NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
1. PASSIVE FIRE PROTECTION WORK FOR CONSTRUCTION OF BERTH A2 AT MARINE TERMINAL, JAMNAGAR, INDIA
SAPURA FABRICATION SDN
BHD April 22, 2019 In Progress
2. SUPPLY AND DELIVERY OF CABLE SARAWAK SHELL
BERHAD April 25, 2019 In Progress
3. FABRICATION AND INSTALLATION SEAFASTENING AND LOADOUT ACTIVITIES FOR GK PHASE 2
MMHE April 18, 2019 In Progress
4. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE OTHERS)
PETRONAS CARIGALI
April 4, 2019 In Progress
5. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE FLOWLINE/WELLHEAD)
PETRONAS CARIGALI
April 3, 2019 In Progress
6. SUPPLY OF HUMIDUR FP PAINTS TO QET BSP April 1, 2019 In Progress
7. MANPOWER SUPPLY (44 PAX) FOR JACKET BOKOR PROJECT MMHE Mar 29, 2019 In Progress
8. PURCHASE OF COMPUTER HARDWARE
EXXONMOBIL EXPLORATION AND
PRODUCTION MALAYSIA INC.
Mar 29, 2019 In Progress
9. PROVISION OF TENSILE TEST ON HELIDECK NETTING TRANSFAME SDN
BHD Mar 29,2019 Completed
10. PRIMAVERA LICENSE RENEWAL PETRONAS TECHNICAL
SERVICES SDN BHD Mar 26, 2019 Completed
11. PAN MALAYSIA FIELD JOINT COATING SERVICES SARAWAK SHELL
BERHAD / SAPURA ENERGY
Mar 21, 2019 In Progress
12. CABLING & TV INSTALLATION FOR FGVT WAR ROOMS FELDA GLOBAL
VENTURES HOLDINGS BERHAD
Mar 20, 2019 In Progress
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
13. SUPPLY OF HUMIDUR TC PAINTS TO QET BSP Mar 20, 2019 Completed
14. SUPPLY OF HUMIDUR FP PAINTS AND HUMICLEAN TO QET BSP Mar 20, 2019 Completed
15. MANPOWER SUPPLY FOR CARPENTER WORK GEMUSUT KAKAP PHASE 2 MMHE / TECHNIPFMC Mar 19, 2019 In Progress
16. SUPPLY AND DELIVERY OF STICKER / STENCIL FOR VESSEL (STATIC PTS-34) PETRONAS CARIGALI
Mar 19, 2019 Completed
17. SUPPLY AND DELIVERY OF ELECTRICAL CABLE SARAWAK SHELL
BERHAD Mar 5, 2019 Completed
18. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD
BLNG Mar 5, 2019 In Progress
19. SUPPLY OF HUMIDUR PAINTS TO TRANSFAME SDN BHD SARAWAK SHELL
BERHAD Mar 4, 2019 Completed
20. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD
BLNG Feb 28, 2019 In Progress
21. SUPPLY AND DELIVERY OF WATER SHUT OFF VALVE 5K 125A (KORVAL) CHEE FATT CO. PTE
LTD Feb 22, 2019 Completed
22. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD
BLNG Feb 22, 2019 Completed
23. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD
BLNG Feb 20, 2019 Completed
24. SUPPLY OF HUMIDUR ME COATING FOR SS PUTERI ZAMRUD EAGLESTAR
SHIPMANAGEMENT Feb 14, 2019 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
25. SUPPLY OF HUMIDUR FP COATING FOR SS PUTERI ZAMRUD EAGLESTAR
SHIPMANAGEMENT Feb 14, 2019 Completed
26. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) Feb 11, 2019 Completed
27. PASSIVE FIRE PROTECTION RECTIFICATION WORK FOR MALIKAI SARAWAK SHELL
BERHAD Feb 11, 2019 Completed
28. SUPPLY OF HUMIDUR TC PAINTS AND TO QET BSP Feb 7, 2019 Completed
29. PASSIVE FIRE PROTECTION TEST PANEL (EARLY MOB) HESS / SAPURA Feb 7, 2019 Completed
30. SUPPLY OF IT HARDWARE & CONSUMABLES HESS Feb 1, 2019 In Progress
31. PROVISION OF ASSAI ONSITE SOFTWARE MAINTENANCE RENEWAL (JANUARY-DECEMBER 2019)
SAPURA EXPLORATION &
PRODUCTION (SARAWAK) INC.
Jan 31, 2019 In Progress
32. SUPPLY AND DELIVERY OF INSTRUMENT CABLES – COST PLUS (GOPA) DAYANG
ENTERPRISE / MURPHY
Jan 16, 2019 Completed
33. SUPPLY OF FOXIT PHANTOM PDF BUSINESS ADDITION FELDA GLOBAL
VENTURES HOLDINGS BERHAD
Jan 11, 2019 Completed
34. SUPPLY OF HUMIDUR PAINTS FOR DARAT PROJECT E38 AND E15 BLNG Dec 28, 2018 Completed
35. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) Dec 24, 2018 In Progress
36. SUPPLY AND DELIVERY OF CABLE INSTRUMENT (ADDITIONAL) FOR HUC MODIFICATION AT D18MP-A FOR D28 PHASE 1 PROJECT
PETRONAS CARIGALI
Dec 17, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
37. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD
BLNG Dec 6, 2018 In Progress
38. PROVISION OF CISCO HARDWARE & SUPPORT SERVICES TO REFRESH NETWORK SYSTEM
HESS Dec 6, 2018 In Progress
39. PROVISION OF SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION WORK FOR ZETUNG TOPSIDE
HESS / SAPURA Nov 22, 2018 Completed
40. PROVISION OF SERVER SOFTWARE, LICENSES AND SERVICES FOR MURPHY’S OPERATIONS
MURPHY Nov 22, 2018 Completed
41. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) Nov 11, 2018 Completed
42. SUPPLY OF HUMIDUR PAINT FOR MESPLT GUMUSUT DEVELOPMENT AND MALIKAI STORE
SABAH SHELL PETROLEUM
Nov 9, 2018 In Progress
43. MATERIAL FRO TELCO SATELLITE ANTENNA PEDESTAL AT WPPA – COST PLUS (ANTI-SLIP)
DAYANG ENTERPRISE /
MURPHY Oct 17, 2018 Completed
44. PROVISION OF ELECTRONIC OFFICE APPLICATION LEAVE FOR PTTEP HK OFFSHORE LIMITED
PTTEP HK OFFSHORE LIMITED
Oct 12, 2018 Completed
45. SUPPLY OF PRIMARY UNIT REGULATOR VALVE 20K 50A WITH GAUGE (KORVAL)
PFLNG Oct 4, 2018 Completed
46. SUPPLY AND DELIVERY ELECTRICAL MATERIAL FOR DULANG V-507 SEPARATOR CONTROL UPGRADE
PETRONAS CARIGALI
Sept 23, 2018 Completed
47. SUPPLY AND DELIVERY OF CABLE AND ACCESSORIES FOR DULANG WELL FLOW MEASUREMENT B23SL DULANG B PLATFORM
PETRONAS CARIGALI
Sept 21, 2018 Completed
48. SUPPLY OF SWA CABLE DAYANG
ENTERPRISE Sept 14, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
49. SUPPLY OF HUMIDUR PAINTS FOR MESPLT GUMUSUT DEVELOPMENT SABAH SELL PETROLEUM
Aug 30, 2018 Completed
50. SUPPLY & DELIVERY OF TOOLS AND CONSUMABLE (WELDING ELECTRODE) FOR MAINTENANCE, CONSTRUCTION AND MODIFICATION (MCM)
PETRONAS CARIGALI
Aug 28, 2018 Completed
51. SUPPLY OF HUMIDUR PAINTS FOR BLNG CSIP USAGE BLNG Aug 20, 2018 Completed
52. SUPPLY OF INSTRUMENT CABLE FOR SAPA INFILL E & I BULK MATERIAL – COST PLUS
DAYANG ENTERPRISE
Aug 2, 2018 Completed
53. SUPPLY OF 3M 8515 N95 DISPOSABLE RESPIRATOR PETRONAS GAS
BERHAD July 31, 2018 Completed
54. SUPPLY OF HUMIDUR FP COATING FOR LNG PUTERI NILAM EAGLESTAR
SHIPMANAGEMENT July 27, 2018 Completed
55. RENTAL OF DRY-ICE BLASTING SYSTEM FOR 3 MONTHS EVERSOLVE July 23, 2018 In Progress
56. SUPPLY OF HUMIDUR PAINTS FOR U7200 TRESTLE STRUCTURE B/P ACTIVITIES EVERSOLVE July 23, 2018 In Progress
57. SUPPLY & DELIVERY OF KOBE ELECTRODE FOR INVENTORY STOCK MMHE July 20, 2018 Completed
58. PROVISION OF PASSIVE FIRE PROTECTIONS (PFP) FOR BR-A PLATFORM REPSOL
REPSOL July 19, 2018 Completed
59. STRUCTURAL WORKS FOR BOKOR CPP TOPSIDES PETRONAS CARIGALI
July 18, 2018 Completed
60. PROVISION OF SUPPLY OF MANPOWER, MATERIALS AND EQUIPMENT FOR INSTALLATION OF A60 RATED FIRE INSULATION WORK AT SELIGI
ENQUEST July 18, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
61. SUPPLY AND DELIVERY OF CABLES FOR SUMANDAK SELATAN INFILL PROJECT
PETRONAS CARIGALI
July 13, 2018 Completed
62. SUPPLY OF DISPOSABLE RESPIRATOR (REPEAT ORDER) MALAYSIAN
REFINING COMPANY July 13, 2018 Completed
63.
