Social Monitoring Report
This report has been submitted to ADB by the Project Implementation Unit, UEAP- Tourism (Garhwal), Dehradun, Government of Uttarakhand, Dehrdaun and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB.
This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area
Project Number: 47229-001 May 2017 Period: July 2016 – December 2016
IND: Uttarakhand Emergency Assistance Project
Submitted by
Project Implementation Unit, UEAP - Tourism (Garhwal), Dehradun
1
2
Contents
I. Project Fact Sheet .4
1. Introduction .. .5
2. Need of the Subproject ..5
3. Objective of the Subproject .5
4. Impact and Outcome 6
5. Output .. .6
6. Project Beneficiaries ..6
7. Sub project Summary & Implementation Status ..7
8. Land Acquisition and Involuntary Resettlement .12
9. Indigenous Peoples .12
10. Gender Issues ..13
11. Public Consultation .13
12. Grievance Redress Mechanism 14
13. Photographs of Public Consultation ...15
3
ABBREVIATIONS
ADB Asian Development Bank
AP Affected Person
CBO Community Based Organization
CREDA Centre for Rural and Ecological Development
DSC Design and Supervision Consultants
EA Executing Agency
FGD Focus Group Discussions
FHH Female Headed Household
GoI Government of India
GoU Government of Uttarakhand
GRC Grievance Redressal Committee
GMVN Garhwal Mandal Vikas Nigam
KMVN Kumaun Mandal Vikas Nigam
IA Implementing Agency
IP Indigenous Peoples
IR Involuntary Resettlement
PMU Program Management Unit
PIU Program Implementation Unit
LA Land Acquisition
NGO Non-Government Organizations
PIU Project Implementation Unit
RoW Right of Way
RF Resettlement Framework
RP Resettlement Plan
R&R Resettlement & Rehabilitation
SC Schedule Caste
ST Schedule Tribe
TRH Tourist Rest House
UEAP Uttarakhand Emergency Assistance Program
4
I. Project Fact Sheet
Brief Summary of Project
Funded by Asian Development Bank
Loan No 3055- IND
Package No. UK/UEAP-T(KMVN) /NTL/01& 02 (R2),
UK UEAP-T(GMVN)/DDN/03 to 09
Subject Semi Annual Social Safeguard Monitoring Report for
the construction of FRP, LGFS and Hybrid Huts in 5
districts of Uttarakhand
Duration January 2016 to June 2016
Districts Bageshwar, Pithoragarh, Uttarkashi, Rudraprayag &
Chamoli
Implementation Agency Project Implementation Unit- Tourism , Uttarakhand
Executing Agency State Disaster Management Authority, Uttarakhand
IR & IP Category C ( No Impact)
5
1. Introduction
The Uttarakhand Emergency Assistance Project (the project) envisages rehabilitation and
reconstruction of state roads and bridges including urban roads, tourism infrastructure
(including construction of trekking routes), urban water supply and construction of helipads
which were devastated due to unprecedented cloud bursts, incessant rains, major floods, and
landslides in the upper valleys during 15-17 June, 2013. Some major pilgrimage centres in
the districts of Rudrarayag, Chamoli, Uttarkashi Bageshwar and Pithoragarh were affected
seriously. It is anticipated that the project will provide economic and social revival from the
disaster in Uttarakhand state. One of the components is rehabilitation and reconstruction of
Tourism assets of above mentioned five districts of Uttarakhand.
The Uttarakhand Emergency Assistance Project for Tourism (UEAP) targets enhanced
economic growth and provision of livelihood opportunities for local communities through
tourism infrastructure development with a focus on preservation and development of natural
and cultural heritage and incidental services. The Program supports the state of Uttarakhand
to develop the tourism sector as a key driver for economic growth.
2. Need of the Sub Project
The subproject of Tourism has been taken up for the reconstruction and restoration of the
damaged tourism assets of the Uttarakhand. Proposed subprojects would strengthen state s
coping mechanism and help in reviving tourism in Uttarakhand. Construction of
environmentally sustainable, affordable accommodation for tourists with eco-friendly
material would help in bridging the gap in the shortage of accommodation during the tourist
season. The sub-project would ensure the provision of affordable yet safe accommodation to
tourists at various destinations in the form of LGFS/FRP huts which are aesthetically and eco-
friendly designed, taking into consideration the natural landscape of the area. These
accommodation facilities coupled with toilet facilities would encourage tourists to stay at
most frequented locations.
