Transcript of Jeff Parish State of the Parish 2005

  • 8/14/2019 Jeff Parish State of the Parish 2005

    1/21

    STATE OFSTATE OF

    THE PARISHTHE PARISHYEAR ENDING 2005YEAR ENDING 2005

  • 8/14/2019 Jeff Parish State of the Parish 2005

    2/21

    MISSION STATEMENTMISSION STATEMENTJEFFERSON PARISH, LOUISIANAJEFFERSON PARISH, LOUISIANA

    To provide the services,leadership, and vision to

    improve the quality of life inJefferson Parish.

  • 8/14/2019 Jeff Parish State of the Parish 2005

    3/21

    ENVISION 2020ENVISION 2020

    ll The Council has authorized the nextThe Council has authorized the nextphase of ENVISION 2020 as well asphase of ENVISION 2020 as well asactivated the ENVISION 2020activated the ENVISION 2020Comprehensive Land Use PlanComprehensive Land Use Plan

    ll This is the first ever Comprehensive LandThis is the first ever Comprehensive LandUse Plan in Jefferson ParishUse Plan in Jefferson Parish

  • 8/14/2019 Jeff Parish State of the Parish 2005

    4/21

    ll ECONOMIC DEVELOPMENT: MILECONOMIC DEVELOPMENT: MILll SENIOR SERVICES: MILSENIOR SERVICES: MIL

    ll CULTURE & PARKS: 1 MILLCULTURE & PARKS: 1 MILLll CRIMINAL JUSTICE: 1 MILCRIMINAL JUSTICE: 1 MIL

    3 Mills Total

    RECEIVED VOTER APPROVAL

    NOVEMBER 2, 2004

    MILLAGE REDEDICATIONMILLAGE REDEDICATION

    ELECTION PROPOSITIONSELECTION PROPOSITIONS

  • 8/14/2019 Jeff Parish State of the Parish 2005

    5/21

    75%Federal

    25%Parish

    SOUTHEAST LOUISIANASOUTHEAST LOUISIANA

    FLOOD CONTROL PROJECTFLOOD CONTROL PROJECT

    Pump to the River

    East of Harvey

    Hoeys Basin (Eastbank)

    Cataouache Basin (Westbank)

    ApprovedDesign Underway

    Report Being Prepared forCorps Approval

    Preliminary Survey Stage

    PENDING PROJECTS2005*$556 million approved projects

    $367 million funded to date

    $189 million pending

    42 projects completed

    4 under construction or bid16 under design or on hold

    *as of September 05

  • 8/14/2019 Jeff Parish State of the Parish 2005

    6/21

    DRAINAGE/PUMP STATIONSDRAINAGE/PUMP STATIONS

    l $13 billion of drainage improvement projects has been categorizedand prioritized into three phases and prepared for submittal to U.S.Congress for funding

    l Pumping Station repairs (structural and mechanical) are ongoing with

    in-house crews, contractors, FEMA assistance, and through the ArmyCorps of Engineers

    l The Drainage Department has requested funding to repair canal bankfailures due to the effects of Hurricane Katrina from the NaturalResources Conservation Service (NRCS)l funding is presently pending

    l The Drainage Department is monitoring and coordinating:l sheet pile removal at Hammond Highway Bridge along the 17th Street

    Canall pumping activities at New Orleans Pumping Station No. 6 with the U.S.

    Army Corps of Engineers and New Orleans Sewerage and Water Board toensure adequate drainage for Old Metairie and Old Jefferson during rain

    events

  • 8/14/2019 Jeff Parish State of the Parish 2005

    7/21

    RETENTION PONDSRETENTION PONDS

    (Clearview at Earhart)(Clearview at Earhart)Designed to reduce chronicClearview Parkway-EarhartExpressway flooding

    There will be a total of sevenponds when the project iscompleted which will be linkedby pipelines and connected to

    the drainage system

    Ponds will hold approximately 24 million gallons of water

    Construction began early April and is expected to be completed

    the first quarter of 2006

  • 8/14/2019 Jeff Parish State of the Parish 2005

    8/21

    WEST JEFFERSONWEST JEFFERSON

    LEVEE DISTRICTLEVEE DISTRICTl Hurricane Protection Project:

    l In 2005 approximately $88 million in projects were under contractwith an additional $30 million scheduled for 2006

    l Critical feature: The Harvey Canal Sector Gatel estimated to be complete in mid 2006 and will provide elevated flood

    protection along the east side of the Harvey Canal

    l Working with U. S. Army Corps of Engineers, LouisianaDepartment of Transportation & Development, and

