JURUNATURE SDN. BHD. COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT DATE CURRENT STATUS April 30, 2013 1. PROVISION OF HEAT SHIELD FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM EMEPMI April 2013 In Progress 2. SUPPLY AND INSTALLATION OF HEAT SHIELD FOR KINABALU KNPG-B - MMHE PETRONAS CARIGALI SDN BHD April 2013 In Progress 3. OFFSHORE CARRY OVER WORKS FOR PIPING OF TAPIS-Q TOPSIDES - MMHE EMEPMI April 2013 In Progress 4. PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS B WI HTI PIPE SUPPOR TSTOP (AFS003B) – SHAPADU ENERGY & ENGINEERING SDN BHD EMEPMI April 2013 In Progress 5. PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS C PLATFORM TOPSIDE (EXCLUDE LER) - SHAPADU ENERGY & ENGINEERING SDN BHD EMEPMI April 2013 In Progress 6. PROVISION OF FABRICATION AND DELIVERY OF 16” SE-PA RISER LOAD BEARING CLAMP AND SLIDING CLAMP FOR MOC YEAR 2013 PIPELINES INSTALLATION - SAPURA KENCANA PETROLEUM C/O TL OFFSHORE SDN BHD MURPHY SARAWAK OIL. CO. LTD April 2013 In Progress 7. M03 DAMAGED FPF COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed 8. M01 DAMAGED PFP COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed 9. PROVISION OF SUPPLY AND DELIVERY OF MONEL WELDING INTEGRATED TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR EARLY PRODUCTION SCHEME (EPS), INTEGRATED GAS DEVELOPMENT (IGD) PROJECT, NORTH MALAY BASIN (NMB) FIELD – GOM RESOURCES SDN BHD HESS EXPLORATION & PRODUCTION MSIA B.V. March 2013 In Progress 10. SUPPLY AND DELIVER OF CEILING FINISHES - SUSPENDED CEILING SYSTEM SOUTH ACIS OIL & GAS DEVELOPMENT PROJECT (REPEAT ORDER) - BROOKE DOCKYARD & ENGINEERING WORKS CORPORATION BROOKE DOCKYARD & ENGINEERING WORKS CORPORATION March 18, 2013 In Progress 11. ENGINEERING,SUPPLY OF MATERIAL, MANUFACTURING, FABRICATION, INSTALLATION AND MODIFICATION OF FIBERGLASS GRATINGS, STAIRTREADS AND GRE HANDRAILS FOR DAMAR A SUBSTRUCTURE PROJECT - MMHE EMEPMI March 13, 2013 In Progress

Transcript of JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura...

Page 1: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

1. PROVISION OF HEAT SHIELD FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM

EMEPMI April 2013 In Progress

2. SUPPLY AND INSTALLATION OF HEAT SHIELD FOR KINABALU KNPG-B - MMHE PETRONAS

CARIGALI SDN BHD April 2013 In Progress

3. OFFSHORE CARRY OVER WORKS FOR PIPING OF TAPIS-Q TOPSIDES - MMHE EMEPMI April 2013 In Progress

4.

PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS B WI HTI PIPE SUPPOR TSTOP (AFS003B) – SHAPADU ENERGY & ENGINEERING SDN BHD

EMEPMI April 2013 In Progress

5.

PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS C PLATFORM TOPSIDE (EXCLUDE LER) - SHAPADU ENERGY & ENGINEERING SDN BHD

EMEPMI April 2013 In Progress

6.

PROVISION OF FABRICATION AND DELIVERY OF 16” SE-PA RISER LOAD BEARING CLAMP AND SLIDING CLAMP FOR MOC YEAR 2013 PIPELINES INSTALLATION - SAPURA KENCANA PETROLEUM C/O TL OFFSHORE SDN BHD

MURPHY SARAWAK OIL. CO. LTD

April 2013 In Progress

7. M03 DAMAGED FPF COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed

8. M01 DAMAGED PFP COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed

9.

PROVISION OF SUPPLY AND DELIVERY OF MONEL WELDING INTEGRATED TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR EARLY PRODUCTION SCHEME (EPS), INTEGRATED GAS DEVELOPMENT (IGD) PROJECT, NORTH MALAY BASIN (NMB) FIELD – GOM RESOURCES SDN BHD

HESS EXPLORATION & PRODUCTION

MSIA B.V. March 2013 In Progress

10.

SUPPLY AND DELIVER OF CEILING FINISHES - SUSPENDED CEILING SYSTEM SOUTH ACIS OIL & GAS DEVELOPMENT PROJECT (REPEAT ORDER) - BROOKE DOCKYARD & ENGINEERING WORKS CORPORATION

BROOKE DOCKYARD & ENGINEERING

WORKS CORPORATION

March 18, 2013 In Progress

11.

ENGINEERING,SUPPLY OF MATERIAL, MANUFACTURING, FABRICATION, INSTALLATION AND MODIFICATION OF FIBERGLASS GRATINGS, STAIRTREADS AND GRE HANDRAILS FOR DAMAR A SUBSTRUCTURE PROJECT - MMHE

EMEPMI March 13, 2013 In Progress

Page 2: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

12. PROVISION OF FIELD JOINT COATING SERVICES FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE

EMEPMI March 8, 2013 In Progress

13.

SUPPLY & DELIVERY OF FIELD JOINT ANTI CORROSION COATING SYSTEM – HEAT SHRINK SLEEVE (RAYCHEM WPC100) FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE

EMEPMI March 8, 2013 In Progress

14. PROVISION OF PIPELINE FIELD JOINT INFILL MATERIAL FOR TAPIS EOR & DAMAR GAS DEVELOPMENT PROJECT Y2013

EMEPMI March 7, 2013 In Progress

15. PROVISION OF FIRE PROTECTION (PFP) AND INSULATION WORK FOR WEST DESARU TOPSIDES - THHE FABRICATORS SDN BHD

AQUATERRA ENERGY LIMITED

March 7, 2013 In Progress

16. PROVISION OF FIELD JOINT COATING SERVICES FOR HESS 2013 PROJECT – GOM RESOURCES

HESS February 26, 2013 In Progress

17. PROVISION TO SUPPLY AND DELIVER CRUDE OIL WASHING MACHINE (COW MACHINE) SUPPLY FOR BERANTAI OPERATION - PETROFAC

PETRONAS January 29, 2013 In Progress

18. SUBCONTRACTOR FOR PASSIVE FIRE PROTECTION WORKS FOR KBB TOSIDES - MMHE

KPOC January 21, 2013 In Progress

19. ARCHITECTURAL INSULATION PACKAGE SUPPLY OF M90 FIRETEX FOR GREATER EKOFISK AREA 2/4 - SMOE

CONOCO PHILIPS January 15, 2013 In Progress

20. PROVISION OF 3

RD CAMPAIGN SEA-FASTENING WORKS OF J-LAY AND PES

TOWER ON BOARD SAPURA 3000 – SAPURA ACERGY SDN BHD SHELL January 11, 2013 In Progress

21.

PROVISION OF SUPPLY AND DELIVERY OF CEILING FINISHES – SUSPENDED CEILING FOR SOUTH ACIS PROJECT – BROOKE DOCKYARD AND ENGINEERING WORKS.

MURPHY January 10, 2013 Completed

22. DESIGN, FABRICATION & DELIVERY OF FIREWALL FOR DAMAR-A TOPSIDE MMHE

EMEPMI January 08, 2013 In Progress

23. SUPPLY OF PAINT EMEPMI December 27, 2013 Completed

Page 3: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

24.

