. FLARE TOWER PFP REINSTATEMENT FOR KIKEH MURPHY September 11, 2017 Completed

    193. PROVISION OF PASSIVE FIRE PROTECTION FOR M1 TOPSIDE MAINTENANCE AND STRUCTURAL REPAIR

    PETRONAS August 25, 2017 Completed

    194. SUPPLY OF PAINT-MANUFACTURER “ACOTEC & HUMIDUR” SHELL August 24, 2017 Completed

    195. PROVISION OF MOTOROLA PORTABLE RADIO AND ACCESSORIES PETRONAS CARIGALI

    SND BHD August 24, 2017 Completed

    196. PROVISION OF MOTOROLA ACCESSORIES OCEAN MIGHT SDN

    BHD August 22, 2017 Completed

    197. PROVISION OF MOTOROLA PORTABLE RADIO ACCESSORIES SAPURA

    EXPLORATION AND PRODUCTION

    August 14, 2017 Completed

    198. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC – F06

    SHELL August 9, 2017 Completed

    199. SUPPLY OF MATERIALS AND SPARE PARTS FOR BERGADING-CPP FRESH WATER GENERATOR FOR NORTH MALAY BASIN FULL FIELD DEVELOPMENT

    HESS August 7, 2017 Completed

    200. SUPPLY OF AVAYA PABX TELECOMMUNICATION HARDWARE AND ACCESSORIES

    HESS August 4, 2017 Completed

    201. PROVISION FOR MATLAB SOFTWARE MAINTENANCE SUPPORT FOR 2 YEARS HESS EXPLORATION &

    PRODUCTION MALAYSIA B.V

    August 3, 2017 Completed

    202. PROVISION OF MOTOROLA ACCESSORIES REPSOL OIL AND GAS

    MALAYSIA LTD July 24, 2017 Completed

    203. PURCHASE OF IT PERIPHERALS

    EXXONMOBIL EXPLORATION AND

    PRODUCTION MALAYSIA INC.

    July 19, 2017 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    204. RECTIFICATION OF MISALIGNED STEAM TURBINE PIPING ST 8100 AT ACRYLIC PLANT

    BASF July 13, 2017 Completed

    205. PROVISION OF PASSIVE FIRE PROTECTION (PFP) COATING FOR BO-D RISER SPLASH ZONE SECTION FOR BUNGA PAKMA DEVELOPMENT PROJECT – REPSOL 2017

    REPSOL July 10, 2017 Completed

    206. HIRING OF DRY ICE BLASTING VENDOR FOR CARRYING OUT DI BLASTING AT BLNG-CSIP FOR TA 2017

    BLNG June 24, 2017 Completed

    207. PROVISION OF TELWIN ENERGY 650 START BATTERIES SAPURA

    EXPLORATION & PRODUCTION

    June 22, 2017 Completed

    208. PROVISION FOR DESIGN, FABRICATE, SUPPLY AND INSTALLATION ASSISTANCE/SUPERVISION FOR HEAT SHIELD FOR SAPAWI PROJECT

    MURPHY June 21, 2017 Completed

    209. PROVISION OF HAYAMIM AVA ELECTRONIC WHITEBOARD AND ACCESSORIES HESS EXPLORATION &

    PRODUCTION MALAYSIA B.V

    June 1, 2017 Completed

    210. PURCHASE OF IT PERIPHERALS PETRONAS

    DAGANGAN BERHAD May 22, 2017 Completed

    211. PURCHASE OF IT PERIPHERALS PETRONAS

    PENAPISAN (MELAKA) May 8, 2017 Completed

    212. PROVISION OF PASSIVE FIRE PROTECTION SUBCONTRACTING WORK BDEWC April 21, 2017 Completed

    213. PROVISION OF MAINTENANCE RENEWAL OF SECURITY SYSTEM (FIREWALL-CYBEROAM)

    SAPURA EXPLORATION &

    PRODUCTION April 20, 2017 Completed

    214. PURCHASE OF IT PERIPHERALS SAPURA

    EXPLORATION & PRODUCTION

    April 14, 2017 Completed

    215. SUPPLY AND DELIVERY OF PRINTER EPOMS April 5, 2017 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    216. SUPPLY AND DLEIVERY SAMSUNG MOBILE SMARTPHONES EPOMS March 15, 2017 Completed

    217. PROVISIONAL OF SUPERVISION, LABOUR SUPPLY, RENTAL OF MACHINERY AND SCAFFOLDING FOR INSULATION WORK AT LEMONGRASS PROJECT

    BASF March 3, 2017 Completed

    218. JUNIPER NETWORK SUPPORT

    EXXONMOBIL EXPLORATION AND

    PRODUCTION MALAYSIA INC.

    February 22, 2017 Completed

    219. FIRE PROOFING REPAIR FOR U-7420 c/w ALL MATERIALS EQUIPMENT & MANPOWER FOR U-7420

    BLNG January 25, 2017 Completed

    220. PURCHASE OF TELECON/NETWORK EXXONMOBIL December 14, 2016 Completed

    221. PROVISION TO SUPPLY IT HARDWARE & CONSUMABLES HESS November 25, 2016 Completed

    222. RECTIFICATION OF MISALIGNMENT STEAM TURBINE PIPE STAGE 1 BASF November 11, 2016 Completed

    223. PURCHASE OF COMPUTER EQUIPMENT EXXONMOBIL November 1, 2016 Completed

    224. SUPPLY AND DELIVERY OF SAMSUNG MOBILE SMARTPHONES PETRONAS

    TECHNICAL TRAINING SDN BHD

    October 28, 2016 Completed

    225. SUPPLY OF RIBBON ZEBRA PETRONAS CHEMICAL

    DERIVATIVES SDN BHD

    October 25, 2016 Completed

    226. SUPPLY OF RIBBON ZEBRA PETRONAS CHEMICAL

    DERIVATIVES SDN BHD

    October 24, 2016 Completed

    227. PASSIVE FIRE PROTECTION WORK FOR SK310 B15 DEVELOPMENT PETRONAS CARIGALI September 28, 2016 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    228. PROVISION VSAT SERVICES SAPURAKENCANA SK

    GEOTECHNICS August 22, 2016 Completed

    229. SUPPLY OF KOBE ELECTRODE FOR SK310 B15 DEVELOPMENT - TOPSIDE PETRONAS CARIGALI August 16, 2016 Completed

    230. PASSIVE FIRE PROTECTION WORKS FOR BNJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT

    PETRONAS CARIGALI June 8, 2016 Completed

    231. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC – WORKSCOPING AT E11, F23, F13 AND F06

    SHELL May 18, 2016 Completed

    232. CONTRACT NO: UI50960 - SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC

    SHELL April 1, 2016 Completed

    233. PROVISION OF VIV STRAKES FOR MALIKAI’S PIPELINE SHELL March 16, 2016 Completed

    234. PROVISION OF VSAT COMMUNICATION SERVICES & WIRELESS RADIO SERVICES FOR KBM CLUSTER FIELD DEVELOPMENT

    COASTAL ENERGY January 28, 2016 Completed

    235. PROVISION OF NAVAL ARCHITECTURE AND MARINE ENGINEERING FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BOKOR PHASE 3A PROJECT

    PETRONAS CARIGALI November 2, 2015 Completed

    236. PASSIVE FIRE PROTECTION WORKS FOR TTJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT

    PETRONAS CARIGALI October 23, 2015 Completed

    237. PROVISION OF 14” PIPELINE RISER COMPACT FLANGE INSPECTION AND TESTING WORKS FOR KPOC – RM 500,000

    KPOC September 18, 2015 Completed

    238. PROVISION OF FJC SERVICES FOR SHELL MALIKAI PACK B – USD 700,000 SHELL September 10, 2015 Completed

    239. PASSIVE FIRE PROTECTION WORKS FOR EPCIC OF REMOTE WHPS FOR FULL FIELD DEVELOPMENT, NORTH MALAY BASIN PROJECT

    HESS September 8, 2015 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    240. PROVISION OF VSAT COMMUNICATION SERVICES FOR SKE’S DRILLING RIG SAPURAKENCANA

    ENERGY September 1, 2015 Completed

    241. PROVISION OF NAVAL ARCHITECTURE SERVICES FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BARAM HELIDECK PROJECT

    PETRONAS CARIGALI September 1, 2015 Completed

    242. PROVISION AND SUPPLY OF HDPF WITH SEA SLEEVE & INTRAFUSE FOR PROCUREMENT CONSTRUCTION & COMMISSIONING (PCC) OF REGASTIFICATION TERMINAL 2 PIPELINE PROJECT – USD 35,000