Reconstruction/Redevelopment/Strengthening/Restoration of the assets of tourism has
become imperative to provide better and safe accommodation facility to the tourists /pilgrims
of Chardham yatra and livelihood opportunities for local communities with a focus on
preservation and development of natural and cultural heritage and incidental services.
3. Objectives of the subproject
The program objectives are:
• To provide livelihood opportunities for local communities through tourism
infrastructure development, with a focus on preservation and development of natural
and cultural heritage and incidental services.
• To revive the interest and faith of the tourists/pilgrims in Uttarakhand tourism after
the calamity of June 2013.
• To boost up the economy of the Uttarakhand region as tourism is one of the major
sources of revenue in Uttarakhand.
6
4. Impact and Outcome
The subproject is expected to increase the tourist inflow, generate employment opportunities
for young people and for people interested in surrounding villages. As tourism activities
increase, there will be more opportunities for development of retail trade, restaurant and
entertainment options, transport services and this will generate more income. It provides
opportunities for the residents of nearby villages to interact with other people, lifestyles and
cultures. Overall, improving basic infrastructure and services will definitely attract people
and provides a rich experience for tourists, economic benefits to the local people and support
to the reserve.
5. Outputs
The outputs of the Program are:
1. Improved basic urban infrastructure and services at tourist destinations and attractions.
2. Improved connectivity
3. Enhanced quality of natural and cultural attractions
4. Greater participation by local communities in tourism-related economic activities
5. Strengthened capacity of sector agencies and local communities for planning,
development, management, and marketing of tourist destinations and attractions
6. Project Beneficiaries
The primary beneficiaries would be the communities of the affected districts in the State and
the tourist visiting Char-dham shrines that would benefit from the increased accommodation
capacity of the region and improved accommodation facilities for tourist/ pilgrim. Despite
increased accommodation facilities for tourist, it would generate indirect employment for the
locals. Through strengthening of environmentally sustainable tourism support infrastructure,
the project has the potential to benefit the entire State of Uttarakhand.
7. Sub-Project Summary and Implementation Progress of the Sub-Projects
The Uttarakhand Emergency Assistance Project for Tourism (UEAP) targets enhanced
economic growth and provision of livelihood opportunities for local communities
through tourism infrastructure development with a focus on preservation and
development of natural and cultural heritage and incidental services. As tourism
activities increase, there will be more opportunities for development of retail trade,
restaurant and entertainment options, transport services and this will generate more
income. It will provide opportunities for the residents of nearby villages to interact with
other people, lifestyles and cultures. Overall, improving basic infrastructure and
services will definitely attract people and provides a rich experience for tourists,
economic benefits to the local people and support to the reserve.
Under this project the damaged tourism assets are being reconstructed so that the
interest and faith of the tourists in Uttarakhand Tourism can be revived and the
economy of the state which is mostly dependent on the tourism can be invigorated. This
7
project mostly belongs to Char Dham Yatra Route and Kailash Mansarovar Yatra Route.
It is divided in total nine packages in which package 1 and 2 are in Kumaun region
which is being implemented by Tourism Project Implementation Unit- KMVN (Kumaun
Mandal Vikas Nigam) Nainital and rest 7 packages are in GMVN (Garhwal Mandal Vikas
Nigam) which are implemented by GMVN Dehradun.
Package 1 covers Pithoragarh district in which 100 FRP huts in 17 locations have been
proposed and package 2 covers Bageshwar district in which 45 FRP huts at 9 locations
are proposed to be constructed as FRP Huts.
Package 3 covers the Uttarkashi district, at 6 locations in which total 21 hybrid huts are
to be constructed. Package No. 4 covers the Rudraprayag District, where only one sub-
project location is proposed in which total 8 Hybrid huts are to be constructed at
Kanakchauri. Package No. 5 covers the Chamoli District, where 5 sub-project locations
are proposed in which total 32 Hybrid huts are to be constructed. In Package No. 6
constructions/reconstruction of Tourism Assets are proposed in Rudraprayag District.