SUPPLY AND DELIVERY OF CABLE INSTRUMENTATION FOR HUC MODIFICATION AT D18MP-A FOR HOST TIE IN DE-BOTTLENECKING FOR D18 PHASE 2 PROJECT
PETRONAS CARIGALI
July 12, 2018 Completed
64. SUPPLY OF SWA CABLE TAI CREST
RESOURCES July 11, 2018 Completed
65. PROVISION OF SUPPLY INSTRUMENT CONTROL CABLE FOR TIONG-A ICP 2.0 PROJECT AT TIONG-A PLATFORM
PETRONAS CARIGALI
July 10, 2018 Completed
66. SUPPLY OF ELECTRODE FOR BOKOR-BETTY – BASE SCOPE PETRONAS CARIGALI
July 4, 2018 Completed
67. SUPPLY OF DISPOSABLE RESPIRATOR MALAYSIAN
REFINING COMPANY July 3, 2018 Completed
68. PROVISION OF MOXA DEVICES PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) July 2, 2018 Completed
69. PROVISION OF SUPPLY FIBRE OPTIC CABLE FOR TIONG-A ICP 2.0 PROJECT AT TIONG-A PLATFORM
PCSB June 26, 2018 Completed
70. SUPPLY OF ELECTRODE NC36L FOR BOKOR BETTY – BASE SCOPE PETRONAS CARIGALI
June 13, 2018 Completed
71. PASSIVE FIRE PROTECTION WORKS FOR ANJUNG BDEWC May 30, 2018 Completed
72. SUPPLY OF DRAKA CABLE PETRONAS CHEMICALS ETHYLENE
May 22, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
73. SUPPLY OF HEAT BARRIER PANEL FOR AHU AND VSAT ANTENNA HEAT PROTECTION AT EAST BELUMUT PLATFORM
NEWFIELD May 17, 2018 Completed
74. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) May 15, 2018 Completed
75. SUPPLY & DELIVERY OF DRAKA CABLE FOR FSU NAUTICA MUAR (BENTARA) EPOMS April 27, 2018 Completed
76. SUPPLY OF SPARE PART FOR 2WAY CONTROL VALVE (KORVAL) PFLNG April 26, 2018 Completed
77. SUPPLY OF KOBE ELECTRODE FOR HESS PHRASE II HESS Apr 17, 2018 Completed
78. SUPPLY AND RENTAL OF ADDITIONAL DMR HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) May 15, 2018 Completed
79. PURCHASE ADOBE CREATIVE CLOUD PETRONAS GAS
BERHAD May 2, 2018 Completed
80. PROVISION FOR RENEWAL OF ANNUAL SUBSCRIPTION FOR AUTOCAD COMMERCIAL
PETRONAS TECHNICAL
SERVICES SDN BHD April 23, 2018 Completed
81. SUPPLY OF BREAKING LOAD TENSILE TEST FOR HELIDECK NETTING GK MALIKAI – COST PLUS
PETRA RESOURCES April 12, 2018 Completed
82. CONFIGURATION OF ADDITIONAL CHANNEL AND FREQUENCY FOR LEASING PORTABLE RADIOS
PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) April 11, 2018 Completed
83. PROVISION OF MAINTENANCE RENEWAL (SOLARWINDS AND VEEAM)
EXXONMOBIL EXPLORATION AND
PRODUCTION MALAYSIA INC.
April 11, 2018 Completed
84. SUPPLY OF ID CARD PRINTER FOR HSE SAPURA
EXPLORATION AND PRODUCTION
April 10, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
85. SUPPLY OF KOBE ELECTRODE FOR HESS PHRASE II HESS April 10, 2018 Completed
86. PROVISION OF MAINTENANCE RENEWAL (PRIMAVERA P6 ENTERPRISE) PETRONAS TECHNICAL SERVICES
Mar 28, 2018 Completed
87. PROVISION OF LCV ACTUATOR AND PLC NETWORK PETROFAC (PM304-MALAYSIA) LIMITED
Mar 27, 2018 Completed
88. SUPPLY OF INSTRUMENT CABLE (REPEAT ORDER) AFS-887 – SATELLITES TURNAROUND (SATURN) PROJECT - GuF
EMEPMI Mar 23, 2018 Completed
89. PROVISION OF IT PERIPHERALS PETRONAS TECH
TRAINING Mar 19, 2018 Completed
90. SUPPLY OF HUMIDUR FP PAINTS TO QET BSP Mar 14, 2018 Completed
91.
SUPPLY MATERIALS AND APPLICATION FIRE PROOFING MATERIALS ON NEW LOADING PLATFORM STRICTURES FOR SPR 2 PROJECT FIRE PROOFING APPLICATION ON NEW JETTY PLATFORM STRUCTURES
BLNG Mar 7, 2018 In Progress
92. SUPPLY OF HUMIDUR PAINTS FOR UNIT 7200 LNG RUNDOWN LINE (GRE CLADDING) PAINTING WORK
BLNG Feb 26, 2018 Completed
93. PROVISION TO SUPPLY IT HARDWARE & CONSUMABLES HESS EXPLORATION
& PRODUCTION MALAYSIA B.V
Feb 21, 2018 Completed
94. PROVISION OF ADOBE SOFTWARE PETRONAS
CHEMICALS GROUP BERHAD
Feb 20, 2018 Completed
95. SUPPLY OF WELDING ELECTRODE FOR STRUCTURAL INSTALLATION FOR SSB PAN MALAYSIA 2018
SSB Feb 12, 2018 Completed
96. SUPPLY OF INSTRUMENT CABLE (REPEAT ORDER) GUNTONG PRODUCTION OPTIMIZATION - GuD
EMEPMI Feb 9, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
97. SUPPLY OF HUMIDUR PAINTS - WESCO SHELL PHILIPPINES EXPLORATION B.V
Feb 5, 2018 Completed
98. PROVISION OF MOXA DEVICES PETRONAS GAS
BERHAD Jan 30, 2018 Completed
99. SUPPLY OF HEAT SHIELD PANEL FOR BLUE BRUSKER AT DUYONG LQ PETRONAS CARIGALI
Jan 24, 2018 Completed
100. PROVISION TO SUPPLY & DELIVER OF PIPELINE TAPE FOR PCSB-SBO PETRONAS
CARIGALI SDN BHD Jan 23, 2018 Completed
101. ASSAI CALL-OFF MAITENANCE AND SUPPORT SERVICES SAPURA
EXPLORATION & PRODUCTION
Jan 12, 2018 Completed
102.
PROVISION OF DESIGN, SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION FOR BOD HTI – PROVISION BUNGA PAKMA ACCOMODATION WORK BOAT GANGWAY PROJECT
REPSOL Dec 12, 2017 Completed
103. SUPPLY OF HUMIDUR PAINTS FOR U7200 TRESTLE STRUCTURE B/P ACTIVITIES BLNG Nov 29, 2017 Completed
104. SUPPLY OF HUMIDUR FP PAINTS TO MGC BSP Nov 17, 2017 Completed
105. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) Nov 11, 2017 Completed
106. FLARE TOWER PFP REINSTATEMENT FOR KIKEH MURPHY Sept 11, 2017 Completed
107. PROVISION OF PASSIVE FIRE PROTECTION FOR M1 TOPSIDE MAINTENANCE AND STRUCTURAL REPAIR
PETRONAS Aug 25,2017 Completed
108. SUPPLY OF PAINT-MANUFACTURER “ACOTEC & HUMIDUR” SHELL Aug 24, 2017 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
109. PROVISION OF MOTOROLA PORTABLE RADIO AND ACCESSORIES PETRONAS
CARIGALI SND BHD Aug 24, 2017 Completed
110. PROVISION OF MOTOROLA ACCESSORIES OCEAN MIGHT SDN
BHD Aug 22, 2017 Completed
111. PROVISION OF MOTOROLA PORTABLE RADIO ACCESSORIES SAPURA
EXPLORATION AND PRODUCTION
Aug 14, 2017 Completed
112. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC – F06
SHELL Aug 9, 2017 Completed
113. SUPPLY OF MATERIALS AND SPARE PARTS FOR BERGADING-CPP FRESH WATER GENERATOR FOR NORTH MALAY BASIN FULL FIELD DEVELOPMENT
HESS Aug 7, 2017 In Progress
114. SUPPLY OF AVAYA PABX TELECOMMUNICATION HARDWARE AND ACCESSORIES
HESS Aug 4, 2017 Completed
115. PROVISION FOR MATLAB SOFTWARE MAINTENANCE SUPPORT FOR 2 YEARS HESS EXPLORATION
& PRODUCTION MALAYSIA B.V
Aug 3, 2017 Completed
116. PROVISION OF MOTOROLA ACCESSORIES REPSOL OIL AND
GAS MALAYSIA LTD July 24, 2017 Completed
117. PURCHASE OF IT PERIPHERALS
EXXONMOBIL EXPLORATION AND
PRODUCTION MALAYSIA INC.
July 19, 2017 Completed
118. RECTIFICATION OF MISALIGNED STEAM TURBINE PIPING ST 8100 AT ACRYLIC PLANT
BASF July 13, 2017 Completed
119.
PROVISION OF PASSIVE FIRE PROTECTION (PFP) COATING FOR BO-D RISER SPLASH ZONE SECTION FOR BUNGA PAKMA DEVELOPMENT PROJECT – REPSOL 2017
REPSOL July 10, 2017 Completed
120. HIRING OF DRY ICE BLASTING VENDOR FOR CARRYING OUT DI BLASTING AT BLNG-CSIP FOR TA 2017
BLNG June 24, 2017 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
121. PROVISION OF TELWIN ENERGY 650 START BATTERIES SAPURA
EXPLORATION & PRODUCTION
June 22, 2017 Completed
122. PROVISION FOR DESIGN, FABRICATE, SUPPLY AND INSTALLATION ASSISTANCE/SUPERVISION FOR HEAT SHIELD FOR SAPAWI PROJECT
MURPHY June 21, 2017 Completed
123. PROVISION OF HAYAMIM AVA ELECTRONIC WHITEBOARD AND ACCESSORIES HESS EXPLORATION
& PRODUCTION MALAYSIA B.V
June 1, 2017 Completed
124. PURCHASE OF IT PERIPHERALS PETRONAS DAGANGAN BERHAD
May 22, 2017 Completed
125. PURCHASE OF IT PERIPHERALS PETRONAS PENAPISAN (MELAKA)
May 8, 2017 Completed
126. PROVISION OF PASSIVE FIRE PROTECTION SUBCONTRACTING WORK BDEWC Apr 21, 2017 Completed
127. PROVISION OF MAINTENANCE RENEWAL OF SECURITY SYSTEM (FIREWALL-CYBEROAM)
SAPURA EXPLORATION &
PRODUCTION Apr 20, 2017 Completed
128. PURCHASE OF IT PERIPHERALS SAPURA
EXPLORATION & PRODUCTION
Apr 14, 2017 Completed
129. SUPPLY AND DELIVERY OF PRINTER EPOMS Apr 5, 2017 Completed
130. SUPPLY AND DLEIVERY SAMSUNG MOBILE SMARTPHONES EPOMS Mar 15, 2017 Completed
131. PROVISIONAL OF SUPERVISION, LABOUR SUPPLY, RENTAL OF MACHINERY AND SCAFFOLDING FOR INSULATION WORK AT LEMONGRASS PROJECT
BASF Mar 3, 2017 Completed
132. JUNIPER NETWORK SUPPORT
EXXONMOBIL EXPLORATION AND
PRODUCTION MALAYSIA INC.