    CPM GROUP July 28, 2015 Completed

    243. SUPPLY OF STRAKES AND BENDS FOR SHELL GUMUSUT PHASE 2 SHELL July 6, 2015 Completed

    244. SUPPLY OF STRAKES AND STRAPS FOR SHELL GUMUSUT PHASE 2 SHELL June 16, 2015 Completed

    245. SUPPLY OF PIPELINE FIELD JOINT ANTI-CORROSION COATING SYSTEM FOR BESAR PIPELINE INSTALLATION – PCSB YEAR 2015

    PETRONAS CARIGALI May 12, 2015 Completed

    246. TO SUPPLY AND DELIVER CORROSION INHIBITOR TOTE TANK (TTJT-A) FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORMS (WHP)

    PETRONAS CARIGALI May 6, 2015 Completed

    247. TO SUPPLY AND DELIVER WASH WATER STORAGE TANK FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORM

    PETRONAS CARIGALI April 29, 2015 Completed

    248. PASSIVE FIRE PROTECTION WORKS FOR PCC OF BESAR-A WHP TOPSIDE PETRONAS CARIGALI April 24, 2015 Completed

    249. PROVISION OF VSAT COMMUNICATION SERVICES TOTAL E&P MALAYSIA October 1, 2014 Completed

    250. PROVISION OF WASTE DISPOSAL MANAGEMENT FOR BINTULU OPERATIONS BC PETROLEUM SDN

    BHD October 1, 2014 Completed

    251. VSAT SATELITE TELECOMMUNICATION SYSTEM AND SERVICES FOR BOKOR PHASE 3A

    SCHLUMBERGER September 29, 2014 Completed

    252. TO SUPPLY AND DELIVER ATMOSPHERIC TANKS FOR EPCIC OF LAYANG DEVELOPMENT FACILITIES

    JX NIPPON September 17, 2014 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    253. SUPPLY OF SERVIWRAP PETRONAS CARIGALI August 8, 2014 Completed

    254. PROVISION OF PASSIVE FIRE PROTECTION FOR WELLHEAD PLATFORM BLOCK PM 307 BERTAM FILED DEVELOPMENT

    LUNDIN PETROLEUM July 16, 2014 Completed

    255. PROVISION OF COMMUNICATION & ASTRO SERVICE SYSTEM FOR EPV PETRONAS CARIGALI July 7, 2014 Completed

    256. ELECTRODE (KOBELCO) FOR WHEATSTONE PROJECT LNG PLANT – MODULE FABRICATION ISBL

    SAPURAKENCANA July 3, 2014 Completed

    257. SUPPLY AND DELIVERY OF CABLES & ACCESSORIES FOR HUC FOR CENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM304

    KENCANA PETROLEUM

    May 28, 2014 Completed

    258. VSAT SERVICES FOR TALISMAN MALAYSIA’S OFFSHORE PRODUCTION PLATFORMS

    TALISMAN MALAYSIA May 1, 2014 Completed

    259. PROVISION OF 3RD PARTY SERVICES FOR PASSIVE FIRE PROTECTION AT FIREWALL EAST BELUMUT PLATFORM

    MMC OIL & GAS April 30, 2014 Completed

    260. DISPOSAL OF SCRAP METAL ITEMS DUE TO MAINTENANCE, DAMAGE METTALIC PARTS, USED SPARE PARTS, OBSOLETE AND EXPIRED MATERIAL

    PETRONAS PENAPISAN (MELAKA)

    SDN BHD April 21, 2014 Completed

    261. FABRICATION WORKS, SUPPLY OF MATERIAL, EQUIPMENT & MANPOWER AND DELIVERY OF PERMANENT FLANGE PROTECTOR & STUDBOLT FOR SSB PROJECT

    TL OFFSHORE SDN BHD

    April 16, 2014 Completed

    262. PROVISION OF FIXED VSAT SERVICES FOR UMW NAGA JACK-UP RIGS FOR UMW OFFSHORE DRILLING SDN BHD

    UMW OFFSHORE DRILLING

    April 1, 2014 Completed

    263. PROVISION OF VSAT SYSTEM SERVICES FOR EVA-NMB GAS PIPELINE INSTALLATION

    GOM RESOURCES SDN BHD

    April 1, 2014 Completed

    264. M03PQ-A V-3030 AND 3040 STRUCTURE FRAMING PFP COATING REPAIR (OPTION NO.1)

    SHELL February 12, 2014 Completed

    265. PROVISION OF FIXED VSAT SERVICES FOR COASTAL ENERGY’S MOBILE PRODUCTION UNIT, THE EP5 AND EP6

    COASTAL ENERGY January 1, 2014 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    266. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM FOR MAIN WORK BARGES / VESSELS 2014 – 2016 – TL OFFSHORE SDN BHD

    TL OFFSHORE January 1, 2014 Completed

    267. M03PQ-A VESSEL V-6210 PFP COATING SHELL December 27, 2013 Completed

    268. PASSIVE FIRE PROTECTION SYSTEM ON DIESEL STORAGE TANK COLUMN T-S16270 AT KIKEH UNITL SCOPE COMPLETE

    MURPHY November 28, 2013 Completed

    269. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG C STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

    EMEPMI November 13, 2013 Completed

    270. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG B STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

    EMEPMI November 13, 2013 Completed

    271. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR TABU A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

    EMEPMI October 28, 2013 Completed

    272. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR PALAS A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

    EMEPMI October 28, 2013 Completed

    273. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

    EMEPMI October 25, 2013 Completed

    274. PROVISION FOR REMOVAL AND INSTALLATION OF EPOXY-TYPE PASSIVE FIRE PROTECTION FOR HELANG INTEGRATED PLATFORM (HIP)

    MMC OIL & GAS October 22, 2013 Completed

    275. MODIFICATION AND FABRICATION OF NEW GRILLAGES / SKID RADOIL ONSHORE SUPPORT SYSTEM FOR J-LAY TOWER - SASB

    SAPURA ACERGY SDN BHD

    September 12, 2013 Completed

    276. PROVISION OF FIREWALL UPGRADE (PFP COATING) FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM

    EMEPMI September 6, 2013 Completed

    277. PROVISION OF FIELD JOINT COATING SERVICES FOR EVA PROJECT 2013 HESS August 10, 2013 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    278. PROVISION OF FIXED VSAT SERVICES FOR ATWOOD MANTA AND COASTAL ENERGY

    ATWOOD August, 2013 Completed

    279. SUBCONTRACT WORKS FOR PASSIVE FIRE PROTECTION WORKS FOR DAMAR-A PLATFORM

    EMEPMI July 29, 2013 Completed

    280. PROVISION OF FIELD JOINT COATING SERVICES FOR TUKAU PROJECT 2013 HESS July 18, 2013 Completed

    281. PROVISION OF VSAT SERVICES FOR BUMI ARMADA AT-300 VESSEL BUMI ARMADA June, 2013 Completed

    282. PROVISION OF STABILIZED VSAT SERVICES FOR PERISAI PETROLEUM ON THE PERISAI KAMELIA

    PERISAI PETROLEUM June, 2013 Completed

    283. SUPPLY AND DELIVER OF SLIDING PLATE FOR FABRICATION OF KBB TOPSIDES (BOAQ) - MMHE

    KPOC May 23, 2013 Completed

    284. PROVISION OF PASSIVE FIRE PROTECTION FOR SHELL D12 & LAILA FIELD DEVELOPMENT - THHE

    SARAWAK SHELL BERHAD

    May 9, 2013 Completed

    285. PROVISION OF SUPPLY & SERVICE OF HBE COATING APPLICATION FOR 16” X 22KM DAMAR-A TO LAWIT-A CRA PIPELINE – TL OFFSHORE SDN BHD

    EMEPMI May 2, 2013 Completed

    286. PROVISION OF RISER CLAMP & FLANGE PROTECTOR FOR 16” X 52KM GAS EXPORT PIPELINE FROM PLEM & LAWIT A PLATFORM – GOM RESOURCES SDN BHD

    HESS EXPLORATION & PRODUCTION MALAYSIA B.V

    April 29, 2013 Completed

    287. PROVISION OF HEAT SHIELD FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM – SHAPADU ENERGY & ENGINEERING

    EMEPMI April 2013 Completed

    288. SUPPLY AND INSTALLATION OF HEAT SHIELD FOR KINABALU KNPG-B - MMHE

    PETRONAS CARIGALI SDN BHD

    April 2013 Completed

    289. OFFSHORE CARRY OVER WORKS FOR PIPING OF TAPIS-Q TOPSIDES - MMHE EMEPMI April 2013 Completed

    290. PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS B WI HTI PIPE SUPPOR TSTOP (AFS003B) – SHAPADU ENERGY & ENGINEERING SDN BHD

    EMEPMI April 2013 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    291. PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS C PLATFORM TOPSIDE (EXCLUDE LER) - SHAPADU ENERGY & ENGINEERING SDN BHD

    EMEPMI April 2013 Completed

    292. PROVISION OF FABRICATION AND DELIVERY OF 16” SE-PA RISER LOAD BEARING CLAMP AND SLIDING CLAMP FOR MOC YEAR 2013 PIPELINES INSTALLATION - SAPURA KENCANA PETROLEUM C/O TL OFFSHORE SDN BHD

    MURPHY SARAWAK OIL. CO. LTD

    April 2013 Completed

    293. SUPPLY AND DELIVER OF CEILING FINISHES - SUSPENDED CEILING SYSTEM SOUTH ACIS OIL & GAS DEVELOPMENT PROJECT (REPEAT ORDER) - BROOKE DOCKYARD & ENGINEERING WORKS CORPORATION

    BROOKE DOCKYARD & ENGINEERING

    WORKS CORPORATION

    March 18, 2013 Completed

    294.