Total 84 LGFS huts, 1 MPH, 1 MDH and 4 Night Shelters are to be constructed at 6
locations of Rudraprayag District. Package No. 7 contains the Rehabilitation and
Restoration of existing Tourist Rest houses at 6 locations of Rudraprayag District.
Package No. 8 contains the Renovation and up gradation of damaged assets at 10
locations of Chamoli and Uttarkashi districts. Package 9 contains Renovation &
Upgradation of additional damaged Tourism Assets in Chamoli & Uttarkashi District at
11 existing sites in line with Package no. 08. The details of these subprojects are
summarized in the following table 1 to 3.
Project Progress of Package-1 and 2
District Pithoragarh Package No.1 - [UK/UEAP-T (KMVN)/ NTL/01 (R2) Proposed
Huts- 100
Package 1 covers two blocks Dharchula and Munsiyari of district Pithoragarh. Both
blocks situated in the route of Kailash Mansarovar Yatra & Milam Glaciar Track Route.
In this package there are 17 sub projects sites and where 100 FRP Huts are proposed to
be constructed. The construction work for all 17 sites has been started. The progress of
sites is given in Table-1.
Table -1: Detail & Implementation progress of location
S.
N.
Block Construc
tion of FRP in Pithorag
arh
Land
Status
No of
Huts sanctioned
Land
Available
Work progress Remark
1 Dharchula Gunji Tourism
Depart
10 2000 10 huts has been installed Furniture reached at site
Work is stopped due to snow fall and routes are
blocked
8
2 Budi (Chhiyala
k)
ment 10 1400 4 FRP huts has been constructed Furniture
reached at site Toilet work is under progress
As per requirement 4 FRP huts has been
installed remaining huts have been approved by ADB on 25/04/2016 for
the other subproject location in the SAR. No requirement for
remaining FRP huts at site
3 Kalapani 9 2400 Plinth work of 9 Huts
completed FRP huts reached at site for installation
Work stopped due to bad weather condition and route blocked
4 Nabhidha
ng
10 1000 10 FRP Huts installed.
Furniture reached at site Toilet work is under progress
5 Narayan
Ashram
5 2000 5 FRP huts has been installed
Furniture reached at site
6 Malpa (Lamri)
7 400 7 FRP Huts installed Furniture reached at site
Toilet work is under progress
7 Gala
Government Land
5 600 4 FRP huts completed with Door Windows and retaining
wall Furniture reached at site
As per requirement 4 FRP huts has been
installed remaining huts have been approved by ADB on 25/04/2016.
No requirement for remaining FRP huts work stopped due to
bad weather condition.
8 Kutti
Tourism
Department
5 1000 Plinth work of all huts
completed
work stopped due to bad weather condition
9 Burfu
5 650 Plinth work of all huts
completed
10 Dugtu 5 1000 All FRP huts have been
installed
11 Bedang 5 1000 Site inaccessible
12 Balling
5 600 All FRP huts have been
installed
13 Munsiyari Ghangar 5 1150 Plinth work has been completed
14 Martoli 5 1000 Plinth work of all huts completed and Huts have been carted at site
15 Ralam 5 1000 Plinth of huts and toilets completed
16 Sirkha Leased 6 570 FRP Huts have been installed.
Furniture reached at site
17 Tola Leased 5 1200 Plinth of huts and toilets completed
Package-No 2-[UK/UEAP-T (KMVN)/ NTL/01 & 2 (R2) Bageshwar District 45 Huts
proposed
Package 2 covers Kapkot block in district Bageshwar. This block is situated on the trek
route of Pindari Glacier. There are total 9 sub-projects where 45 FRP huts are proposed
to be constructed. The construction work at all sites has been started. The progress of
location/site details are given in table-2.
9
Table -2: Detail & Implementation progress of location
S.N Block Construction
of FRP in
Bageshwar
Land
Status
No of
Huts
sanct
ioned
Land
availab
le
Work progress Remark
1
Kapkot
Supi
Owned by Tourism
Dept.
