JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn....

39
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT DATE CURRENT STATUS May 03, 2019 - (Track Record Updated) 1. PASSIVE FIRE PROTECTION WORK FOR CONSTRUCTION OF BERTH A2 AT MARINE TERMINAL, JAMNAGAR, INDIA SAPURA FABRICATION SDN BHD April 22, 2019 In Progress 2. SUPPLY AND DELIVERY OF CABLE SARAWAK SHELL BERHAD April 25, 2019 In Progress 3. FABRICATION AND INSTALLATION SEAFASTENING AND LOADOUT ACTIVITIES FOR GK PHASE 2 MMHE April 18, 2019 In Progress 4. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE OTHERS) PETRONAS CARIGALI April 4, 2019 In Progress 5. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE FLOWLINE/WELLHEAD) PETRONAS CARIGALI April 3, 2019 In Progress 6. SUPPLY OF HUMIDUR FP PAINTS TO QET BSP April 1, 2019 In Progress 7. MANPOWER SUPPLY (44 PAX) FOR JACKET BOKOR PROJECT MMHE Mar 29, 2019 In Progress 8. PURCHASE OF COMPUTER HARDWARE EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC. Mar 29, 2019 In Progress 9. PROVISION OF TENSILE TEST ON HELIDECK NETTING TRANSFAME SDN BHD Mar 29,2019 Completed 10. PRIMAVERA LICENSE RENEWAL PETRONAS TECHNICAL SERVICES SDN BHD Mar 26, 2019 Completed 11. PAN MALAYSIA FIELD JOINT COATING SERVICES SARAWAK SHELL BERHAD / SAPURA ENERGY Mar 21, 2019 In Progress 12. CABLING & TV INSTALLATION FOR FGVT WAR ROOMS FELDA GLOBAL VENTURES HOLDINGS BERHAD Mar 20, 2019 In Progress

Transcript of JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn....

Page 1: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

1. PASSIVE FIRE PROTECTION WORK FOR CONSTRUCTION OF BERTH A2 AT MARINE TERMINAL, JAMNAGAR, INDIA

SAPURA FABRICATION SDN

BHD April 22, 2019 In Progress

2. SUPPLY AND DELIVERY OF CABLE SARAWAK SHELL

BERHAD April 25, 2019 In Progress

3. FABRICATION AND INSTALLATION SEAFASTENING AND LOADOUT ACTIVITIES FOR GK PHASE 2

MMHE April 18, 2019 In Progress

4. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE OTHERS)

PETRONAS CARIGALI

April 4, 2019 In Progress

5. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE FLOWLINE/WELLHEAD)

PETRONAS CARIGALI

April 3, 2019 In Progress

6. SUPPLY OF HUMIDUR FP PAINTS TO QET BSP April 1, 2019 In Progress

7. MANPOWER SUPPLY (44 PAX) FOR JACKET BOKOR PROJECT MMHE Mar 29, 2019 In Progress

8. PURCHASE OF COMPUTER HARDWARE

EXXONMOBIL EXPLORATION AND

PRODUCTION MALAYSIA INC.

Mar 29, 2019 In Progress

9. PROVISION OF TENSILE TEST ON HELIDECK NETTING TRANSFAME SDN

BHD Mar 29,2019 Completed

10. PRIMAVERA LICENSE RENEWAL PETRONAS TECHNICAL

SERVICES SDN BHD Mar 26, 2019 Completed

11. PAN MALAYSIA FIELD JOINT COATING SERVICES SARAWAK SHELL

BERHAD / SAPURA ENERGY

Mar 21, 2019 In Progress

12. CABLING & TV INSTALLATION FOR FGVT WAR ROOMS FELDA GLOBAL

VENTURES HOLDINGS BERHAD

Mar 20, 2019 In Progress

Page 2: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

13. SUPPLY OF HUMIDUR TC PAINTS TO QET BSP Mar 20, 2019 Completed

14. SUPPLY OF HUMIDUR FP PAINTS AND HUMICLEAN TO QET BSP Mar 20, 2019 Completed

15. MANPOWER SUPPLY FOR CARPENTER WORK GEMUSUT KAKAP PHASE 2 MMHE / TECHNIPFMC Mar 19, 2019 In Progress

16. SUPPLY AND DELIVERY OF STICKER / STENCIL FOR VESSEL (STATIC PTS-34) PETRONAS CARIGALI

Mar 19, 2019 Completed

17. SUPPLY AND DELIVERY OF ELECTRICAL CABLE SARAWAK SHELL

BERHAD Mar 5, 2019 Completed

18. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD

BLNG Mar 5, 2019 In Progress

19. SUPPLY OF HUMIDUR PAINTS TO TRANSFAME SDN BHD SARAWAK SHELL

BERHAD Mar 4, 2019 Completed

20. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD

BLNG Feb 28, 2019 In Progress

21. SUPPLY AND DELIVERY OF WATER SHUT OFF VALVE 5K 125A (KORVAL) CHEE FATT CO. PTE

LTD Feb 22, 2019 Completed

22. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

BLNG Feb 22, 2019 Completed

23. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

BLNG Feb 20, 2019 Completed

24. SUPPLY OF HUMIDUR ME COATING FOR SS PUTERI ZAMRUD EAGLESTAR

SHIPMANAGEMENT Feb 14, 2019 Completed

Page 3: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

25. SUPPLY OF HUMIDUR FP COATING FOR SS PUTERI ZAMRUD EAGLESTAR

SHIPMANAGEMENT Feb 14, 2019 Completed

26. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

(PENGERANG) Feb 11, 2019 Completed

27. PASSIVE FIRE PROTECTION RECTIFICATION WORK FOR MALIKAI SARAWAK SHELL

BERHAD Feb 11, 2019 Completed

28. SUPPLY OF HUMIDUR TC PAINTS AND TO QET BSP Feb 7, 2019 Completed

29. PASSIVE FIRE PROTECTION TEST PANEL (EARLY MOB) HESS / SAPURA Feb 7, 2019 Completed

30. SUPPLY OF IT HARDWARE & CONSUMABLES HESS Feb 1, 2019 In Progress

31. PROVISION OF ASSAI ONSITE SOFTWARE MAINTENANCE RENEWAL (JANUARY-DECEMBER 2019)

SAPURA EXPLORATION &

PRODUCTION (SARAWAK) INC.

Jan 31, 2019 In Progress

32. SUPPLY AND DELIVERY OF INSTRUMENT CABLES – COST PLUS (GOPA) DAYANG

ENTERPRISE / MURPHY

Jan 16, 2019 Completed

33. SUPPLY OF FOXIT PHANTOM PDF BUSINESS ADDITION FELDA GLOBAL

VENTURES HOLDINGS BERHAD

Jan 11, 2019 Completed

34. SUPPLY OF HUMIDUR PAINTS FOR DARAT PROJECT E38 AND E15 BLNG Dec 28, 2018 Completed

35. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

(PENGERANG) Dec 24, 2018 In Progress

36. SUPPLY AND DELIVERY OF CABLE INSTRUMENT (ADDITIONAL) FOR HUC MODIFICATION AT D18MP-A FOR D28 PHASE 1 PROJECT

PETRONAS CARIGALI

Dec 17, 2018 Completed

Page 4: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

37. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD

BLNG Dec 6, 2018 In Progress

38. PROVISION OF CISCO HARDWARE & SUPPORT SERVICES TO REFRESH NETWORK SYSTEM

HESS Dec 6, 2018 In Progress

39. PROVISION OF SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION WORK FOR ZETUNG TOPSIDE

HESS / SAPURA Nov 22, 2018 Completed

40. PROVISION OF SERVER SOFTWARE, LICENSES AND SERVICES FOR MURPHY’S OPERATIONS

MURPHY Nov 22, 2018 Completed

41. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

(PENGERANG) Nov 11, 2018 Completed

42. SUPPLY OF HUMIDUR PAINT FOR MESPLT GUMUSUT DEVELOPMENT AND MALIKAI STORE

SABAH SHELL PETROLEUM

Nov 9, 2018 In Progress

43. MATERIAL FRO TELCO SATELLITE ANTENNA PEDESTAL AT WPPA – COST PLUS (ANTI-SLIP)

DAYANG ENTERPRISE /

MURPHY Oct 17, 2018 Completed

44. PROVISION OF ELECTRONIC OFFICE APPLICATION LEAVE FOR PTTEP HK OFFSHORE LIMITED

PTTEP HK OFFSHORE LIMITED

Oct 12, 2018 Completed

45. SUPPLY OF PRIMARY UNIT REGULATOR VALVE 20K 50A WITH GAUGE (KORVAL)

PFLNG Oct 4, 2018 Completed

46. SUPPLY AND DELIVERY ELECTRICAL MATERIAL FOR DULANG V-507 SEPARATOR CONTROL UPGRADE

PETRONAS CARIGALI

Sept 23, 2018 Completed

47. SUPPLY AND DELIVERY OF CABLE AND ACCESSORIES FOR DULANG WELL FLOW MEASUREMENT B23SL DULANG B PLATFORM

PETRONAS CARIGALI

Sept 21, 2018 Completed

48. SUPPLY OF SWA CABLE DAYANG

ENTERPRISE Sept 14, 2018 Completed

Page 5: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

49. SUPPLY OF HUMIDUR PAINTS FOR MESPLT GUMUSUT DEVELOPMENT SABAH SELL PETROLEUM

Aug 30, 2018 Completed

50. SUPPLY & DELIVERY OF TOOLS AND CONSUMABLE (WELDING ELECTRODE) FOR MAINTENANCE, CONSTRUCTION AND MODIFICATION (MCM)

PETRONAS CARIGALI

Aug 28, 2018 Completed

51. SUPPLY OF HUMIDUR PAINTS FOR BLNG CSIP USAGE BLNG Aug 20, 2018 Completed

52. SUPPLY OF INSTRUMENT CABLE FOR SAPA INFILL E & I BULK MATERIAL – COST PLUS

DAYANG ENTERPRISE

Aug 2, 2018 Completed

53. SUPPLY OF 3M 8515 N95 DISPOSABLE RESPIRATOR PETRONAS GAS

BERHAD July 31, 2018 Completed

54. SUPPLY OF HUMIDUR FP COATING FOR LNG PUTERI NILAM EAGLESTAR

SHIPMANAGEMENT July 27, 2018 Completed

55. RENTAL OF DRY-ICE BLASTING SYSTEM FOR 3 MONTHS EVERSOLVE July 23, 2018 In Progress

56. SUPPLY OF HUMIDUR PAINTS FOR U7200 TRESTLE STRUCTURE B/P ACTIVITIES EVERSOLVE July 23, 2018 In Progress

57. SUPPLY & DELIVERY OF KOBE ELECTRODE FOR INVENTORY STOCK MMHE July 20, 2018 Completed

58. PROVISION OF PASSIVE FIRE PROTECTIONS (PFP) FOR BR-A PLATFORM REPSOL

REPSOL July 19, 2018 Completed

59. STRUCTURAL WORKS FOR BOKOR CPP TOPSIDES PETRONAS CARIGALI

July 18, 2018 Completed

60. PROVISION OF SUPPLY OF MANPOWER, MATERIALS AND EQUIPMENT FOR INSTALLATION OF A60 RATED FIRE INSULATION WORK AT SELIGI

ENQUEST July 18, 2018 Completed

Page 6: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

61. SUPPLY AND DELIVERY OF CABLES FOR SUMANDAK SELATAN INFILL PROJECT

PETRONAS CARIGALI

July 13, 2018 Completed

62. SUPPLY OF DISPOSABLE RESPIRATOR (REPEAT ORDER) MALAYSIAN

REFINING COMPANY July 13, 2018 Completed

63.