    ENGINEERING,SUPPLY OF MATERIAL, MANUFACTURING, FABRICATION, INSTALLATION AND MODIFICATION OF FIBERGLASS GRATINGS, STAIRTREADS AND GRE HANDRAILS FOR DAMAR A SUBSTRUCTURE PROJECT – MMHE

    EMEPMI March 13, 2013 Completed

    295. PROVISION OF 3LPE FIELD JOINT COATING ON 12” & 10” LINEPIPE SERVICES FOR SIAKAP NORTH PETAI (SNP) DEVELOPMENT PROJECT

    MURPHY SNP March 11, 2013 Completed

    296. PROVISION OF FIELD JOINT COATING SERVICES FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE

    EMEPMI March 8, 2013 Completed

    297. SUPPLY & DELIVERY OF FIELD JOINT ANTI CORROSION COATING SYSTEM HEAT SHRINK SLEEVE (RAYCHEM WPC100) FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE

    EMEPMI March 8, 2013 Completed

    298. PROVISION OF PIPELINE FIELD JOINT INFILL MATERIAL FOR TAPIS EOR & DAMAR GAS DEVELOPMENT PROJECT Y2013

    EMEPMI March 7, 2013 Completed

    299. PROVISION OF FIRE PROTECTION (PFP) AND INSULATION WORK FOR WEST DESARU TOPSIDES - THHE FABRICATORS SDN BHD

    AQUATERRA ENERGY LIMITED

    March 7, 2013 Completed

    300. M03 DAMAGED FPF COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed

    301. M01 DAMAGED PFP COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed

    302.

    PROVISION OF SUPPLY AND DELIVERY OF MONEL WELDING INTEGRATED TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR EARLY PRODUCTION SCHEME (EPS), INTEGRATED GAS DEVELOPMENT (IGD) PROJECT, NORTH MALAY BASIN (NMB) FIELD – GOM RESOURCES SDN BHD

    HESS EXPLORATION & PRODUCTION

    MSIA B.V. March 2013 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    303. PROVISION OF FIELD JOINT COATING SERVICES FOR HESS 2013 PROJECT – GOM RESOURCES

    HESS February 26, 2013 Completed

    304. PROVISION TO SUPPLY AND DELIVER CRUDE OIL WASHING MACHINE (COW MACHINE) SUPPLY FOR BERANTAI OPERATION - PETROFAC

    PETRONAS January 29, 2013 Completed

    305. SUBCONTRACTOR FOR PASSIVE FIRE PROTECTION WORKS FOR KBB TOPSIDES - MMHE

    KPOC January 21, 2013 Completed

    306. ARCHITECTURAL INSULATION PACKAGE SUPPLY OF M90 FIRETEX FOR GREATER EKOFISK AREA 2/4 - SMOE

    CONOCO PHILIPS January 15, 2013 Completed

    307. PROVISION OF 3RD CAMPAIGN SEA-FASTENING WORKS OF J-LAY AND PES TOWER ON BOARD SAPURA 3000 – SAPURA ACERGY SDN BHD

    SHELL January 11, 2013 Completed

    308. PROVISION OF SUPPLY AND DELIVERY OF CEILING FINISHES – SUSPENDED CEILING FOR SOUTH ACIS PROJECT – BROOKE DOCKYARD AND ENGINEERING WORKS.

    MURPHY January 10, 2013 Completed

    309. DESIGN, FABRICATION & DELIVERY OF FIREWALL FOR DAMAR-A TOPSIDE MMHE

    EMEPMI January 08, 2013 Completed

    310. SUPPLY OF PAINT EMEPMI December 27, 2012 Completed

    311. E & I WORKS-FABRICATION AND INSTALLATION FOR F14DR-A TOPSIDES & F14/F29 PROCESS MODULE – MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

    SHELL December 17, 2012 Completed

    312. STRUCTURE WORKS FOR DAMAR-A PLATFORM (TOPSIDE) - MMHE EMEPMI November 12, 2012 Completed

    313. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

    KPOC October 18, 2012 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    314.

    SUPPLY, DELIVERY, AND INSTALLATION SUPERVISION OF COMPOSITE MATERIALS (FIBERGLASS) & ACCESSORIES FOR WAVE ZONE GRATING FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM, EMEPMI EPCM BROWNFIELD PROJECT.

    EMEPMI October 5, 2012 Completed

    315. SUPPLY AND DELIVER OF OFFICE EQUIPMENT (HS1146630X FIRE FIGHTING SUIT) HS1146630X FIRE FIGHTING SUIT

    UNIVERSITI TELNOLOGI

    PETRONAS, TRONOH PERAK

    October 2012 Completed

    316. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (BOAQ)(5.12M002B) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

    KPOC September 24, 2012 Completed

    317. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

    KPOC September 24, 2012 Completed

    318. PROVISION OF FABRICATION 18” AND 12” FLEXIJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

    SHELL September 13, 2012 Completed

    319. PROVISION OF FABRICATION 8” AND 10” STRESSJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

    SHELL September 12, 2012 Completed

    320. PROVISION OF FIELD JOINT COATING SERVICES FOR 8" AND 10" MALIKAI PIPELINE – GOM RESOURCES

    SHELL September 11, 2012 Completed

    321. PROVISION OF FABRICATE AND SUPPLY OF WS2 UPPER MAST ELEMENT 2 LIFTING PAD EYE FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

    SHELL September 5, 2012 Completed

    322.

    PROVISION OF FABRICATE AND SUPPLY OF NEW 18” ESCALATOR TROLLEY INSERTS, ACCESS TO HPU BOOST PUMPS, WS2 LOWER MAST ELEMENT 2, WS2 HINGE HATCH COVER, WS1 RAIN PROTECTION IMPROVEMENT FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

    SHELL September 5, 2012 Completed

    323. PROVISION OF STABILIZED VSAT SATELLITE COMMUNICATIONS FOR SAPURAACERGY ON THE SAPURA3000

    SAPURAACERGY September, 2012 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    324. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL August 30, 2012 Completed

    325. PROVISION OF DISPOSAL OF DAMAGED KOSMO, IVECO AND MAN BUSES AND ITS COMPONENTS – SYARIKAT PRASANA NEGARA BERHAD

    SPNB August 29, 2012 Completed

    326. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TAPIS Q TOPSIDE – MMHE SDN BHD

    EMEPMI August 28, 2012 Completed

    327. SUPPLY AND DELIVERY OF HSS (WPC100M) FOR MALIKAI PIPELINE – GOM RESOURCES

    SHELL August 18, 2012 Completed

    328. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TELOK A TOPSIDES – MMHE SDN BHD

    EMEPMI August 9, 2012 Completed

    329. PROVISION OF VSAT SERVICES IN GULF OF MEXICO – SAPURA ACERGY SDN BHD

    SAPURA ACERGY August 9, 2012 Completed

    330. PROVISION OF FIELD JOINT COATING SERVICES AND SUPPLY OF ANTICORROSSION TAPE (SERVIWRAP M30B) FOR 6" X 7.6KM BEKOK-A TO TIONG-A PIPELINE INSTALLATION – GOM RESOURCES

    PETRONAS August 2, 2012 Completed

    331. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S TABU A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY

    EMEPMI July 31, 2012 Completed

    332. SUPPLY AND DELIVER OF HEAVY DUTY ANTI SLIP STEP COVER – TALISMAN MALAYSIA LIMITED

    TALISMAN July 12, 2012 Completed

    333. PROVISION OF TELECOMMUNICATION SYSTEM FOR TOISA PALADIN – FUGRO GEODETIC (M) SDN BHD

    FUGRO GEODETIC July 12, 2012 Completed

    334. FABRICATION AND INSTALLATION OF STRUCTURE WORKS FOR PACKAGE 1, DECK NORTH AND MISC FOR TAPIR R TOPSIDES PROJECT - MMHE SDN BHD

    EMEPMI July 10, 2012 Completed

    335. SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) AND PACKAGE B: B-193 A-P FOR (PGC & AGRU) – SIME DARBY ENGINEERING SDN BHD

    OIL AND NATURAL GAS CORPORATION

    LTD (ONGC) July 07, 2012 Completed

    336. SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) – SIME DARBY ENGINEERING SDN BHD

    OIL AND NATURAL GAS CORPORATION

    LTD (ONGC) July 04, 2012 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    337. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S PALAS A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY

    EMEPMI July 04, 2012 Completed

    338. SUPPLY AND DELIVER OFSLIDING PLATE FOR FABRICATION ON KBB TOPSIDES (BOAQ) - MMHE

    KPOC July 02, 2012 Completed

    339. TO SUPPLY MATERIALS, EQUIPMENT, CONSUMABLES, TOOLS AND MANPOWER FOR COOLING MANIFOLD RELOCATION FOR GUMUSUT KAKAP, J LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

    SHELL June 12, 2012 Completed

    340. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF VESSEL DLB264 – GOM RESOURCES

    GOM RESOURCES June 11, 2012 Completed

    341. PROVISION OF PULLING & REMOVE CABLE FOR LNGC SERI ALAM – MMHE SDN. BHD.

    MISC May 21, 2012 Completed

    342. SUPPLY, FABRICATE AND DELIVERY SEA FASTENING FOR CARGO BARGE FOR LAN DO DEVELOPMENT PROJECT – SAPURA ACERGY SDN BHD

    TNK VIETNAM BV May 17, 2012 Completed

    343. PROVISION OF FIELD JOINT COATING SERVICES FOR MOC TRANSPORTATION AND INSTALLATION OF OFFSHORE PIPELINES AND FACILITIES FOR YEAR 2012 – TL OFFSHORE SDN BHD

    MURPHY OIL May 9, 2012 Completed

    344. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT PM318-PUTERI FWS PIPELINE REPLACEMENT PROJECT - NEWFIELD

    NEWFIELD April 9, 2012 Completed

    345. PROVISION OF VSAT TELECOMMUNICATION AND SERVICES FOR PETRONAS CARIGALI SDN BHD – IPERINTIS SDN BHD

    IPERINTIS April 6, 2012 Completed

    346. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - SCHLUMBERGER GROUP

    SCHLUMBERGER April 4, 2012 Completed

    347. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - HALLIBURTON ENERGY SERVICES (M) SDN BHD

    HALLIBURTON April 4, 2012 Completed

    348. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF HEAVY LIFT PIPE LAY VESSEL LTS3000

    L & T SAPURA April 1, 2012 Completed

    349. DESIGN, FABRICATION AND DELIVERY OF FIREWALL FOR TELOK A & B PROJECT – MMHE SDN BHD

    SHELL March 23, 2012 Completed

    350. COMMISSIONING OF STABILISED VSAT SERVICES AND VPN ONBOARD MV. WANGSAMAJU – OCEANTECH GEOMATICS

    OCEANTECH GEOMATIC

    March 14, 2012 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    351. PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION TAPE (SERVIWRAP M30B) FOR KEBABANGAN DEVELOPMENT PROJECT – GLOBAL OFFSHORE MALAYSIA

    KPOC March 13, 2012 Completed

    352.

    SUPPLY AND DELIVERY OF HANGER FLANGE, RISER GUARD AND RISER CLAMP FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR PETRONAS CARIGALI SKO PIPELINE REJUVENATION PROJECT. – CARIMIN ENGINEERING SERVICES

    PETRONAS March 12, 2012 Completed

    353. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL March 5, 2012 Completed

    354. SUPPLY AND DELIVERY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR TCOT PWSU TAIL END & REMEDIAL WORK FOR EMEPMI EPCM BROWNFIELD PROJECT – PERUNDING RANHILL WORLEY

    EMEPMI March 1, 2012 Completed

    355. PROVISION OF FIELD JOINT COATING FOR SOGT PROJECT – ALAM SWIBER PETRONAS February 27, 2012 Completed

    356. PROVISION OF FIELD JOINT COATING AND SUPPLY OF HSS (RAYCHEM WPC100M) FOR EMEMPI’S TAPIS EOR REJUVENATION AND TELOK DEVELOMENT PROJECT. – TL OFFSHORE SDN BHD

    EMEPMI February 24, 2012 Completed

    357. DESIGN, ENGINEERING, AND DELIVERY OF FAIRINGS & THRUST COLLARS FOR DRILLING RISERS – SONGA OFFSHORE

    PETRONAS February 22, 2012 Completed

    358. PROVIDING STABILISED VSAT SYSTEM FOR SEMI-SUBMERSIBLE RIG, OCEANROVER FOR DEEPWATER PROJECT, KIKEH – DIAMOND OFFSHORE

    MURPHY OIL February 14, 2012 Completed

    359. PROVISION OF VSAT SYSTEM AND PROVIDING VPN RENTAL SERVICES FOR DLB264 – GLOBAL OFFSHORE MALAYSIA

    GLOBAL OFFSHORE February 09, 2012 Completed

    360. PIPELINE AND SPOOLS FIELD JOINT COATING SERVICES FOR LAN DO DEVELOPMENT PROJECT VIETNAM – SAPURA ACERGY SDN BHD

    TNK VIETNAM BV January 20, 2012 Completed

    361.

    PROVISION FOR DETAILED DESIGN ENGINEERING SERVICES FOR PACKAGE THIRD PARTY VERIFICATION OF GUE H RATED FIREWALL TO WITH STAND 30-MINUTES JET FIRE FOR TELOK GAS DEVELOPMENT PROJECT – PERUNDING RANHILL WORLEY SDN BHD

    EMEPMI December 29, 2011 Completed

    362. PROVISION OF INSTALLATION AND MAINTENANCE OF VPN INTERNET SERVICES – ASIAN SUPPLY BASE SDN BHD

    ASIAN SUPPLY BINTULU

    December 21, 2011 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    363. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT M01 AND E11 FOR TI-FIX AND IR PROJECT - SHELL

    SHELL December 21, 2011 Completed

    364. SUPPLY MANPOWER, EQUIPMENTS AND MATERIALS FOR PM329 EAST PIATU TOPSIDES – KENCANA HL SDN BHD

    NEWFIELD December 1, 2011 Completed

    365. E & I FABRICATION, INSTALLATION, TESTING, PRE-COMMISSIONING WORK, FOR TAPIS EOR PROJECT (PACKAGE B AND PACKAGE C) – MMHE SDN BHD

    EMEPMI December, 2011 Completed

    366. PIPING FABRICATION AND INSTALLATION FOR TAPIS Q LIVING QUARTERS – MMHE SDN BHD

    EMEPMI November, 2011 Completed

    367. SUPPLY OF H120 FIRE/BLAST WALL FOR KEBABANGAN TOPSIDES – SIME DARBY ENGINEERING SDN BHD

    KPOC November 25, 2011 Completed

    368. PROVISION OF FIELD JOINT COATING FOR BCOT PROJECT – ALAM SWIBER PETRONAS October 10, 2011 Completed

    369. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION CASTING FOR SDV ON BUNGA RAYA-B – APEX ENERGY SDN. BHD.

    TALISMAN September 27, 2011 Completed

    370. PROVISION OF PASSIVE FIRE PROTECTION (PFP) SERVICES FOR PCC OF TOPSIDES AND PIPELINE FOR PM318 PUTERI PIPELINE RESTORATION PROJECT – KENCANA HL SDN BHD

    NEWFIELD September 15, 2011 Completed

    371.

    PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIAL (SERVIWRAP) FOR 14” AND 24” EXPORT PIPELINE SHORE APPROACH INSTALLATION FOR KEBABANGAN NORTHERN HUB DEVELOPMENT – PBJV GROUP SDN BHD

    PETRONAS CARIGALI SDN BHD

    September 15, 2011 Completed

    372.

    PROVISION OF PASSIVE FIRE PROTECTION (PFP), TOOLS/ EQUIPMENT & MATERIALS TO REMOVE THE DEGRADED PFP & APPLICATION OF NEW PFP AT M3PQ-A LIVING QUARTER WEST WALL – SARKU ENGINEERING SERVICES SDN. BHD.

    SHELL September 15, 2011 Completed

    373. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR HELANG TOPSIDES (E-9550 & E-9650) – MONT TRINITY

    NIPPON OIL September 12, 2011 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    374.

    PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR INTRAGRATED TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES (TIONG A) PROJECT – GLOBAL OFFSHORE MALAYSIA SDN BHD

    NEWFIELD August 17, 2011 Completed

    375. PROVISION OF REMOVAL, REPAIR & REINSTATEMENT OF BLASTWALL ON M3P-Q PLATFORM – DAYANG ENTERPRISE & SSB

    SHELL August 5, 2011 Completed

    376. DESIGN, MANUFACTURE AND SUPPLY OF VIV SUSPRESSION STRAKES FOR BLOCK 06.1 PHASE III PROJECT – LAN DO DEVELOPMENT PROJECT – RANHILL WORLEYPARSONS SDN BHD

    BP EXPLORATION OPERATING CO. LTD

    August 3, 2011 Completed

    377.

    PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR SKO PIPELINE REPLACEMENT PROJECT – TARGET ENERGY CO. (M) SDN. BHD.

    PETRONAS CARIGALI SDN BHD

    July 25, 2011 Completed

    378. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH) TAPIS-R DECK (SOUTH), TAPIS-R LIVING QUARTERS & BRIDGES SKID BEAM AND TAPIS-Q DECK – MMHE SDN. BHD.