E & I WORKS-FABRICATION AND INSTALLATION FOR F14DR-A TOPSIDES & F14/F29 PROCESS MODULE – MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

SHELL December 17, 2012 In Progress

25. STRUCTURE WORKS FOR DAMAR-A PLATFORM (TOPSIDE) - MMHE EMEPMI November 12, 2012 In Progress

26. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

KPOC October 18, 2012 In Progress

27.

SUPPLY, DELIVERY, AND INSTALLATION SUPERVISION OF COMPOSITE MATERIALS (FIBERGLASS) & ACCESSORIES FOR WAVE ZONE GRATING FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM, EMEPMI EPCM BROWNFIELD PROJECT.

EMEPMI October 5, 2012 Completed

28. SUPPLY AND DELIVER OF OFFICE EQUIPMENT (HS1146630X FIRE FIGHTING SUIT) HS1146630X FIRE FIGHTING SUIT

UNIVERSITI TELNOLOGI

PETRONAS, TRONOH PERAK

October 2012 Completed

29.

SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (BOAQ)(5.12M002B) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

KPOC September 24, 2012 In Progress

30. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

KPOC September 24, 2012 In Progress

31.

PROVISION OF FABRICATION 18” AND 12” FLEXIJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 13, 2012 Completed

32.

PROVISION OF FABRICATION 8” AND 10” STRESSJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 12, 2012 Completed

33. PROVISION OF FIELD JOINT COATING SERVICES FOR 8" AND 10" MALIKAI PIPELINE – GOM RESOURCES

SHELL September 11, 2012 Completed

34.

PROVISION OF FABRICATE AND SUPPLY OF WS2 UPPER MAST ELEMENT 2 LIFTING PAD EYE FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 5, 2012 In Progress

Page 4: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

35.

PROVISION OF FABRICATE AND SUPPLY OF NEW 18” ESCALATOR TROLLEY INSERTS, ACCESS TO HPU BOOST PUMPS, WS2 LOWER MAST ELEMENT 2, WS2 HINGE HATCH COVER, WS1 RAIN PROTECTION IMPROVEMENT FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 5, 2012 In Progress

36. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL August 30, 2012 In Progress

37. PROVISION OF DISPOSAL OF DAMAGED KOSMO, IVECO AND MAN BUSES AND ITS COMPONENTS – SYARIKAT PRASANA NEGARA BERHAD

SPNB August 29, 2012 Completed

38. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TAPIS Q TOPSIDE – MMHE SDN BHD

EMEPMI August 28, 2012 In Progress

39. SUPPLY AND DELIVERY OF HSS (WPC100M) FOR MALIKAI PIPELINE – GOM RESOURCES

SHELL August 18, 2012 Completed

40. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TELOK A TOPSIDES – MMHE SDN BHD

EMEPMI August 9, 2012 Completed

41. PROVISION OF VSAT SERVICES IN GULF OF MEXICO – SAPURA ACERGY SDN BHD

GULF August 9, 2012 In Progress

42.

PROVISION OF FIELD JOINT COATING SERVICES AND SUPPLY OF ANTICORROSSION TAPE (SERVIWRAP M30B) FOR 6" X 7.6KM BEKOK-A TO TIONG-A PIPELINE INSTALLATION – GOM RESOURCES

PETRONAS August 2, 2012 Completed

43. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S TABU A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY

EMEPMI July 31, 2012 Completed

44. SUPPLY AND DELIVER OF HEAVY DUTY ANTI SLIP STEP COVER – TALISMAN MALAYSIA LIMITED

TALISMAN July 12, 2012 Completed

45. PROVISION OF TELECOMMUNICATION SYSTEM FOR TOISA PALADIN – FUGRO GEODETIC (M) SDN BHD

FUGRO GEODETIC July 12, 2012 In Progress

46.

FABRICATION AND INSTALLATION OF STRUCTURE WORKS FOR PACKAGE 1, DECK NORTH AND MISC FOR TAPIR R TOPSIDES PROJECT – SIME DARBY ENGINEERING SDN. BHD.

EMEPMI July 10, 2012 In Progress

Page 5: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

47.

SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) AND PACKAGE B: B-193 A-P FOR (PGC & AGRU) – SIME DARBY ENGINEERING SDN BHD

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) July 07, 2012 In Progress

48.

SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) – SIME DARBY ENGINEERING SDN BHD

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) July 04, 2012 Completed

49. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S PALAS A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY

EMEPMI July 04, 2012 Completed

50. SUPPLY AND DELIVER OFSLIDING PLATE FOR FABRICATION ON KBB TOPSIDES (BOAQ) - MMHE

KPOC July 02,2012 In Progress

51.

TO SUPPLY MATERIALS, EQUIPMENT, CONSUMABLES, TOOLS AND MANPOWER FOR COOLING MANIFOLD RELOCATION FOR GUMUSUT KAKAP, J LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL June 12, 2012 Completed

52. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF VESSEL DLB264 – GOM RESOURCES

GOM RESOURCES June 11, 2012 In Progress

53. PROVISION OF PULLING & REMOVE CABLE FOR LNGC SERI ALAM – MMHE SDN. BHD.

MISC May 21, 2012 Completed

54. SUPPLY, FABRICATE AND DELIVERY SEA FASTENING FOR CARGO BARGE FOR LAN DO DEVELOPMENT PROJECT – SAPURA ACERGY SDN BHD

TNK VIETNAM BV May 17, 2012 In Progress

55.

PROVISION OF FIELD JOINT COATING SERVICES FOR MOC TRANSPORTATION AND INSTALLATION OF OFFSHORE PIPELINES AND FACILITIES FOR YEAR 2012 – TL OFFSHORE SDN BHD

MURPHY OIL May 9, 2012 Completed

56. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT PM318-PUTERI FWS PIPELINE REPLACEMENT PROJECT - NEWFIELD

NEWFIELD April 9, 2012 Completed

57. PROVISION OF VSAT TELECOMMUNICATION AND SERVICES FOR PETRONAS CARIGALI SDN BHD – IPERINTIS SDN BHD

IPERINTIS April 6, 2012 In Progress

58. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - SCHLUMBERGER GROUP

SCHLUMBERGER April 4, 2012 In Progress

59. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - HALLIBURTON ENERGY SERVICES (M) SDN BHD

HALLIBURTON April 4, 2012 In Progress

Page 6: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

60. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF HEAVY LIFT PIPE LAY VESSEL LTS3000

L & T SAPURA April 1, 2012 In Progress

61. DESIGN, FABRICATION AND DELIVERY OF FIREWALL FOR TELOK A & B PROJECT – MMHE SDN BHD

SHELL March 23, 2012 In Progress

62. COMMISSIONING OF STABILISED VSAT SERVICES AND VPN ONBOARD MV. WANGSAMAJU – OCEANTECH GEOMATICS

OCEANTECH GEOMATIC

March 14, 2012 In Progress

63.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION TAPE (SERVIWRAP M30B) FOR KEBABANGAN DEVELOPMENT PROJECT – GLOBAL OFFSHORE MALAYSIA

KPOC March 13, 2012 Completed

64.

SUPPLY AND DELIVERY OF HANGER FLANGE, RISER GUARD AND RISER CLAMP FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR PCSB SKO PIPELINE REJUVENATION PROJECT. – CARIMIN ENGINEERING SERVICES

PETRONAS March 12, 2012 Completed

65. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL March 5, 2012 In Progress

66.