SUPPLY AND DELIVERY OF CABLE INSTRUMENTATION FOR HUC MODIFICATION AT D18MP-A FOR HOST TIE IN DE-BOTTLENECKING FOR D18 PHASE 2 PROJECT

PETRONAS CARIGALI

July 12, 2018 Completed

64. SUPPLY OF SWA CABLE TAI CREST

RESOURCES July 11, 2018 Completed

65. PROVISION OF SUPPLY INSTRUMENT CONTROL CABLE FOR TIONG-A ICP 2.0 PROJECT AT TIONG-A PLATFORM

PETRONAS CARIGALI

July 10, 2018 Completed

66. SUPPLY OF ELECTRODE FOR BOKOR-BETTY – BASE SCOPE PETRONAS CARIGALI

July 4, 2018 Completed

67. SUPPLY OF DISPOSABLE RESPIRATOR MALAYSIAN

REFINING COMPANY July 3, 2018 Completed

68. PROVISION OF MOXA DEVICES PRPC UTILITIES AND FACILITIES SDN BHD

(PENGERANG) July 2, 2018 Completed

69. PROVISION OF SUPPLY FIBRE OPTIC CABLE FOR TIONG-A ICP 2.0 PROJECT AT TIONG-A PLATFORM

PCSB June 26, 2018 Completed

70. SUPPLY OF ELECTRODE NC36L FOR BOKOR BETTY – BASE SCOPE PETRONAS CARIGALI

June 13, 2018 Completed

71. PASSIVE FIRE PROTECTION WORKS FOR ANJUNG BDEWC May 30, 2018 Completed

72. SUPPLY OF DRAKA CABLE PETRONAS CHEMICALS ETHYLENE

May 22, 2018 Completed

Page 7: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

73. SUPPLY OF HEAT BARRIER PANEL FOR AHU AND VSAT ANTENNA HEAT PROTECTION AT EAST BELUMUT PLATFORM

NEWFIELD May 17, 2018 Completed

74. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

(PENGERANG) May 15, 2018 Completed

75. SUPPLY & DELIVERY OF DRAKA CABLE FOR FSU NAUTICA MUAR (BENTARA) EPOMS April 27, 2018 Completed

76. SUPPLY OF SPARE PART FOR 2WAY CONTROL VALVE (KORVAL) PFLNG April 26, 2018 Completed

77. SUPPLY OF KOBE ELECTRODE FOR HESS PHRASE II HESS Apr 17, 2018 Completed

78. SUPPLY AND RENTAL OF ADDITIONAL DMR HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

(PENGERANG) May 15, 2018 Completed

79. PURCHASE ADOBE CREATIVE CLOUD PETRONAS GAS

BERHAD May 2, 2018 Completed

80. PROVISION FOR RENEWAL OF ANNUAL SUBSCRIPTION FOR AUTOCAD COMMERCIAL

PETRONAS TECHNICAL

SERVICES SDN BHD April 23, 2018 Completed

81. SUPPLY OF BREAKING LOAD TENSILE TEST FOR HELIDECK NETTING GK MALIKAI – COST PLUS

PETRA RESOURCES April 12, 2018 Completed

82. CONFIGURATION OF ADDITIONAL CHANNEL AND FREQUENCY FOR LEASING PORTABLE RADIOS

PRPC UTILITIES AND FACILITIES SDN BHD

(PENGERANG) April 11, 2018 Completed

83. PROVISION OF MAINTENANCE RENEWAL (SOLARWINDS AND VEEAM)

EXXONMOBIL EXPLORATION AND

PRODUCTION MALAYSIA INC.

April 11, 2018 Completed

84. SUPPLY OF ID CARD PRINTER FOR HSE SAPURA

EXPLORATION AND PRODUCTION

April 10, 2018 Completed

Page 8: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

85. SUPPLY OF KOBE ELECTRODE FOR HESS PHRASE II HESS April 10, 2018 Completed

86. PROVISION OF MAINTENANCE RENEWAL (PRIMAVERA P6 ENTERPRISE) PETRONAS TECHNICAL SERVICES

Mar 28, 2018 Completed

87. PROVISION OF LCV ACTUATOR AND PLC NETWORK PETROFAC (PM304-MALAYSIA) LIMITED

Mar 27, 2018 Completed

88. SUPPLY OF INSTRUMENT CABLE (REPEAT ORDER) AFS-887 – SATELLITES TURNAROUND (SATURN) PROJECT - GuF

EMEPMI Mar 23, 2018 Completed

89. PROVISION OF IT PERIPHERALS PETRONAS TECH

TRAINING Mar 19, 2018 Completed

90. SUPPLY OF HUMIDUR FP PAINTS TO QET BSP Mar 14, 2018 Completed

91.

SUPPLY MATERIALS AND APPLICATION FIRE PROOFING MATERIALS ON NEW LOADING PLATFORM STRICTURES FOR SPR 2 PROJECT FIRE PROOFING APPLICATION ON NEW JETTY PLATFORM STRUCTURES

BLNG Mar 7, 2018 In Progress

92. SUPPLY OF HUMIDUR PAINTS FOR UNIT 7200 LNG RUNDOWN LINE (GRE CLADDING) PAINTING WORK

BLNG Feb 26, 2018 Completed

93. PROVISION TO SUPPLY IT HARDWARE & CONSUMABLES HESS EXPLORATION

& PRODUCTION MALAYSIA B.V

Feb 21, 2018 Completed

94. PROVISION OF ADOBE SOFTWARE PETRONAS

CHEMICALS GROUP BERHAD

Feb 20, 2018 Completed

95. SUPPLY OF WELDING ELECTRODE FOR STRUCTURAL INSTALLATION FOR SSB PAN MALAYSIA 2018

SSB Feb 12, 2018 Completed

96. SUPPLY OF INSTRUMENT CABLE (REPEAT ORDER) GUNTONG PRODUCTION OPTIMIZATION - GuD

EMEPMI Feb 9, 2018 Completed

Page 9: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

97. SUPPLY OF HUMIDUR PAINTS - WESCO SHELL PHILIPPINES EXPLORATION B.V

Feb 5, 2018 Completed

98. PROVISION OF MOXA DEVICES PETRONAS GAS

BERHAD Jan 30, 2018 Completed

99. SUPPLY OF HEAT SHIELD PANEL FOR BLUE BRUSKER AT DUYONG LQ PETRONAS CARIGALI

Jan 24, 2018 Completed

100. PROVISION TO SUPPLY & DELIVER OF PIPELINE TAPE FOR PCSB-SBO PETRONAS

CARIGALI SDN BHD Jan 23, 2018 Completed

101. ASSAI CALL-OFF MAITENANCE AND SUPPORT SERVICES SAPURA

EXPLORATION & PRODUCTION

Jan 12, 2018 Completed

102.

PROVISION OF DESIGN, SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION FOR BOD HTI – PROVISION BUNGA PAKMA ACCOMODATION WORK BOAT GANGWAY PROJECT

REPSOL Dec 12, 2017 Completed

103. SUPPLY OF HUMIDUR PAINTS FOR U7200 TRESTLE STRUCTURE B/P ACTIVITIES BLNG Nov 29, 2017 Completed

104. SUPPLY OF HUMIDUR FP PAINTS TO MGC BSP Nov 17, 2017 Completed

105. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

(PENGERANG) Nov 11, 2017 Completed

106. FLARE TOWER PFP REINSTATEMENT FOR KIKEH MURPHY Sept 11, 2017 Completed

107. PROVISION OF PASSIVE FIRE PROTECTION FOR M1 TOPSIDE MAINTENANCE AND STRUCTURAL REPAIR

PETRONAS Aug 25,2017 Completed

108. SUPPLY OF PAINT-MANUFACTURER “ACOTEC & HUMIDUR” SHELL Aug 24, 2017 Completed

Page 10: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

109. PROVISION OF MOTOROLA PORTABLE RADIO AND ACCESSORIES PETRONAS

CARIGALI SND BHD Aug 24, 2017 Completed

110. PROVISION OF MOTOROLA ACCESSORIES OCEAN MIGHT SDN

BHD Aug 22, 2017 Completed

111. PROVISION OF MOTOROLA PORTABLE RADIO ACCESSORIES SAPURA

EXPLORATION AND PRODUCTION

Aug 14, 2017 Completed

112. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC – F06

SHELL Aug 9, 2017 Completed

113. SUPPLY OF MATERIALS AND SPARE PARTS FOR BERGADING-CPP FRESH WATER GENERATOR FOR NORTH MALAY BASIN FULL FIELD DEVELOPMENT

HESS Aug 7, 2017 In Progress

114. SUPPLY OF AVAYA PABX TELECOMMUNICATION HARDWARE AND ACCESSORIES

HESS Aug 4, 2017 Completed

115. PROVISION FOR MATLAB SOFTWARE MAINTENANCE SUPPORT FOR 2 YEARS HESS EXPLORATION

& PRODUCTION MALAYSIA B.V

Aug 3, 2017 Completed

116. PROVISION OF MOTOROLA ACCESSORIES REPSOL OIL AND

GAS MALAYSIA LTD July 24, 2017 Completed

117. PURCHASE OF IT PERIPHERALS

EXXONMOBIL EXPLORATION AND

PRODUCTION MALAYSIA INC.

July 19, 2017 Completed

118. RECTIFICATION OF MISALIGNED STEAM TURBINE PIPING ST 8100 AT ACRYLIC PLANT

BASF July 13, 2017 Completed

119.

PROVISION OF PASSIVE FIRE PROTECTION (PFP) COATING FOR BO-D RISER SPLASH ZONE SECTION FOR BUNGA PAKMA DEVELOPMENT PROJECT – REPSOL 2017

REPSOL July 10, 2017 Completed

120. HIRING OF DRY ICE BLASTING VENDOR FOR CARRYING OUT DI BLASTING AT BLNG-CSIP FOR TA 2017

BLNG June 24, 2017 Completed

Page 11: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

121. PROVISION OF TELWIN ENERGY 650 START BATTERIES SAPURA

EXPLORATION & PRODUCTION

June 22, 2017 Completed

122. PROVISION FOR DESIGN, FABRICATE, SUPPLY AND INSTALLATION ASSISTANCE/SUPERVISION FOR HEAT SHIELD FOR SAPAWI PROJECT

MURPHY June 21, 2017 Completed

123. PROVISION OF HAYAMIM AVA ELECTRONIC WHITEBOARD AND ACCESSORIES HESS EXPLORATION

& PRODUCTION MALAYSIA B.V

June 1, 2017 Completed

124. PURCHASE OF IT PERIPHERALS PETRONAS DAGANGAN BERHAD

May 22, 2017 Completed

125. PURCHASE OF IT PERIPHERALS PETRONAS PENAPISAN (MELAKA)

May 8, 2017 Completed

126. PROVISION OF PASSIVE FIRE PROTECTION SUBCONTRACTING WORK BDEWC Apr 21, 2017 Completed

127. PROVISION OF MAINTENANCE RENEWAL OF SECURITY SYSTEM (FIREWALL-CYBEROAM)

SAPURA EXPLORATION &

PRODUCTION Apr 20, 2017 Completed

128. PURCHASE OF IT PERIPHERALS SAPURA

EXPLORATION & PRODUCTION

Apr 14, 2017 Completed

129. SUPPLY AND DELIVERY OF PRINTER EPOMS Apr 5, 2017 Completed

130. SUPPLY AND DLEIVERY SAMSUNG MOBILE SMARTPHONES EPOMS Mar 15, 2017 Completed

131. PROVISIONAL OF SUPERVISION, LABOUR SUPPLY, RENTAL OF MACHINERY AND SCAFFOLDING FOR INSULATION WORK AT LEMONGRASS PROJECT

BASF Mar 3, 2017 Completed

132. JUNIPER NETWORK SUPPORT

EXXONMOBIL EXPLORATION AND

PRODUCTION MALAYSIA INC.