    EMEPMI July 15, 2011 Completed

    379. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH), TAPIS-Q DECK, MISCELLANEOUS WORKS TAPIS-Q – MMHE SDN. BHD.

    EMEPMI July 3, 2011 Completed

    380. SUPPLY, DELIVERY AND INSTALLATION OF STRAKES FOR GUMUSUT KAKAP JUMPERS - FMC

    SHELL June 17,2011 Completed

    381. PROVISION OF PIPELINE FIELD JOINT COATING WORKS FOR THE FABRICATION SERVICES OF FLOWLINE JUMPER – LABUAN SHIPYARD

    SAPURA ACERGY/ SHELL

    April 14, 2011 Completed

    382. PROVISION OF PIPELINE INFIELD FIELD JOINT COATING FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD

    PETRONAS CARIGALI SDN BHD

    April 12, 2011 Completed

    383.

    PROVISION OF PIPELINE ANTI CORROSION MATERIAL (SERVIWRAP) FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD

    PETRONAS CARIGALI SDN BHD

    March 31, 2011 Completed

    384. PROVISION OF FIELD JOINT COATING SERVICES FOR F28DR-A/F6K-A PIPELINE PROJECT – TL OFFSHORE SDN BHD

    SHELL March 18, 2011 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    385.

    FABRICATION AND INSTALLATION OF STRUCTURAL WORKS FOR TOPSIDES A-Q COMPRISING PART OF SURVEY, DESIGN, ENGINEERING, PROCUREMENT, FABRICATION, LOAD OUT, TIE-DOWN/SEAFASTENING, TRANSPORTATION, INSTALLATION, HOOK-UP, TESTING, COMMISSIONING (EPCIC) OF PROCESS PLATFORM FOR B-193 PROJECT – SIME DARBY ENGINEERING

    OIL AND NATURAL GAS CORPORATION

    LTD (ONGC) February 25, 2011 Completed

    386. PROVISION OF PIPELINE MATERIALS WITH SEA SLEEVES C/W EQUIPMENT FOR NEWFIELD’S EAST PIATU INSTALLATION – TL OFFSHORE SDN BHD

    NEWFIELD February 24, 2011 Completed

    387. PROVISION OF PASSIVE FIRE PROTECTION SERVICES) FOR NEWFIELD'S EAST PIATU'S JACKET & TOPSIDES - KENCANA HL

    NEWFIELD February 11, 2011 Completed

    388. PROVISION OF FIELD JOINT COATING AND INFILL MATERIALS FOR PUTERI PIPELINE RESTORATION PROJECT – TL OFFSHORE SDN BHD

    NEWFIELD February 11, 2011 Completed

    389. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR CAKERWALLA OFFSHORE - SHAPADU ENERGY & ENGINEERING SDN BHD

    CARIGALI HESS February 1, 2011 Completed

    390. PROVISION OF FIELD JOINT COATING, SUPPLY AND INSTALLATION OF CANUSA GTS-PP WRAPID SLEEVE FOR CILIPADI PIPELINE PROJECT – TL OFFSHORE SDN BHD

    SHELL January 17, 2011 Completed

    391. REPAIR WORKS OF BLASTWALL AND FIREWALL FOR MODULE 3 KUMANG TOPSIDE - OFFSHORE WORKS

    PETRONAS CARIGALI SDN BHD

    December 13, 2010 Completed

    392. DESIGN, CONSTRUCT, SUPPLY AND DELIVERY OF NOISE ATTENUATORS AND EXPANSION SPOOLS FOR F13 PROCESSING MODULE GLYCOL REBOILER SKID AT E11P-B PLATFORM

    SARAWAK SHELL BERHAD

    November 24, 2010 Completed

    393.

    FABRICATION AND INSTALLATION OF THE MOORING PORCHES, CHAIN JACK GANTRIES AND ASSOCIATED PLATFORMS, AND INSTALLATION OF FAIRLEAD FOUNDATIONS FOR GUMUSUT KAKAP FPS HULL (36010863) AT MALAYSIA MARINE AND HEAVY ENGINEERING

    SHELL / MISC November 12, 2010 Completed

    394. SUBCONTRACT FOR STRUCTURAL WORKS FOR PROCESS PLATFORM FOR B -193 PROJECT AT SIME DARBY ENGINEERING

    OIL AND NATURAL GAS CORPORATION

    LTD (ONGC) October 22, 2010 Completed

    395. DESIGN, FABRICATE AND SUPPLY FIRE RATED ROLLER SHUTTER FOR KINABALU NAG DEVELOPMENT PROJECT (KNPG-B) - MMHE

    PETRONAS CARIGALI SDN BHD

    October 21, 2010 Completed

    396. SUPPLY AND DELIVERY OF SAFETY EQUIPMENTS FOR SAMARANG (PHASE 1 – ACCELERATED DRILLING) DEVELOPMENT PROJECT – KENCANA PETROLUEM

    PETRONAS CARIGALI SDN BHD

    October 6, 2010 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    397. PROVISION OF BR-B REPLACEMENT – RISER PIPE, CLAMP AND I-TUBE – FIELD JOINT COATING

    TALISMAN September 20, 2010 Completed

    398. DESIGN, FABRICATE AND SUPPLY OF BLASTWALL FOR LIVING QUARTERS FOR JACKETS OF PM329 EAST PIATU DEVELOPMENT PROJECT – KENCANA HL

    NEWFIELD September 17, 2010 Completed

    399. PROVISION OF PIPELINE FIELD JOINT COATING SERVICES AND INFILL MATERIALS FOR PETRONAS CARIGALI’S SKO PIPELINE PROJECT – TL OFFSHORE

    PETRONAS CARIGALI SDN BHD

    September 7, 2010 Completed

    400. PROVISION OF FLOWLINE AND RISER FIELD JOINT COATING SERVICES FOR GUMUSUT KAKAP PROJECT – SAPURA ACERGY

    SHELL August 6, 2010 Completed

    401. UMBRELLA CONTRACTS FOR SALE OF SSB/SSPC SCRAP METAL (600865) SARAWAK SHELL

    BERHAD August 3, 2010 Completed

    402. PROVISION OF THE SERVICE FOR DISPOSAL OF SURPLUS MATERIALS FOR PETRONAS GROUP OF COMPANIES FOR YEAR 2010-2013 (UMBRELLA CONTRACT)

    PETROLIAM NASIONAL BERHAD

    July 28, 2010 Completed

    403. SUPPLY AND DELIVERY OF INSTRUMENT FIRE & GAS CABLES FOR MRU - BUNGA ORKID DEV. PROJECT FOR SDE

    TALISMAN MALAYSIA LIMITED

    July 23, 2010 Completed

    404. PROVISION OF PIPELINE FIELD JOINT COATING AND INFILL MATERIAL FOR ST. JOSEPH PIPELINE INSTALLATION ON E3 – TL OFFSHORE

    SABAH SHELL PETROLUEM CO. LTD

    July 22, 2010 Completed

    405. SUPPLY AND DELIVER OF INSTRUMENT CABLES & GLANDS FOR EMEMPI’S SELIGI AND SEMANGKUK PIPELINE REPLACEMENT PROJECT

    RANHILL WORLEY PARSONS

    June 29, 2010 Completed

    406. STRUCTURAL WORK ~(5-TOPSIDES) - EPCIC OF (5) WELLHEAD PLATFORM FOR B-193 PROJECT – SDE

    OIL AND NATURAL GAS CORP. LTD

    (ONGC) June 12, 2010 Completed

    407. SUPPLY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR GUNTONG E AIR UTILITY SYSTEM UPGRADE PROJECT

    RANHILL WORLEY PARSONS

    May 27, 2010 Completed

    408. SUPPLY OF CABLES FOR INTERGRATED PROCUREMENT AND CONSTRUCTION DEVELOPMENT PROJECT (PHASE 1)

    SIME DARBY May 18, 2010 Completed

    409. PROVISION OF FIELD JOINT COATING SERVICES FOR DEVIL’S CREEK DEVELOPMENT PROJECT

    SAPURA ACERGY May 15, 2010 Completed

    410. SUPPLY OF SERVI-WRAP ANTI-CORROSION MATERIALS SARAWAK SHELL May 13, 2010 Completed

    411. SUPPLY OF INSTRUMENT CABLES & CABLE GLANDS FOR TAPIS PUMP FIRE AND GAS SYSTEM UPGRADE PROJECT - EMEPMI

    RANHILL WORLEY PARSONS

    May 4, 2010 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    412. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM INCLUDING LAN/WAN – TL OFFSHORE SDN BHD

    TL OFFSHORE May 1, 2010 Completed

    413. SUPPLY, FABRICATE, INSTALL AND PRE-COMMISSION ONE UNIT OF GYM ROOM FOR BRE

    TALISMAN MALAYSIA LIMITED

    April 29, 2010 Completed

    414. DESIGN, SUPPLY, APPLICATION AND INSTALLATION OF PASSIVE FIRE PROTECTION (PACKAGE NO.SF03) FOR GUMUSUT KAKAP SEMI-FPS PROJECT

