Page 1: Issue: The Missing Money

www.ces-ltd.com

LTTR, FCM, RPM, MRTU: Do More Acronyms Mean Better RTO Markets?

An Overview of Various RTO Capacity Constructs and their Impact on Load Serving Entities

Page 2: Issue: The Missing Money

2www.ces-ltd.com

Issue: The Missing Money

• In an average year, some peaking generation will only run a few hours a year.

• For most commodities, infrequent utilization/purchase of a resource/product may be a signal that the resource/product is not needed.

• Electricity is different: we must keep the lights on, so must hold onto some infrequently utilized resources.

• In today’s energy markets:– If a generator does not run, it does not get paid– ISOs need a way to repay this “missing money” to keep enough

generation on hand.

Page 3: Issue: The Missing Money

3www.ces-ltd.com

How to Recover the Missing Money

• Scarcity Pricing Only: To ensure that sufficient investment is made in supply, a market can be designed such that during those infrequent periods of unusually high demand, prices are also permitted to go unusually high.

• Capacity Market: To combat market power concerns, the energy price is mitigated and generally assumed to only cover short-term variable costs, and a second revenue stream via a capacity construct is developed to cover long-term fixed costs.

• Hybrid: This approach combines a capacity construct with relaxed energy market mitigation and/or limited administrative price setting.

Page 4: Issue: The Missing Money

4www.ces-ltd.com

Previous Capacity Market Approach

• Unforced Capacity (UCAP) market– Generators assigned an Unforced Capacity value based on

the generator’s forced outage rate– ISO’s goal was to procure enough unforced capacity to meet

the expected load forecast plus a sufficient Installed Reserve Margin (IRM) to ensure a loss of load probability less than one in ten years.

• Loads must procure sufficient capacity to cover unforced capacity obligation or pay deficiency charge– Capacity could be acquired through:

• Bilateral contracts

• Auctions (loads needed only procure the delta between their requirement and bilateral contracts)

Page 5: Issue: The Missing Money

5www.ces-ltd.com

Previous Capacity Market Issues

• Auctions resulted in very low ($5/mw-day) or very high clearing prices ($160/mw-day) with little in between

0

20

40

60

80

100

120

140

160

180

0.95 0.97 1 1.05

Demand

Supply

Case 1: Capacity less than

Installed Reserve Margin: Capacity

Clears at Deficiency Rate

Case 2: Capacity greater than

Installed Reserve Margin: Capacity

Clears very low

Page 6: Issue: The Missing Money

6www.ces-ltd.com

Previous Capacity Markets

• The Good:– Loads can easily fulfill obligations through long term bilateral

contracts– Multiple options to make up for capacity requirements

beyond bilateral contracts• Monthly, multi-monthly, and daily auctions

• The Bad:– Price volatility increases long term investment risk– RTO wide clearing price results in low price for capacity, but

does not recognize localized capacity shortages– Low prices have caused high marginal cost units in areas

like New Jersey and Southeastern Mass to retire, requiring expensive out of market Reliability Must Run (RMR) contracts

Page 7: Issue: The Missing Money

7www.ces-ltd.com

Case Study: PJM’s RPM Approach

• Capacity acquired through annual, forward auctions– Centralized procurement

– Auctions cleared based on resource offers, demand obligation, and reliability metrics

• Auctions contain a Variable Resource Requirement (aka “Demand Curve”)– Values capacity above the installed reserve margin requirement

– Sets clearing price at intersection with supply curve

• Locational clearing prices– Locational Deliverability Areas (LDAs) defined based on

transmission import capability into local areas

– Each LDA’s clearing price may contain an adder over the system price, if additional capacity is needed in the LDA

Page 8: Issue: The Missing Money

8www.ces-ltd.com

Variable Resource Requirement

• RPM includes a Variable Resource Requirement (aka “Demand Curve”) that will establish the market clearing prices in each LDA

• Clearing prices set at the intersection of the supply curve and Variable Resource Requirement

• Curve is intended to value capacity above the Installed Reserve Margin requirement, theoretically resulting in lower capacity costs in the long run, due to minimizing the boom / bust capacity cycle

• Curve is based on the daily cost for a new combustion turbine, minus the revenues a combustion turbine would earn from the Energy and Ancillary Services Markets