Feb 22, 2017 Completed

Page 12: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

133. FIRE PROOFING REPAIR FOR U-7420 c/w ALL MATERIALS EQUIPMENT & MANPOWER FOR U-7420

BLNG Jan 25, 2017 Completed

134. PURCHASE OF TELECON/NETWORK EXXONMOBIL Dec 14, 2016 Completed

135. PROVISION TO SUPPLY IT HARDWARE & CONSUMABLES HESS Nov 25, 2016 Completed

136. RECTIFICATION OF MISALIGNMENT STEAM TURBINE PIPE STAGE 1 BASF Nov 11, 2016 Completed

137. PURCHASE OF COMPUTER EQUIPMENT EXXONMOBIL Nov 1, 2016 Completed

138. SUPPLY AND DELIVERY OF SAMSUNG MOBILE SMARTPHONES PETRONAS TECHNICAL

TRAINING SDN BHD Oct 28, 2016 Completed

139. SUPPLY OF RIBBON ZEBRA

PETRONAS CHEMICAL

DERIVATIVES SDN BHD

Oct 25, 2016 Completed

140. SUPPLY OF RIBBON ZEBRA

PETRONAS CHEMICAL

DERIVATIVES SDN BHD

Oct 24, 2016 Completed

141. PASSIVE FIRE PROTECTION WORK FOR SK310 B15 DEVELOPMENT PETRONAS CARIGALI

Sept 28, 2016 Completed

142. PROVISION VSAT SERVICES SAPURAKENCANA SK GEOTECHNICS

Aug 22, 2016 In Progress

143. SUPPLY OF KOBE ELECTRODE FOR SK310 B15 DEVELOPMENT - TOPSIDE PETRONAS CARIGALI

Aug 16, 2016 Completed

144. PASSIVE FIRE PROTECTION WORKS FOR BNJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT

PETRONAS CARIGALI

June 8, 2016 Completed

Page 13: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

145. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC – WORKSCOPING AT E11, F23, F13 AND F06

SHELL May 18, 2016 Completed

146. CONTRACT NO: UI50960 - SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC

SHELL Apr 1, 2016 Completed

147. PROVISION OF VIV STRAKES FOR MALIKAI’S PIPELINE SHELL Mar 16, 2016 Completed

148. PROVISION OF VSAT COMMUNICATION SERVICES & WIRELESS RADIO SERVICES FOR KBM CLUSTER FIELD DEVELOPMENT

COASTAL ENERGY Jan 28, 2016 In Progress

149.

PROVISION OF NAVAL ARCHITECTURE AND MARINE ENGINEERING FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BOKOR PHASE 3A PROJECT

PETRONAS CARIGALI Nov 2, 2015 Completed

150. PASSIVE FIRE PROTECTION WORKS FOR TTJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT

PETRONAS CARIGALI Oct 23, 2015 Completed

151. PROVISION OF 14” PIPELINE RISER COMPACT FLANGE INSPECTION AND TESTING WORKS FOR KPOC – RM 500,000

KPOC Sept 18, 2015 Completed

152. PROVISION OF FJC SERVICES FOR SHELL MALIKAI PACK B – USD 700,000 SHELL Sept 10, 2015 Completed

153. PASSIVE FIRE PROTECTION WORKS FOR EPCIC OF REMOTE WHPS FOR FULL FIELD DEVELOPMENT, NORTH MALAY BASIN PROJECT

HESS Sept 8, 2015 Completed

154. PROVISION OF VSAT COMMUNICATION SERVICES FOR SKE’S DRILLING RIG SAPURAKENCANA

ENERGY Sept 1, 2015 Completed

155. PROVISION OF NAVAL ARCHITECTURE SERVICES FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BARAM HELIDECK PROJECT

PETRONAS CARIGALI

Sept 1, 2015 Completed

156.

PROVISION AND SUPPLY OF HDPF WITH SEA SLEEVE & INTRAFUSE FOR PROCUREMENT CONSTRUCTION & COMMISSIONING (PCC) OF REGASTIFICATION TERMINAL 2 PIPELINE PROJECT – USD 35,000

CPM GROUP July 28, 2015 Completed

Page 14: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

157. SUPPLY OF STRAKES AND BENDS FOR SHELL GUMUSUT PHASE 2 SHELL July 6, 2015 Completed

158. SUPPLY OF STRAKES AND STRAPS FOR SHELL GUMUSUT PHASE 2 SHELL June 16, 2015 Completed

159. SUPPLY OF PIPELINE FIELD JOINT ANTI-CORROSION COATING SYSTEM FOR BESAR PIPELINE INSTALLATION – PCSB YEAR 2015

PETRONAS CARIGALI May 12, 2015 Completed

160. TO SUPPLY AND DELIVER CORROSION INHIBITOR TOTE TANK (TTJT-A) FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORMS (WHP)

PETRONAS CARIGALI May 6, 2015 Completed

161. TO SUPPLY AND DELIVER WASH WATER STORAGE TANK FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORM

PETRONAS CARIGALI April 29, 2015 Completed

162. PASSIVE FIRE PROTECTION WORKS FOR PCC OF BESAR-A WHP TOPSIDE PETRONAS CARIGALI April 24, 2015 Completed

163. PROVISION OF VSAT COMMUNICATION SERVICES TOTAL E&P MALAYSIA

Oct 1, 2014 Completed

164. PROVISION OF WASTE DISPOSAL MANAGEMENT FOR BINTULU OPERATIONS BC PETROLEUM SDN

BHD Oct 1, 2014 Completed

165. VSAT SATELITE TELECOMMUNICATION SYSTEM AND SERVICES FOR BOKOR PHASE 3A

SCHLUMBERGER Sept 29, 2014 Completed

166. TO SUPPLY AND DELIVER ATMOSPHERIC TANKS FOR EPCIC OF LAYANG DEVELOPMENT FACILITIES

JX NIPPON Sept 17, 2014 Completed

167. SUPPLY OF SERVIWRAP PETRONAS CARIGALI

Aug 8, 2014 Completed

168. PROVISION OF PASSIVE FIRE PROTECTION FOR WELLHEAD PLATFORM BLOCK PM 307 BERTAM FILED DEVELOPMENT

LUNDIN PETROLEUM July 16, 2014 Completed

169. PROVISION OF COMMUNICATION & ASTRO SERVICE SYSTEM FOR EPV PETRONAS CARIGALI

July 7, 2014 Completed

Page 15: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

170. ELECTRODE (KOBELCO) FOR WHEATSTONE PROJECT LNG PLANT – MODULE FABRICATION ISBL

SAPURAKENCANA July 3, 2014 Completed

171. SUPPLY AND DELIVERY OF CABLES & ACCESSORIES FOR HUC FOR CENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM304

KENCANA PETROLEUM

May 28, 2014 Completed

172. VSAT SERVICES FOR TALISMAN MALAYSIA’S OFFSHORE PRODUCTION PLATFORMS

TALISMAN MALAYSIA

May 1, 2014 In Progress

173. PROVISION OF 3RD PARTY SERVICES FOR PASSIVE FIRE PROTECTION AT FIREWALL EAST BELUMUT PLATFORM

MMC OIL & GAS April 30, 2014 Completed

174. DISPOSAL OF SCRAP METAL ITEMS DUE TO MAINTENANCE, DAMAGE METTALIC PARTS, USED SPARE PARTS, OBSOLETE AND EXPIRED MATERIAL

PETRONAS PENAPISAN

(MELAKA) SDN BHD April 21, 2014 Completed

175.

FABRICATION WORKS, SUPPLY OF MATERIAL, EQUIPMENT & MANPOWER AND DELIVERY OF PERMANENT FLANGE PROTECTOR & STUDBOLT FOR SSB PROJECT

TL OFFSHORE SDN BHD

April 16, 2014 Completed

176. PROVISION OF FIXED VSAT SERVICES FOR UMW NAGA JACK-UP RIGS FOR UMW OFFSHORE DRILLING SDN BHD

UMW OFFSHORE DRILLING

April 1, 2014 In Progress

177. PROVISION OF VSAT SYSTEM SERVICES FOR EVA-NMB GAS PIPELINE INSTALLATION

GOM RESOURCES SDN BHD

April 1, 2014 Completed

178. M03PQ-A V-3030 AND 3040 STRUCTURE FRAMING PFP COATING REPAIR (OPTION NO.1)

SHELL February 12, 2014 Completed

179. PROVISION OF FIXED VSAT SERVICES FOR COASTAL ENERGY’S MOBILE PRODUCTION UNIT, THE EP5 AND EP6

COASTAL ENERGY January 1, 2014 In Progress

180. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM FOR MAIN WORK BARGES / VESSELS 2014 – 2016 – TL OFFSHORE SDN BHD

TL OFFSHORE January 1, 2014 In Progress

181. M03PQ-A VESSEL V-6210 PFP COATING SHELL December 27, 2013 Completed

182. PASSIVE FIRE PROTECTION SYSTEM ON DIESEL STORAGE TANK COLUMN T-S16270 AT KIKEH UNITL SCOPE COMPLETE

MURPHY November 28, 2013 Completed

Page 16: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

183.

SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG C STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

EMEPMI November 13, 2013 Completed

184.

SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG B STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

EMEPMI November 13, 2013 Completed

185.

SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR TABU A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

EMEPMI October 28, 2013 Completed

186.

SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR PALAS A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

EMEPMI October 28, 2013 Completed

187.

SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

EMEPMI October 25, 2013 Completed

188. PROVISION FOR REMOVAL AND INSTALLATION OF EPOXY-TYPE PASSIVE FIRE PROTECTION FOR HELANG INTEGRATED PLATFORM (HIP)

MMC OIL & GAS October 22, 2013 Completed

189. MODIFICATION AND FABRICATION OF NEW GRILLAGES / SKID RADOIL ONSHORE SUPPORT SYSTEM FOR J-LAY TOWER - SASB

SAPURA ACERGY SDN BHD

September 12, 2013 Completed

190. PROVISION OF FIREWALL UPGRADE (PFP COATING) FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM

EMEPMI September 6, 2013 Completed

191. PROVISION OF FIELD JOINT COATING SERVICES FOR EVA PROJECT 2013 HESS August 10, 2013 Completed

192. PROVISION OF FIXED VSAT SERVICES FOR ATWOOD MANTA AND COASTAL ENERGY

ATWOOD August, 2013 Completed

193. SUBCONTRACT WORKS FOR PASSIVE FIRE PROTECTION WORKS FOR DAMAR-A PLATFORM

EMEPMI July 29, 2013 Completed

194. PROVISION OF FIELD JOINT COATING SERVICES FOR TUKAU PROJECT 2013 HESS July 18, 2013 Completed

Page 17: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

195. PROVISION OF VSAT SERVICES FOR BUMI ARMADA AT-300 VESSEL BUMI ARMADA June, 2013 Completed

196. PROVISION OF STABILIZED VSAT SERVICES FOR PERISAI PETROLEUM ON THE PERISAI KAMELIA

PERISAI PETROLEUM June, 2013 Completed

197. SUPPLY AND DELIVER OF SLIDING PLATE FOR FABRICATION OF KBB TOPSIDES (BOAQ) - MMHE

KPOC May 23, 2013 Completed

198. PROVISION OF PASSIVE FIRE PROTECTION FOR SHELL D12 & LAILA FIELD DEVELOPMENT - THHE

SARAWAK SHELL BERHAD

May 9, 2013 Completed

199. PROVISION OF SUPPLY & SERVICE OF HBE COATING APPLICATION FOR 16” X 22KM DAMAR-A TO LAWIT-A CRA PIPELINE – TL OFFSHORE SDN BHD

EMEPMI May 2, 2013 Completed

200.