    MMHE April 21, 2010 Completed

    415. APPLICATION OF FOAM INSULATION FOR CAMERON INTERNATIONAL (M) SYSTEM SDN BHD

    CAMERON INTERNATIONAL (M)

    SDN BHD April 10, 2010 Completed

    416. FIELD JOINT COATING WORK AT TLO FOR 2010 MURPHY PIPELINE PROJECT MURPHY OIL CORP March 16, 2010 Completed

    417. FIELD JOINT COATING WORK AT GLOBAL OFFSHORE MALAYSIA FOR 2010 PETRONAS PIPELINES PROJECT

    PETRONAS CARIGALI March 16, 2010 Completed

    418. SUPPLY OF CABLES FOR F23R-A CILIPADI GAS FIELD DEVELOPMENT PROJECT

    PFCE March 15, 2010 Completed

    419. PASSIVE FIRE PROTECTION FOR SARAWAK SHELL E-8 PLATFORM SARAWAK SHELL March 15, 2010 Completed

    420. DISPOSAL & REMOVAL OF SCRAP MATERIALS FROM MMHE SARAWAK SHELL March 15, 2010 Completed

    421. SALE OF USED/SCRAP MATERIALS AND EQUIPMENT MLNG March 10, 2010 Completed

    422. THERMOCOUPLE CABLE FOR BUNGA ORCHID-A TALISMAN MALAYSIA March 9, 2010 Completed

    423. HEAT SHIELD PANELS FOR ABU FIELD PETRONAS CARIGALI March 3, 2010 Completed

    424. SUPPLY AND APPLICATION OF PFP FOR F23DR-A CILIPADI PROJECT AT RFSB FOR PFCE

    SARAWAK SHELL BERHAD

    February 28, 2010 Completed

    425. J-LAY TOWER REFURBISHMENT PROJECT (STRUCTURAL WORKS) FOR SAPURA ACERGY

    SHELL / MISC February 25, 2010 Completed

    426. SUPPLY OF LIGHT WATER STATION PETRONAS CARIGALI February 5, 2010 Completed

    427. BLASTING AND PAINTING FOR JLT STRUCTURE SERVICES FOR GUMUSUT AT SAPURA ACERGY

    SHELL/ MISC January 28 2010 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    428. SUPPLY OF HEATSHIELDS TO CILIPADI PROJECT AT RFSB FOR PFCE SARAWAK SHELL December 28 2009 Completed

    429. DISPOSAL OF EXXON MOBIL OBSOLETE, PROJECT SURPLUS, AND USED MATERIALS

    EMEMPI December 8, 2009 Completed

    430. S-LAY FIELD JOINT COATING CONTRACT FOR GUMUSUT PIPELINE AT SAPURA ACERGY

    SHELL / MISC November 26, 2009 Completed

    431. SUPPLY AND APPLICATION OF PFP FOR TANGGA BARAT CPP TOPSIDE @ MMHE

    PETRONAS CARIGALI November 3, 2009 Completed

    432. DISPOSAL OF TML SLOW MOVING AND OBSOLETE GOODS AT KSB (SCRAP METAL)

    TALISMAN October 30, 2009 Completed

    433. SUPPLY OF BLASTWALL FOR F23 (CILIPADI) AT RAMUNIA YARD @ PFCE SARAWAK SHELL October 21, 2009 Completed

    434. SUPPLY OF BLASTWALL TO J.R MCDERMOTT FOR THE KIPPER TUNA PROJECT

    ESSO AUSTRALIA August 25, 2009 Completed

    435. SUPPLY OF INSTRUMENT, FIRE & GAS, ELECTRICAL AND TELECOM CABLES TO PFCE AT RAMUNIA FABRICATION YARD FOR 23 TOPSIDE PROJECT

    SARAWAK SHELL August 24, 2009 Completed

    436. SUPPLY OF AIMS RFP MUDMAT SYSTEM FOR NEWFIELD’S WEST BELUMUT WELLHEAD JACKET AT KENCANA HL

    NEWFIELD July 31, 2009 Completed

    437. SUPPLY OF CHEMICALS – TRIETHYLENE GLYCOL – 99.9%, 235 KGS DRUM UNDER PRICE AGREEMENT WITH PETRONAS CARIGALI

    PETRONAS CARIGALI July 15, 2009 Completed

    438. ELECTRICAL AND INSTRUMENTATION FABRICATION & HOST TIE & HOOK-UP COMMISSIONING OF GUA FLAREBOOM REPLACEMENT AT BOUSTEAD PENANG SHIPYARD S/B

    EXXON MOBIL June 22, 2009 Completed

    439. FABRICATION OF INSTRUMENT GAS SKID FOR KUMANG PROJECT AT SDE PETRONAS CARIGALI June 15, 2009 Completed

    440. FIELD JOINT COATING WORK AT TLO FOR 2009 PETRONAS PIPELINE PROJECT

    PETRONAS CARIGALI June 8, 2009 Completed

    441. SUPPLY OF SERVIWRAP TO TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI May 15 , 2009 Completed

    442. FIELD JOINT COATING WORK AT TLO FOR BEKOK-DULANG PROJECT FOR PETRONAS PIPELINE PROJECT

    PETRONAS CARIGALI April 17, 2009 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    443. FIELD JOINT COATING WORK AT TLO FOR WEST LUTONG PROJECT FOR PETRONAS PIPELINE PROJECT

    PETRONAS CARIGALI March 6, 2009 Completed

    444. FIELD JOINT COATING WORK AT TLO FOR BETTY BAKAU PROJECT FOR PETRONAS PIPELINE PROJECT

    PETRONAS CARIGALI February 12, 2009

    Completed

    445. PASSIVE FIRE PROTECTION FOR B11 LQ & HELIDECK AT BDEWC, SARAWAK SARAWAK SHELL

    BERHAD February 11, 2009 Completed

    446. PASSIVE FIRE PROTECTION FOR PC-4 RISER AT BD11 DR-A PLATFORM FOR MMHE

    PETRONAS CARIGALI January 19, 2009 Completed

    447. SUPPLY OF ELECTRICAL AND INSTRUMENTATION CABLES FOR F23 VLAP COMPRESSION AT SDE

    SARAWAK SHELL BERHAD

    January 5, 2009 Completed

    448. MARK AND CUT STEEL STRUCTURAL WORKS FOR MCR-A PROJECT AT MMHE MMHE JV WITH

    TECHNIP January 2, 2009 Completed

    449. FABRICATION OF STRUCTURAL WORKS FOR EAST MODULE TOPSIDES OF GUMUSUT KAPAP AT MMHE

    SHELL AND MISC December 31, 2008 Completed

    450. E & I AND PIPING WORK AT MMHE FOR TANGGA BARAT CPP TOPSIDES PETRONAS CARIGALI December 24, 2008 Completed

    451. PASSIVE FIRE PROTECTION FOR B-11 TOPSIDES AT BROOKE DOCK YARD SARAWAK SHELL

    BERHAD December 19, 2008 Completed

    452. SUPPLY OF KOBE ELECTRODES FOR F23-RA TOPSIDES AT RFSB SARAWAK SHELL

    BERHAD December 19, 2008 Completed

    453. INSTRUMENTATION & FGS & TELECON JUNCTION BOX – DULANG B AT KENCANA HL

    PETRONAS CARIGALI November 4, 2008 Completed

    454. SUPPLY OF TOTE TANKS PETRONAS CARIGALI October 29, 2008 Completed

    455. SUPPLY OF FIRE RATED WINDOWS FOR KUMANG AND TANGGA BARAT AT SDE

    PETRONAS CARIGALI October 21, 2008 Completed

    456. SUPPLY OF INSTRUMENT CABLES FOR FPSO RUBY AT MMHE MISC October 15, 2008 Completed

    457. STRUCTURAL FABRICATION WORK FOR TANGGA BARAT AT MMHE PETRONAS CARIGALI October 13, 2008 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    458. SUPPLY AND INSTALL KUMANG BLASTWALL/ FIREWALL COMPLETE SYSTEM INCLUDING PFP AT SDE TO MEET FIRE RATINGS