Feb 22, 2017 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
133. FIRE PROOFING REPAIR FOR U-7420 c/w ALL MATERIALS EQUIPMENT & MANPOWER FOR U-7420
BLNG Jan 25, 2017 Completed
134. PURCHASE OF TELECON/NETWORK EXXONMOBIL Dec 14, 2016 Completed
135. PROVISION TO SUPPLY IT HARDWARE & CONSUMABLES HESS Nov 25, 2016 Completed
136. RECTIFICATION OF MISALIGNMENT STEAM TURBINE PIPE STAGE 1 BASF Nov 11, 2016 Completed
137. PURCHASE OF COMPUTER EQUIPMENT EXXONMOBIL Nov 1, 2016 Completed
138. SUPPLY AND DELIVERY OF SAMSUNG MOBILE SMARTPHONES PETRONAS TECHNICAL
TRAINING SDN BHD Oct 28, 2016 Completed
139. SUPPLY OF RIBBON ZEBRA
PETRONAS CHEMICAL
DERIVATIVES SDN BHD
Oct 25, 2016 Completed
140. SUPPLY OF RIBBON ZEBRA
PETRONAS CHEMICAL
DERIVATIVES SDN BHD
Oct 24, 2016 Completed
141. PASSIVE FIRE PROTECTION WORK FOR SK310 B15 DEVELOPMENT PETRONAS CARIGALI
Sept 28, 2016 Completed
142. PROVISION VSAT SERVICES SAPURAKENCANA SK GEOTECHNICS
Aug 22, 2016 In Progress
143. SUPPLY OF KOBE ELECTRODE FOR SK310 B15 DEVELOPMENT - TOPSIDE PETRONAS CARIGALI
Aug 16, 2016 Completed
144. PASSIVE FIRE PROTECTION WORKS FOR BNJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT
PETRONAS CARIGALI
June 8, 2016 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
145. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC – WORKSCOPING AT E11, F23, F13 AND F06
SHELL May 18, 2016 Completed
146. CONTRACT NO: UI50960 - SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC
SHELL Apr 1, 2016 Completed
147. PROVISION OF VIV STRAKES FOR MALIKAI’S PIPELINE SHELL Mar 16, 2016 Completed
148. PROVISION OF VSAT COMMUNICATION SERVICES & WIRELESS RADIO SERVICES FOR KBM CLUSTER FIELD DEVELOPMENT
COASTAL ENERGY Jan 28, 2016 In Progress
149.
PROVISION OF NAVAL ARCHITECTURE AND MARINE ENGINEERING FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BOKOR PHASE 3A PROJECT
PETRONAS CARIGALI Nov 2, 2015 Completed
150. PASSIVE FIRE PROTECTION WORKS FOR TTJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT
PETRONAS CARIGALI Oct 23, 2015 Completed
151. PROVISION OF 14” PIPELINE RISER COMPACT FLANGE INSPECTION AND TESTING WORKS FOR KPOC – RM 500,000
KPOC Sept 18, 2015 Completed
152. PROVISION OF FJC SERVICES FOR SHELL MALIKAI PACK B – USD 700,000 SHELL Sept 10, 2015 Completed
153. PASSIVE FIRE PROTECTION WORKS FOR EPCIC OF REMOTE WHPS FOR FULL FIELD DEVELOPMENT, NORTH MALAY BASIN PROJECT
HESS Sept 8, 2015 Completed
154. PROVISION OF VSAT COMMUNICATION SERVICES FOR SKE’S DRILLING RIG SAPURAKENCANA
ENERGY Sept 1, 2015 Completed
155. PROVISION OF NAVAL ARCHITECTURE SERVICES FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BARAM HELIDECK PROJECT
PETRONAS CARIGALI
Sept 1, 2015 Completed
156.
PROVISION AND SUPPLY OF HDPF WITH SEA SLEEVE & INTRAFUSE FOR PROCUREMENT CONSTRUCTION & COMMISSIONING (PCC) OF REGASTIFICATION TERMINAL 2 PIPELINE PROJECT – USD 35,000
CPM GROUP July 28, 2015 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
157. SUPPLY OF STRAKES AND BENDS FOR SHELL GUMUSUT PHASE 2 SHELL July 6, 2015 Completed
158. SUPPLY OF STRAKES AND STRAPS FOR SHELL GUMUSUT PHASE 2 SHELL June 16, 2015 Completed
159. SUPPLY OF PIPELINE FIELD JOINT ANTI-CORROSION COATING SYSTEM FOR BESAR PIPELINE INSTALLATION – PCSB YEAR 2015
PETRONAS CARIGALI May 12, 2015 Completed
160. TO SUPPLY AND DELIVER CORROSION INHIBITOR TOTE TANK (TTJT-A) FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORMS (WHP)
PETRONAS CARIGALI May 6, 2015 Completed
161. TO SUPPLY AND DELIVER WASH WATER STORAGE TANK FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORM
PETRONAS CARIGALI April 29, 2015 Completed
162. PASSIVE FIRE PROTECTION WORKS FOR PCC OF BESAR-A WHP TOPSIDE PETRONAS CARIGALI April 24, 2015 Completed
163. PROVISION OF VSAT COMMUNICATION SERVICES TOTAL E&P MALAYSIA
Oct 1, 2014 Completed
164. PROVISION OF WASTE DISPOSAL MANAGEMENT FOR BINTULU OPERATIONS BC PETROLEUM SDN
BHD Oct 1, 2014 Completed
165. VSAT SATELITE TELECOMMUNICATION SYSTEM AND SERVICES FOR BOKOR PHASE 3A
SCHLUMBERGER Sept 29, 2014 Completed
166. TO SUPPLY AND DELIVER ATMOSPHERIC TANKS FOR EPCIC OF LAYANG DEVELOPMENT FACILITIES
JX NIPPON Sept 17, 2014 Completed
167. SUPPLY OF SERVIWRAP PETRONAS CARIGALI
Aug 8, 2014 Completed
168. PROVISION OF PASSIVE FIRE PROTECTION FOR WELLHEAD PLATFORM BLOCK PM 307 BERTAM FILED DEVELOPMENT
LUNDIN PETROLEUM July 16, 2014 Completed
169. PROVISION OF COMMUNICATION & ASTRO SERVICE SYSTEM FOR EPV PETRONAS CARIGALI
July 7, 2014 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
170. ELECTRODE (KOBELCO) FOR WHEATSTONE PROJECT LNG PLANT – MODULE FABRICATION ISBL
SAPURAKENCANA July 3, 2014 Completed
171. SUPPLY AND DELIVERY OF CABLES & ACCESSORIES FOR HUC FOR CENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM304
KENCANA PETROLEUM
May 28, 2014 Completed
172. VSAT SERVICES FOR TALISMAN MALAYSIA’S OFFSHORE PRODUCTION PLATFORMS
TALISMAN MALAYSIA
May 1, 2014 In Progress
173. PROVISION OF 3RD PARTY SERVICES FOR PASSIVE FIRE PROTECTION AT FIREWALL EAST BELUMUT PLATFORM
MMC OIL & GAS April 30, 2014 Completed
174. DISPOSAL OF SCRAP METAL ITEMS DUE TO MAINTENANCE, DAMAGE METTALIC PARTS, USED SPARE PARTS, OBSOLETE AND EXPIRED MATERIAL
PETRONAS PENAPISAN
(MELAKA) SDN BHD April 21, 2014 Completed
175.
FABRICATION WORKS, SUPPLY OF MATERIAL, EQUIPMENT & MANPOWER AND DELIVERY OF PERMANENT FLANGE PROTECTOR & STUDBOLT FOR SSB PROJECT
TL OFFSHORE SDN BHD
April 16, 2014 Completed
176. PROVISION OF FIXED VSAT SERVICES FOR UMW NAGA JACK-UP RIGS FOR UMW OFFSHORE DRILLING SDN BHD
UMW OFFSHORE DRILLING
April 1, 2014 In Progress
177. PROVISION OF VSAT SYSTEM SERVICES FOR EVA-NMB GAS PIPELINE INSTALLATION
GOM RESOURCES SDN BHD
April 1, 2014 Completed
178. M03PQ-A V-3030 AND 3040 STRUCTURE FRAMING PFP COATING REPAIR (OPTION NO.1)
SHELL February 12, 2014 Completed
179. PROVISION OF FIXED VSAT SERVICES FOR COASTAL ENERGY’S MOBILE PRODUCTION UNIT, THE EP5 AND EP6
COASTAL ENERGY January 1, 2014 In Progress
180. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM FOR MAIN WORK BARGES / VESSELS 2014 – 2016 – TL OFFSHORE SDN BHD
TL OFFSHORE January 1, 2014 In Progress
181. M03PQ-A VESSEL V-6210 PFP COATING SHELL December 27, 2013 Completed
182. PASSIVE FIRE PROTECTION SYSTEM ON DIESEL STORAGE TANK COLUMN T-S16270 AT KIKEH UNITL SCOPE COMPLETE
MURPHY November 28, 2013 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
183.
SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG C STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI November 13, 2013 Completed
184.
SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG B STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI November 13, 2013 Completed
185.
SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR TABU A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI October 28, 2013 Completed
186.
SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR PALAS A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI October 28, 2013 Completed
187.
SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI October 25, 2013 Completed
188. PROVISION FOR REMOVAL AND INSTALLATION OF EPOXY-TYPE PASSIVE FIRE PROTECTION FOR HELANG INTEGRATED PLATFORM (HIP)
MMC OIL & GAS October 22, 2013 Completed
189. MODIFICATION AND FABRICATION OF NEW GRILLAGES / SKID RADOIL ONSHORE SUPPORT SYSTEM FOR J-LAY TOWER - SASB
SAPURA ACERGY SDN BHD
September 12, 2013 Completed
190. PROVISION OF FIREWALL UPGRADE (PFP COATING) FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM
EMEPMI September 6, 2013 Completed
191. PROVISION OF FIELD JOINT COATING SERVICES FOR EVA PROJECT 2013 HESS August 10, 2013 Completed
192. PROVISION OF FIXED VSAT SERVICES FOR ATWOOD MANTA AND COASTAL ENERGY
ATWOOD August, 2013 Completed
193. SUBCONTRACT WORKS FOR PASSIVE FIRE PROTECTION WORKS FOR DAMAR-A PLATFORM
EMEPMI July 29, 2013 Completed
194. PROVISION OF FIELD JOINT COATING SERVICES FOR TUKAU PROJECT 2013 HESS July 18, 2013 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
195. PROVISION OF VSAT SERVICES FOR BUMI ARMADA AT-300 VESSEL BUMI ARMADA June, 2013 Completed
196. PROVISION OF STABILIZED VSAT SERVICES FOR PERISAI PETROLEUM ON THE PERISAI KAMELIA
PERISAI PETROLEUM June, 2013 Completed
197. SUPPLY AND DELIVER OF SLIDING PLATE FOR FABRICATION OF KBB TOPSIDES (BOAQ) - MMHE
KPOC May 23, 2013 Completed
198. PROVISION OF PASSIVE FIRE PROTECTION FOR SHELL D12 & LAILA FIELD DEVELOPMENT - THHE
SARAWAK SHELL BERHAD
May 9, 2013 Completed
199. PROVISION OF SUPPLY & SERVICE OF HBE COATING APPLICATION FOR 16” X 22KM DAMAR-A TO LAWIT-A CRA PIPELINE – TL OFFSHORE SDN BHD
EMEPMI May 2, 2013 Completed
200.
PROVISION OF RISER CLAMP & FLANGE PROTECTOR FOR 16” X 52KM GAS EXPORT PIPELINE FROM PLEM & LAWIT A PLATFORM – GOM RESOURCES SDN BHD
HESS EXPLORATION & PRODUCTION MALAYSIA B.V
April 29, 2013 Completed
201. PROVISION OF HEAT SHIELD FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM – SHAPADU ENERGY & ENGINEERING
EMEPMI April 2013 Completed
202. SUPPLY AND INSTALLATION OF HEAT SHIELD FOR KINABALU KNPG-B - MMHE PETRONAS
CARIGALI SDN BHD April 2013 Completed
203. OFFSHORE CARRY OVER WORKS FOR PIPING OF TAPIS-Q TOPSIDES - MMHE EMEPMI April 2013 Completed
204.
PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS B WI HTI PIPE SUPPOR TSTOP (AFS003B) – SHAPADU ENERGY & ENGINEERING SDN BHD
EMEPMI April 2013 Completed
205.
PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS C PLATFORM TOPSIDE (EXCLUDE LER) - SHAPADU ENERGY & ENGINEERING SDN BHD
EMEPMI April 2013 Completed
206.
PROVISION OF FABRICATION AND DELIVERY OF 16” SE-PA RISER LOAD BEARING CLAMP AND SLIDING CLAMP FOR MOC YEAR 2013 PIPELINES INSTALLATION - SAPURA KENCANA PETROLEUM C/O TL OFFSHORE SDN BHD
MURPHY SARAWAK OIL. CO. LTD
April 2013 Completed
207.
SUPPLY AND DELIVER OF CEILING FINISHES - SUSPENDED CEILING SYSTEM SOUTH ACIS OIL & GAS DEVELOPMENT PROJECT (REPEAT ORDER) - BROOKE DOCKYARD & ENGINEERING WORKS CORPORATION
BROOKE DOCKYARD & ENGINEERING
WORKS CORPORATION
March 18, 2013 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
208.
ENGINEERING,SUPPLY OF MATERIAL, MANUFACTURING, FABRICATION, INSTALLATION AND MODIFICATION OF FIBERGLASS GRATINGS, STAIRTREADS AND GRE HANDRAILS FOR DAMAR A SUBSTRUCTURE PROJECT – MMHE
EMEPMI March 13, 2013 Completed
209. PROVISION OF 3LPE FIELD JOINT COATING ON 12” & 10” LINEPIPE SERVICES FOR SIAKAP NORTH PETAI (SNP) DEVELOPMENT PROJECT
MURPHY SNP March 11, 2013 Completed
210. PROVISION OF FIELD JOINT COATING SERVICES FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE
EMEPMI March 8, 2013 Completed
211.
SUPPLY & DELIVERY OF FIELD JOINT ANTI CORROSION COATING SYSTEM HEAT SHRINK SLEEVE (RAYCHEM WPC100) FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE
EMEPMI March 8, 2013 Completed
212. PROVISION OF PIPELINE FIELD JOINT INFILL MATERIAL FOR TAPIS EOR & DAMAR GAS DEVELOPMENT PROJECT Y2013
EMEPMI March 7, 2013 Completed
213. PROVISION OF FIRE PROTECTION (PFP) AND INSULATION WORK FOR WEST DESARU TOPSIDES - THHE FABRICATORS SDN BHD
AQUATERRA ENERGY LIMITED
March 7, 2013 Completed
214. M03 DAMAGED FPF COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed
215. M01 DAMAGED PFP COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed
216.
PROVISION OF SUPPLY AND DELIVERY OF MONEL WELDING INTEGRATED TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR EARLY PRODUCTION SCHEME (EPS), INTEGRATED GAS DEVELOPMENT (IGD) PROJECT, NORTH MALAY BASIN (NMB) FIELD – GOM RESOURCES SDN BHD
HESS EXPLORATION & PRODUCTION
MSIA B.V. March 2013 Completed
217. PROVISION OF FIELD JOINT COATING SERVICES FOR HESS 2013 PROJECT – GOM RESOURCES
HESS February 26, 2013 Completed
218. PROVISION TO SUPPLY AND DELIVER CRUDE OIL WASHING MACHINE (COW MACHINE) SUPPLY FOR BERANTAI OPERATION - PETROFAC
PETRONAS January 29, 2013 Completed
219. SUBCONTRACTOR FOR PASSIVE FIRE PROTECTION WORKS FOR KBB TOPSIDES - MMHE
KPOC January 21, 2013 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
220. ARCHITECTURAL INSULATION PACKAGE SUPPLY OF M90 FIRETEX FOR GREATER EKOFISK AREA 2/4 - SMOE
CONOCO PHILIPS January 15, 2013 Completed
221.
PROVISION OF 3RD CAMPAIGN SEA-FASTENING WORKS OF J-LAY AND PES TOWER ON BOARD SAPURA 3000 – SAPURA ACERGY SDN BHD
SHELL January 11, 2013 Completed
222.
PROVISION OF SUPPLY AND DELIVERY OF CEILING FINISHES – SUSPENDED CEILING FOR SOUTH ACIS PROJECT – BROOKE DOCKYARD AND ENGINEERING WORKS.
MURPHY January 10, 2013 Completed
223. DESIGN, FABRICATION & DELIVERY OF FIREWALL FOR DAMAR-A TOPSIDE MMHE
EMEPMI January 08, 2013 Completed
224. SUPPLY OF PAINT EMEPMI December 27, 2012 Completed
225.
E & I WORKS-FABRICATION AND INSTALLATION FOR F14DR-A TOPSIDES & F14/F29 PROCESS MODULE – MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.
SHELL December 17, 2012 Completed
226. STRUCTURE WORKS FOR DAMAR-A PLATFORM (TOPSIDE) - MMHE EMEPMI November 12, 2012 Completed
227. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.
KPOC October 18, 2012 Completed
228.
SUPPLY, DELIVERY, AND INSTALLATION SUPERVISION OF COMPOSITE MATERIALS (FIBERGLASS) & ACCESSORIES FOR WAVE ZONE GRATING FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM, EMEPMI EPCM BROWNFIELD PROJECT.
EMEPMI October 5, 2012 Completed
229. SUPPLY AND DELIVER OF OFFICE EQUIPMENT (HS1146630X FIRE FIGHTING SUIT) HS1146630X FIRE FIGHTING SUIT
UNIVERSITI TELNOLOGI
PETRONAS, TRONOH PERAK
October 2012 Completed
230.
SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (BOAQ)(5.12M002B) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.
KPOC September 24, 2012 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
231. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.
KPOC September 24, 2012 Completed
232.
PROVISION OF FABRICATION 18” AND 12” FLEXIJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 13, 2012 Completed
233.
PROVISION OF FABRICATION 8” AND 10” STRESSJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 12, 2012 Completed
234. PROVISION OF FIELD JOINT COATING SERVICES FOR 8" AND 10" MALIKAI PIPELINE – GOM RESOURCES
SHELL September 11, 2012 Completed
235.
PROVISION OF FABRICATE AND SUPPLY OF WS2 UPPER MAST ELEMENT 2 LIFTING PAD EYE FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 5, 2012 Completed
236.
PROVISION OF FABRICATE AND SUPPLY OF NEW 18” ESCALATOR TROLLEY INSERTS, ACCESS TO HPU BOOST PUMPS, WS2 LOWER MAST ELEMENT 2, WS2 HINGE HATCH COVER, WS1 RAIN PROTECTION IMPROVEMENT FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 5, 2012 Completed
237. PROVISION OF STABILIZED VSAT SATELLITE COMMUNICATIONS FOR SAPURAACERGY ON THE SAPURA3000
SAPURAACERGY September, 2012 Completed
238. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL August 30, 2012 Completed
239. PROVISION OF DISPOSAL OF DAMAGED KOSMO, IVECO AND MAN BUSES AND ITS COMPONENTS – SYARIKAT PRASANA NEGARA BERHAD
SPNB August 29, 2012 Completed
240. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TAPIS Q TOPSIDE – MMHE SDN BHD
EMEPMI August 28, 2012 Completed
241. SUPPLY AND DELIVERY OF HSS (WPC100M) FOR MALIKAI PIPELINE – GOM RESOURCES
SHELL August 18, 2012 Completed
242. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TELOK A TOPSIDES – MMHE SDN BHD
EMEPMI August 9, 2012 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
243. PROVISION OF VSAT SERVICES IN GULF OF MEXICO – SAPURA ACERGY SDN BHD
SAPURA ACERGY August 9, 2012 Completed
244.
PROVISION OF FIELD JOINT COATING SERVICES AND SUPPLY OF ANTICORROSSION TAPE (SERVIWRAP M30B) FOR 6" X 7.6KM BEKOK-A TO TIONG-A PIPELINE INSTALLATION – GOM RESOURCES
PETRONAS August 2, 2012 Completed
245. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S TABU A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY
EMEPMI July 31, 2012 Completed
246. SUPPLY AND DELIVER OF HEAVY DUTY ANTI SLIP STEP COVER – TALISMAN MALAYSIA LIMITED
TALISMAN July 12, 2012 Completed
247. PROVISION OF TELECOMMUNICATION SYSTEM FOR TOISA PALADIN – FUGRO GEODETIC (M) SDN BHD
FUGRO GEODETIC July 12, 2012 Completed
248. FABRICATION AND INSTALLATION OF STRUCTURE WORKS FOR PACKAGE 1, DECK NORTH AND MISC FOR TAPIR R TOPSIDES PROJECT - MMHE SDN BHD
EMEPMI July 10, 2012 Completed
249.
SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) AND PACKAGE B: B-193 A-P FOR (PGC & AGRU) – SIME DARBY ENGINEERING SDN BHD
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) July 07, 2012 Completed
250.
SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) – SIME DARBY ENGINEERING SDN BHD
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) July 04, 2012 Completed
251. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S PALAS A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY
EMEPMI July 04, 2012 Completed
252. SUPPLY AND DELIVER OFSLIDING PLATE FOR FABRICATION ON KBB TOPSIDES (BOAQ) - MMHE
KPOC July 02, 2012 Completed
253.
TO SUPPLY MATERIALS, EQUIPMENT, CONSUMABLES, TOOLS AND MANPOWER FOR COOLING MANIFOLD RELOCATION FOR GUMUSUT KAKAP, J LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL June 12, 2012 Completed
254. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF VESSEL DLB264 – GOM RESOURCES
GOM RESOURCES June 11, 2012 Completed
255. PROVISION OF PULLING & REMOVE CABLE FOR LNGC SERI ALAM – MMHE SDN. BHD.
MISC May 21, 2012 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
256. SUPPLY, FABRICATE AND DELIVERY SEA FASTENING FOR CARGO BARGE FOR LAN DO DEVELOPMENT PROJECT – SAPURA ACERGY SDN BHD
TNK VIETNAM BV May 17, 2012 Completed
257.
PROVISION OF FIELD JOINT COATING SERVICES FOR MOC TRANSPORTATION AND INSTALLATION OF OFFSHORE PIPELINES AND FACILITIES FOR YEAR 2012 – TL OFFSHORE SDN BHD
MURPHY OIL May 9, 2012 Completed
258. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT PM318-PUTERI FWS PIPELINE REPLACEMENT PROJECT - NEWFIELD
NEWFIELD April 9, 2012 Completed
259. PROVISION OF VSAT TELECOMMUNICATION AND SERVICES FOR PETRONAS CARIGALI SDN BHD – IPERINTIS SDN BHD
IPERINTIS April 6, 2012 Completed
260. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - SCHLUMBERGER GROUP
SCHLUMBERGER April 4, 2012 Completed
261. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - HALLIBURTON ENERGY SERVICES (M) SDN BHD
HALLIBURTON April 4, 2012 Completed
262. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF HEAVY LIFT PIPE LAY VESSEL LTS3000
L & T SAPURA April 1, 2012 Completed
263. DESIGN, FABRICATION AND DELIVERY OF FIREWALL FOR TELOK A & B PROJECT – MMHE SDN BHD
SHELL March 23, 2012 Completed
264. COMMISSIONING OF STABILISED VSAT SERVICES AND VPN ONBOARD MV. WANGSAMAJU – OCEANTECH GEOMATICS
OCEANTECH GEOMATIC
March 14, 2012 Completed
265.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION TAPE (SERVIWRAP M30B) FOR KEBABANGAN DEVELOPMENT PROJECT – GLOBAL OFFSHORE MALAYSIA
KPOC March 13, 2012 Completed
266.