    Jefferson Parish to construct levees and floodwalls in theLafitte areal Following many years of study, the $16 million Fisher School Basin

    Project will let its first contract in early 2006 and the Pen Levee inlower Lafitte will see construction of a $3 million floodwall

  • 8/14/2019 Jeff Parish State of the Parish 2005

    9/21

    AST JEFFERSONEAST JEFFERSON

    LEVEE DISTRICTLEVEE DISTRICTLEVEE LIFT PROJECTSl Causeway to the Suburban Canal: damaged during Katrina and Rita, but has

    been repaired by the contractor. Construction work is proceeding and theCorps will be negotiating the contract for the additional work (the wideningcrowns and flattened side slopes) This initial contract was $1.5 million and thiscontract change should be $1.4 million.

    l Duncan to St. Charles Parish line: the contract to lift this 2-mile section of leveeis about to go out to bid by the Corps of Engineers. It will likely be completedby December 2006 and it will lift the levee about 2-3 feet.

    AIRPORT FLOODGATE PROJECT : protects East Jeff from LakePontchartrain storm surgel $5 million floodgate set into place at the East Jeff / St. Charles Parish line on the

    southwest corner of the Armstrong International Airport runway in October2005.

    l The Corps did not have the funding and the airport paid the entire constructioncost; projected to be completed by December 16th.

    HAMMOND HIGHWAY: completed just prior to Katrina.l The bridge has served as a staging ground for the 17th St. Canal repairs. After

    the canal repairs are completed, the roadway will require repairs due to theheavy construction equipment that was required for the task.

  • 8/14/2019 Jeff Parish State of the Parish 2005

    10/21

    E.J. LEVEE DISTRICTE.J. LEVEE DISTRICT(continued)(continued)

    CAUSEWAY ROCK DIKE AND LINEAR PATH: sustained damagedue to hurricanes and has been included in FEMA claiml Once repaired and bike path completed, the bike path should be

    continuous from Huron (west end of Bucktown) to WilliamsBoulevard by Spring, 2006.

    REHABILITATION ASSISTANCE REQUESTSl Submitted to the Corps for damage sustained to the Lake

    Pontchartrain and Vicinity Hurricane Protection Project and to theMississippi River Project, the floodwalls and other features on theparish line canals from the river to the lake.

    l The EJLD has asked that the Corps to include sections thatcurrently have no protection on the Orleans and St. Charles Parish

    lines under the Hurricane Protection Project to completely seal JPoff from other parishes.

    17TH STREET CANALl The East Jefferson side of the 17th Street Canal is being monitored

    including the scours inside the canal near the Hammond HighwayBridge. The Corps will soon be performing an assessment of allfloodwalls.

  • 8/14/2019 Jeff Parish State of the Parish 2005

    11/21

    LOUISIANA COASTAL WETLANDS:LOUISIANA COASTAL WETLANDS:A RESOURCE AT RISKA RESOURCE AT RISKl

    Approximately 60% of Jeffersonsland area is coastal marshlandswhich:

    l Supports and protects the wetlandenvironment

    l Protects the citizens againsthurricane winds and tidal surges

    l Preserves the economic andcultural heritage

    l On July 29, 2005 the Energy Bill

    Conference Report was adopted byCongress and sent to PresidentBush for his signaturel Allocates $1 billion in coastal impact assistance to six (6) coastal energy

    producing states: Louisiana, Texas, Mississippi, Alabama, Alaska, and California

    l The nineteen coastal parishes of Louisiana, including Jefferson Parish, willreceive 35% of the states annual share of the $135 million dollars

    l Each parish can receive 25% of its total in an equal amount each year starting inthe federal FY 2007 to 2010 for a total of 100%

    l It is estimated that Jefferson Parish will receive $17,147,332 for coastal projects

    18391870

    1993 2020

  • 8/14/2019 Jeff Parish State of the Parish 2005

    12/21

    11-- 99

    EXTENTIONEXTENTIONWhen Completed:Would connect the metro area toKansas City, MO.