SUPPLY AND DELIVERY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR TCOT PWSU TAIL END & REMEDIAL WORK FOR EMEPMI EPCM BROWNFIELD PROJECT – PERUNDING RANHILL WORLEY

EMEPMI March 1, 2012 Completed

67. PROVISION OF FIELD JOINT COATING FOR SOGT PROJECT – ALAM SWIBER PETRONAS February 27, 2012 Completed

68.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF HSS (RAYCHEM WPC100M) FOR EMEMPI’S TAPIS EOR REJUVENATION AND TELOK DEVELOMENT PROJECT. – TL OFFSHORE SDN BHD

EMEPMI February 24, 2012 Completed

69. DESIGN, ENGINEERING, AND DELIVERY OF FAIRINGS & THRUST COLLARS FOR DRILLING RISERS – SONGA OFFSHORE

PETRONAS February 22, 2012 Completed

70. PROVIDING STABILISED VSAT SYSTEM FOR SEMI-SUBMERSIBLE RIG, OCEANROVER FOR DEEPWATER PROJECT, KIKEH – DIAMOND OFFSHORE

MURPHY OIL February 14, 2012 In Progress

71. PROVISION OF VSAT SYSTEM AND PROVIDING VPN RENTAL SERVICES FOR DLB264 – GLOBAL OFFSHORE MALAYSIA

GLOBAL OFFSHORE February 09, 2012 In Progress

72. PIPELINE AND SPOOLS FIELD JOINT COATING SERVICES FOR LAN DO DEVELOPMENT PROJECT VIETNAM – SAPURA ACERGY SDN BHD

TNK VIETNAM BV January 20, 2012 Completed

Page 7: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

73.

PROVISION FOR DETAILED DESIGN ENGINEERING SERVICES FOR PACKAGE THIRD PARTY VERIFICATION OF GUE H RATED FIREWALL TO WITH STAND 30-MINUTES JET FIRE FOR TELOK GAS DEVELOPMENT PROJECT – PERUNDING RANHILL WORLEY SDN BHD

EMEPMI December 29, 2011 Completed

74. PROVISION OF INSTALLATION AND MAINTENANCE OF VPN INTERNET SERVICES – ASIAN SUPPLY BASE SDN BHD

ASIAN SUPPLY BINTULU

December 21, 2011 In Progress

75. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT M01 AND E11 FOR TI-FIX AND IR PROJECT - SHELL

SHELL December 21, 2011 In Progress

76. SUPPLY MANPOWER, EQUIPMENTS AND MATERIALS FOR PM329 EAST PIATU TOPSIDES – KENCANA HL SDN BHD

NEWFIELD December 1, 2011 Completed

77. E & I FABRICATION, INSTALLATION, TESTING, PRE-COMMISSIONING WORK, FOR TAPIS EOR PROJECT (PACKAGE B AND PACKAGE C) – MMHE SDN BHD

EMEPMI December, 2011 Completed

78. PIPING FABRICATION AND INSTALLATION FOR TAPIS Q LIVING QUARTERS – MMHE SDN BHD

EMEPMI November, 2011 In Progress

79. SUPPLY OF H120 FIRE/BLAST WALL FOR KEBABANGAN TOPSIDES – SIME DARBY ENGINEERING SDN BHD

KPOC November 25, 2011 In Progress

80. PROVISION OF FIELD JOINT COATING FOR BCOT PROJECT – ALAM SWIBER PETRONAS October 10, 2011 Completed

81.

PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION CASTING FOR SDV ON BUNGA RAYA-B – APEX ENERGY SDN. BHD.

TALISMAN September 27, 2011 Completed

82.

PROVISION OF PASSIVE FIRE PROTECTION (PFP) SERVICES FOR PCC OF TOPSIDES AND PIPELINE FOR PM318 PUTERI PIPELINE RESTORATION PROJECT – KENCANA HL SDN BHD

NEWFIELD September 15, 2011 Completed

83.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIAL (SERVIWRAP) FOR 14” AND 24” EXPORT PIPELINE SHORE APPROACH INSTALLATION FOR KEBABANGAN NORTHERN HUB DEVELOPMENT – PBJV GROUP SDN BHD

PETRONAS CARIGALI SDN BHD

September 15, 2011 Completed

84.

PROVISION OF PASSIVE FIRE PROTECTION (PFP), TOOLS/ EQUIPMENT & MATERIALS TO REMOVE THE DEGRADED PFP & APPLICATION OF NEW PFP AT M3PQ-A LIVING QUARTER WEST WALL – SARKU ENGINEERING SERVICES SDN. BHD.

SHELL September 15, 2011 Completed

Page 8: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

85.

PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR HELANG TOPSIDES (E-9550 & E-9650) – MONT TRINITY

NIPPON OIL September 12, 2011 Completed

86.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR INTRAGRATED TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES (TIONG A) PROJECT – GLOBAL OFFSHORE MALAYSIA SDN BHD

NEWFIELD August 17, 2011 Completed

87. PROVISION OF REMOVAL, REPAIR & REINSTATEMENT OF BLASTWALL ON M3P-Q PLATFORM – DAYANG ENTERPRISE & SSB

SHELL August 5, 2011 Completed

88.

DESIGN, MANUFACTURE AND SUPPLY OF VIV SUSPRESSION STRAKES FOR BLOCK 06.1 PHASE III PROJECT – LAN DO DEVELOPMENT PROJECT – RANHILL WORLEYPARSONS SDN BHD

BP EXPLORATION OPERATING CO. LTD

August 3, 2011 Completed

89. SUPPLY, DELIVERY AND INSTALLATION OF STRAKES FOR GUMUSUT KAKAP JUMPERS - FMC

SHELL June 17,2011 Completed

90.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR SKO PIPELINE REPLACEMENT PROJECT – TARGET ENERGY CO. (M) SDN. BHD.

PETRONAS CARIGALI SDN BHD

July 25, 2011 Completed

91.

FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH) TAPIS-R DECK (SOUTH), TAPIS-R LIVING QUARTERS & BRIDGES SKID BEAM AND TAPIS-Q DECK – MMHE SDN. BHD.

EMEPMI July 15, 2011 In Progress

92. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH), TAPIS-Q DECK, MISCELLANEOUS WORKS TAPIS-Q – MMHE SDN. BHD.

EMEPMI July 3, 2011 In Progress

93. PROVISION OF PIPELINE FIELD JOINT COATING WORKS FOR THE FABRICATION SERVICES OF FLOWLINE JUMPER – LABUAN SHIPYARD

SAPURA ACERGY/ SHELL

April 14, 2011 Completed

94.

PROVISION OF PIPELINE INFIELD FIELD JOINT COATING FOR PCSB INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD

PETRONAS CARIGALI SDN BHD

April 12, 2011 Completed

95.

PROVISION OF PIPELINE ANTI CORROSION MATERIAL (SERVIWRAP) FOR PCSB INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD

PETRONAS CARIGALI SDN BHD

March 31, 2011 Completed

Page 9: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

96. PROVISION OF FIELD JOINT COATING SERVICES FOR F28DR-A/F6K-A PIPELINE PROJECT – TL OFFSHORE SDN BHD

SHELL March 18, 2011 Completed

97.