PROVISION OF RISER CLAMP & FLANGE PROTECTOR FOR 16” X 52KM GAS EXPORT PIPELINE FROM PLEM & LAWIT A PLATFORM – GOM RESOURCES SDN BHD

HESS EXPLORATION & PRODUCTION MALAYSIA B.V

April 29, 2013 Completed

201. PROVISION OF HEAT SHIELD FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM – SHAPADU ENERGY & ENGINEERING

EMEPMI April 2013 Completed

202. SUPPLY AND INSTALLATION OF HEAT SHIELD FOR KINABALU KNPG-B - MMHE PETRONAS

CARIGALI SDN BHD April 2013 Completed

203. OFFSHORE CARRY OVER WORKS FOR PIPING OF TAPIS-Q TOPSIDES - MMHE EMEPMI April 2013 Completed

204.

PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS B WI HTI PIPE SUPPOR TSTOP (AFS003B) – SHAPADU ENERGY & ENGINEERING SDN BHD

EMEPMI April 2013 Completed

205.

PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS C PLATFORM TOPSIDE (EXCLUDE LER) - SHAPADU ENERGY & ENGINEERING SDN BHD

EMEPMI April 2013 Completed

206.

PROVISION OF FABRICATION AND DELIVERY OF 16” SE-PA RISER LOAD BEARING CLAMP AND SLIDING CLAMP FOR MOC YEAR 2013 PIPELINES INSTALLATION - SAPURA KENCANA PETROLEUM C/O TL OFFSHORE SDN BHD

MURPHY SARAWAK OIL. CO. LTD

April 2013 Completed

207.

SUPPLY AND DELIVER OF CEILING FINISHES - SUSPENDED CEILING SYSTEM SOUTH ACIS OIL & GAS DEVELOPMENT PROJECT (REPEAT ORDER) - BROOKE DOCKYARD & ENGINEERING WORKS CORPORATION

BROOKE DOCKYARD & ENGINEERING

WORKS CORPORATION

March 18, 2013 Completed

Page 18: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

208.

ENGINEERING,SUPPLY OF MATERIAL, MANUFACTURING, FABRICATION, INSTALLATION AND MODIFICATION OF FIBERGLASS GRATINGS, STAIRTREADS AND GRE HANDRAILS FOR DAMAR A SUBSTRUCTURE PROJECT – MMHE

EMEPMI March 13, 2013 Completed

209. PROVISION OF 3LPE FIELD JOINT COATING ON 12” & 10” LINEPIPE SERVICES FOR SIAKAP NORTH PETAI (SNP) DEVELOPMENT PROJECT

MURPHY SNP March 11, 2013 Completed

210. PROVISION OF FIELD JOINT COATING SERVICES FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE

EMEPMI March 8, 2013 Completed

211.

SUPPLY & DELIVERY OF FIELD JOINT ANTI CORROSION COATING SYSTEM HEAT SHRINK SLEEVE (RAYCHEM WPC100) FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE

EMEPMI March 8, 2013 Completed

212. PROVISION OF PIPELINE FIELD JOINT INFILL MATERIAL FOR TAPIS EOR & DAMAR GAS DEVELOPMENT PROJECT Y2013

EMEPMI March 7, 2013 Completed

213. PROVISION OF FIRE PROTECTION (PFP) AND INSULATION WORK FOR WEST DESARU TOPSIDES - THHE FABRICATORS SDN BHD

AQUATERRA ENERGY LIMITED

March 7, 2013 Completed

214. M03 DAMAGED FPF COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed

215. M01 DAMAGED PFP COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed

216.

PROVISION OF SUPPLY AND DELIVERY OF MONEL WELDING INTEGRATED TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR EARLY PRODUCTION SCHEME (EPS), INTEGRATED GAS DEVELOPMENT (IGD) PROJECT, NORTH MALAY BASIN (NMB) FIELD – GOM RESOURCES SDN BHD

HESS EXPLORATION & PRODUCTION

MSIA B.V. March 2013 Completed

217. PROVISION OF FIELD JOINT COATING SERVICES FOR HESS 2013 PROJECT – GOM RESOURCES

HESS February 26, 2013 Completed

218. PROVISION TO SUPPLY AND DELIVER CRUDE OIL WASHING MACHINE (COW MACHINE) SUPPLY FOR BERANTAI OPERATION - PETROFAC

PETRONAS January 29, 2013 Completed

219. SUBCONTRACTOR FOR PASSIVE FIRE PROTECTION WORKS FOR KBB TOPSIDES - MMHE

KPOC January 21, 2013 Completed

Page 19: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

220. ARCHITECTURAL INSULATION PACKAGE SUPPLY OF M90 FIRETEX FOR GREATER EKOFISK AREA 2/4 - SMOE

CONOCO PHILIPS January 15, 2013 Completed

221.

PROVISION OF 3RD CAMPAIGN SEA-FASTENING WORKS OF J-LAY AND PES TOWER ON BOARD SAPURA 3000 – SAPURA ACERGY SDN BHD

SHELL January 11, 2013 Completed

222.

PROVISION OF SUPPLY AND DELIVERY OF CEILING FINISHES – SUSPENDED CEILING FOR SOUTH ACIS PROJECT – BROOKE DOCKYARD AND ENGINEERING WORKS.

MURPHY January 10, 2013 Completed

223. DESIGN, FABRICATION & DELIVERY OF FIREWALL FOR DAMAR-A TOPSIDE MMHE

EMEPMI January 08, 2013 Completed

224. SUPPLY OF PAINT EMEPMI December 27, 2012 Completed

225.

E & I WORKS-FABRICATION AND INSTALLATION FOR F14DR-A TOPSIDES & F14/F29 PROCESS MODULE – MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

SHELL December 17, 2012 Completed

226. STRUCTURE WORKS FOR DAMAR-A PLATFORM (TOPSIDE) - MMHE EMEPMI November 12, 2012 Completed

227. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

KPOC October 18, 2012 Completed

228.

SUPPLY, DELIVERY, AND INSTALLATION SUPERVISION OF COMPOSITE MATERIALS (FIBERGLASS) & ACCESSORIES FOR WAVE ZONE GRATING FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM, EMEPMI EPCM BROWNFIELD PROJECT.

EMEPMI October 5, 2012 Completed

229. SUPPLY AND DELIVER OF OFFICE EQUIPMENT (HS1146630X FIRE FIGHTING SUIT) HS1146630X FIRE FIGHTING SUIT

UNIVERSITI TELNOLOGI

PETRONAS, TRONOH PERAK

October 2012 Completed

230.

SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (BOAQ)(5.12M002B) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

KPOC September 24, 2012 Completed

Page 20: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

231. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

KPOC September 24, 2012 Completed

232.

PROVISION OF FABRICATION 18” AND 12” FLEXIJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 13, 2012 Completed

233.

PROVISION OF FABRICATION 8” AND 10” STRESSJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 12, 2012 Completed

234. PROVISION OF FIELD JOINT COATING SERVICES FOR 8" AND 10" MALIKAI PIPELINE – GOM RESOURCES

SHELL September 11, 2012 Completed

235.

PROVISION OF FABRICATE AND SUPPLY OF WS2 UPPER MAST ELEMENT 2 LIFTING PAD EYE FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 5, 2012 Completed

236.

PROVISION OF FABRICATE AND SUPPLY OF NEW 18” ESCALATOR TROLLEY INSERTS, ACCESS TO HPU BOOST PUMPS, WS2 LOWER MAST ELEMENT 2, WS2 HINGE HATCH COVER, WS1 RAIN PROTECTION IMPROVEMENT FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 5, 2012 Completed

237. PROVISION OF STABILIZED VSAT SATELLITE COMMUNICATIONS FOR SAPURAACERGY ON THE SAPURA3000

SAPURAACERGY September, 2012 Completed

238. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL August 30, 2012 Completed

239. PROVISION OF DISPOSAL OF DAMAGED KOSMO, IVECO AND MAN BUSES AND ITS COMPONENTS – SYARIKAT PRASANA NEGARA BERHAD

SPNB August 29, 2012 Completed

240. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TAPIS Q TOPSIDE – MMHE SDN BHD

EMEPMI August 28, 2012 Completed

241. SUPPLY AND DELIVERY OF HSS (WPC100M) FOR MALIKAI PIPELINE – GOM RESOURCES

SHELL August 18, 2012 Completed

242. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TELOK A TOPSIDES – MMHE SDN BHD

EMEPMI August 9, 2012 Completed

Page 21: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

243. PROVISION OF VSAT SERVICES IN GULF OF MEXICO – SAPURA ACERGY SDN BHD

SAPURA ACERGY August 9, 2012 Completed

244.

PROVISION OF FIELD JOINT COATING SERVICES AND SUPPLY OF ANTICORROSSION TAPE (SERVIWRAP M30B) FOR 6" X 7.6KM BEKOK-A TO TIONG-A PIPELINE INSTALLATION – GOM RESOURCES

PETRONAS August 2, 2012 Completed

245. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S TABU A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY

EMEPMI July 31, 2012 Completed

246. SUPPLY AND DELIVER OF HEAVY DUTY ANTI SLIP STEP COVER – TALISMAN MALAYSIA LIMITED

TALISMAN July 12, 2012 Completed

247. PROVISION OF TELECOMMUNICATION SYSTEM FOR TOISA PALADIN – FUGRO GEODETIC (M) SDN BHD

FUGRO GEODETIC July 12, 2012 Completed

248. FABRICATION AND INSTALLATION OF STRUCTURE WORKS FOR PACKAGE 1, DECK NORTH AND MISC FOR TAPIR R TOPSIDES PROJECT - MMHE SDN BHD

EMEPMI July 10, 2012 Completed

249.

SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) AND PACKAGE B: B-193 A-P FOR (PGC & AGRU) – SIME DARBY ENGINEERING SDN BHD

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) July 07, 2012 Completed

250.

SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) – SIME DARBY ENGINEERING SDN BHD

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) July 04, 2012 Completed

251. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S PALAS A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY

EMEPMI July 04, 2012 Completed

252. SUPPLY AND DELIVER OFSLIDING PLATE FOR FABRICATION ON KBB TOPSIDES (BOAQ) - MMHE

KPOC July 02, 2012 Completed

253.

TO SUPPLY MATERIALS, EQUIPMENT, CONSUMABLES, TOOLS AND MANPOWER FOR COOLING MANIFOLD RELOCATION FOR GUMUSUT KAKAP, J LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL June 12, 2012 Completed

254. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF VESSEL DLB264 – GOM RESOURCES

GOM RESOURCES June 11, 2012 Completed

255. PROVISION OF PULLING & REMOVE CABLE FOR LNGC SERI ALAM – MMHE SDN. BHD.

MISC May 21, 2012 Completed

Page 22: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

256. SUPPLY, FABRICATE AND DELIVERY SEA FASTENING FOR CARGO BARGE FOR LAN DO DEVELOPMENT PROJECT – SAPURA ACERGY SDN BHD

TNK VIETNAM BV May 17, 2012 Completed

257.