SUPPLY AND DELIVERY OF HANGER FLANGE, RISER GUARD AND RISER CLAMP FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR PETRONAS CARIGALI SKO PIPELINE REJUVENATION PROJECT. – CARIMIN ENGINEERING SERVICES
PETRONAS March 12, 2012 Completed
267. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL March 5, 2012 Completed
268.
SUPPLY AND DELIVERY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR TCOT PWSU TAIL END & REMEDIAL WORK FOR EMEPMI EPCM BROWNFIELD PROJECT – PERUNDING RANHILL WORLEY
EMEPMI March 1, 2012 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
269. PROVISION OF FIELD JOINT COATING FOR SOGT PROJECT – ALAM SWIBER PETRONAS February 27, 2012 Completed
270.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF HSS (RAYCHEM WPC100M) FOR EMEMPI’S TAPIS EOR REJUVENATION AND TELOK DEVELOMENT PROJECT. – TL OFFSHORE SDN BHD
EMEPMI February 24, 2012 Completed
271. DESIGN, ENGINEERING, AND DELIVERY OF FAIRINGS & THRUST COLLARS FOR DRILLING RISERS – SONGA OFFSHORE
PETRONAS February 22, 2012 Completed
272. PROVIDING STABILISED VSAT SYSTEM FOR SEMI-SUBMERSIBLE RIG, OCEANROVER FOR DEEPWATER PROJECT, KIKEH – DIAMOND OFFSHORE
MURPHY OIL February 14, 2012 Completed
273. PROVISION OF VSAT SYSTEM AND PROVIDING VPN RENTAL SERVICES FOR DLB264 – GLOBAL OFFSHORE MALAYSIA
GLOBAL OFFSHORE February 09, 2012 Completed
274. PIPELINE AND SPOOLS FIELD JOINT COATING SERVICES FOR LAN DO DEVELOPMENT PROJECT VIETNAM – SAPURA ACERGY SDN BHD
TNK VIETNAM BV January 20, 2012 Completed
275.
PROVISION FOR DETAILED DESIGN ENGINEERING SERVICES FOR PACKAGE THIRD PARTY VERIFICATION OF GUE H RATED FIREWALL TO WITH STAND 30-MINUTES JET FIRE FOR TELOK GAS DEVELOPMENT PROJECT – PERUNDING RANHILL WORLEY SDN BHD
EMEPMI December 29, 2011 Completed
276. PROVISION OF INSTALLATION AND MAINTENANCE OF VPN INTERNET SERVICES – ASIAN SUPPLY BASE SDN BHD
ASIAN SUPPLY BINTULU
December 21, 2011 Completed
277. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT M01 AND E11 FOR TI-FIX AND IR PROJECT - SHELL
SHELL December 21, 2011 Completed
278. SUPPLY MANPOWER, EQUIPMENTS AND MATERIALS FOR PM329 EAST PIATU TOPSIDES – KENCANA HL SDN BHD
NEWFIELD December 1, 2011 Completed
279. E & I FABRICATION, INSTALLATION, TESTING, PRE-COMMISSIONING WORK, FOR TAPIS EOR PROJECT (PACKAGE B AND PACKAGE C) – MMHE SDN BHD
EMEPMI December, 2011 Completed
280. PIPING FABRICATION AND INSTALLATION FOR TAPIS Q LIVING QUARTERS – MMHE SDN BHD
EMEPMI November, 2011 Completed
281. SUPPLY OF H120 FIRE/BLAST WALL FOR KEBABANGAN TOPSIDES – SIME DARBY ENGINEERING SDN BHD
KPOC November 25, 2011 Completed
282. PROVISION OF FIELD JOINT COATING FOR BCOT PROJECT – ALAM SWIBER PETRONAS October 10, 2011 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
283.
PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION CASTING FOR SDV ON BUNGA RAYA-B – APEX ENERGY SDN. BHD.
TALISMAN September 27, 2011 Completed
284.
PROVISION OF PASSIVE FIRE PROTECTION (PFP) SERVICES FOR PCC OF TOPSIDES AND PIPELINE FOR PM318 PUTERI PIPELINE RESTORATION PROJECT – KENCANA HL SDN BHD
NEWFIELD September 15, 2011 Completed
285.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIAL (SERVIWRAP) FOR 14” AND 24” EXPORT PIPELINE SHORE APPROACH INSTALLATION FOR KEBABANGAN NORTHERN HUB DEVELOPMENT – PBJV GROUP SDN BHD
PETRONAS CARIGALI SDN BHD
September 15, 2011 Completed
286.
PROVISION OF PASSIVE FIRE PROTECTION (PFP), TOOLS/ EQUIPMENT & MATERIALS TO REMOVE THE DEGRADED PFP & APPLICATION OF NEW PFP AT M3PQ-A LIVING QUARTER WEST WALL – SARKU ENGINEERING SERVICES SDN. BHD.
SHELL September 15, 2011 Completed
287.
PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR HELANG TOPSIDES (E-9550 & E-9650) – MONT TRINITY
NIPPON OIL September 12, 2011 Completed
288.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR INTRAGRATED TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES (TIONG A) PROJECT – GLOBAL OFFSHORE MALAYSIA SDN BHD
NEWFIELD August 17, 2011 Completed
289. PROVISION OF REMOVAL, REPAIR & REINSTATEMENT OF BLASTWALL ON M3P-Q PLATFORM – DAYANG ENTERPRISE & SSB
SHELL August 5, 2011 Completed
290.
DESIGN, MANUFACTURE AND SUPPLY OF VIV SUSPRESSION STRAKES FOR BLOCK 06.1 PHASE III PROJECT – LAN DO DEVELOPMENT PROJECT – RANHILL WORLEYPARSONS SDN BHD
BP EXPLORATION OPERATING CO. LTD
August 3, 2011 Completed
291.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR SKO PIPELINE REPLACEMENT PROJECT – TARGET ENERGY CO. (M) SDN. BHD.
PETRONAS CARIGALI SDN BHD
July 25, 2011 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
292.
FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH) TAPIS-R DECK (SOUTH), TAPIS-R LIVING QUARTERS & BRIDGES SKID BEAM AND TAPIS-Q DECK – MMHE SDN. BHD.
EMEPMI July 15, 2011 Completed
293. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH), TAPIS-Q DECK, MISCELLANEOUS WORKS TAPIS-Q – MMHE SDN. BHD.
EMEPMI July 3, 2011 Completed
294. SUPPLY, DELIVERY AND INSTALLATION OF STRAKES FOR GUMUSUT KAKAP JUMPERS - FMC
SHELL June 17,2011 Completed
295. PROVISION OF PIPELINE FIELD JOINT COATING WORKS FOR THE FABRICATION SERVICES OF FLOWLINE JUMPER – LABUAN SHIPYARD
SAPURA ACERGY/ SHELL
April 14, 2011 Completed
296.
PROVISION OF PIPELINE INFIELD FIELD JOINT COATING FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD
PETRONAS CARIGALI SDN BHD
April 12, 2011 Completed
297.
PROVISION OF PIPELINE ANTI CORROSION MATERIAL (SERVIWRAP) FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD
PETRONAS CARIGALI SDN BHD
March 31, 2011 Completed
298. PROVISION OF FIELD JOINT COATING SERVICES FOR F28DR-A/F6K-A PIPELINE PROJECT – TL OFFSHORE SDN BHD
SHELL March 18, 2011 Completed
299.
FABRICATION AND INSTALLATION OF STRUCTURAL WORKS FOR TOPSIDES A-Q COMPRISING PART OF SURVEY, DESIGN, ENGINEERING, PROCUREMENT, FABRICATION, LOAD OUT, TIE-DOWN/SEAFASTENING, TRANSPORTATION, INSTALLATION, HOOK-UP, TESTING, COMMISSIONING (EPCIC) OF PROCESS PLATFORM FOR B-193 PROJECT – SIME DARBY ENGINEERING
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) February 25, 2011 Completed
300. PROVISION OF PIPELINE MATERIALS WITH SEA SLEEVES C/W EQUIPMENT FOR NEWFIELD’S EAST PIATU INSTALLATION – TL OFFSHORE SDN BHD
NEWFIELD February 24, 2011 Completed
301. PROVISION OF PASSIVE FIRE PROTECTION SERVICES) FOR NEWFIELD'S EAST PIATU'S JACKET & TOPSIDES - KENCANA HL
NEWFIELD February 11, 2011 Completed
302. PROVISION OF FIELD JOINT COATING AND INFILL MATERIALS FOR PUTERI PIPELINE RESTORATION PROJECT – TL OFFSHORE SDN BHD
NEWFIELD February 11, 2011 Completed
303.
PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR CAKERWALLA OFFSHORE - SHAPADU ENERGY & ENGINEERING SDN BHD
CARIGALI HESS February 1, 2011 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
304.
PROVISION OF FIELD JOINT COATING, SUPPLY AND INSTALLATION OF CANUSA GTS-PP WRAPID SLEEVE FOR CILIPADI PIPELINE PROJECT – TL OFFSHORE SDN BHD
SHELL January 17, 2011 Completed
305. REPAIR WORKS OF BLASTWALL AND FIREWALL FOR MODULE 3 KUMANG TOPSIDE - OFFSHORE WORKS
PETRONAS CARIGALI SDN BHD
December 13, 2010 Completed
306.
DESIGN, CONSTRUCT, SUPPLY AND DELIVERY OF NOISE ATTENUATORS AND EXPANSION SPOOLS FOR F13 PROCESSING MODULE GLYCOL REBOILER SKID AT E11P-B PLATFORM
SARAWAK SHELL BERHAD
November 24, 2010 Completed
307.
FABRICATION AND INSTALLATION OF THE MOORING PORCHES, CHAIN JACK GANTRIES AND ASSOCIATED PLATFORMS, AND INSTALLATION OF FAIRLEAD FOUNDATIONS FOR GUMUSUT KAKAP FPS HULL (36010863) AT MALAYSIA MARINE AND HEAVY ENGINEERING
SHELL / MISC November 12, 2010 Completed
308. SUBCONTRACT FOR STRUCTURAL WORKS FOR PROCESS PLATFORM FOR B -193 PROJECT AT SIME DARBY ENGINEERING
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) October 22, 2010 Completed
309. DESIGN, FABRICATE AND SUPPLY FIRE RATED ROLLER SHUTTER FOR KINABALU NAG DEVELOPMENT PROJECT (KNPG-B) - MMHE
PETRONAS CARIGALI SDN BHD
October 21, 2010 Completed
310. SUPPLY AND DELIVERY OF SAFETY EQUIPMENTS FOR SAMARANG (PHASE 1 – ACCELERATED DRILLING) DEVELOPMENT PROJECT – KENCANA PETROLUEM
PETRONAS CARIGALI SDN BHD
October 6, 2010 Completed
311. PROVISION OF BR-B REPLACEMENT – RISER PIPE, CLAMP AND I-TUBE – FIELD JOINT COATING
TALISMAN September 20, 2010 Completed
312. DESIGN, FABRICATE AND SUPPLY OF BLASTWALL FOR LIVING QUARTERS FOR JACKETS OF PM329 EAST PIATU DEVELOPMENT PROJECT – KENCANA HL
NEWFIELD September 17, 2010 Completed
313.