FABRICATION AND INSTALLATION OF STRUCTURAL WORKS FOR TOPSIDES A-Q COMPRISING PART OF SURVEY, DESIGN, ENGINEERING, PROCUREMENT, FABRICATION, LOAD OUT, TIE-DOWN/SEAFASTENING, TRANSPORTATION, INSTALLATION, HOOK-UP, TESTING, COMMISSIONING (EPCIC) OF PROCESS PLATFORM FOR B-193 PROJECT – SIME DARBY ENGINEERING

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) February 25, 2011 In Progress

98. PROVISION OF PIPELINE MATERIALS WITH SEA SLEEVES C/W EQUIPMENT FOR NEWFIELD’S EAST PIATU INSTALLATION – TL OFFSHORE SDN BHD

NEWFIELD February 24, 2011 Completed

99. PROVISION OF PASSIVE FIRE PROTECTION SERVICES) FOR NEWFIELD'S EAST PIATU'S JACKET & TOPSIDES - KENCANA HL

NEWFIELD February 11, 2011 Completed

100. PROVISION OF FIELD JOINT COATING AND INFILL MATERIALS FOR PUTERI PIPELINE RESTORATION PROJECT – TL OFFSHORE SDN BHD

NEWFIELD February 11, 2011 Completed

101.

PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR CAKERWALLA OFFSHORE - SHAPADU ENERGY & ENGINEERING SDN BHD

CARIGALI HESS February 1, 2011 Completed

102.

PROVISION OF FIELD JOINT COATING, SUPPLY AND INSTALLATION OF CANUSA GTS-PP WRAPID SLEEVE FOR CILIPADI PIPELINE PROJECT – TL OFFSHORE SDN BHD

SHELL January 17, 2011 Completed

103. REPAIR WORKS OF BLASTWALL AND FIREWALL FOR MODULE 3 KUMANG TOPSIDE - OFFSHORE WORKS

PETRONAS CARIGALI SDN BHD

December 13, 2010 Completed

104.

DESIGN, CONSTRUCT, SUPPLY AND DELIVERY OF NOISE ATTENUATORS AND EXPANSION SPOOLS FOR F13 PROCESSING MODULE GLYCOL REBOILER SKID AT E11P-B PLATFORM

SARAWAK SHELL BERHAD

November 24, 2010 Completed

105.

FABRICATION AND INSTALLATION OF THE MOORING PORCHES, CHAIN JACK GANTRIES AND ASSOCIATED PLATFORMS, AND INSTALLATION OF FAIRLEAD FOUNDATIONS FOR GUMUSUT KAKAP FPS HULL (36010863) AT MALAYSIA MARINE AND HEAVY ENGINEERING

SHELL / MISC November 12, 2010 In Progress

106. SUBCONTRACT FOR STRUCTURAL WORKS FOR PROCESS PLATFORM FOR B-193 PROJECT AT SIME DARBY ENGINEERING

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) October 22, 2010 In Progress

107. DESIGN, FABRICATE AND SUPPLY FIRE RATED ROLLER SHUTTER FOR KINABALU NAG DEVELOPMENT PROJECT (KNPG-B) - MMHE

PETRONAS CARIGALI SDN BHD

October 21, 2010 Completed

Page 10: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

108. SUPPLY AND DELIVERY OF SAFETY EQUIPMENTS FOR SAMARANG (PHASE 1 – ACCELERATED DRILLING) DEVELOPMENT PROJECT – KENCANA PETROLUEM

PETRONAS CARIGALI SDN BHD

October 6, 2010 Completed

109. PROVISION OF BR-B REPLACEMENT – RISER PIPE, CLAMP AND I-TUBE – FIELD JOINT COATING

TALISMAN September 20, 2010 Completed

110.

DESIGN, FABRICATE AND SUPPLY OF BLASTWALL FOR LIVING QUARTERS FOR JACKETS OF PM329 EAST PIATU DEVELOPMENT PROJECT – KENCANA HL

NEWFIELD September 17, 2010 Completed

111. PROVISION OF PIPELINE FIELD JOINT COATING SERVICES AND INFILL MATERIALS FOR PCSB’S SKO PIPELINE PROJECT – TL OFFSHORE

PETRONAS CARIGALI SDN BHD

September 7, 2010 Completed

112. PROVISION OF FLOWLINE AND RISER FIELD JOINT COATING SERVICES FOR GUMUSUT KAKAP PROJECT – SAPURA ACERGY

SHELL August 6, 2010 In Progress

113. UMBRELLA CONTRACTS FOR SALE OF SSB/SSPC SCRAP METAL (600865) SARAWAK SHELL

BERHAD August 03, 2010 In progress

114. SUPPLY AND DELIVERY OF INSTRUMENT FIRE & GAS CABLES FOR MRU-BUNGA ORKID DEV. PROJECT FOR SDE

TALISMAN MALAYSIA LIMITED

July 23, 2010 Completed

115. PROVISION OF PIPELINE FIELD JOINT COATING AND INFILL MATERIAL FOR ST. JOSEPH PIPELINE INSTALLATION ON E3 – TL OFFSHORE

SABAH SHELL PETROLUEM CO. LTD

July 22, 2010 Completed

116.

PROVISION OF THE SERVICE FOR DISPOSAL OF SURPLUS MATERIALS FOR PETRONAS GROUP OF COMPANIES FOR YEAR 2010-2013 (UMBRELLA CONTRACT)

PETROLIAM NASIONAL BERHAD

July 28, 2010 In progress

117. SUPPLY AND DELIVER OF INSTRUMENT CABLES & GLANDS FOR EMEMPI’S SELIGI AND SEMANGKUK PIPELINE REPLACEMENT PROJECT

RANHILL WORLEY PARSONS

June 29, 2010 Completed

118. STRUCTURAL WORK ~(5-TOPSIDES) - EPCIC OF (5) WELLHEAD PLATFORM FOR B-193 PROJECT – SDE

OIL AND NATURAL GAS CORP. LTD

(ONGC) June 12, 2010 In progress

119. SUPPLY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR GUNTONG E AIR UTILITY SYSTEM UPGRADE PROJECT

RANHILL WORLEY PARSONS

May 27, 2010 Completed

120. SUPPLY OF CABLES FOR INTERGRATED PROCUREMENT AND CONSTRUCTION DEVELOPMENT PROJECT (PHASE 1)

SIME DARBY May 18, 2010 Completed

121. PROVISION OF FIELD JOINT COATING SERVICES FOR DEVIL’S CREEK DEVELOPMENT PROJECT

SAPURA ACERGY May 15, 2010 Completed

Page 11: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

122. SUPPLY OF SERVI-WRAP ANTI-CORROSION MATERIALS SARAWAK SHELL May 13, 2010 Completed

123. SUPPLY OF INSTRUMENT CABLES & CABLE GLANDS FOR TAPIS PUMP FIRE AND GAS SYSTEM UPGRADE PROJECT - EMEPMI

RANHILL WORLEY PARSONS

May 4, 2010 Completed

124. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM INCLUDING LAN/WAN – TL OFFSHORE SDN BHD

TL OFFSHORE May 1, 2010 In Progress

125. SUPPLY, FABRICATE, INSTALL AND PRE-COMMISSION ONE UNIT OF GYM ROOM FOR BRE

TALISMAN MALAYSIA LIMITED

April 29, 2010 Completed

126. DESIGN, SUPPLY, APPLICATION AND INSTALLATION OF PASSIVE FIRE PROTECTION (PACKAGE NO.SF03) FOR GUMUSUT KAKAP SEMI-FPS PROJECT

