JB115

3
Jennifer Blair San Luis Obispo, CA (714) 336-3946 [email protected] _________________________________________________________________ _______ Qualification Summary: · Office of Primary Responsibility (OPR)/Project Management. · Cross Functional Team Leadership experience. · Electrical System Design experience. · Electrical Schematics and ICD familiarity. · Matlab experience. · C++ familiarity. · Failure Mode Analysis/Root Cause experience. · Experience with complete product life cycle. · Experience with UAV aircraft. · CATIA V5, CEEDs. AutoCAD and Visio experience, VeSys (Mentor Graphics). · Familiar with Federal Aviation Regulations and MIL-STDs (particularly Parts 25 and 121, DO-160, MIL-STD- 461, MIL-STD-810). · CAN Bus experience (MIL-STD-1553). · Familiarity with Airbus and Boeing (737, 747, 757, 767, 777) aircraft and systems. · Experience designing In-Flight Entertainment systems and cabin lighting systems. · Prototype IFE Installation and Testing Experience. · Experience designing Block Diagrams, Wire Harnesses, Wiring Diagrams and Cable/Harness Assembly Drawings, BOMs, Layout Drawings, Schedules. · EMI testing experience. · Avionics hardware experience. · Ability to perform a variety of tasks independently. · Possess great interpersonal skills and determination to complete tasks and goals on time. · Possess extensive analytical skills and logic to assist in supplying reasonable solutions to problems. Computer Skills: AutoCAD, Catia V5, VeSys (Mentor Graphics), CEEDS, Teamcenter, Visio, C++, MATLAB, Agile Work Experience Josyln Sunbank June 2014 - Present Connector, Backshell, Conduit Design Solidworks, Oracle, MFG PRO familiarity Wire Harness testing and set up (Eye Pattern testing) B/E Aerospace January 2014 - March 2014 Lead Electrical Engineer on IPT team Galley Design Connector Selection

Transcript of JB115

Page 1: JB115

Jennifer BlairSan Luis Obispo, CA

(714) [email protected]

________________________________________________________________________Qualification Summary:

· Office of Primary Responsibility (OPR)/Project Management. · Cross Functional Team Leadership experience. · Electrical System Design experience. · Electrical Schematics and ICD familiarity. · Matlab experience. · C++ familiarity. · Failure Mode Analysis/Root Cause experience. · Experience with complete product life cycle. · Experience with UAV aircraft. · CATIA V5, CEEDs. AutoCAD and Visio experience, VeSys (Mentor Graphics). · Familiar with Federal Aviation Regulations and MIL-STDs (particularly Parts 25 and 121, DO-160,

MIL-STD- 461, MIL-STD-810). · CAN Bus experience (MIL-STD-1553). · Familiarity with Airbus and Boeing (737, 747, 757, 767, 777) aircraft and systems. · Experience designing In-Flight Entertainment systems and cabin lighting systems. · Prototype IFE Installation and Testing Experience. · Experience designing Block Diagrams, Wire Harnesses, Wiring Diagrams and Cable/Harness Assembly

Drawings, BOMs, Layout Drawings, Schedules. · EMI testing experience. · Avionics hardware experience. · Ability to perform a variety of tasks independently. · Possess great interpersonal skills and determination to complete tasks and goals on time. · Possess extensive analytical skills and logic to assist in supplying reasonable solutions to problems.

Computer Skills:AutoCAD, Catia V5, VeSys (Mentor Graphics), CEEDS, Teamcenter, Visio, C++, MATLAB, Agile

Work ExperienceJosyln Sunbank June 2014 - Present

• Connector, Backshell, Conduit Design• Solidworks, Oracle, MFG PRO familiarity• Wire Harness testing and set up (Eye Pattern testing)

B/E Aerospace January 2014 - March 2014 • Lead Electrical Engineer on IPT team• Galley Design• Connector Selection• Weight analysis

Independent Commercial Contract Services January 2013 - December 2013 • Create wiring diagrams, ICDs for LRU’s to be placed in various fleets• Worked closely with various customers• Wifi connectivity and IFE for 737s, 757s, 767s, 777s, Airbus A319, A320, A330• STC familiarity• CAN bus familiarity.• Prototype IFE Installation and EMI Testing Experience• Worked with Electrical Interior Monuments

Page 2: JB115

• Wiring for Electronics of VIP 747 aircraft (LED lighting, IFE, Lavatories, Galley)• AutoCAD 2013 and VeSys (Mentor Graphics) for designing wire diagrams

Jamco-America September 2012 - January 2013 • Design and create Cable Assemblies, Wire Diagrams, Wire Harnesses using AutoCAD• Work on First Class and Business Class Seats for Boeing and Airbus Aircraft• Use of Smarteam

L-3 Communications August 2011 - June 2012 • Cable Assemblies, Wire Diagrams, Wire Harnesses using AutoCAD• Manufacturing Liaison for cables• Use of Teamcenter for document release• Created Test Procedures

ION GXT February 2011 - July 2011 · Geophysicist · Seismic Surveying offshore · Experience with ProMax, ProManager, Multiviewer, CJM, Galaxy

Northrop Grumman May 2009 - November 2010 · Level 2 Engineer · UAV aircraft · Designed wire harness on HarneSYS

Boeing September 2005 - May 2009 · Engineer/Scientist: B-1B Electrical Systems Design: Created wire harness and wire diagrams for upgrades on

the B1-B using Catia V5, CMstat, CEEDS and Visio · Engineer/Scientist: B-1B Avionics Hardware: Created SPECS, SOW, and SDRL for testing avionics hardware

and evaluated test results · Engineer/Scientist: C-130 Aircraft Computing Environment: create and update WDTs (Wiring Data

Transmittal) and CEEDS drawings · Experience of operating as the OPR (Office of Primary Responsibility) for a project on B-1B, cross functional

team leadership, product life cycle development. · Ability to interpret requirement specifications of ICDs, Test Plans and Test Procedures as well as SOWs and

SDRLs · Analyzed test results of avionics hardware · Lab experience monitoring testing, observing results and recording data · In charge of projects and responsible for meeting deadlines · Experience preparing Documentation for testing specifications and requirements · Experience reviewing technical documents and verifying requirements · Experience being the primary contact point between vendors/customers · Capable of working on various tasks and projects simultaneously

InternshipFuture Jet Aerospace

· Worked with wire harnesses, data entry, databases, Excel, and AutoCAD drawings · Used AutoCAD and VeSys to design lighting system on aircraft · Worked with Electrical Interior Monuments

EducationSouthern Methodist University, Dallas, TexasSchool of EngineeringBachelor of Science in Electrical Engineering with a Biomedical SpecializationDecember 2004 graduation

Page 3: JB115

Activities and AffiliationsBoeing Pride AwardSMU Institute of Electrical and Electronics Engineers - Secretary, Vice PresidentDale Carnegie Leadership Course

Available for travel, weekends and overtime.