PROVISION OF PIPELINE FIELD JOINT COATING SERVICES AND INFILL MATERIALS FOR PETRONAS CARIGALI’S SKO PIPELINE PROJECT – TL OFFSHORE
PETRONAS CARIGALI SDN BHD
September 7, 2010 Completed
314. PROVISION OF FLOWLINE AND RISER FIELD JOINT COATING SERVICES FOR GUMUSUT KAKAP PROJECT – SAPURA ACERGY
SHELL August 6, 2010 Completed
315. UMBRELLA CONTRACTS FOR SALE OF SSB/SSPC SCRAP METAL (600865) SARAWAK SHELL
BERHAD August 3, 2010 Completed
316.
PROVISION OF THE SERVICE FOR DISPOSAL OF SURPLUS MATERIALS FOR PETRONAS GROUP OF COMPANIES FOR YEAR 2010-2013 (UMBRELLA CONTRACT)
PETROLIAM NASIONAL BERHAD
July 28, 2010 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
317. SUPPLY AND DELIVERY OF INSTRUMENT FIRE & GAS CABLES FOR MRU - BUNGA ORKID DEV. PROJECT FOR SDE
TALISMAN MALAYSIA LIMITED
July 23, 2010 Completed
318. PROVISION OF PIPELINE FIELD JOINT COATING AND INFILL MATERIAL FOR ST. JOSEPH PIPELINE INSTALLATION ON E3 – TL OFFSHORE
SABAH SHELL PETROLUEM CO. LTD
July 22, 2010 Completed
319. SUPPLY AND DELIVER OF INSTRUMENT CABLES & GLANDS FOR EMEMPI’S SELIGI AND SEMANGKUK PIPELINE REPLACEMENT PROJECT
RANHILL WORLEY PARSONS
June 29, 2010 Completed
320. STRUCTURAL WORK ~(5-TOPSIDES) - EPCIC OF (5) WELLHEAD PLATFORM FOR B-193 PROJECT – SDE
OIL AND NATURAL GAS CORP. LTD
(ONGC) June 12, 2010 Completed
321. SUPPLY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR GUNTONG E AIR UTILITY SYSTEM UPGRADE PROJECT
RANHILL WORLEY PARSONS
May 27, 2010 Completed
322. SUPPLY OF CABLES FOR INTERGRATED PROCUREMENT AND CONSTRUCTION DEVELOPMENT PROJECT (PHASE 1)
SIME DARBY May 18, 2010 Completed
323. PROVISION OF FIELD JOINT COATING SERVICES FOR DEVIL’S CREEK DEVELOPMENT PROJECT
SAPURA ACERGY May 15, 2010 Completed
324. SUPPLY OF SERVI-WRAP ANTI-CORROSION MATERIALS SARAWAK SHELL May 13, 2010 Completed
325. SUPPLY OF INSTRUMENT CABLES & CABLE GLANDS FOR TAPIS PUMP FIRE AND GAS SYSTEM UPGRADE PROJECT - EMEPMI
RANHILL WORLEY PARSONS
May 4, 2010 Completed
326. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM INCLUDING LAN/WAN – TL OFFSHORE SDN BHD
TL OFFSHORE May 1, 2010 Completed
327. SUPPLY, FABRICATE, INSTALL AND PRE-COMMISSION ONE UNIT OF GYM ROOM FOR BRE
TALISMAN MALAYSIA LIMITED
April 29, 2010 Completed
328. DESIGN, SUPPLY, APPLICATION AND INSTALLATION OF PASSIVE FIRE PROTECTION (PACKAGE NO.SF03) FOR GUMUSUT KAKAP SEMI-FPS PROJECT
MMHE April 21, 2010 Completed
329. APPLICATION OF FOAM INSULATION FOR CAMERON INTERNATIONAL (M) SYSTEM SDN BHD
CAMERON INTERNATIONAL (M)
SDN BHD April 10, 2010 Completed
330. FIELD JOINT COATING WORK AT TLO FOR 2010 MURPHY PIPELINE PROJECT MURPHY OIL CORP March 16, 2010 Completed
331. FIELD JOINT COATING WORK AT GLOBAL OFFSHORE MALAYSIA FOR 2010 PETRONAS PIPELINES PROJECT
PETRONAS CARIGALI
March 16, 2010 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
332. SUPPLY OF CABLES FOR F23R-A CILIPADI GAS FIELD DEVELOPMENT PROJECT PFCE March 15, 2010 Completed
333. PASSIVE FIRE PROTECTION FOR SARAWAK SHELL E-8 PLATFORM SARAWAK SHELL March 15, 2010 Completed
334. DISPOSAL & REMOVAL OF SCRAP MATERIALS FROM MMHE SARAWAK SHELL March 15, 2010 Completed
335. SALE OF USED/SCRAP MATERIALS AND EQUIPMENT MLNG March 10, 2010 Completed
336. THERMOCOUPLE CABLE FOR BUNGA ORCHID-A TALISMAN MALAYSIA
March 9, 2010 Completed
337. HEAT SHIELD PANELS FOR ABU FIELD PETRONAS CARIGALI
March 3, 2010 Completed
338. SUPPLY AND APPLICATION OF PFP FOR F23DR-A CILIPADI PROJECT AT RFSB FOR PFCE
SARAWAK SHELL BERHAD
February 28, 2010 Completed
339. J-LAY TOWER REFURBISHMENT PROJECT (STRUCTURAL WORKS) FOR SAPURA ACERGY
SHELL / MISC February 25, 2010 Completed
340. SUPPLY OF LIGHT WATER STATION PETRONAS CARIGALI
February 5, 2010 Completed
341. BLASTING AND PAINTING FOR JLT STRUCTURE SERVICES FOR GUMUSUT AT SAPURA ACERGY
SHELL/ MISC January 28 2010 Completed
342. SUPPLY OF HEATSHIELDS TO CILIPADI PROJECT AT RFSB FOR PFCE SARAWAK SHELL December 28 2009 Completed
343. DISPOSAL OF EXXON MOBIL OBSOLETE, PROJECT SURPLUS, AND USED MATERIALS
EMEMPI December 8, 2009 Completed
344. S-LAY FIELD JOINT COATING CONTRACT FOR GUMUSUT PIPELINE AT SAPURA ACERGY
SHELL / MISC November 26, 2009 Completed
345. SUPPLY AND APPLICATION OF PFP FOR TANGGA BARAT CPP TOPSIDE @ MMHE
PETRONAS CARIGALI
November 3, 2009 Completed
346. DISPOSAL OF TML SLOW MOVING AND OBSOLETE GOODS AT KSB (SCRAP METAL)
TALISMAN October 30, 2009 Completed
347. SUPPLY OF BLASTWALL FOR F23 (CILIPADI) AT RAMUNIA YARD @ PFCE SARAWAK SHELL October 21, 2009 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
348. SUPPLY OF BLASTWALL TO J.R MCDERMOTT FOR THE KIPPER TUNA PROJECT ESSO AUSTRALIA August 25, 2009 Completed
349. SUPPLY OF INSTRUMENT, FIRE & GAS, ELECTRICAL AND TELECOM CABLES TO PFCE AT RAMUNIA FABRICATION YARD FOR 23 TOPSIDE PROJECT
SARAWAK SHELL August 24, 2009 Completed
350. SUPPLY OF AIMS RFP MUDMAT SYSTEM FOR NEWFIELD’S WEST BELUMUT WELLHEAD JACKET AT KENCANA HL
NEWFIELD July 31, 2009 Completed
351. SUPPLY OF CHEMICALS – TRIETHYLENE GLYCOL – 99.9%, 235 KGS DRUM UNDER PRICE AGREEMENT WITH PETRONAS CARIGALI
PETRONAS CARIGALI
July 15, 2009 Completed
352.