MMHE April 21, 2010 Completed

127. APPLICATION OF FOAM INSULATION FOR CAMERON INTERNATIONAL (M) SYSTEM SDN BHD

CAMERON INTERNATIONAL (M)

SDN BHD April 10, 2010 Completed

128. FIELD JOINT COATING WORK AT TLO FOR 2010 MURPHY PIPELINE PROJECT MURPHY OIL CORP March 16, 2010 Completed

129. FIELD JOINT COATING WORK AT GLOBAL OFFSHORE MALAYSIA FOR 2010 PETRONAS PIPELINES PROJECT

PETRONAS CARIGALI

March 16, 2010 Completed

130. SUPPLY OF CABLES FOR F23R-A CILIPADI GAS FIELD DEVELOPMENT PROJECT

PFCE

March 15, 2010 Completed

131. PASSIVE FIRE PROTECTION FOR SARAWAK SHELL E-8 PLATFORM SARAWAK SHELL March 15, 2010 Completed

132. DISPOSAL & REMOVAL OF SCRAP MATERIALS FROM MMHE SARAWAK SHELL March 15, 2010 Completed

133. SALE OF USED/SCRAP MATERIALS AND EQUIPMENT MLNG March 10, 2010 Completed

134. THERMOCOUPLE CABLE FOR BUNGA ORCHID-A TALISMAN MALAYSIA

March 9, 2010 Completed

135. HEAT SHIELD PANELS FOR ABU FIELD PETRONAS CARIGALI

March 3, 2010 Completed

136. SUPPLY AND APPLICATION OF PFP FOR F23DR-A CILIPADI PROJECT AT RFSB FOR PFCE

SARAWAK SHELL BERHAD

February 28, 2010 Completed

137. J-LAY TOWER REFURBISHMENT PROJECT (STRUCTURAL WORKS) FOR SAPURA ACERGY

SHELL / MISC February 25, 2010 Completed

Page 12: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

138. SUPPLY OF LIGHT WATER STATION PETRONAS CARIGALI

February 5, 2010 Completed

139. BLASTING AND PAINTING FOR JLT STRUCTURE SERVICES FOR GUMUSUT AT SAPURA ACERGY

SHELL/ MISC January 28 2010 Completed

140. SUPPLY OF HEATSHIELDS TO CILIPADI PROJECT AT RFSB FOR PFCE SARAWAK SHELL December 28 2009 Completed

141. DISPOSAL OF EXXON MOBIL OBSOLETE, PROJECT SURPLUS, AND USED MATERIALS

EMEMPI December 8, 2009 Completed

142. S-LAY FIELD JOINT COATING CONTRACT FOR GUMUSUT PIPELINE AT SAPURA ACERGY

SHELL / MISC November 26, 2009 Completed

143. SUPPLY AND APPLICATION OF PFP FOR TANGGA BARAT CPP TOPSIDE @ MMHE

PETRONAS CARIGALI

November 3, 2009 Completed

144. DISPOSAL OF TML SLOW MOVING AND OBSOLETE GOODS AT KSB (SCRAP METAL)

TALISMAN October 30, 2009 Completed

145. SUPPLY OF BLASTWALL FOR F23 (CILIPADI) AT RAMUNIA YARD @ PFCE SARAWAK SHELL October 21, 2009 Completed

146. SUPPLY OF BLASTWALL TO J.R McDERMOTT FOR THE KIPPER TUNA PROJECT

ESSO AUSTRALIA August 25, 2009 Completed

147. SUPPLY OF INSTRUMENT, FIRE & GAS, ELECTRICAL AND TELECOM CABLES TO PFCE AT RAMUNIA FABRICATION YARD FOR 23 TOPSIDE PROJECT

SARAWAK SHELL August 24, 2009 Completed

148. SUPPLY OF AIMS RFP MUDMAT SYSTEM FOR NEWFIELD’S WEST BELUMUT WELLHEAD JACKET AT KENCANA HL

NEWFIELD July 31, 2009 Completed

149. SUPPLY OF CHEMICALS – TRIETHYLENE GLYCOL – 99.9%, 235 KGS DRUM UNDER PRICE AGREEMENT WITH PETRONAS CARIGALI

PETRONAS CARIGALI

July 15, 2009 Completed

150.

ELECTRICAL AND INSTRUMENTATION FABRICATION & HOST TIE & HOOK-UP COMMISSIONING OF GUA FLAREBOOM REPLACEMENT AT BOUSTEAD PENANG SHIPYARD S/B