PROVISION OF FIELD JOINT COATING SERVICES FOR MOC TRANSPORTATION AND INSTALLATION OF OFFSHORE PIPELINES AND FACILITIES FOR YEAR 2012 – TL OFFSHORE SDN BHD

MURPHY OIL May 9, 2012 Completed

258. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT PM318-PUTERI FWS PIPELINE REPLACEMENT PROJECT - NEWFIELD

NEWFIELD April 9, 2012 Completed

259. PROVISION OF VSAT TELECOMMUNICATION AND SERVICES FOR PETRONAS CARIGALI SDN BHD – IPERINTIS SDN BHD

IPERINTIS April 6, 2012 Completed

260. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - SCHLUMBERGER GROUP

SCHLUMBERGER April 4, 2012 Completed

261. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - HALLIBURTON ENERGY SERVICES (M) SDN BHD

HALLIBURTON April 4, 2012 Completed

262. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF HEAVY LIFT PIPE LAY VESSEL LTS3000

L & T SAPURA April 1, 2012 Completed

263. DESIGN, FABRICATION AND DELIVERY OF FIREWALL FOR TELOK A & B PROJECT – MMHE SDN BHD

SHELL March 23, 2012 Completed

264. COMMISSIONING OF STABILISED VSAT SERVICES AND VPN ONBOARD MV. WANGSAMAJU – OCEANTECH GEOMATICS

OCEANTECH GEOMATIC

March 14, 2012 Completed

265.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION TAPE (SERVIWRAP M30B) FOR KEBABANGAN DEVELOPMENT PROJECT – GLOBAL OFFSHORE MALAYSIA

KPOC March 13, 2012 Completed

266.

SUPPLY AND DELIVERY OF HANGER FLANGE, RISER GUARD AND RISER CLAMP FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR PETRONAS CARIGALI SKO PIPELINE REJUVENATION PROJECT. – CARIMIN ENGINEERING SERVICES

PETRONAS March 12, 2012 Completed

267. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL March 5, 2012 Completed

268.

SUPPLY AND DELIVERY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR TCOT PWSU TAIL END & REMEDIAL WORK FOR EMEPMI EPCM BROWNFIELD PROJECT – PERUNDING RANHILL WORLEY

EMEPMI March 1, 2012 Completed

Page 23: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

269. PROVISION OF FIELD JOINT COATING FOR SOGT PROJECT – ALAM SWIBER PETRONAS February 27, 2012 Completed

270.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF HSS (RAYCHEM WPC100M) FOR EMEMPI’S TAPIS EOR REJUVENATION AND TELOK DEVELOMENT PROJECT. – TL OFFSHORE SDN BHD

EMEPMI February 24, 2012 Completed

271. DESIGN, ENGINEERING, AND DELIVERY OF FAIRINGS & THRUST COLLARS FOR DRILLING RISERS – SONGA OFFSHORE

PETRONAS February 22, 2012 Completed

272. PROVIDING STABILISED VSAT SYSTEM FOR SEMI-SUBMERSIBLE RIG, OCEANROVER FOR DEEPWATER PROJECT, KIKEH – DIAMOND OFFSHORE

MURPHY OIL February 14, 2012 Completed

273. PROVISION OF VSAT SYSTEM AND PROVIDING VPN RENTAL SERVICES FOR DLB264 – GLOBAL OFFSHORE MALAYSIA

GLOBAL OFFSHORE February 09, 2012 Completed

274. PIPELINE AND SPOOLS FIELD JOINT COATING SERVICES FOR LAN DO DEVELOPMENT PROJECT VIETNAM – SAPURA ACERGY SDN BHD

TNK VIETNAM BV January 20, 2012 Completed

275.

PROVISION FOR DETAILED DESIGN ENGINEERING SERVICES FOR PACKAGE THIRD PARTY VERIFICATION OF GUE H RATED FIREWALL TO WITH STAND 30-MINUTES JET FIRE FOR TELOK GAS DEVELOPMENT PROJECT – PERUNDING RANHILL WORLEY SDN BHD

EMEPMI December 29, 2011 Completed

276. PROVISION OF INSTALLATION AND MAINTENANCE OF VPN INTERNET SERVICES – ASIAN SUPPLY BASE SDN BHD

ASIAN SUPPLY BINTULU

December 21, 2011 Completed

277. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT M01 AND E11 FOR TI-FIX AND IR PROJECT - SHELL

SHELL December 21, 2011 Completed

278. SUPPLY MANPOWER, EQUIPMENTS AND MATERIALS FOR PM329 EAST PIATU TOPSIDES – KENCANA HL SDN BHD

NEWFIELD December 1, 2011 Completed

279. E & I FABRICATION, INSTALLATION, TESTING, PRE-COMMISSIONING WORK, FOR TAPIS EOR PROJECT (PACKAGE B AND PACKAGE C) – MMHE SDN BHD

EMEPMI December, 2011 Completed

280. PIPING FABRICATION AND INSTALLATION FOR TAPIS Q LIVING QUARTERS – MMHE SDN BHD

EMEPMI November, 2011 Completed

281. SUPPLY OF H120 FIRE/BLAST WALL FOR KEBABANGAN TOPSIDES – SIME DARBY ENGINEERING SDN BHD

KPOC November 25, 2011 Completed

282. PROVISION OF FIELD JOINT COATING FOR BCOT PROJECT – ALAM SWIBER PETRONAS October 10, 2011 Completed

Page 24: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

283.

PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION CASTING FOR SDV ON BUNGA RAYA-B – APEX ENERGY SDN. BHD.

TALISMAN September 27, 2011 Completed

284.

PROVISION OF PASSIVE FIRE PROTECTION (PFP) SERVICES FOR PCC OF TOPSIDES AND PIPELINE FOR PM318 PUTERI PIPELINE RESTORATION PROJECT – KENCANA HL SDN BHD

NEWFIELD September 15, 2011 Completed

285.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIAL (SERVIWRAP) FOR 14” AND 24” EXPORT PIPELINE SHORE APPROACH INSTALLATION FOR KEBABANGAN NORTHERN HUB DEVELOPMENT – PBJV GROUP SDN BHD

PETRONAS CARIGALI SDN BHD

September 15, 2011 Completed

286.

PROVISION OF PASSIVE FIRE PROTECTION (PFP), TOOLS/ EQUIPMENT & MATERIALS TO REMOVE THE DEGRADED PFP & APPLICATION OF NEW PFP AT M3PQ-A LIVING QUARTER WEST WALL – SARKU ENGINEERING SERVICES SDN. BHD.

SHELL September 15, 2011 Completed

287.

PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR HELANG TOPSIDES (E-9550 & E-9650) – MONT TRINITY

NIPPON OIL September 12, 2011 Completed

288.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR INTRAGRATED TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES (TIONG A) PROJECT – GLOBAL OFFSHORE MALAYSIA SDN BHD

NEWFIELD August 17, 2011 Completed

289. PROVISION OF REMOVAL, REPAIR & REINSTATEMENT OF BLASTWALL ON M3P-Q PLATFORM – DAYANG ENTERPRISE & SSB

SHELL August 5, 2011 Completed

290.

DESIGN, MANUFACTURE AND SUPPLY OF VIV SUSPRESSION STRAKES FOR BLOCK 06.1 PHASE III PROJECT – LAN DO DEVELOPMENT PROJECT – RANHILL WORLEYPARSONS SDN BHD

BP EXPLORATION OPERATING CO. LTD

August 3, 2011 Completed

291.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR SKO PIPELINE REPLACEMENT PROJECT – TARGET ENERGY CO. (M) SDN. BHD.

PETRONAS CARIGALI SDN BHD

July 25, 2011 Completed

Page 25: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

292.

FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH) TAPIS-R DECK (SOUTH), TAPIS-R LIVING QUARTERS & BRIDGES SKID BEAM AND TAPIS-Q DECK – MMHE SDN. BHD.

EMEPMI July 15, 2011 Completed

293. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH), TAPIS-Q DECK, MISCELLANEOUS WORKS TAPIS-Q – MMHE SDN. BHD.

EMEPMI July 3, 2011 Completed

294. SUPPLY, DELIVERY AND INSTALLATION OF STRAKES FOR GUMUSUT KAKAP JUMPERS - FMC

SHELL June 17,2011 Completed

295. PROVISION OF PIPELINE FIELD JOINT COATING WORKS FOR THE FABRICATION SERVICES OF FLOWLINE JUMPER – LABUAN SHIPYARD

SAPURA ACERGY/ SHELL

April 14, 2011 Completed

296.

PROVISION OF PIPELINE INFIELD FIELD JOINT COATING FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD

PETRONAS CARIGALI SDN BHD

April 12, 2011 Completed

297.

PROVISION OF PIPELINE ANTI CORROSION MATERIAL (SERVIWRAP) FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD

PETRONAS CARIGALI SDN BHD

March 31, 2011 Completed

298. PROVISION OF FIELD JOINT COATING SERVICES FOR F28DR-A/F6K-A PIPELINE PROJECT – TL OFFSHORE SDN BHD

SHELL March 18, 2011 Completed

299.

FABRICATION AND INSTALLATION OF STRUCTURAL WORKS FOR TOPSIDES A-Q COMPRISING PART OF SURVEY, DESIGN, ENGINEERING, PROCUREMENT, FABRICATION, LOAD OUT, TIE-DOWN/SEAFASTENING, TRANSPORTATION, INSTALLATION, HOOK-UP, TESTING, COMMISSIONING (EPCIC) OF PROCESS PLATFORM FOR B-193 PROJECT – SIME DARBY ENGINEERING

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) February 25, 2011 Completed

300. PROVISION OF PIPELINE MATERIALS WITH SEA SLEEVES C/W EQUIPMENT FOR NEWFIELD’S EAST PIATU INSTALLATION – TL OFFSHORE SDN BHD

NEWFIELD February 24, 2011 Completed

301. PROVISION OF PASSIVE FIRE PROTECTION SERVICES) FOR NEWFIELD'S EAST PIATU'S JACKET & TOPSIDES - KENCANA HL

NEWFIELD February 11, 2011 Completed

302. PROVISION OF FIELD JOINT COATING AND INFILL MATERIALS FOR PUTERI PIPELINE RESTORATION PROJECT – TL OFFSHORE SDN BHD

NEWFIELD February 11, 2011 Completed

303.

PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR CAKERWALLA OFFSHORE - SHAPADU ENERGY & ENGINEERING SDN BHD

CARIGALI HESS February 1, 2011 Completed

Page 26: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

304.

PROVISION OF FIELD JOINT COATING, SUPPLY AND INSTALLATION OF CANUSA GTS-PP WRAPID SLEEVE FOR CILIPADI PIPELINE PROJECT – TL OFFSHORE SDN BHD

SHELL January 17, 2011 Completed

305. REPAIR WORKS OF BLASTWALL AND FIREWALL FOR MODULE 3 KUMANG TOPSIDE - OFFSHORE WORKS

PETRONAS CARIGALI SDN BHD

December 13, 2010 Completed

306.

DESIGN, CONSTRUCT, SUPPLY AND DELIVERY OF NOISE ATTENUATORS AND EXPANSION SPOOLS FOR F13 PROCESSING MODULE GLYCOL REBOILER SKID AT E11P-B PLATFORM

SARAWAK SHELL BERHAD

November 24, 2010 Completed

307.