ELECTRICAL AND INSTRUMENTATION FABRICATION & HOST TIE & HOOK-UP COMMISSIONING OF GUA FLAREBOOM REPLACEMENT AT BOUSTEAD PENANG SHIPYARD S/B
EXXON MOBIL June 22, 2009 Completed
353. FABRICATION OF INSTRUMENT GAS SKID FOR KUMANG PROJECT AT SDE PETRONAS CARIGALI
June 15, 2009 Completed
354. FIELD JOINT COATING WORK AT TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI
June 8, 2009 Completed
355. SUPPLY OF SERVIWRAP TO TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI
May 15 , 2009 Completed
356. FIELD JOINT COATING WORK AT TLO FOR BEKOK-DULANG PROJECT FOR PETRONAS PIPELINE PROJECT
PETRONAS CARIGALI
April 17, 2009 Completed
357. FIELD JOINT COATING WORK AT TLO FOR WEST LUTONG PROJECT FOR PETRONAS PIPELINE PROJECT
PETRONAS CARIGALI
March 6, 2009 Completed
358. FIELD JOINT COATING WORK AT TLO FOR BETTY BAKAU PROJECT FOR PETRONAS PIPELINE PROJECT
PETRONAS CARIGALI
February 12, 2009
Completed
359. PASSIVE FIRE PROTECTION FOR B11 LQ & HELIDECK AT BDEWC, SARAWAK SARAWAK SHELL
BERHAD February 11, 2009 Completed
360. PASSIVE FIRE PROTECTION FOR PC-4 RISER AT BD11 DR-A PLATFORM FOR MMHE
PETRONAS CARIGALI
January 19, 2009 Completed
361. SUPPLY OF ELECTRICAL AND INSTRUMENTATION CABLES FOR F23 VLAP COMPRESSION AT SDE
SARAWAK SHELL BERHAD
January 5, 2009 Completed
362. MARK AND CUT STEEL STRUCTURAL WORKS FOR MCR-A PROJECT AT MMHE MMHE JV WITH
TECHNIP January 2, 2009 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
363. FABRICATION OF STRUCTURAL WORKS FOR EAST MODULE TOPSIDES OF GUMUSUT KAPAP AT MMHE
SHELL AND MISC Dec 31, 2008 Completed
364. E & I AND PIPING WORK AT MMHE FOR TANGGA BARAT CPP TOPSIDES PETRONAS CARIGALI
Dec 24, 2008 Completed
365. PASSIVE FIRE PROTECTION FOR B-11 TOPSIDES AT BROOKE DOCK YARD SARAWAK SHELL
BERHAD Dec 19, 2008 Completed
366. SUPPLY OF KOBE ELECTRODES FOR F23-RA TOPSIDES AT RFSB SARAWAK SHELL
BERHAD Dec 19, 2008 Completed
367. INSTRUMENTATION & FGS & TELECON JUNCTION BOX – DULANG B AT KENCANA HL
PETRONAS CARIGALI
November 4, 2008 Completed
368. SUPPLY OF TOTE TANKS PETRONAS CARIGALI
October 29, 2008 Completed
369. SUPPLY OF FIRE RATED WINDOWS FOR KUMANG AND TANGGA BARAT AT SDE PETRONAS CARIGALI
October 21, 2008 Completed
370. SUPPLY OF INSTRUMENT CABLES FOR FPSO RUBY AT MMHE MISC October 15, 2008 Completed
371. STRUCTURAL FABRICATION WORK FOR TANGGA BARAT AT MMHE PETRONAS CARIGALI
October 13, 2008 Completed
372. SUPPLY AND INSTALL KUMANG BLASTWALL/ FIREWALL COMPLETE SYSTEM INCLUDING PFP AT SDE TO MEET FIRE RATINGS
PETRONAS CARIGALI
October 10, 2008 Completed
373. SUPPLY OF ELECTRICAL AND INSTRUMENTATION (E&I) CABLES FOR KUMANG AND TANGGA BARAT AT SDE
PETRONAS CARIGALI
Sept 27, 2008 Completed
374. PIPING FABRICATION WORK FOR B11 KA TOPSIDE @ MMHE SARAWAK SHELL
BERHAD Sept 16, 2008 Completed
375. SUPPLY OF PERSONNEL TRANSFER BASKET AND CABLE GLAND / FITTINGS TO MURPHY OIL
MURPHY SARAWAK OIL CO. LTD
Sept 15, 2008 Completed
376. FIELD JOINT COATING WORK FOR CPOC PIPELINES AT TLO PETRONAS CARIGALI
Sept 10, 2008 Completed
377. PASSIVE FIRE PROTECTION FOR PLUTO PROJECT @ RFSB WOODSIDE ENERGY August 15, 2008 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
378. FIELD JOINT COATING WORK AT TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT
SARAWAK SHELL BERHAD
August 1, 2008 Completed
379. SUPPLY OF CANUSA HSS TO TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT
SARAWAK SHELL BERHAD
July 22, 2008 Completed
380. SUPPLY OF DOUBLE SKIN HEAT SHIELDS FOR B11 KA PROJECT AT MMHE SARAWAK SHELL
BERHAD June 30, 2008 Completed
381. PASSIVE FIRE PROTECTION OF ANDP-D AT RFSB PETRONAS CARIGALI
June 30, 2008 Completed
382. SUPPLY OF SERVIWRAP FOR CPOC PIPELINE TO TLO PETRONAS CARIGALI
June 26, 2008 Completed
383. E&I, PIPING, MECHANICAL & STRUCTURAL FABRICATION FOR KUMANG CLUSTER DEVELOPMENT / TANGGA BARAT PROJECT @ SDE
PETRONAS CARIGALI
June 11, 2008 Completed
384. DESIGN, SUPPLY, FABRICATION AND INSTALL NEW FIRE AND BLASWALL FOR BR-A
TALISMAN MALAYSIA LIMITED
May 23, 2008 Completed
385. PASSIVE FIRE PROTECTION OF GOPA-GOPB AT KHL MURPHY SARAWAK
OIL CO. LTD May 8, 2008 Completed
386. SUPPLY AND DELIVERY OF CONCRETE MATRESSES, SLEEPERS, LIFTING FRAME FOR 24” ANDR-A/TCOT PIPELINE FOR TLO
PETRONAS CARIGALI
April 30, 2008 Completed
387. ELECTRICAL AND INSTRUMENTATION FABRICATION WORK AT RFSB ON ANGSI –D PLATFORM
PETRONAS CARIGALI
April 24, 2008 Completed
388. PFP for F23 AND F6 AT BROOKE DOCKYARD, KUCHING, SARAWAK SARAWAK SHELL
BERHAD April 11, 2008 Completed
389. SUPPLY OF POWER & INSTRUMENTATION CABLES MURPHY SARAWAK
OIL CO. LTD April 10, 2008 Completed
390. SUPPLY OF HEATSHIELDS TO CLOUGH FOR MONTARA PROJECT IN THAILAND CLOUGH (THAILAND)
CO. LTD April 10, 2008 Completed
391. FIELD JOINT COATING SERVICES FOR TALISMAN PIPELINE INSTALLATION TALIMAN MALAYSIA
LIMITED April 10, 2008 Completed
392. FIELD JOINT COATING FOR PETRONAS CARIGALI 2008 PIPELINE INSTALLATION AT TLO FOR 5 PIPELINES
PETRONAS CARIGALI
April 10, 2008 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
393. SUPPLY AND APPLICATION OF WET AND CASTING PFP FOR TALISMAN RISERSAND ESDVS
TALIMAN MALAYSIA LIMITED
April 8, 2008 Completed
394. SUPPLY OF FIRE RATED DOORS TO MMHE PETRONAS CARIGALI
April 5, 2008 Completed
395. SUPPLY OF RADIANT HEATSHIELD, LOUVERS AND MISC ITEMS FOR PC 4 @ MMHE
PETRONAS CARIGALI
March 31, 2008 Completed
396. FIELD JOINT COATING FOR KEA- TIA @ PBJV
PETRONAS CARIGALI
March 7, 2008 Completed
397. SUPPLY OF ELECTRICAL OPERATED MONORAIL TROLLEY HOIST, 5 MT – MMHE
MMHE March 7, 2008 Completed
398. SUPPLY OF MANUAL OPERATED GANTRY CRANE TO MMHE MMHE March 7, 2008 Completed
399. ENGINEERING, DESIGN, FABRICATION AND INSTALLATION OF SHELTER CABIN FOR PC4 AT MMHE
PETRONAS CARIGALI
Feb 28, 2008 Completed
400. SUPPLY OF LINE PIPES SMLS API TYPE OF VARIOUS SIZES TO MMHE PETRONAS CARIGALI
Jan 17, 2008 Completed
401. SUPPLY OF FIRE RATED DOORS TO TURKMENISTAN GAS DEVELOPMENT PROJECT
MITCO JAPAN SDN BHD
Jan 11, 2008 Completed
402. PASSIVE FIRE PROTECTION FOR BUNGA ORKID @ SDE TALISMAN
MALAYSIA LIMITED Jan 3, 2008 Completed
403. FABRICATION OF GUMUSUT-KAKAP SEMISUBMERSIBLE HULL (PACKAGE 2) SHELL AND MISC December 5, 2007 Completed
404. STRUCTURAL FABRICATION FOR CPOC PROJECT AT MMHE PETRONAS CARGALI
SDN BHD Nov 30, 2007 Completed
405. SUPPLY OF FIRE RATED WINDOWS FOR BUNGA ORKID PROJECT AT SDE TALISMAN
MALAYSIA LIMITED October 23, 2007 Completed
406. SUPPLY OF TOTE TANKS TO EMEPMI EXXON MOBIL Sept 30, 2007 Completed
407. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E& I AND BLASTING/ PAINTING FOR PC 4 TOPSIDE WORK @ MMHE
PETRONAS CARGALI SDN BHD
July 26, 2007 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
408. FIELD JOINT COATINGS FOR VASAI EAST DEVELOPMENT PROJECT AT RAMUNIA FABRICATORS SDN BHD
OIL & NATURAL GAS CORPORATION,
INDIA August 27, 2007 Completed
409. SUPPLY & APPLICATION OF PASSIVE FIRE PROTECTION -TALISMAN NORTHERN FIELD
TALISMAN MALAYSIA LIMITED
August 23, 2007
Completed
410. FIELD JOINT COATINGS FOR JERNEH PIPELINES AT TLO EXXONMOBIL August 8, 2007 Completed
411. FABRICATE BEAM HAUNCH, CROSS OVER SPOOL FOR HIGH PRESSURE MUD LINE AND CRANE BEAM
SAAG DRILLING & WELL SERVICES SDN
BHD August 7, 2007 Completed
412. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR BELUMUT AT RAMUNIA FABRICATORS SDN BHD
PETRONAS CARIGALI SDN BHD
August 5, 2007 Completed
413. FIELD JOINT COATINGS FOR SEMARANG PIPELINES AT TLO PETRONAS CARGALI
SDN BHD July 28, 2007
Completed
414. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR INTRALINE RESOURCES
TALISMAN MALAYSIA LIMITED
July 16, 2007 Completed
415. FIELD JOINT COATINGS FOR ANDR-A PIPELINES AT TLO PETRONAS
CARIGALI SDN BHD June 25, 2007
Completed
416. FIELD JOINT COATINGS FOR 18 “ GUE PIPELINE AT TLO EXXONMOBIL June 20, 2007 Completed
417. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SUMANDAK TOPSIDES
PETRONAS CARIGALI
June 13, 2007 Completed
418. SUPPLY OF SPARES FOR CLOSURE DOOR TO MMHE SARAWAK SHELL
BERHAD June 6, 2007
Completed
419. FIELD JOINT COATINGS FOR BETTY– BORONIA 18” P/L SARAWAK SHELL
BERHAD June 1, 2007 Completed
420. ENGINEERING, PROC, CONSTRUCTION & COMMISSIONING OF FIRE PROTECTION SYSTEM
PETRONAS DAGANGAN BERHAD
May 28, 2007 Completed
421. FIELD JOINT COATING FOR TAPM-3 CAA NORTHEN FIELD DEVELOPMENT TALISMAN
MALAYSIA LIMITED May 22, 2007
Completed
422. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SCDR-A TOPSIDES
SARAWAK SHELL BERHAD
May 4, 2007 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
423. SUPPLY OF SAFETY EQUIPMENT AND LIFE RAFT TO MDFT FOR KIKEH PROJECT M.D.F.T (KIKEH) LTD May 2, 2007
Completed
424. FIELD JOINT COATINGS FOR ALL SUMANDAK PIPELINES AND SUPPLY OF SERVIWRAP TO TL OFFSHORE