    In Avondale:

    Possible corridors narrowed down to three:1.) To follow the U.S. 90 right-of-way and two would cut south ofthe highway just west of the St. Charles-Jefferson parish line2.) One of the southerly routes would reconnect with U.S. 90between Avondale and the TPC golf course3.) Would rejoin the existing highway corridor between the golfcourse and Bayou Segnette Park

    all are elevated roadways

    The segment between the Westbank Expressway inWestwego and LA 306 in St. Charles Parish is estimated

    to cost between $960 million and $1.1 billion

  • 8/14/2019 Jeff Parish State of the Parish 2005

    13/21

    HUEY P. LONG BRIDGE

    EXPANSION

    TIMED ProjectTIMED Project

    approved by voters in 1989; funded byapproved by voters in 1989; funded byTIMED Project funds (fuel tax)TIMED Project funds (fuel tax)

    MultiMulti--phase projectphase project First phase to be bid in MayFirst phase to be bid in May

    2005 (total of five construction2005 (total of five constructionphases)phases)

    Estimated Costs: $400Estimated Costs: $400millionmillion

    Will widen the bridge fromWill widen the bridge fromfour to six lanes (three infour to six lanes (three ineach direction) witheach direction) with

    shouldersshoulders

    Both approaches (East andBoth approaches (East andWest Banks) will beWest Banks) will becompletely reconstructedcompletely reconstructed

    DOTD's current goal is toDOTD's current goal is tocomplete the entire projectcomplete the entire project

    by December 2010by December 2010

    Phase I (Main Substructure) to commenceduring the first quarter of 2006

  • 8/14/2019 Jeff Parish State of the Parish 2005

    14/21

    NIMS STUDIOl More than 18 feature films, television movies, commercials

    and music videos have been made with combinedproduction budgets of $382.5 million dollarsl Feature films average 300 workers, television movies average 150 workers.

    The average film production job pays more than $70,000 annually.

    l Expanded operations in early January 2006: newly purchasedPaul Prudhomme Magic Seasoning Blends building, adjacent to theCenterl New sound stage and additional production offices and will bring the total

    Nims Center StudioPlex square footage to more than 110,000 square feet.

    l

    Soon to be the region's first high-definition post-production facility at a cost of more than $1 million dollars

    l In 2006:l Three major feature films with combined budgets of $170 million dollars

    and eight television movies with combined budgets of $32 million dollarswill be shot at the Nims Center.

  • 8/14/2019 Jeff Parish State of the Parish 2005

    15/21

    PERFORMING ARTSPERFORMING ARTS

    CENTERCENTERl 2005-06 LegislativeSession:l $6.5 million in Priority 1

    funding (was $14.5million--$8 millionrescinded in October2005)

    l $5.5 million in Priority 5

    funding

    l Begin Construction:March of 2006

  • 8/14/2019 Jeff Parish State of the Parish 2005

    16/21

    TECHNOLOGY & BUSINESS PARK

    Image: A high-profile, planneddevelopment

    Phase I: Donation of 40 acreswith an additional 460 acresavailable for futuredevelopment

    Impact: Property valued at $442million with annual payrolls of$492 million, 12,700 jobs withan average salary of $38,747

    Short Term Design Plans: Office

    Buildings, Film Soundstage,Hotel, Conference Center andScience and TechnologySchool

    Future of Surrounding Area:Mixed use housing, recreation

    and retail

    Situated at the center of JeffersonSituated at the center of JeffersonParish, 12 miles from LouisParish, 12 miles from Louis

    Armstrong Airport; 20 minutes fromArmstrong Airport; 20 minutes from

    Downtown New OrleansDowntown New Orleans

  • 8/14/2019 Jeff Parish State of the Parish 2005

    17/21

    OPERATING BUDGETOPERATING BUDGET

    Revenues & ExpendituresRevenues & Expenditures

    2004 Fund Balance$71,702,490

    2005 Revenues

    $320,925,070

    2005 Expenditures

    $331,762,258

  • 8/14/2019 Jeff Parish State of the Parish 2005

    18/21

    SALES TAX COLLECTIONS

    $1,000,000

    $4,000,000

    $7,000,000

    $10,000,000

    $13,000,000

    January

    Febru

    aryMa

    rch April

    May

    June Ju

    ly

    August

    Septe

    mber

    Octob

    er

    Novemb

    er

    Decemb

    er

    1996 2004 2005

    $1,500,000

  • 8/14/2019 Jeff Parish State of the Parish 2005

    19/21

    BOND RATINGBOND RATING

    ll Fitch Rating:Fitch Rating:

    ll General Obligation bonds AA underlyingGeneral Obligation bonds AA underlying

    ratingrating

    Fitch Ratings News ReleaseOctober 26, 2005

    Jefferson Parish appears to have recovered more

    quickly than other areas due to relatively limited

    flooding and wind damage.

  • 8/14/2019 Jeff Parish State of the Parish 2005

    20/21

    NORMALCY

    FLOOD PROTECTIONREVITALIZATION

    NORMALCY

    FLOOD PROTECTIONREVITALIZATION

  • 8/14/2019 Jeff Parish State of the Parish 2005

    21/21

    STATE OFSTATE OF

    THE PARISHTHE PARISHYEAR ENDING 2005YEAR ENDING 2005