FABRICATION AND INSTALLATION OF THE MOORING PORCHES, CHAIN JACK GANTRIES AND ASSOCIATED PLATFORMS, AND INSTALLATION OF FAIRLEAD FOUNDATIONS FOR GUMUSUT KAKAP FPS HULL (36010863) AT MALAYSIA MARINE AND HEAVY ENGINEERING

SHELL / MISC November 12, 2010 Completed

308. SUBCONTRACT FOR STRUCTURAL WORKS FOR PROCESS PLATFORM FOR B -193 PROJECT AT SIME DARBY ENGINEERING

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) October 22, 2010 Completed

309. DESIGN, FABRICATE AND SUPPLY FIRE RATED ROLLER SHUTTER FOR KINABALU NAG DEVELOPMENT PROJECT (KNPG-B) - MMHE

PETRONAS CARIGALI SDN BHD

October 21, 2010 Completed

310. SUPPLY AND DELIVERY OF SAFETY EQUIPMENTS FOR SAMARANG (PHASE 1 – ACCELERATED DRILLING) DEVELOPMENT PROJECT – KENCANA PETROLUEM

PETRONAS CARIGALI SDN BHD

October 6, 2010 Completed

311. PROVISION OF BR-B REPLACEMENT – RISER PIPE, CLAMP AND I-TUBE – FIELD JOINT COATING

TALISMAN September 20, 2010 Completed

312. DESIGN, FABRICATE AND SUPPLY OF BLASTWALL FOR LIVING QUARTERS FOR JACKETS OF PM329 EAST PIATU DEVELOPMENT PROJECT – KENCANA HL

NEWFIELD September 17, 2010 Completed

313.

PROVISION OF PIPELINE FIELD JOINT COATING SERVICES AND INFILL MATERIALS FOR PETRONAS CARIGALI’S SKO PIPELINE PROJECT – TL OFFSHORE

PETRONAS CARIGALI SDN BHD

September 7, 2010 Completed

314. PROVISION OF FLOWLINE AND RISER FIELD JOINT COATING SERVICES FOR GUMUSUT KAKAP PROJECT – SAPURA ACERGY

SHELL August 6, 2010 Completed

315. UMBRELLA CONTRACTS FOR SALE OF SSB/SSPC SCRAP METAL (600865) SARAWAK SHELL

BERHAD August 3, 2010 Completed

316.

PROVISION OF THE SERVICE FOR DISPOSAL OF SURPLUS MATERIALS FOR PETRONAS GROUP OF COMPANIES FOR YEAR 2010-2013 (UMBRELLA CONTRACT)

PETROLIAM NASIONAL BERHAD

July 28, 2010 Completed

Page 27: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

317. SUPPLY AND DELIVERY OF INSTRUMENT FIRE & GAS CABLES FOR MRU - BUNGA ORKID DEV. PROJECT FOR SDE

TALISMAN MALAYSIA LIMITED

July 23, 2010 Completed

318. PROVISION OF PIPELINE FIELD JOINT COATING AND INFILL MATERIAL FOR ST. JOSEPH PIPELINE INSTALLATION ON E3 – TL OFFSHORE

SABAH SHELL PETROLUEM CO. LTD

July 22, 2010 Completed

319. SUPPLY AND DELIVER OF INSTRUMENT CABLES & GLANDS FOR EMEMPI’S SELIGI AND SEMANGKUK PIPELINE REPLACEMENT PROJECT

RANHILL WORLEY PARSONS

June 29, 2010 Completed

320. STRUCTURAL WORK ~(5-TOPSIDES) - EPCIC OF (5) WELLHEAD PLATFORM FOR B-193 PROJECT – SDE

OIL AND NATURAL GAS CORP. LTD

(ONGC) June 12, 2010 Completed

321. SUPPLY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR GUNTONG E AIR UTILITY SYSTEM UPGRADE PROJECT

RANHILL WORLEY PARSONS

May 27, 2010 Completed

322. SUPPLY OF CABLES FOR INTERGRATED PROCUREMENT AND CONSTRUCTION DEVELOPMENT PROJECT (PHASE 1)

SIME DARBY May 18, 2010 Completed

323. PROVISION OF FIELD JOINT COATING SERVICES FOR DEVIL’S CREEK DEVELOPMENT PROJECT

SAPURA ACERGY May 15, 2010 Completed

324. SUPPLY OF SERVI-WRAP ANTI-CORROSION MATERIALS SARAWAK SHELL May 13, 2010 Completed

325. SUPPLY OF INSTRUMENT CABLES & CABLE GLANDS FOR TAPIS PUMP FIRE AND GAS SYSTEM UPGRADE PROJECT - EMEPMI

RANHILL WORLEY PARSONS

May 4, 2010 Completed

326. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM INCLUDING LAN/WAN – TL OFFSHORE SDN BHD

TL OFFSHORE May 1, 2010 Completed

327. SUPPLY, FABRICATE, INSTALL AND PRE-COMMISSION ONE UNIT OF GYM ROOM FOR BRE

TALISMAN MALAYSIA LIMITED

April 29, 2010 Completed

328. DESIGN, SUPPLY, APPLICATION AND INSTALLATION OF PASSIVE FIRE PROTECTION (PACKAGE NO.SF03) FOR GUMUSUT KAKAP SEMI-FPS PROJECT

MMHE April 21, 2010 Completed

329. APPLICATION OF FOAM INSULATION FOR CAMERON INTERNATIONAL (M) SYSTEM SDN BHD

CAMERON INTERNATIONAL (M)

SDN BHD April 10, 2010 Completed

330. FIELD JOINT COATING WORK AT TLO FOR 2010 MURPHY PIPELINE PROJECT MURPHY OIL CORP March 16, 2010 Completed

331. FIELD JOINT COATING WORK AT GLOBAL OFFSHORE MALAYSIA FOR 2010 PETRONAS PIPELINES PROJECT

PETRONAS CARIGALI

March 16, 2010 Completed

Page 28: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

332. SUPPLY OF CABLES FOR F23R-A CILIPADI GAS FIELD DEVELOPMENT PROJECT PFCE March 15, 2010 Completed

333. PASSIVE FIRE PROTECTION FOR SARAWAK SHELL E-8 PLATFORM SARAWAK SHELL March 15, 2010 Completed

334. DISPOSAL & REMOVAL OF SCRAP MATERIALS FROM MMHE SARAWAK SHELL March 15, 2010 Completed

335. SALE OF USED/SCRAP MATERIALS AND EQUIPMENT MLNG March 10, 2010 Completed

336. THERMOCOUPLE CABLE FOR BUNGA ORCHID-A TALISMAN MALAYSIA

March 9, 2010 Completed

337. HEAT SHIELD PANELS FOR ABU FIELD PETRONAS CARIGALI

March 3, 2010 Completed

338. SUPPLY AND APPLICATION OF PFP FOR F23DR-A CILIPADI PROJECT AT RFSB FOR PFCE

SARAWAK SHELL BERHAD

February 28, 2010 Completed

339. J-LAY TOWER REFURBISHMENT PROJECT (STRUCTURAL WORKS) FOR SAPURA ACERGY

SHELL / MISC February 25, 2010 Completed

340. SUPPLY OF LIGHT WATER STATION PETRONAS CARIGALI

February 5, 2010 Completed

341. BLASTING AND PAINTING FOR JLT STRUCTURE SERVICES FOR GUMUSUT AT SAPURA ACERGY

SHELL/ MISC January 28 2010 Completed

342. SUPPLY OF HEATSHIELDS TO CILIPADI PROJECT AT RFSB FOR PFCE SARAWAK SHELL December 28 2009 Completed

343. DISPOSAL OF EXXON MOBIL OBSOLETE, PROJECT SURPLUS, AND USED MATERIALS

EMEMPI December 8, 2009 Completed

344. S-LAY FIELD JOINT COATING CONTRACT FOR GUMUSUT PIPELINE AT SAPURA ACERGY

SHELL / MISC November 26, 2009 Completed

345. SUPPLY AND APPLICATION OF PFP FOR TANGGA BARAT CPP TOPSIDE @ MMHE

PETRONAS CARIGALI

November 3, 2009 Completed

346. DISPOSAL OF TML SLOW MOVING AND OBSOLETE GOODS AT KSB (SCRAP METAL)

TALISMAN October 30, 2009 Completed

347. SUPPLY OF BLASTWALL FOR F23 (CILIPADI) AT RAMUNIA YARD @ PFCE SARAWAK SHELL October 21, 2009 Completed

Page 29: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

348. SUPPLY OF BLASTWALL TO J.R MCDERMOTT FOR THE KIPPER TUNA PROJECT ESSO AUSTRALIA August 25, 2009 Completed

349. SUPPLY OF INSTRUMENT, FIRE & GAS, ELECTRICAL AND TELECOM CABLES TO PFCE AT RAMUNIA FABRICATION YARD FOR 23 TOPSIDE PROJECT

SARAWAK SHELL August 24, 2009 Completed

350. SUPPLY OF AIMS RFP MUDMAT SYSTEM FOR NEWFIELD’S WEST BELUMUT WELLHEAD JACKET AT KENCANA HL

NEWFIELD July 31, 2009 Completed

351. SUPPLY OF CHEMICALS – TRIETHYLENE GLYCOL – 99.9%, 235 KGS DRUM UNDER PRICE AGREEMENT WITH PETRONAS CARIGALI

PETRONAS CARIGALI

July 15, 2009 Completed

352.

ELECTRICAL AND INSTRUMENTATION FABRICATION & HOST TIE & HOOK-UP COMMISSIONING OF GUA FLAREBOOM REPLACEMENT AT BOUSTEAD PENANG SHIPYARD S/B