EXXON MOBIL June 22, 2009 Completed

151. FABRICATION OF INSTRUMENT GAS SKID FOR KUMANG PROJECT AT SDE PETRONAS CARIGALI

June 15, 2009 Completed

152. FIELD JOINT COATING WORK AT TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI

June 8, 2009 Completed

Page 13: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

153. SUPPLY OF SERVIWRAP TO TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI

May 15 , 2009 Completed

154. FIELD JOINT COATING WORK AT TLO FOR BEKOK-DULANG PROJECT FOR PETRONAS PIPELINE PROJECT

PETRONAS CARIGALI

April 17, 2009 Completed

155. FIELD JOINT COATING WORK AT TLO FOR WEST LUTONG PROJECT FOR PETRONAS PIPELINE PROJECT

PETRONAS CARIGALI

March 6, 2009 Completed

156. FIELD JOINT COATING WORK AT TLO FOR BETTY BAKAU PROJECT FOR PETRONAS PIPELINE PROJECT

PETRONAS CARIGALI

February 12, 2009

Completed

157. PASSIVE FIRE PROTECTION FOR B11 LQ & HELIDECK AT BDEWC, SARAWAK SARAWAK SHELL

BERHAD February 11, 2009 Completed

158. PASSIVE FIRE PROTECTION FOR PC-4 RISER AT BD11 DR-A PLATFORM FOR MMHE

PETRONAS CARIGALI

January 19, 2009 Completed

159. SUPPLY OF ELECTRICAL AND INSTRUMENTATION CABLES FOR F23 VLAP COMPRESSION AT SDE

SARAWAK SHELL BERHAD

January 5, 2009 Completed

160. MARK AND CUT STEEL STRUCTURAL WORKS FOR MCR-A PROJECT AT MMHE MMHE JV WITH

TECHNIP January 2, 2009 Completed

161. FABRICATION OF STRUCTURAL WORKS FOR EAST MODULE TOPSIDES OF GUMUSUT KAPAP AT MMHE

SHELL AND MISC Dec 31, 2008 In progress

162. E & I AND PIPING WORK AT MMHE FOR TANGGA BARAT CPP TOPSIDES PETRONAS CARIGALI

Dec 24, 2008 Completed

163. PASSIVE FIRE PROTECTION FOR B-11 TOPSIDES AT BROOKE DOCK YARD SARAWAK SHELL

BERHAD Dec 19, 2008 Completed

164. SUPPLY OF KOBE ELECTRODES FOR F23-RA TOPSIDES AT RFSB SARAWAK SHELL

BERHAD Dec 19, 2008 Completed

165. INSTRUMENTATION & FGS & TELECON JUNCTION BOX – DULANG B AT KENCANA HL

PETRONAS CARIGALI

November 4, 2008 Completed

166. SUPPLY OF TOTE TANKS PETRONAS CARIGALI

October 29, 2008 Completed

167. SUPPLY OF FIRE RATED WINDOWS FOR KUMANG AND TANGGA BARAT AT SDE

PETRONAS CARIGALI

October 21, 2008 Completed

Page 14: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

168. SUPPLY OF INSTRUMENT CABLES FOR FPSO RUBY AT MMHE MISC October 15, 2008 Completed

169. STRUCTURAL FABRICATION WORK FOR TANGGA BARAT AT MMHE PETRONAS CARIGALI

October 13, 2008 Completed

170. SUPPLY AND INSTALL KUMANG BLASTWALL/ FIREWALL COMPLETE SYSTEM INCLUDING PFP AT SDE TO MEET FIRE RATINGS

PETRONAS CARIGALI

October 10, 2008 Completed

171. SUPPLY OF ELECTRICAL AND INSTRUMENTATION (E&I) CABLES FOR KUMANG AND TANGGA BARAT AT SDE

PETRONAS CARIGALI

Sept 27, 2008 Completed

172. PIPING FABRICATION WORK FOR B11 KA TOPSIDE @ MMHE SARAWAK SHELL

BERHAD Sept 16, 2008 Completed

173. SUPPLY OF PERSONNEL TRANSFER BASKET AND CABLE GLAND / FITTINGS TO MURPHY OIL

MURPHY SARAWAK OIL CO. LTD

Sept 15, 2008 Completed

174. FIELD JOINT COATING WORK FOR CPOC PIPELINES AT TLO PETRONAS CARIGALI

Sept 10, 2008 Completed

175. PASSIVE FIRE PROTECTION FOR PLUTO PROJECT @ RFSB WOODSIDE ENERGY August 15, 2008 Completed

176. FIELD JOINT COATING WORK AT TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT

SARAWAK SHELL BERHAD

August 1, 2008 Completed

177. SUPPLY OF CANUSA HSS TO TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT

SARAWAK SHELL BERHAD

July 22,2008 Completed

178. SUPPLY OF DOUBLE SKIN HEAT SHIELDS FOR B11 KA PROJECT AT MMHE SARAWAK SHELL

BERHAD June 30, 2008 Completed

179. PASSIVE FIRE PROTECTION OF ANDP-D AT RFSB PETRONAS CARIGALI

June 30, 2008 Completed

180. SUPPLY OF SERVIWRAP FOR CPOC PIPELINE TO TLO PETRONAS CARIGALI

June 26, 2008 Completed

181. E&I, PIPING, MECHANICAL & STRUCTURAL FABRICATION FOR KUMANG CLUSTER DEVELOPMENT / TANGGA BARAT PROJECT @ SDE

PETRONAS CARIGALI

June 11, 2008 Completed

182. DESIGN, SUPPLY, FABRICATION AND INSTALL NEW FIRE AND BLASWALL FOR BR-A

TALISMAN MALAYSIA LIMITED

May 23, 2008 Completed

Page 15: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

183. PASSIVE FIRE PROTECTION OF GOPA-GOPB AT KHL MURPHY SARAWAK

OIL CO. LTD May 8, 2008 Completed

184. SUPPLY AND DELIVERY OF CONCRETE MATRESSES, SLEEPERS, LIFTING FRAME FOR 24” ANDR-A/TCOT PIPELINE FOR TLO

PETRONAS CARIGALI

April 30, 2008 Completed

185. ELECTRICAL AND INSTRUMENTATION FABRICATION WORK AT RFSB ON ANGSI –D PLATFORM

PETRONAS CARIGALI

April 24, 2008 Completed

186. PFP for F23 AND F6 AT BROOKE DOCKYARD, KUCHING, SARAWAK SARAWAK SHELL

BERHAD April 11, 2008 Completed

187. SUPPLY OF POWER & INSTRUMENTATION CABLES MURPHY SARAWAK

OIL CO. LTD April 10, 2008 Completed

188. SUPPLY OF HEATSHIELDS TO CLOUGH FOR MONTARA PROJECT IN THAILAND CLOUGH (THAILAND)

CO. LTD April 10, 2008 Completed

189. FIELD JOINT COATING SERVICES FOR TALISMAN PIPELINE INSTALLATION TALIMAN MALAYSIA

LIMITED April 10, 2008 Completed

190. FIELD JOINT COATING FOR PETRONAS CARIGALI 2008 PIPELINE INSTALLATION AT TLO FOR 5 PIPELINES

PETRONAS CARIGALI

April 10, 2008 Completed

191. SUPPLY AND APPLICATION OF WET AND CASTING PFP FOR TALISMAN RISERSAND ESDVS

TALIMAN MALAYSIA LIMITED

April 8, 2008 Completed

192. SUPPLY OF FIRE RATED DOORS TO MMHE PETRONAS CARIGALI

April 5, 2008 Completed

193. SUPPLY OF RADIANT HEATSHIELD, LOUVERS AND MISC ITEMS FOR PC 4 @ MMHE

PETRONAS CARIGALI

March 31, 2008 Completed

194. FIELD JOINT COATING FOR KEA- TIA @ PBJV

PETRONAS CARIGALI

March 7, 2008 Completed

195. SUPPLY OF ELECTRICAL OPERATED MONORAIL TROLLEY HOIST, 5 MT – MMHE

MMHE March 7, 2008 Completed

196. SUPPLY OF MANUAL OPERATED GANTRY CRANE TO MMHE MMHE March 7, 2008 Completed

197. ENGINEERING, DESIGN, FABRICATION AND INSTALLATION OF SHELTER CABIN FOR PC4 AT MMHE

PETRONAS CARIGALI

Feb 28, 2008 Completed

Page 16: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

198. SUPPLY OF LINE PIPES SMLS API TYPE OF VARIOUS SIZES TO MMHE PETRONAS CARIGALI

Jan 17, 2008 Completed

199. SUPPLY OF FIRE RATED DOORS TO TURKMENISTAN GAS DEVELOPMENT PROJECT

MITCO JAPAN SDN BHD

Jan 11, 2008 Completed

200. PASSIVE FIRE PROTECTION FOR BUNGA ORKID @ SDE TALISMAN

MALAYSIA LIMITED Jan 3, 2008 Completed

201. FABRICATION OF GUMUSUT-KAKAP SEMISUBMERSIBLE HULL (PACKAGE 2) SHELL AND MISC December 5, 2007 Completed

202. STRUCTURAL FABRICATION FOR CPOC PROJECT AT MMHE PETRONAS CARGALI

SDN BHD Nov 30, 2007 Completed

203. SUPPLY OF FIRE RATED WINDOWS FOR BUNGA ORKID PROJECT AT SDE TALISMAN

MALAYSIA LIMITED October 23, 2007 Completed

204. SUPPLY OF TOTE TANKS TO EMEPMI EXXON MOBIL Sept 30, 2007 Completed

205. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E& I AND BLASTING/ PAINTING FOR PC 4 TOPSIDE WORK @ MMHE

PETRONAS CARGALI SDN BHD

July 26, 2007 Completed

206. FIELD JOINT COATINGS FOR VASAI EAST DEVELOPMENT PROJECT AT RAMUNIA FABRICATORS SDN BHD

OIL & NATURAL GAS CORPORATION,

INDIA August 27,2007 Completed

207. SUPPLY & APPLICATION OF PASSIVE FIRE PROTECTION -TALISMAN NORTHERN FIELD

TALISMAN MALAYSIA LIMITED

August 23, 2007

Completed

208. FIELD JOINT COATINGS FOR JERNEH PIPELINES AT TLO EXXONMOBIL August 8, 2007 Completed

209. FABRICATE BEAM HAUNCH, CROSS OVER SPOOL FOR HIGH PRESSURE MUD LINE AND CRANE BEAM

SAAG DRILLING & WELL SERVICES SDN

BHD August 7, 2007 Completed

210. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR BELUMUT AT RAMUNIA FABRICATORS SDN BHD