5
1200 5 huts with toilets have been
installed
2 Jhooni
5
400 5 Huts and 3 toilets have been
installed
Sanitary work is in progress
3 Badiyakot
5
400 5 Huts and 3 toilets have been
installed
4 Pindari Phurkiya
5 400
3 Huts have been
installed
Only 3 FRP huts will be constructed as per
requirement. remaining huts have been approved by ADB on
22/03/2016. Work stopped due to bad weather condition
5 Jaikuni 5 400
5 Huts and 3 toilets have been installed
RR dry wall work is in progress
6 Sorag 7 400
7 Huts 3 toilets have been installed
Water line work is in progress
7 Baccham Tok
Dhakuri 5 400
5 Huts and 3 toilets have been installed Ground
levelling and RR dry wall work is also completed
Finishing work is in progress
8 Teek
Donated
5 600 5 Huts and 3 toilets have been installed
Dannama Land, DDR and SAR approved by ADB
9 Sorag Tok
Dhoor 5 500
5 Huts and 3 toilets have been installed
approach and water line work is also completed
Dannama Land, DDR and SAR approved by ADB
In this duration the following SAR have been prepared and submitted to ADB for
approval-
1. Supply and Installation of Solar Street Light and Solar Water Heater.
2. Supply and Installation of Sewage Treatment Plan
3. Supply and Installation of Furniture, kitchen equipment and utensils.
4. Supply and Installation of Reverse Osmosis Water Purifier system
5. Rehabilitation and modernization of Tourism Assets in Disaster Affected Districts Bageshwar & Pithoragarh
Table 3: Implementation Progress Package 3 to 9 of GMVN
Package 3 covers the 6 locations of Uttarkashi whereas package 4 covers the one site of
Rudraprayag District and package 5 is in Chamoli district having 5 locations. In these all the
10
three Packages, Hybrid huts are being constructed on the other hand package 6 of Rudraprayag
district having 6 locations LGFS Huts are being constructed. Package 7 is basically
Rehabilitation and Restoration of Tourist Rest Houses in Various Locations at Rudraprayag
District and package 8 is Renovation and up gradation of damaged tourist assets in Chamoli
and Uttarkashi District. In the same way package 9 is Renovation & Upgradation of additional
damaged Tourism Assets in Chamoli & Uttarkashi District (Kaleshwar, Aadibadri, Gopeshwar,
TL Badrinath & Yatri Niwas Badrinath-500 bed in Chamoli District and Purola, TRH- Barkot
Annexy, TL Barkot, TRH Syanachatti, TRH-Hanumanchatti & TRH Maneri in Uttarkashi
District.
Till the end of December 2016 civil works on all the 7 packages of Garhwal has been started.
Package 3, 4, 5 and 6 are construction of new huts (Hybrid & LGFS) at different locations of
Rudraprayag, Chamoli and Uttarkashi. In rest 3 packages (Package no 7, 8 and 9) there is only
the work of renovation and restoration in existing TRHs. No any social issue envisaged on any
of the sub-project started so far. In Garhwal out of 18 sites work on the entire site is in
progress. In package no 6, (two sites Guptkashi and Gaurikund) construction of one LGFS hut
at each of the site has been completed and made available for the use of tourists. In Package no.
7 and 8 & 9 works of renovation and restoration has been started. In package no. The detail of
implementation progress of package 3-9 is given in the following table no 3.
11
Table no. 3
S .no Location (District)/ type of
Huts
Package No. Land
ownershi
p
No of Huts Physical Progress
1 Package no. UK UEAP-
T(GMVN)/DDN/03 includes
the construction of Hybrid
Huts in 6 towns of
Uttarkashi such as Purola,
Barkot, Raithal, Barsu,
Harshil and Phoolchatti,
UK UEAP-
T(GMVN)/DD
N/03
Tourism Total no of
blocks are13
having 21
rooms on 6
sites of
package -03
72% physical work has been completed
and works on all the sites are still under progress. No social issues envisaged as the
construction of the huts are within the premises of the GMVN. During field visit it is observed that locals are satisfied. In
some of the sites local expressed that
during pilgrimage season we will get
benefitted financially as well as culturally.
2 Package no. UK UEAP-
T(GMVN)/DDN/04 includes
the construction of Hybrid
huts at Kanakchauri in
Rudraprayag district
UK UEAP-
T(GMVN)/DD
N/04
Tourism There are 2 blocks having 8
rooms on one
site of package
4
Kanakchauri is a very beautiful place in Rudraprayag district. It on the foot of the
hill where Kartik swami temple is situated.