EXXON MOBIL June 22, 2009 Completed

353. FABRICATION OF INSTRUMENT GAS SKID FOR KUMANG PROJECT AT SDE PETRONAS CARIGALI

June 15, 2009 Completed

354. FIELD JOINT COATING WORK AT TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI

June 8, 2009 Completed

355. SUPPLY OF SERVIWRAP TO TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI

May 15 , 2009 Completed

356. FIELD JOINT COATING WORK AT TLO FOR BEKOK-DULANG PROJECT FOR PETRONAS PIPELINE PROJECT

PETRONAS CARIGALI

April 17, 2009 Completed

357. FIELD JOINT COATING WORK AT TLO FOR WEST LUTONG PROJECT FOR PETRONAS PIPELINE PROJECT

PETRONAS CARIGALI

March 6, 2009 Completed

358. FIELD JOINT COATING WORK AT TLO FOR BETTY BAKAU PROJECT FOR PETRONAS PIPELINE PROJECT

PETRONAS CARIGALI

February 12, 2009

Completed

359. PASSIVE FIRE PROTECTION FOR B11 LQ & HELIDECK AT BDEWC, SARAWAK SARAWAK SHELL

BERHAD February 11, 2009 Completed

360. PASSIVE FIRE PROTECTION FOR PC-4 RISER AT BD11 DR-A PLATFORM FOR MMHE

PETRONAS CARIGALI

January 19, 2009 Completed

361. SUPPLY OF ELECTRICAL AND INSTRUMENTATION CABLES FOR F23 VLAP COMPRESSION AT SDE

SARAWAK SHELL BERHAD

January 5, 2009 Completed

362. MARK AND CUT STEEL STRUCTURAL WORKS FOR MCR-A PROJECT AT MMHE MMHE JV WITH

TECHNIP January 2, 2009 Completed

Page 30: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

363. FABRICATION OF STRUCTURAL WORKS FOR EAST MODULE TOPSIDES OF GUMUSUT KAPAP AT MMHE

SHELL AND MISC Dec 31, 2008 Completed

364. E & I AND PIPING WORK AT MMHE FOR TANGGA BARAT CPP TOPSIDES PETRONAS CARIGALI

Dec 24, 2008 Completed

365. PASSIVE FIRE PROTECTION FOR B-11 TOPSIDES AT BROOKE DOCK YARD SARAWAK SHELL

BERHAD Dec 19, 2008 Completed

366. SUPPLY OF KOBE ELECTRODES FOR F23-RA TOPSIDES AT RFSB SARAWAK SHELL

BERHAD Dec 19, 2008 Completed

367. INSTRUMENTATION & FGS & TELECON JUNCTION BOX – DULANG B AT KENCANA HL

PETRONAS CARIGALI

November 4, 2008 Completed

368. SUPPLY OF TOTE TANKS PETRONAS CARIGALI

October 29, 2008 Completed

369. SUPPLY OF FIRE RATED WINDOWS FOR KUMANG AND TANGGA BARAT AT SDE PETRONAS CARIGALI

October 21, 2008 Completed

370. SUPPLY OF INSTRUMENT CABLES FOR FPSO RUBY AT MMHE MISC October 15, 2008 Completed

371. STRUCTURAL FABRICATION WORK FOR TANGGA BARAT AT MMHE PETRONAS CARIGALI

October 13, 2008 Completed

372. SUPPLY AND INSTALL KUMANG BLASTWALL/ FIREWALL COMPLETE SYSTEM INCLUDING PFP AT SDE TO MEET FIRE RATINGS

PETRONAS CARIGALI

October 10, 2008 Completed

373. SUPPLY OF ELECTRICAL AND INSTRUMENTATION (E&I) CABLES FOR KUMANG AND TANGGA BARAT AT SDE

PETRONAS CARIGALI

Sept 27, 2008 Completed

374. PIPING FABRICATION WORK FOR B11 KA TOPSIDE @ MMHE SARAWAK SHELL

BERHAD Sept 16, 2008 Completed

375. SUPPLY OF PERSONNEL TRANSFER BASKET AND CABLE GLAND / FITTINGS TO MURPHY OIL

MURPHY SARAWAK OIL CO. LTD

Sept 15, 2008 Completed

376. FIELD JOINT COATING WORK FOR CPOC PIPELINES AT TLO PETRONAS CARIGALI

Sept 10, 2008 Completed

377. PASSIVE FIRE PROTECTION FOR PLUTO PROJECT @ RFSB WOODSIDE ENERGY August 15, 2008 Completed

Page 31: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

378. FIELD JOINT COATING WORK AT TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT

SARAWAK SHELL BERHAD

August 1, 2008 Completed

379. SUPPLY OF CANUSA HSS TO TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT

SARAWAK SHELL BERHAD

July 22, 2008 Completed

380. SUPPLY OF DOUBLE SKIN HEAT SHIELDS FOR B11 KA PROJECT AT MMHE SARAWAK SHELL

BERHAD June 30, 2008 Completed

381. PASSIVE FIRE PROTECTION OF ANDP-D AT RFSB PETRONAS CARIGALI

June 30, 2008 Completed

382. SUPPLY OF SERVIWRAP FOR CPOC PIPELINE TO TLO PETRONAS CARIGALI

June 26, 2008 Completed

383. E&I, PIPING, MECHANICAL & STRUCTURAL FABRICATION FOR KUMANG CLUSTER DEVELOPMENT / TANGGA BARAT PROJECT @ SDE

PETRONAS CARIGALI

June 11, 2008 Completed

384. DESIGN, SUPPLY, FABRICATION AND INSTALL NEW FIRE AND BLASWALL FOR BR-A

TALISMAN MALAYSIA LIMITED

May 23, 2008 Completed

385. PASSIVE FIRE PROTECTION OF GOPA-GOPB AT KHL MURPHY SARAWAK

OIL CO. LTD May 8, 2008 Completed

386. SUPPLY AND DELIVERY OF CONCRETE MATRESSES, SLEEPERS, LIFTING FRAME FOR 24” ANDR-A/TCOT PIPELINE FOR TLO

PETRONAS CARIGALI

April 30, 2008 Completed

387. ELECTRICAL AND INSTRUMENTATION FABRICATION WORK AT RFSB ON ANGSI –D PLATFORM

PETRONAS CARIGALI

April 24, 2008 Completed

388. PFP for F23 AND F6 AT BROOKE DOCKYARD, KUCHING, SARAWAK SARAWAK SHELL

BERHAD April 11, 2008 Completed

389. SUPPLY OF POWER & INSTRUMENTATION CABLES MURPHY SARAWAK

OIL CO. LTD April 10, 2008 Completed

390. SUPPLY OF HEATSHIELDS TO CLOUGH FOR MONTARA PROJECT IN THAILAND CLOUGH (THAILAND)

CO. LTD April 10, 2008 Completed

391. FIELD JOINT COATING SERVICES FOR TALISMAN PIPELINE INSTALLATION TALIMAN MALAYSIA

LIMITED April 10, 2008 Completed

392. FIELD JOINT COATING FOR PETRONAS CARIGALI 2008 PIPELINE INSTALLATION AT TLO FOR 5 PIPELINES

PETRONAS CARIGALI

April 10, 2008 Completed

Page 32: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

393. SUPPLY AND APPLICATION OF WET AND CASTING PFP FOR TALISMAN RISERSAND ESDVS

TALIMAN MALAYSIA LIMITED

April 8, 2008 Completed

394. SUPPLY OF FIRE RATED DOORS TO MMHE PETRONAS CARIGALI

April 5, 2008 Completed

395. SUPPLY OF RADIANT HEATSHIELD, LOUVERS AND MISC ITEMS FOR PC 4 @ MMHE

PETRONAS CARIGALI

March 31, 2008 Completed

396. FIELD JOINT COATING FOR KEA- TIA @ PBJV

PETRONAS CARIGALI

March 7, 2008 Completed

397. SUPPLY OF ELECTRICAL OPERATED MONORAIL TROLLEY HOIST, 5 MT – MMHE

MMHE March 7, 2008 Completed

398. SUPPLY OF MANUAL OPERATED GANTRY CRANE TO MMHE MMHE March 7, 2008 Completed

399. ENGINEERING, DESIGN, FABRICATION AND INSTALLATION OF SHELTER CABIN FOR PC4 AT MMHE

PETRONAS CARIGALI

Feb 28, 2008 Completed

400. SUPPLY OF LINE PIPES SMLS API TYPE OF VARIOUS SIZES TO MMHE PETRONAS CARIGALI

Jan 17, 2008 Completed

401. SUPPLY OF FIRE RATED DOORS TO TURKMENISTAN GAS DEVELOPMENT PROJECT

MITCO JAPAN SDN BHD

Jan 11, 2008 Completed

402. PASSIVE FIRE PROTECTION FOR BUNGA ORKID @ SDE TALISMAN

MALAYSIA LIMITED Jan 3, 2008 Completed

403. FABRICATION OF GUMUSUT-KAKAP SEMISUBMERSIBLE HULL (PACKAGE 2) SHELL AND MISC December 5, 2007 Completed

404. STRUCTURAL FABRICATION FOR CPOC PROJECT AT MMHE PETRONAS CARGALI

SDN BHD Nov 30, 2007 Completed

405. SUPPLY OF FIRE RATED WINDOWS FOR BUNGA ORKID PROJECT AT SDE TALISMAN

MALAYSIA LIMITED October 23, 2007 Completed

406. SUPPLY OF TOTE TANKS TO EMEPMI EXXON MOBIL Sept 30, 2007 Completed

407. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E& I AND BLASTING/ PAINTING FOR PC 4 TOPSIDE WORK @ MMHE

PETRONAS CARGALI SDN BHD

July 26, 2007 Completed

Page 33: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

408. FIELD JOINT COATINGS FOR VASAI EAST DEVELOPMENT PROJECT AT RAMUNIA FABRICATORS SDN BHD

OIL & NATURAL GAS CORPORATION,

INDIA August 27, 2007 Completed

409. SUPPLY & APPLICATION OF PASSIVE FIRE PROTECTION -TALISMAN NORTHERN FIELD

TALISMAN MALAYSIA LIMITED

August 23, 2007

Completed

410. FIELD JOINT COATINGS FOR JERNEH PIPELINES AT TLO EXXONMOBIL August 8, 2007 Completed

411. FABRICATE BEAM HAUNCH, CROSS OVER SPOOL FOR HIGH PRESSURE MUD LINE AND CRANE BEAM

SAAG DRILLING & WELL SERVICES SDN

BHD August 7, 2007 Completed

412. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR BELUMUT AT RAMUNIA FABRICATORS SDN BHD

PETRONAS CARIGALI SDN BHD

August 5, 2007 Completed

413. FIELD JOINT COATINGS FOR SEMARANG PIPELINES AT TLO PETRONAS CARGALI

SDN BHD July 28, 2007

Completed

414. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR INTRALINE RESOURCES

TALISMAN MALAYSIA LIMITED

July 16, 2007 Completed

415. FIELD JOINT COATINGS FOR ANDR-A PIPELINES AT TLO PETRONAS

CARIGALI SDN BHD June 25, 2007

Completed

416. FIELD JOINT COATINGS FOR 18 “ GUE PIPELINE AT TLO EXXONMOBIL June 20, 2007 Completed

417. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SUMANDAK TOPSIDES

PETRONAS CARIGALI

June 13, 2007 Completed

418. SUPPLY OF SPARES FOR CLOSURE DOOR TO MMHE SARAWAK SHELL

BERHAD June 6, 2007

Completed

419. FIELD JOINT COATINGS FOR BETTY– BORONIA 18” P/L SARAWAK SHELL

BERHAD June 1, 2007 Completed

420. ENGINEERING, PROC, CONSTRUCTION & COMMISSIONING OF FIRE PROTECTION SYSTEM

PETRONAS DAGANGAN BERHAD

May 28, 2007 Completed

421. FIELD JOINT COATING FOR TAPM-3 CAA NORTHEN FIELD DEVELOPMENT TALISMAN

MALAYSIA LIMITED May 22, 2007

Completed

422. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SCDR-A TOPSIDES

SARAWAK SHELL BERHAD

May 4, 2007 Completed

Page 34: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

423. SUPPLY OF SAFETY EQUIPMENT AND LIFE RAFT TO MDFT FOR KIKEH PROJECT M.D.F.T (KIKEH) LTD May 2, 2007

Completed

424. FIELD JOINT COATINGS FOR ALL SUMANDAK PIPELINES AND SUPPLY OF SERVIWRAP TO TL OFFSHORE

PETRONAS CARIGALI

(PETRONAS CARIGALI)

April 6, 2007 Completed

425. 2007-2009 OFFSHORE FACILITIES TRANSPORT AND INSTALLATION OF FIELD JOINT COATINGS FOR MCDERMOTT

SARAWAK SHELL BERHAD

March 27, 2007 Completed

426. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR PETRONAS CARIGALI’S BELUMUT PROJECT AT RFSB

PETRONAS CARIGALI

(PETRONAS CARIGALI)

March 19, 2007 Completed

427. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR ANGEL GAS TOPSIDE PROJECT AT MMHE

WOODSIDE ENERGY March 15, 2007 Completed

428. FIELD JOINT COATING OF 10” BAP-AA TO BADP-G PIPELINE FOR TL OFFSHORE

PETRONAS CARIGALI

(PETRONAS CARIGALI)

March 1, 2007 Completed

429. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR SHELL’S SCDR-A AT MMHE