PETRONAS CARIGALI SDN BHD

August 5, 2007 Completed

211. FIELD JOINT COATINGS FOR SEMARANG PIPELINES AT TLO PETRONAS CARGALI

SDN BHD July 28, 2007

Completed

212. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR INTRALINE RESOURCES

TALISMAN MALAYSIA LIMITED

July 16, 2007 Completed

Page 17: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

213. FIELD JOINT COATINGS FOR ANDR-A PIPELINES AT TLO PETRONAS

CARIGALI SDN BHD June 25, 2007

Completed

214. FIELD JOINT COATINGS FOR 18 “ GUE PIPELINE AT TLO EXXONMOBIL June 20, 2007 Completed

215. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SUMANDAK TOPSIDES

PETRONAS CARIGALI

June 13, 2007 Completed

216. SUPPLY OF SPARES FOR CLOSURE DOOR TO MMHE SARAWAK SHELL

BERHAD June 6, 2007

Completed

217. FIELD JOINT COATINGS FOR BETTY– BORONIA 18” P/L SARAWAK SHELL

BERHAD June 1, 2007 Completed

218. ENGINEERING, PROC, CONSTRUCTION & COMMISSIONING OF FIRE PROTECTION SYSTEM

PETRONAS DAGANGAN BERHAD

May 28, 2007 Completed

219. FIELD JOINT COATING FOR TAPM-3 CAA NORTHEN FIELD DEVELOPMENT TALISMAN

MALAYSIA LIMITED May 22, 2007

Completed

220. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SCDR-A TOPSIDES

SARAWAK SHELL BERHAD

May 4, 2007 Completed

221. SUPPLY OF SAFETY EQUIPMENT AND LIFE RAFT TO MDFT FOR KIKEH PROJECT

M.D.F.T (KIKEH) LTD May 2, 2007

Completed

222. FIELD JOINT COATINGS FOR ALL SUMANDAK PIPELINES AND SUPPLY OF SERVIWRAP TO TL OFFSHORE

PETRONAS CARIGALI (PCSB)

April 6, 2007 Completed

223. 2007-2009 OFFSHORE FACILITIES TRANSPORT AND INSTALLATION OF FIELD JOINT COATINGS FOR MCDERMOTT

SARAWAK SHELL BERHAD

March 27, 2007 Completed

224. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR PCSB’S BELUMUT PROJECT AT RFSB

PETRONAS CARIGALI (PCSB)

March 19, 2007 Completed

225. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR ANGEL GAS TOPSIDE PROJECT AT MMHE

WOODSIDE ENERGY March 15, 2007 Completed

226. FIELD JOINT COATING OF 10” BAP-AA TO BADP-G PIPELINE FOR TL OFFSHORE

PETRONAS CARIGALI (PCSB)

March 1, 2007 Completed

227. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR SHELL’S SCDR-A AT MMHE

SARAWAK SHELL March 1, 2007 Completed

Page 18: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

228. FABRICATION, INSTALLATION, TESTING AND PRE-COMMISSIONING OF PIPINGAND MECHANICAL WORKS FOR SCDR-A TOPSIDES AT MMHE

SARAWAK SHELL February 14, 2007 Completed

229. DESIGN, ENGINEERING AND FABRICATION OF END CLOSURE FOR SHELL’S SCDR-A PROJECT AT MMHE

SARAWAK SHELL February 6, 2007 Completed

230. ENGINEERING, DESIGN & FABRICATION OF PFP CASTINGS FOR METERING RUN - BR-B PLATFORM OFFSHORE

TALISMAN MALAYSIA LIMITED

January 29, 2007 Completed

231. FABRICATE GUMUSUT-KAKAP SEMI-SUBMERSIBLE HULL SHELL January 25, 2007 Completed

232. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E& I AND BLASTING/PAINTING FOR F6 REJUVENATION WORKS

SARAWAK SHELL January 23, 2007

Completed

233. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR MAARI FIELD DEVELOPMENT AT KENCANA HL ENGINEERING

CLOUGH PROJECT INTERNATIONAL PTY

LTD, AUSTRALIA January 17, 2007 Completed

234. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR ANGEL GAS PROJECT AT MMHE

WOODSIDE ENERGY LTD, AUSTRALIA

January 15, 2007 Completed

235. SUPPLY OF ANTI-SKID BRE STAIRWAYS TALISMAN

MALAYSIA LIMITED January 4, 2007 Completed

236. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR SCDR-A PROJECT AT MMHE

SARAWAK SHELL Dec 27, 2006 Completed

237. SUPPLY OF INSTR. CABLE CONNECTING BRA AND BRE PAGA SYSTEM TALISMAN

MALAYSIA LIMITED Nov 15, 2006 Completed

238. FIELD JOINT COATING FOR PBJV GROUP SDN BHD FOR WEST LUTONG PROJECT

PETRONAS CARIGALI

Nov 11, 2006 Completed

239. CONTRACT FOR CIVIL WORKS PACKAGE FOR KUANTAN –KERTEH RAILWAY PROJEC, INCL. VEHICULAR, DRAINAGE & UTILITY BOX CULVERTS