    PETRONAS CARIGALI October 10, 2008 Completed

    459. SUPPLY OF ELECTRICAL AND INSTRUMENTATION (E&I) CABLES FOR KUMANG AND TANGGA BARAT AT SDE

    PETRONAS CARIGALI September 27, 2008 Completed

    460. PIPING FABRICATION WORK FOR B11 KA TOPSIDE @ MMHE SARAWAK SHELL

    BERHAD September 16, 2008 Completed

    461. SUPPLY OF PERSONNEL TRANSFER BASKET AND CABLE GLAND / FITTINGS TO MURPHY OIL

    MURPHY SARAWAK OIL CO. LTD

    September 15, 2008 Completed

    462. FIELD JOINT COATING WORK FOR CPOC PIPELINES AT TLO PETRONAS CARIGALI September 10, 2008 Completed

    463. PASSIVE FIRE PROTECTION FOR PLUTO PROJECT @ RFSB WOODSIDE ENERGY August 15, 2008 Completed

    464. FIELD JOINT COATING WORK AT TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT

    SARAWAK SHELL BERHAD

    August 1, 2008 Completed

    465. SUPPLY OF CANUSA HSS TO TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT

    SARAWAK SHELL BERHAD

    July 22, 2008 Completed

    466. SUPPLY OF DOUBLE SKIN HEAT SHIELDS FOR B11 KA PROJECT AT MMHE SARAWAK SHELL

    BERHAD June 30, 2008 Completed

    467. PASSIVE FIRE PROTECTION OF ANDP-D AT RFSB PETRONAS CARIGALI June 30, 2008 Completed

    468. SUPPLY OF SERVIWRAP FOR CPOC PIPELINE TO TLO PETRONAS CARIGALI June 26, 2008 Completed

    469. E&I, PIPING, MECHANICAL & STRUCTURAL FABRICATION FOR KUMANG CLUSTER DEVELOPMENT / TANGGA BARAT PROJECT @ SDE

    PETRONAS CARIGALI June 11, 2008 Completed

    470. DESIGN, SUPPLY, FABRICATION AND INSTALL NEW FIRE AND BLASWALL FOR BR-A

    TALISMAN MALAYSIA LIMITED

    May 23, 2008 Completed

    471. PASSIVE FIRE PROTECTION OF GOPA-GOPB AT KHL MURPHY SARAWAK

    OIL CO. LTD May 8, 2008 Completed

    472. SUPPLY AND DELIVERY OF CONCRETE MATRESSES, SLEEPERS, LIFTING FRAME FOR 24” ANDR-A/TCOT PIPELINE FOR TLO

    PETRONAS CARIGALI April 30, 2008 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    473. ELECTRICAL AND INSTRUMENTATION FABRICATION WORK AT RFSB ON ANGSI –D PLATFORM

    PETRONAS CARIGALI April 24, 2008 Completed

    474. PFP for F23 AND F6 AT BROOKE DOCKYARD, KUCHING, SARAWAK SARAWAK SHELL

    BERHAD April 11, 2008 Completed

    475. SUPPLY OF POWER & INSTRUMENTATION CABLES MURPHY SARAWAK

    OIL CO. LTD April 10, 2008 Completed

    476. SUPPLY OF HEATSHIELDS TO CLOUGH FOR MONTARA PROJECT IN THAILAND

    CLOUGH (THAILAND) CO. LTD

    April 10, 2008 Completed

    477. FIELD JOINT COATING SERVICES FOR TALISMAN PIPELINE INSTALLATION TALIMAN MALAYSIA

    LIMITED April 10, 2008 Completed

    478. FIELD JOINT COATING FOR PETRONAS CARIGALI 2008 PIPELINE INSTALLATION AT TLO FOR 5 PIPELINES

    PETRONAS CARIGALI April 10, 2008 Completed

    479. SUPPLY AND APPLICATION OF WET AND CASTING PFP FOR TALISMAN RISERSAND ESDVS

    TALIMAN MALAYSIA LIMITED

    April 8, 2008 Completed

    480. SUPPLY OF FIRE RATED DOORS TO MMHE PETRONAS CARIGALI April 5, 2008 Completed

    481. SUPPLY OF RADIANT HEATSHIELD, LOUVERS AND MISC ITEMS FOR PC 4 @ MMHE

    PETRONAS CARIGALI March 31, 2008 Completed

    482. FIELD JOINT COATING FOR KEA- TIA @ PBJV

    PETRONAS CARIGALI March 7, 2008 Completed

    483. SUPPLY OF ELECTRICAL OPERATED MONORAIL TROLLEY HOIST, 5 MT – MMHE

    MMHE March 7, 2008 Completed

    484. SUPPLY OF MANUAL OPERATED GANTRY CRANE TO MMHE MMHE March 7, 2008 Completed

    485. ENGINEERING, DESIGN, FABRICATION AND INSTALLATION OF SHELTER CABIN FOR PC4 AT MMHE

    PETRONAS CARIGALI February 28, 2008 Completed

    486. SUPPLY OF LINE PIPES SMLS API TYPE OF VARIOUS SIZES TO MMHE PETRONAS CARIGALI January 17, 2008 Completed

    487. SUPPLY OF FIRE RATED DOORS TO TURKMENISTAN GAS DEVELOPMENT PROJECT

    MITCO JAPAN SDN BHD

    January 11, 2008 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    488. PASSIVE FIRE PROTECTION FOR BUNGA ORKID @ SDE TALISMAN MALAYSIA

    LIMITED January 3, 2008 Completed

    489. FABRICATION OF GUMUSUT-KAKAP SEMISUBMERSIBLE HULL (PACKAGE 2) SHELL AND MISC December 5, 2007 Completed

    490. STRUCTURAL FABRICATION FOR CPOC PROJECT AT MMHE PETRONAS CARGALI

    SDN BHD November 30, 2007 Completed

    491. SUPPLY OF FIRE RATED WINDOWS FOR BUNGA ORKID PROJECT AT SDE TALISMAN MALAYSIA

    LIMITED October 23, 2007 Completed

    492. SUPPLY OF TOTE TANKS TO EMEPMI EXXON MOBIL September 30, 2007 Completed

    493. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E& I AND BLASTING/ PAINTING FOR PC 4 TOPSIDE WORK @ MMHE

    PETRONAS CARGALI SDN BHD

    July 26, 2007 Completed

    494. FIELD JOINT COATINGS FOR VASAI EAST DEVELOPMENT PROJECT AT RAMUNIA FABRICATORS SDN BHD

    OIL & NATURAL GAS CORPORATION, INDIA

    August 27, 2007 Completed

    495. SUPPLY & APPLICATION OF PASSIVE FIRE PROTECTION -TALISMAN NORTHERN FIELD

    TALISMAN MALAYSIA LIMITED

    August 23, 2007

    Completed

    496. FIELD JOINT COATINGS FOR JERNEH PIPELINES AT TLO EXXONMOBIL August 8, 2007 Completed

    497. FABRICATE BEAM HAUNCH, CROSS OVER SPOOL FOR HIGH PRESSURE MUD LINE AND CRANE BEAM

    SAAG DRILLING & WELL SERVICES SDN

    BHD August 7, 2007 Completed

    498. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR BELUMUT AT RAMUNIA FABRICATORS SDN BHD

    PETRONAS CARIGALI SDN BHD

    August 5, 2007 Completed

    499. FIELD JOINT COATINGS FOR SEMARANG PIPELINES AT TLO PETRONAS CARGALI

    SDN BHD July 28, 2007

    Completed

    500. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR INTRALINE RESOURCES

    TALISMAN MALAYSIA LIMITED

    July 16, 2007 Completed

    501. FIELD JOINT COATINGS FOR ANDR-A PIPELINES AT TLO PETRONAS CARIGALI

    SDN BHD June 25, 2007

    Completed

    502. FIELD JOINT COATINGS FOR 18 “ GUE PIPELINE AT TLO EXXONMOBIL June 20, 2007 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    503. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SUMANDAK TOPSIDES

    PETRONAS CARIGALI June 13, 2007 Completed

    504. SUPPLY OF SPARES FOR CLOSURE DOOR TO MMHE SARAWAK SHELL

    BERHAD June 6, 2007

    Completed

    505. FIELD JOINT COATINGS FOR BETTY– BORONIA 18” P/L SARAWAK SHELL

    BERHAD June 1, 2007 Completed

    506. ENGINEERING, PROC, CONSTRUCTION & COMMISSIONING OF FIRE PROTECTION SYSTEM

    PETRONAS DAGANGAN BERHAD

    May 28, 2007 Completed

    507. FIELD JOINT COATING FOR TAPM-3 CAA NORTHEN FIELD DEVELOPMENT TALISMAN MALAYSIA

    LIMITED May 22, 2007

    Completed

    508. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SCDR-A TOPSIDES

    SARAWAK SHELL BERHAD

    May 4, 2007 Completed

    509. SUPPLY OF SAFETY EQUIPMENT AND LIFE RAFT TO MDFT FOR KIKEH PROJECT

    M.D.F.T (KIKEH) LTD May 2, 2007

    Completed

    510. FIELD JOINT COATINGS FOR ALL SUMANDAK PIPELINES AND SUPPLY OF SERVIWRAP TO TL OFFSHORE

    PETRONAS CARIGALI (PETRONAS CARIGALI)

    April 6, 2007 Completed

    511. 2007-2009 OFFSHORE FACILITIES TRANSPORT AND INSTALLATION OF FIELD JOINT COATINGS FOR MCDERMOTT

    SARAWAK SHELL BERHAD

    March 27, 2007 Completed

    512. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR PETRONAS CARIGALI’S BELUMUT PROJECT AT RFSB

    PETRONAS CARIGALI (PETRONAS CARIGALI)