Page 9: Issue: The Missing Money

9www.ces-ltd.com

PJM’s Variable Resource Requirement

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

-10 -8 -6 -4 -2 0 2 4 6 8 10

Percentage Point Change From Installed Reserve Margin

Mu

ltip

le o

f C

ost

of

New

En

try

Supply Curve

Clearing Price established

By intersection of VRR and

Supply curve

Load required to purchase more than

Installed Reserve Margin (104.5% in this case)

Page 10: Issue: The Missing Money

10www.ces-ltd.com

Locational Deliverability Areas

• RPM adds a locational component to PJM capacity pricing:

– Each “Locational Deliverability Area” under RPM is subject to a locational price adder, inflating an LDA’s price over the RTO price

– LDAs are defined based on transmission capacity transfer capability into an area

– LDA price will only be higher than the remaining RTO if additional, more expensive capacity is needed within the LDA

Page 11: Issue: The Missing Money

11www.ces-ltd.com

Locational Deliverability Areas

Page 12: Issue: The Missing Money

12www.ces-ltd.com

RPM Auctions

• Under RPM, PJM will conduct forward auctions.– Auctions held three years in advance of the planning year– Auctions held for an entire planning year (June 1 to May 31)

• Unlike the current capacity market, load does not directly participate in RPM auctions– PJM administratively bids load into the auctions via the

demand curve– Loads will ultimately pay zonal capacity prices based on the

auction clearing prices– Bilateral contracts will provide a credit against the capacity

prices, but the credit may not equal the capacity charge

Page 13: Issue: The Missing Money

13www.ces-ltd.com

Auction Results

• First RPM auction was held in April, 2007– Auction prices apply for the 2007/2008 Delivery Year

• Load Prices as a result of the auction:

Locational Deliverability Area Load Price ($/mw-day)

Eastern MAAC (NJ, Eastern PA, Delmarva):

$177

Southwestern MAAC (DC, Baltimore):

$140

Remainder of PJM: $41

Page 14: Issue: The Missing Money

14www.ces-ltd.com

Forward Procurement: Good or Bad?

• Three year forward auction provides:– Ability for new generation to offer into the market and be

guaranteed a capacity price– Certainty for PJM that it will have sufficient installed capacity

• Forward auction also:– Limits ability for load serving entities to arrange bilateral

capacity– Adds risk to generation owners to offer full amount of

capacity into the market, which can result in a premium on the generator’s offer

Page 15: Issue: The Missing Money

15www.ces-ltd.com

Locational Capacity Pros and Cons

• Arguments for:

– Engineering reality of the electric grid is that generation can’t all be built in the same place and transmission relied upon to deliver to any location.

– Sends price signals to locate generators in the proper areas or build transmission into constrained areas

Doesn’t LMP already do this?

Page 16: Issue: The Missing Money

16www.ces-ltd.com

Locational Capacity Pros and Cons

• Arguments against:

– If a location is constrained, it will already be subject to higher LMP prices and higher capacity prices only serve to punish the load in that area further.

– If the previous construct allowed obligation to be met with remote resources, entities that believed they had satisfied their obligation for the long-term may find that the resource they contracted with no longer satisfies the requirement.

Page 17: Issue: The Missing Money

17www.ces-ltd.com

Transmission Impacts

• The forward capacity markets are intended to help bolster transmission upgrades– PJM’s RPM allows transmission upgrades to be offered into

the market to increase the transmission capacity into constrained Locational Deliverability Areas

– Locational price differences will help justify economic upgrades developed by PJM

• The key is that transmission planning still needs to occur on a longer horizon– RTO’s cannot count on these capacity markets along to

develop the system!

Page 18: Issue: The Missing Money

18www.ces-ltd.com

Other RTO Solutions

• ISO-NE: – Forward Capacity Market, similar to PJM

• Contains locational component• Three year forward procurement

– Descending clock auction

• MISO:– Hybrid approach that pairs a bilateral based decentralized

capacity construct with a formalized scarcity pricing mechanism.

– Theory is that capacity markets with forward procurement and longer commitment periods are attempts to emulate in an administrative fashion the outcomes that should occur from a competitive market.

– Called “Reliability Through Markets (RTM)”

Page 19: Issue: The Missing Money

www.ces-ltd.com

Questions?

Erik PaulsonDirector of Regulatory Affairs, PJM

[email protected]