PETRONAS CARIGALI
(PETRONAS CARIGALI)
April 6, 2007 Completed
425. 2007-2009 OFFSHORE FACILITIES TRANSPORT AND INSTALLATION OF FIELD JOINT COATINGS FOR MCDERMOTT
SARAWAK SHELL BERHAD
March 27, 2007 Completed
426. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR PETRONAS CARIGALI’S BELUMUT PROJECT AT RFSB
PETRONAS CARIGALI
(PETRONAS CARIGALI)
March 19, 2007 Completed
427. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR ANGEL GAS TOPSIDE PROJECT AT MMHE
WOODSIDE ENERGY March 15, 2007 Completed
428. FIELD JOINT COATING OF 10” BAP-AA TO BADP-G PIPELINE FOR TL OFFSHORE
PETRONAS CARIGALI
(PETRONAS CARIGALI)
March 1, 2007 Completed
429. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR SHELL’S SCDR-A AT MMHE
SARAWAK SHELL March 1, 2007 Completed
430. FABRICATION, INSTALLATION, TESTING AND PRE-COMMISSIONING OF PIPINGAND MECHANICAL WORKS FOR SCDR-A TOPSIDES AT MMHE
SARAWAK SHELL February 14, 2007 Completed
431. DESIGN, ENGINEERING AND FABRICATION OF END CLOSURE FOR SHELL’S SCDR-A PROJECT AT MMHE
SARAWAK SHELL February 6, 2007 Completed
432. ENGINEERING, DESIGN & FABRICATION OF PFP CASTINGS FOR METERING RUN - BR-B PLATFORM OFFSHORE
TALISMAN MALAYSIA LIMITED
January 29, 2007 Completed
433. FABRICATE GUMUSUT-KAKAP SEMI-SUBMERSIBLE HULL SHELL January 25, 2007 Completed
434. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E&I AND BLASTING/PAINTING FOR F6 REJUVENATION WORKS
SARAWAK SHELL January 23, 2007
Completed
435. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR MAARI FIELD DEVELOPMENT AT KENCANA HL ENGINEERING
CLOUGH PROJECT INTERNATIONAL PTY
LTD, AUSTRALIA January 17, 2007 Completed
436. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR ANGEL GAS PROJECT AT MMHE
WOODSIDE ENERGY LTD, AUSTRALIA
January 15, 2007 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
437. SUPPLY OF ANTI-SKID BRE STAIRWAYS TALISMAN
MALAYSIA LIMITED January 4, 2007 Completed
438. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR SCDR-A PROJECT AT MMHE
SARAWAK SHELL Dec 27, 2006 Completed
439. SUPPLY OF INSTR. CABLE CONNECTING BRA AND BRE PAGA SYSTEM TALISMAN
MALAYSIA LIMITED Nov 15, 2006 Completed
440. FIELD JOINT COATING FOR PBJV GROUP SDN BHD FOR WEST LUTONG PROJECT
PETRONAS CARIGALI
Nov 11, 2006 Completed
441. CONTRACT FOR CIVIL WORKS PACKAGE FOR KUANTAN – KERTEH RAILWAY PROJEC, INCL. VEHICULAR, DRAINAGE & UTILITY BOX CULVERTS
PERCON BABENA JOINT VENTURE
October 15, 2006 Completed
442. STRUCTURAL STEEL FABRICATION FOR SUMANDAK SELATAN TOPSIDES AND HOST
PETRONAS CARIGALI
Sept 27, 2006 Completed
443. FJ COATING FOR TLO PETRONAS
CARIGALI AND SHELL
August 10, 2006 Completed
444. PIPING WORKS FOR KIKEH FPSO AT MMHE MURPHY OIL August 2, 2006 Completed
445. SUPPLY OF HEATSHIELDS FOR F13W PROJECT AT RAMUNIA FABRICATORS SARAWAK SHELL June 15, 2006 Completed
446. SUPPLY OF END CLOSURE DOORS- F13W AT RFSB SARAWAK SHELL June 09, 2006 Completed
447. PASSIVE FIRE PROTECTION FOR KIKEH DTU TOPSIDES MURPHY OIL
May 3, 2006 Completed
448. FIELD JOINT COATINGS AT BARMADA MCDERMOTT TALISMAN
MALAYSIA LIMITED March 14, 2006 Completed
449. FIELD JOINT COATINGS FOR BARMADA MCDERMOTT S/B EXXON MOBIL March 14, 2006 Completed
450. PASSIVE FIRE PROTECTION FOR ARTHIT PFP AT Mc DERMOTT YARD IN BATAM INDONESIA
PTTEP and KBR February 27, 2006 Completed
451. PIPING WORKS FABRICATION FOR MURPHY KIKEH PROJECT @ MMHE MURPHY OIL January 14, 2006 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
452. ELECTRICAL AND INSTRUMENTATION FOR MODEC RJS-409 MODULE FABRICATION @ SDE
PETROBRAS December 1, 2005 Completed
453. PIPELINE FIELD JOINT COATING FOR BARAM (MCOT) 16” AND 10” PETRONAS
CARIGALI – TLO Nov 30, 2005 Completed
454. STRUCTURAL FABRICATION FOR MODEC RJS-409 ESPADARTE MODULE FABRICATION @ SDE
PETROBRAS November 1, 2005 Completed
455. SPECIAL STRUCTURAL SPECIAL FABRICATION FOR MURPHY KIKEH PROJECT MURPHY OIL September 9, 2005 Completed
456. SUPPLY AND INSTALL OF FIRESEAL FOR AMENAM KPONO PROJECT TOTAL ELF September 9, 2005 Completed
457. ARCHITECTURAL FITTINGS FOR CLIFF HEAD A PLATFORM AT HL ENGINEERING ROC OIL, AUSTRALIA August 6, 2005 Completed
458. PFP FOR SHELL E11 –PB SARAWAK SHELL August 3 2005 Completed
459. SUPPLY OF BARUNIA PROTECTIVE RELAYS PETRONAS
CARIGALI SDN BHD August 3, 2005 Completed
460. MAJOR STRUCTURAL FABRICATION FOR MURPHY KIKEH DTU SPAR HULL MURPHY OIL May 3, 2005 Completed
461. PFP FOR BARAM TOPSIDE AT BDEWC PETRONAS
CARIGALI SDN BHD April 2005 Completed
462. DESIGN, ENGINEERING AND FABRICATION OF BARAM HEATSHIELD AT BDEWC PETRONAS
CARIGALI SDN BHD April 2005 Completed
463. BLASTING AND PAINTING WORKS AT SSE FOR GUE EXXONMOBIL March 2005 Completed
464. DESIGN, ENGINEERING AND FABRICATION OF E11 P-B BLASTWALL AT MSE SARAWAK SHELL
BERHAD March 2005 Completed
465. PFP FOR SHELL’S E8-DR-A AT RAMUNIA FABRICATORS SARAWAK SHELL
BERHAD March 2005 Completed
466. PFP FOR SHELL’S F13 SARAWAK SHELL February 2005 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
467. PFP FOR BR-E JACKET AND TRIPOD PROJECT AT MSE TALISMAN ENERGY February 2005 Completed
468. PFP FOR BR-E CO2 REMOVAL PROJECT AT SSE TALISMAN ENERGY February 2005 Completed
469. PFP FOR GUNTONG E PROJECT AT SIME SEMBCORP ENGINEERING EXXONMOBIL
EXPLORATION & PRODUCTION INC
January 2005 Completed
470. DESIGN, ENGINEERING AND FABRICATION OF SCKA & SF 13 HEATSHIELDS SARAWAK SHELL
BERHAD October 2004 Completed
471. DESIGN, ENGINEERING AND FABRICATION OF GUNTONG- E BLASTWALL EXXONMOBIL
EXPLORATION & PRODUCTION INC
July 2004 Completed
472. STRUCTURAL STEEL FABRICATION & WELDING AT MSE FOR MOAB TALISMAN ENERGY July 22, 2004 Completed
473. BLASTWALL REINSTAMENT TO H60 RATING – PFP TALISMAN ENERGY July 5, 2004 Completed
474. SUPPLY OF VESSELS UNDER MASTER SPOPT CHARTER PARTY FCF653 EXXONMOBIL
EXPLORATION & PRODUCTION INC
June 26, 2004 Completed
475. PASSIVE FIRE PROTECTION SUPPLY AND APPLY FOR AMENAM PROJECT AT SSE TOTAL ELF FINA @
NIGERIA June 2004 Completed
476. SUPPLY OF PRODUCTION & TEG CHEMICALS - 3 YEARS SARAWAK SHELL/
PETRONAS CARIGALI / NIPPON
June 23, 2004 Completed
477. CASTINGS FOR BUNGA RAYA-A PLATFORM TALISMAN ENERGY March 3, 2004 Completed
478. PFP FOR YOHO PROJECT PROTECTION EXXON MOBIL
NIGERIA March 2004 Completed
479. CASTINGS FOR SDV on BUNGA RAYA-A TALISMAN ENERGY December 2003 Completed
480. PFP FOR SERAI PROJECT SARAWAK SHELL September 2003 Completed
481. PFP FOR JINTAN PROJECT PROTECTION SARAWAK SHELL
BERHAD July 2003 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
482. INFIELD JOINT COATING FOR NIPPON STEEL (NSC) PETRONAS CARIGALI
May 8, 2003 Completed
483. YOHO PLATFORM ELECTRODE EXXON MOBIL
NIGERIA February 2003 Completed
484. BUNGA RAYA 24” Riser PFP PETRONAS
CARIGALI/TALISMAN February 2003 Completed
485. SHELL M3 BLASTWALL SARAWAK SHELL January 11, 2003 Completed
486. HELANG’s RISER / SDV/ FLANGE / VALVE PFP CASTING NIPPON OIL
EXPLORATION January 2003 Completed
487. MLNG SPHERE PFP MLNG SDN BHD December 2002 Completed
488. LUNDIN RISER / SDV PFP TALISMAN December 2002 Completed
489. HALFDAN HEATSHIELDS ENGINEERING DESIGN SEMBCORP ENGRG
SINGAPORE September 6, 2002 Completed
490. SHELL M1 BLASTWALL ENGINEERING DESIGN SARAWAK SHELL
BERHAD September 2002 Completed
491. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP NIPPON OIL
(HELANG) AT MSE July 15, 2002 Completed
492. MODIFICATION & INSTALL ELECTRICAL WORK FOR SWITCHGEARS (KNDP-A) SARAWAK SHELL
BERHAD Nov 18, 2001 Completed
493. PASSIVE FIRE PROTECTION FOR MLNG3 SLUGCATCHER PETRONAS CARIGALI
October 29, 2001 Completed
494. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP MALAYSIA LNG
SDN BHD October 20, 2001 Completed
495. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP PETRONAS CARIGALI
October 15, 2001 Completed
496. SUPPLY/ INSTALL E & I SWITCHGEAR SARAWAK SHELL
BERHAD August 20, 2001 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
May 03, 2019 - (Track Record Updated)
497. INSULATION CONTRACT WITH PETRA RESOURCES ESSO PRODUCTION
MALAYSIA INC. July 6, 2001 Completed
498. SUPPLY OF ELECTRODES DOTANAH ENGRG &
CONSTRUCTORS July 2, 2001 Completed
499. ELECTRODE SUPPLY FOR NIPPON OIL (HELANG) MALAYSIA
SHIPYARD (MSE) June 15, 2001 Completed
500. ELECTRODE SUPPLY FOR PETRONAS CARIGALI (ANGSI-A) SIME SEMBCORP
ENGINEERING June 15, 2001 Completed
501. ELECTRODE SUPPLY FOR ESSO (SATELIT) AND LARUT MSE February 2001 Completed
502. SUPPLY OF ELECTRODES FOR ESSO (LARUT-A) SIME SEMBCORP
ENGINEERING July 6, 2000 Completed
503. SUPPLY OF ELECTRODES PETRONAS FERTILIZER
TENDER Completed
504. SUPPLY OF CONSUMABLES FOR PETRONAS PETRONAS
AMMONIA SDN BHD TENDER TENDER
505. SUPPLY OF CONSUMABLES FOR PETRONAS CARIGALI PETRONAS CARIGALI
TENDER TENDER