    March 19, 2007 Completed

    513. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR ANGEL GAS TOPSIDE PROJECT AT MMHE

    WOODSIDE ENERGY March 15, 2007 Completed

    514. FIELD JOINT COATING OF 10” BAP-AA TO BADP-G PIPELINE FOR TL OFFSHORE

    PETRONAS CARIGALI (PETRONAS CARIGALI)

    March 1, 2007 Completed

    515. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR SHELL’S SCDR-A AT MMHE

    SARAWAK SHELL March 1, 2007 Completed

    516. FABRICATION, INSTALLATION, TESTING AND PRE-COMMISSIONING OF PIPINGAND MECHANICAL WORKS FOR SCDR-A TOPSIDES AT MMHE

    SARAWAK SHELL February 14, 2007 Completed

    517. DESIGN, ENGINEERING AND FABRICATION OF END CLOSURE FOR SHELL’S SCDR-A PROJECT AT MMHE

    SARAWAK SHELL February 6, 2007 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    518. ENGINEERING, DESIGN & FABRICATION OF PFP CASTINGS FOR METERING RUN - BR-B PLATFORM OFFSHORE

    TALISMAN MALAYSIA LIMITED

    January 29, 2007 Completed

    519. FABRICATE GUMUSUT-KAKAP SEMI-SUBMERSIBLE HULL SHELL January 25, 2007 Completed

    520. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E&I AND BLASTING/PAINTING FOR F6 REJUVENATION WORKS

    SARAWAK SHELL January 23, 2007

    Completed

    521. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR MAARI FIELD DEVELOPMENT AT KENCANA HL ENGINEERING

    CLOUGH PROJECT INTERNATIONAL PTY

    LTD, AUSTRALIA January 17, 2007 Completed

    522. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR ANGEL GAS PROJECT AT MMHE

    WOODSIDE ENERGY LTD, AUSTRALIA

    January 15, 2007 Completed

    523. SUPPLY OF ANTI-SKID BRE STAIRWAYS TALISMAN MALAYSIA

    LIMITED January 4, 2007 Completed

    524. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR SCDR-A PROJECT AT MMHE

    SARAWAK SHELL December 27, 2006 Completed

    525. SUPPLY OF INSTR. CABLE CONNECTING BRA AND BRE PAGA SYSTEM TALISMAN MALAYSIA

    LIMITED November 15, 2006 Completed

    526. FIELD JOINT COATING FOR PBJV GROUP SDN BHD FOR WEST LUTONG PROJECT

    PETRONAS CARIGALI November 11, 2006 Completed

    527. CONTRACT FOR CIVIL WORKS PACKAGE FOR KUANTAN – KERTEH RAILWAY PROJEC, INCL. VEHICULAR, DRAINAGE & UTILITY BOX CULVERTS

    PERCON BABENA JOINT VENTURE

    October 15, 2006 Completed

    528. STRUCTURAL STEEL FABRICATION FOR SUMANDAK SELATAN TOPSIDES AND HOST

    PETRONAS CARIGALI September 27, 2006 Completed

    529. FJ COATING FOR TLO PETRONAS CARIGALI

    AND SHELL August 10, 2006 Completed

    530. PIPING WORKS FOR KIKEH FPSO AT MMHE MURPHY OIL August 2, 2006 Completed

    531. SUPPLY OF HEATSHIELDS FOR F13W PROJECT AT RAMUNIA FABRICATORS SARAWAK SHELL June 15, 2006 Completed

    532. SUPPLY OF END CLOSURE DOORS- F13W AT RFSB SARAWAK SHELL June 09, 2006 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    533. PASSIVE FIRE PROTECTION FOR KIKEH DTU TOPSIDES MURPHY OIL

    May 3, 2006 Completed

    534. FIELD JOINT COATINGS AT BARMADA MCDERMOTT TALISMAN MALAYSIA

    LIMITED March 14, 2006 Completed

    535. FIELD JOINT COATINGS FOR BARMADA MCDERMOTT S/B EXXON MOBIL March 14, 2006 Completed

    536. PASSIVE FIRE PROTECTION FOR ARTHIT PFP AT Mc DERMOTT YARD IN BATAM INDONESIA

    PTTEP and KBR February 27, 2006 Completed

    537. PIPING WORKS FABRICATION FOR MURPHY KIKEH PROJECT @ MMHE MURPHY OIL January 14, 2006 Completed

    538. ELECTRICAL AND INSTRUMENTATION FOR MODEC RJS-409 MODULE FABRICATION @ SDE

    PETROBRAS December 1, 2005 Completed

    539. PIPELINE FIELD JOINT COATING FOR BARAM (MCOT) 16” AND 10” PETRONAS CARIGALI

    – TLO November 30, 2005 Completed

    540. STRUCTURAL FABRICATION FOR MODEC RJS-409 ESPADARTE MODULE FABRICATION @ SDE

    PETROBRAS November 1, 2005 Completed

    541. SPECIAL STRUCTURAL SPECIAL FABRICATION FOR MURPHY KIKEH PROJECT MURPHY OIL September 9, 2005 Completed

    542. SUPPLY AND INSTALL OF FIRESEAL FOR AMENAM KPONO PROJECT TOTAL ELF September 9, 2005 Completed

    543. ARCHITECTURAL FITTINGS FOR CLIFF HEAD A PLATFORM AT HL ENGINEERING

    ROC OIL, AUSTRALIA August 6, 2005 Completed

    544. PFP FOR SHELL E11 –PB SARAWAK SHELL August 3 2005 Completed

    545. SUPPLY OF BARUNIA PROTECTIVE RELAYS PETRONAS CARIGALI

    SDN BHD August 3, 2005 Completed

    546. MAJOR STRUCTURAL FABRICATION FOR MURPHY KIKEH DTU SPAR HULL MURPHY OIL May 3, 2005 Completed

    547. PFP FOR BARAM TOPSIDE AT BDEWC PETRONAS CARIGALI

    SDN BHD April 2005 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    548. DESIGN, ENGINEERING AND FABRICATION OF BARAM HEATSHIELD AT BDEWC

    PETRONAS CARIGALI SDN BHD

    April 2005 Completed

    549. BLASTING AND PAINTING WORKS AT SSE FOR GUE EXXONMOBIL March 2005 Completed

    550. DESIGN, ENGINEERING AND FABRICATION OF E11 P-B BLASTWALL AT MSE SARAWAK SHELL

    BERHAD March 2005 Completed

    551. PFP FOR SHELL’S E8-DR-A AT RAMUNIA FABRICATORS SARAWAK SHELL

    BERHAD March 2005 Completed

    552. PFP FOR SHELL’S F13 SARAWAK SHELL February 2005 Completed

    553. PFP FOR BR-E JACKET AND TRIPOD PROJECT AT MSE TALISMAN ENERGY February 2005 Completed

    554. PFP FOR BR-E CO2 REMOVAL PROJECT AT SSE TALISMAN ENERGY February 2005 Completed

    555. PFP FOR GUNTONG E PROJECT AT SIME SEMBCORP ENGINEERING EXXONMOBIL

    EXPLORATION & PRODUCTION INC

    January 2005 Completed

    556. DESIGN, ENGINEERING AND FABRICATION OF SCKA & SF 13 HEATSHIELDS SARAWAK SHELL

    BERHAD October 2004 Completed

    557. DESIGN, ENGINEERING AND FABRICATION OF GUNTONG- E BLASTWALL EXXONMOBIL

    EXPLORATION & PRODUCTION INC

    July 2004 Completed

    558. STRUCTURAL STEEL FABRICATION & WELDING AT MSE FOR MOAB TALISMAN ENERGY July 22, 2004 Completed

    559. BLASTWALL REINSTAMENT TO H60 RATING – PFP TALISMAN ENERGY July 5, 2004 Completed

    560. SUPPLY OF VESSELS UNDER MASTER SPOPT CHARTER PARTY FCF653 EXXONMOBIL

    EXPLORATION & PRODUCTION INC

    June 26, 2004 Completed

    561. PASSIVE FIRE PROTECTION SUPPLY AND APPLY FOR AMENAM PROJECT AT SSE TOTAL ELF FINA @

    NIGERIA June 2004 Completed

    562. SUPPLY OF PRODUCTION & TEG CHEMICALS - 3 YEARS SARAWAK SHELL/

    PETRONAS CARIGALI / NIPPON

    June 23, 2004 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    Dec 26, 2019 - (Track Record Updated)

    563. CASTINGS FOR BUNGA RAYA-A PLATFORM TALISMAN ENERGY March 3, 2004 Completed

    564. PFP FOR YOHO PROJECT PROTECTION EXXON MOBIL

    NIGERIA March 2004 Completed

    565. CASTINGS FOR SDV on BUNGA RAYA-A TALISMAN ENERGY December 2003 Completed