SARAWAK SHELL March 1, 2007 Completed

430. FABRICATION, INSTALLATION, TESTING AND PRE-COMMISSIONING OF PIPINGAND MECHANICAL WORKS FOR SCDR-A TOPSIDES AT MMHE

SARAWAK SHELL February 14, 2007 Completed

431. DESIGN, ENGINEERING AND FABRICATION OF END CLOSURE FOR SHELL’S SCDR-A PROJECT AT MMHE

SARAWAK SHELL February 6, 2007 Completed

432. ENGINEERING, DESIGN & FABRICATION OF PFP CASTINGS FOR METERING RUN - BR-B PLATFORM OFFSHORE

TALISMAN MALAYSIA LIMITED

January 29, 2007 Completed

433. FABRICATE GUMUSUT-KAKAP SEMI-SUBMERSIBLE HULL SHELL January 25, 2007 Completed

434. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E&I AND BLASTING/PAINTING FOR F6 REJUVENATION WORKS

SARAWAK SHELL January 23, 2007

Completed

435. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR MAARI FIELD DEVELOPMENT AT KENCANA HL ENGINEERING

CLOUGH PROJECT INTERNATIONAL PTY

LTD, AUSTRALIA January 17, 2007 Completed

436. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR ANGEL GAS PROJECT AT MMHE

WOODSIDE ENERGY LTD, AUSTRALIA

January 15, 2007 Completed

Page 35: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

437. SUPPLY OF ANTI-SKID BRE STAIRWAYS TALISMAN

MALAYSIA LIMITED January 4, 2007 Completed

438. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR SCDR-A PROJECT AT MMHE

SARAWAK SHELL Dec 27, 2006 Completed

439. SUPPLY OF INSTR. CABLE CONNECTING BRA AND BRE PAGA SYSTEM TALISMAN

MALAYSIA LIMITED Nov 15, 2006 Completed

440. FIELD JOINT COATING FOR PBJV GROUP SDN BHD FOR WEST LUTONG PROJECT

PETRONAS CARIGALI

Nov 11, 2006 Completed

441. CONTRACT FOR CIVIL WORKS PACKAGE FOR KUANTAN – KERTEH RAILWAY PROJEC, INCL. VEHICULAR, DRAINAGE & UTILITY BOX CULVERTS

PERCON BABENA JOINT VENTURE

October 15, 2006 Completed

442. STRUCTURAL STEEL FABRICATION FOR SUMANDAK SELATAN TOPSIDES AND HOST

PETRONAS CARIGALI

Sept 27, 2006 Completed

443. FJ COATING FOR TLO PETRONAS

CARIGALI AND SHELL

August 10, 2006 Completed

444. PIPING WORKS FOR KIKEH FPSO AT MMHE MURPHY OIL August 2, 2006 Completed

445. SUPPLY OF HEATSHIELDS FOR F13W PROJECT AT RAMUNIA FABRICATORS SARAWAK SHELL June 15, 2006 Completed

446. SUPPLY OF END CLOSURE DOORS- F13W AT RFSB SARAWAK SHELL June 09, 2006 Completed

447. PASSIVE FIRE PROTECTION FOR KIKEH DTU TOPSIDES MURPHY OIL

May 3, 2006 Completed

448. FIELD JOINT COATINGS AT BARMADA MCDERMOTT TALISMAN

MALAYSIA LIMITED March 14, 2006 Completed

449. FIELD JOINT COATINGS FOR BARMADA MCDERMOTT S/B EXXON MOBIL March 14, 2006 Completed

450. PASSIVE FIRE PROTECTION FOR ARTHIT PFP AT Mc DERMOTT YARD IN BATAM INDONESIA

PTTEP and KBR February 27, 2006 Completed

451. PIPING WORKS FABRICATION FOR MURPHY KIKEH PROJECT @ MMHE MURPHY OIL January 14, 2006 Completed

Page 36: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

452. ELECTRICAL AND INSTRUMENTATION FOR MODEC RJS-409 MODULE FABRICATION @ SDE

PETROBRAS December 1, 2005 Completed

453. PIPELINE FIELD JOINT COATING FOR BARAM (MCOT) 16” AND 10” PETRONAS

CARIGALI – TLO Nov 30, 2005 Completed

454. STRUCTURAL FABRICATION FOR MODEC RJS-409 ESPADARTE MODULE FABRICATION @ SDE

PETROBRAS November 1, 2005 Completed

455. SPECIAL STRUCTURAL SPECIAL FABRICATION FOR MURPHY KIKEH PROJECT MURPHY OIL September 9, 2005 Completed

456. SUPPLY AND INSTALL OF FIRESEAL FOR AMENAM KPONO PROJECT TOTAL ELF September 9, 2005 Completed

457. ARCHITECTURAL FITTINGS FOR CLIFF HEAD A PLATFORM AT HL ENGINEERING ROC OIL, AUSTRALIA August 6, 2005 Completed

458. PFP FOR SHELL E11 –PB SARAWAK SHELL August 3 2005 Completed

459. SUPPLY OF BARUNIA PROTECTIVE RELAYS PETRONAS

CARIGALI SDN BHD August 3, 2005 Completed

460. MAJOR STRUCTURAL FABRICATION FOR MURPHY KIKEH DTU SPAR HULL MURPHY OIL May 3, 2005 Completed

461. PFP FOR BARAM TOPSIDE AT BDEWC PETRONAS

CARIGALI SDN BHD April 2005 Completed

462. DESIGN, ENGINEERING AND FABRICATION OF BARAM HEATSHIELD AT BDEWC PETRONAS

CARIGALI SDN BHD April 2005 Completed

463. BLASTING AND PAINTING WORKS AT SSE FOR GUE EXXONMOBIL March 2005 Completed

464. DESIGN, ENGINEERING AND FABRICATION OF E11 P-B BLASTWALL AT MSE SARAWAK SHELL

BERHAD March 2005 Completed

465. PFP FOR SHELL’S E8-DR-A AT RAMUNIA FABRICATORS SARAWAK SHELL

BERHAD March 2005 Completed

466. PFP FOR SHELL’S F13 SARAWAK SHELL February 2005 Completed

Page 37: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

467. PFP FOR BR-E JACKET AND TRIPOD PROJECT AT MSE TALISMAN ENERGY February 2005 Completed

468. PFP FOR BR-E CO2 REMOVAL PROJECT AT SSE TALISMAN ENERGY February 2005 Completed

469. PFP FOR GUNTONG E PROJECT AT SIME SEMBCORP ENGINEERING EXXONMOBIL

EXPLORATION & PRODUCTION INC

January 2005 Completed

470. DESIGN, ENGINEERING AND FABRICATION OF SCKA & SF 13 HEATSHIELDS SARAWAK SHELL

BERHAD October 2004 Completed

471. DESIGN, ENGINEERING AND FABRICATION OF GUNTONG- E BLASTWALL EXXONMOBIL

EXPLORATION & PRODUCTION INC

July 2004 Completed

472. STRUCTURAL STEEL FABRICATION & WELDING AT MSE FOR MOAB TALISMAN ENERGY July 22, 2004 Completed

473. BLASTWALL REINSTAMENT TO H60 RATING – PFP TALISMAN ENERGY July 5, 2004 Completed

474. SUPPLY OF VESSELS UNDER MASTER SPOPT CHARTER PARTY FCF653 EXXONMOBIL

EXPLORATION & PRODUCTION INC

June 26, 2004 Completed

475. PASSIVE FIRE PROTECTION SUPPLY AND APPLY FOR AMENAM PROJECT AT SSE TOTAL ELF FINA @

NIGERIA June 2004 Completed

476. SUPPLY OF PRODUCTION & TEG CHEMICALS - 3 YEARS SARAWAK SHELL/

PETRONAS CARIGALI / NIPPON

June 23, 2004 Completed

477. CASTINGS FOR BUNGA RAYA-A PLATFORM TALISMAN ENERGY March 3, 2004 Completed

478. PFP FOR YOHO PROJECT PROTECTION EXXON MOBIL

NIGERIA March 2004 Completed

479. CASTINGS FOR SDV on BUNGA RAYA-A TALISMAN ENERGY December 2003 Completed

480. PFP FOR SERAI PROJECT SARAWAK SHELL September 2003 Completed

481. PFP FOR JINTAN PROJECT PROTECTION SARAWAK SHELL

BERHAD July 2003 Completed

Page 38: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

482. INFIELD JOINT COATING FOR NIPPON STEEL (NSC) PETRONAS CARIGALI

May 8, 2003 Completed

483. YOHO PLATFORM ELECTRODE EXXON MOBIL

NIGERIA February 2003 Completed

484. BUNGA RAYA 24” Riser PFP PETRONAS

CARIGALI/TALISMAN February 2003 Completed

485. SHELL M3 BLASTWALL SARAWAK SHELL January 11, 2003 Completed

486. HELANG’s RISER / SDV/ FLANGE / VALVE PFP CASTING NIPPON OIL

EXPLORATION January 2003 Completed

487. MLNG SPHERE PFP MLNG SDN BHD December 2002 Completed

488. LUNDIN RISER / SDV PFP TALISMAN December 2002 Completed

489. HALFDAN HEATSHIELDS ENGINEERING DESIGN SEMBCORP ENGRG

SINGAPORE September 6, 2002 Completed

490. SHELL M1 BLASTWALL ENGINEERING DESIGN SARAWAK SHELL

BERHAD September 2002 Completed

491. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP NIPPON OIL

(HELANG) AT MSE July 15, 2002 Completed

492. MODIFICATION & INSTALL ELECTRICAL WORK FOR SWITCHGEARS (KNDP-A) SARAWAK SHELL

BERHAD Nov 18, 2001 Completed

493. PASSIVE FIRE PROTECTION FOR MLNG3 SLUGCATCHER PETRONAS CARIGALI

October 29, 2001 Completed

494. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP MALAYSIA LNG

SDN BHD October 20, 2001 Completed

495. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP PETRONAS CARIGALI

October 15, 2001 Completed

496. SUPPLY/ INSTALL E & I SWITCHGEAR SARAWAK SHELL

BERHAD August 20, 2001 Completed

Page 39: JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD Record Updated - May 03, 2019.pdfjurunature sdn. bhd. - company current track record no work description owner commencement date current

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

May 03, 2019 - (Track Record Updated)

497. INSULATION CONTRACT WITH PETRA RESOURCES ESSO PRODUCTION

MALAYSIA INC. July 6, 2001 Completed

498. SUPPLY OF ELECTRODES DOTANAH ENGRG &

CONSTRUCTORS July 2, 2001 Completed

499. ELECTRODE SUPPLY FOR NIPPON OIL (HELANG) MALAYSIA

SHIPYARD (MSE) June 15, 2001 Completed

500. ELECTRODE SUPPLY FOR PETRONAS CARIGALI (ANGSI-A) SIME SEMBCORP

ENGINEERING June 15, 2001 Completed

501. ELECTRODE SUPPLY FOR ESSO (SATELIT) AND LARUT MSE February 2001 Completed

502. SUPPLY OF ELECTRODES FOR ESSO (LARUT-A) SIME SEMBCORP

ENGINEERING July 6, 2000 Completed

503. SUPPLY OF ELECTRODES PETRONAS FERTILIZER

TENDER Completed

504. SUPPLY OF CONSUMABLES FOR PETRONAS PETRONAS

AMMONIA SDN BHD TENDER TENDER

505. SUPPLY OF CONSUMABLES FOR PETRONAS CARIGALI PETRONAS CARIGALI

TENDER TENDER