It is a place where tourists use to go in all
the season. 60% physical work has been completed on this site. Locals are supporting the work of the UEAP as
according to them it will help them enhancing the cultural as well financial
conditions.
Package no. UK UEAP-
T(GMVN)/DDN/05 includes
the construction of Hybrid
Huts in 5 towns of Chamoli
such as Pandukeshwar,
Lohjung, Auli, Joshimath,
Deval
UK UEAP-
T(GMVN)/DD
N/05
Tourism
In Chamoli there are total 8
blocks including 32
rooms at 5 sites in different towns.
In Chamoli total 77% physical work has been completed and remaining work is
under progress. During public consultation pamphlets has been distributed to the
community to make them aware about the project activities. After knowing the work of UEAP the community responded
positively and revealed that how they will get benefitted by this project after
completion.
4 Construction/Reconstruction
of LGFS structures at 6
locations in Rudraprayag
District. It is all under
Package no. UK UEAP-
T(GMVN)/DDN/06 and the
locations are Tilwara, Jakholi,
Sonprayag, Triyuginarayan,
Gaurikund & Guptkashi
UK UEAP-
T(GMVN)/DD
N/06
Tourism
In Rudraprayag
there are total
84 rooms in 21
blocks
including 1
MPH, 1 MDH
and 1 night
shelter at 6
different
locations.
In Rudraprayag district work is under progress at total 6 locations. The work of huts at two sites in this package that is
Guptkashi and Gaurikund has been completed and handed over to the
department on June 2016. The department
earned total Rs. 315000 and Rs.66330
from Guptkashi and Gaurikund
respectively during the Pilgrimage
season (July, Aug, Sep and Oct 2016).
As a whole only 62% work of this package has been completed so far.
5. Rehabilitation and
Restoration of Tourist Rest
Houses in Various Locations
at Rudraprayag District in
Tilwara, Jakholi, Guptkashi,
Rampur, Trituginarayan and
Gaurikund.
UK UEAP-
T(GMVN)
/DDN/07
Already
Existing
TRHs
As it is a work
going on the
already
existing 6
TRHs of
Rudraprayag
District.
As Rudraprayag is the most effected district during the disaster of June 15 to
17, 2013, the tourism assets also got damaged. So many TRHs were merged within the Mandakini river and some were
partially damaged which needs to be restored. For restoration 6 sites of
Rudraprayag has been taken into consideration. As renovation /restoration work is in the existing TRHs which are
within the premises of GMVN, there is no any issue to the local community.
12
6 Renovation and up gradation
of damaged Tourism Assets
in Chamoli and Uttarkashi
District in Joshimath Old,
Guchar, Karnprayag,
Gairsain, Joshimath New
Nandprayag, Pipalkoti, Hotel
Devlok Badrinath and
Uttarkashi
UK UEAP-
T(GMVN)
/DDN/08
Already
Existing
TRHs
It is a work of
Renovation &
up gradation at
already
existing 10
sites. Out of
which 8 Sites
at Chamoli & 2
Sites at
Uttarkashi.
Chamoli and Uttarkashi are the two districts besides Rudraprayag in Garhwal
region which were badly damaged during the disaster of June 2013.Disaster also
affected the tourism as well as tourist guest houses which needs to be renovated. All the work of Renovation and Up gradation
is in the existing TRHs which are within the premises of GMVN and without
creating any issues.
7.
Renovation & Upgradation of
additional damaged Tourism Assets in Chamoli &
Uttarkashi District (Kaleshwar, Aadibadri, Gopeshwar, TL Badrinath &
Yatri Niwas Badrinath-500
beded in Chamoli District and
Purola, TRH- Barkot Annexy, TL Barkot, TRH Syanachatti,
TRH-Hanumanchatti & TRH Maneri in Uttarkashi District) in line with Package no. 08.
UK/UEAP-
T(GMVN)/DDN/09/LOT
C1/C2/C3/C4/ C5/U1/U2/U3/U4/U5/U6
Renovatio
n and Up gradation
of exiting TRHs
It is a work of
Renovation & up gradation at
already existing 11 sites. Out
which 6 Sites
at Chamoli & 5
Sites at Uttarkashi.
The contracts of all 11 lots have been
awarded on 07.09.2016 and notice to proceed has been issued on 28.10.2016 for
8 out of 11 lots. Work is being started. As all the work is on the existing TRHs there is no social issue.