PERCON BABENA JOINT VENTURE

October 15, 2006 Completed

240. STRUCTURAL STEEL FABRICATION FOR SUMANDAK SELATAN TOPSIDES AND HOST

PETRONAS CARIGALI

Sept 27, 2006 Completed

241. FJ COATING FOR TLO PCSB AND SHELL August 10, 2006 Completed

242. PIPING WORKS FOR KIKEH FPSO AT MMHE MURPHY OIL August 2, 2006 Completed

Page 19: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

243. SUPPLY OF HEATSHIELDS FOR F13W PROJECT AT RAMUNIA FABRICATORS SARAWAK SHELL June 15, 2006 Completed

244. SUPPLY OF END CLOSURE DOORS- F13W AT RFSB SARAWAK SHELL June 09, 2006 Completed

245. PASSIVE FIRE PROTECTION FOR KIKEH DTU TOPSIDES MURPHY OIL

May 3, 2006 Completed

246. FIELD JOINT COATINGS AT BARMADA MCDERMOTT TALISMAN

MALAYSIA LIMITED March 14, 2006 Completed

247. FIELD JOINT COATINGS FOR BARMADA MCDERMOTT S/B EXXON MOBIL March 14, 2006 Completed

248. PASSIVE FIRE PROTECTION FOR ARTHIT PFP AT Mc DERMOTT YARD IN BATAM INDONESIA

PTTEP and KBR February 27, 2006 Completed

249. PIPING WORKS FABRICATION FOR MURPHY KIKEH PROJECT @ MMHE MURPHY OIL January 14, 2006 Completed

250. ELECTRICAL AND INSTRUMENTATION FOR MODEC RJS-409 MODULE FABRICATION @ SDE

PETROBRAS December 1, 2005 Completed

251. PIPELINE FIELD JOINT COATING FOR BARAM (MCOT) 16” AND 10” PETRONAS

CARIGALI – TLO Nov 30, 2005 Completed

252. STRUCTURAL FABRICATION FOR MODEC RJS-409 ESPADARTE MODULE FABRICATION @ SDE

PETROBRAS November 1, 2005 Completed

253. SPECIAL STRUCTURAL SPECIAL FABRICATION FOR MURPHY KIKEH PROJECT MURPHY OIL September 9, 2005 Completed

254. SUPPLY AND INSTALL OF FIRESEAL FOR AMENAM KPONO PROJECT TOTAL ELF September 9, 2005 Completed

255. ARCHITECTURAL FITTINGS FOR CLIFF HEAD A PLATFORM AT HL ENGINEERING

ROC OIL, AUSTRALIA August 6, 2005 Completed

256. PFP FOR SHELL E11 –PB SARAWAK SHELL August 3 2005 Completed

257. SUPPLY OF BARUNIA PROTECTIVE RELAYS PETRONAS

CARIGALI SDN BHD August 3, 2005 Completed

Page 20: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

258. MAJOR STRUCTURAL FABRICATION FOR MURPHY KIKEH DTU SPAR HULL MURPHY OIL May 3, 2005 Completed

259. PFP FOR BARAM TOPSIDE AT BDEWC PETRONAS

CARIGALI SDN BHD April 2005 Completed

260. DESIGN, ENGINEERING AND FABRICATION OF BARAM HEATSHIELD AT BDEWC

PETRONAS CARIGALI SDN BHD

April 2005 Completed

261. BLASTING AND PAINTING WORKS AT SSE FOR GUE EXXONMOBIL March 2005 Completed

262. DESIGN, ENGINEERING AND FABRICATION OF E11 P-B BLASTWALL AT MSE SARAWAK SHELL

BERHAD March 2005 Completed

263. PFP FOR SHELL’S E8-DR-A AT RAMUNIA FABRICATORS SARAWAK SHELL

BERHAD March 2005 Completed

264. PFP FOR SHELL’S F13 SARAWAK SHELL February 2005 Completed

265. PFP FOR BR-E JACKET AND TRIPOD PROJECT AT MSE TALISMAN ENERGY February 2005 Completed

266. PFP FOR BR-E CO2 REMOVAL PROJECT AT SSE TALISMAN ENERGY February 2005 Completed

267. PFP FOR GUNTONG E PROJECT AT SIME SEMBCORP ENGINEERING EXXONMOBIL

EXPLORATION & PRODUCTION INC

January 2005 Completed

268. DESIGN, ENGINEERING AND FABRICATION OF SCKA & SF 13 HEATSHIELDS SARAWAK SHELL

BERHAD October 2004 Completed

269. DESIGN, ENGINEERING AND FABRICATION OF GUNTONG- E BLASTWALL EXXONMOBIL

EXPLORATION & PRODUCTION INC

July 2004 Completed

270. STRUCTURAL STEEL FABRICATION & WELDING AT MSE FOR MOAB TALISMAN ENERGY July 22, 2004 Completed

271. BLASTWALL REINSTAMENT TO H60 RATING – PFP TALISMAN ENERGY July 5, 2004 Completed

272. SUPPLY OF VESSELS UNDER MASTER SPOPT CHARTER PARTY FCF653 EXXONMOBIL

EXPLORATION & PRODUCTION INC

June 26, 2004 Completed

Page 21: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

273. PASSIVE FIRE PROTECTION SUPPLY AND APPLY FOR AMENAM PROJECT AT SSE TOTAL ELF FINA @

NIGERIA June 2004 Completed

274. SUPPLY OF PRODUCTION & TEG CHEMICALS - 3 YEARS SARAWAK SHELL/

PCSB / NIPPON June 23, 2004 Completed

275. CASTINGS FOR BUNGA RAYA-A PLATFORM TALISMAN ENERGY March 3, 2004 Completed

276. PFP FOR YOHO PROJECT PROTECTION EXXON MOBIL

NIGERIA March 2004 Completed

277. CASTINGS FOR SDV on BUNGA RAYA-A TALISMAN ENERGY December 2003 Completed

278. PFP FOR SERAI PROJECT SARAWAK SHELL September 2003 Completed

279. PFP FOR JINTAN PROJECT PROTECTION SARAWAK SHELL

BERHAD July 2003 Completed

280. INFIELD JOINT COATING FOR NIPPON STEEL (NSC) PETRONAS CARIGALI

May 8, 2003 Completed

281. YOHO PLATFORM ELECTRODE EXXON MOBIL

NIGERIA February 2003 Completed

282. BUNGA RAYA 24” Riser PFP PCSB/TALISMAN February 2003 Completed

283. SHELL M3 BLASTWALL SARAWAK SHELL January 11, 2003 Completed

284. HELANG’s RISER / SDV/ FLANGE / VALVE PFP CASTING NIPPON OIL

EXPLORATION January 2003 Completed

285. MLNG SPHERE PFP MLNG SDN BHD December 2002 Completed

286. LUNDIN RISER / SDV PFP TALISMAN December 2002 Completed

287. HALFDAN HEATSHIELDS ENGINEERING DESIGN SEMBCORP ENGRG

SINGAPORE September 6, 2002 Completed

Page 22: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

288. SHELL M1 BLASTWALL ENGINEERING DESIGN SARAWAK SHELL

BERHAD September 2002 Completed

289. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP NIPPON OIL

(HELANG) AT MSE July 15, 2002 Completed

290. MODIFICATION & INSTALL ELECTRICAL WORK FOR SWITCHGEARS (KNDP-A) SARAWAK SHELL

BERHAD Nov 18, 2001 Completed

291. PASSIVE FIRE PROTECTION FOR MLNG3 SLUGCATCHER PETRONAS CARIGALI

October 29, 2001 Completed

292. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP MALAYSIA LNG

SDN BHD October 20, 2001 Completed

293. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP PETRONAS CARIGALI

October 15, 2001 Completed

294. SUPPLY/ INSTALL E & I SWITCHGEAR SARAWAK SHELL

BERHAD August 20, 2001 Completed

295. INSULATION CONTRACT WITH PETRA RESOURCES ESSO PRODUCTION

MALAYSIA INC. July 6, 2001 Completed

296. SUPPLY OF ELECTRODES DOTANAH ENGRG &

CONSTRUCTORS July 2, 2001 Completed

297. ELECTRODE SUPPLY FOR NIPPON OIL (HELANG) MALAYSIA

SHIPYARD (MSE) June 15, 2001 Completed

298. ELECTRODE SUPPLY FOR PETRONAS CARIGALI (ANGSI-A) SIME SEMBCORP

ENGINEERING June 15, 2001 Completed

299. ELECTRODE SUPPLY FOR ESSO (SATELIT) AND LARUT MSE February 2001 Completed

300. SUPPLY OF ELECTRODES FOR ESSO (LARUT-A) SIME SEMBCORP

ENGINEERING July 6, 2000 Completed

301. SUPPLY OF ELECTRODES PETRONAS FERTILIZER

TENDER Completed

302. SUPPLY OF CONSUMABLES FOR PETRONAS PETRONAS

AMMONIA SDN BHD TENDER TENDER

Page 23: JURUNATURE SDN. BHD. COMPANY CURRENT … sdn. bhd. – company current track record ... sapura kencana petroleum c/o tl offshore sdn bhd ... jurunature sdn. bhd. – company current

JURUNATURE SDN. BHD. – COMPANY CURRENT TRACK RECORD

NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

April 30, 2013

303. SUPPLY OF CONSUMABLES FOR PCSB PETRONAS CARIGALI

TENDER TENDER