8. Land Acquisition and Involuntary Resettlement
The subproject Tourism does not entail any permanent land acquisition and resettlement. Efforts have
been made by the engineering team to minimize the resettlement impact by considerable design as all
the implementation activities under this subproject will be confined to the existing place only. Most of
the works will be undertaken within the existing campus of GMVN & KMVN except four sites of
KMVN that is Teek, Sorag Tok Dhoor, Sirkha & Tola. Out of four sites two are leased land two are
donated land.
The DDR for the same has been submitted to ADB on 22nd
July 2016 and got the approval on August
11, 2016 from ADB. All the above four land is a barren land. There was neither any construction work
on the land or used as agricultural purpose by the owners of the land. They provided their land after
understanding the project and its benefits. As they are well aware about the tourism activity and its
benefits they donated their land to the department. They were involved there in the tourism activity as
guide, porter and restaurant owner etc.
As it is an implementation phase, no social impact has been seen so far. Therefore, it is proposed that
works are carried out in phases, so that disturbance could be minimized.
As per baseline survey conducted, there is no physical or economic, temporary or permanent, IR
impact. Under this sub project no person or community is being adversely affected, rather, the tourists
and local community will be benefited. Similarly, no land or asset acquisition is necessitated in this
sub-project. So people and communities will not be physically or economically displaced due to the
sub-project interventions.
9. Indigenous Peoples
In this subproject not a single household or person of indigenous community will be negatively
impacted. Instead, they will enjoy the same benefits as other people of the state i.e. the project will
help them in restoring their livelihood opportunities through increased tourist influx in the state. The
subproject is categorized as Category C for Indigenous Peoples and hence, no indigenous people
13
plan (IPP) is required. However, an Indigenous Peoples Planning Framework (IPPF) is in place to
suggest mitigation measures for all negative impacts on indigenous people.
10. Gender Issues
The project will not have any adverse impact on status of women except some positive potential
employment scope. However, as a part of social due diligence, focused group discussions were
conducted with the women groups in the surrounding villages of the project site to create awareness
among them regarding developmental activities and their livelihood opportunities which are likely to
come up. Consultation will be a continuing activity during implementation of the project. The
implementing NGO has been conducting series of consultation meetings, focus group discussions
(FGD), particularly with females in community and labours employed in construction works etc, on
safety and security measures of employment opportunity, policy of equal payment for similar work by
male and female workers and on other similar issues. They are also conducting meeting and
consultations with community people on health and hygiene. They conducted awareness campaigns on
HIV/ AIDS and prepared and distributed IEC material on the same.
11. Public Consultation
Public consultation and information disclosure is an integral part of the social assessment process.
During the project formulation stage and preparation of DPR consultation were held with all the
stakeholders for incorporating their views. Considerable dialogue was held with the EA/IA during the
due diligence process and this will continue throughout the construction and implementation process.
The proposed sub projects will in fact bring lot of benefit to mass people in the urban centres of the
subproject area. Since the construction will be done mostly along on the GMVN/KMVN/Government
Land, so, there will be no need for additional land. But on four sites of KMVN private land has been
taken up in which land of two sites is donated and two sites is leased.
Public Consultation for the Awareness of Project for Tourism KMVN- Package1 & 2 -
Public consultation is a continuous process for the formulation and implementation of the
project. In this duration social expert and officials of KMVN have organized public consultation/
meetings at different locations of project. The objective of the public consultations was to build
capacity and enhance understanding of project to community, labours and contractors. They
also aware and sensitized them for health & hygiene, HIV/AIDs, equal wage for equal work under
GAP, core labour laws and use of PPEs for labours. One brochure has also been prepared in Hindi
language for the distribution among the community. Information boards are also being prepared
for sites by which community can aware about the project.
The brief description of the of consultations which have been carried out is given below in Table
no- 4
No of
Public
Consultati
ons (PC)
Date Venue Total
participants
Total number of
Women
participants
List Topics covered Remark
01 PC 15/11/2016
Patal
Bhubnes
war
5 01
14
01 PC 15/11/2016 Bageswar 11 01
Information & Benefit of
project, awareness for GAP
GAP and Social Safeguards
Organized by officials of
UEAP,PIU-T,KMVN
01 PC 15/1/2016 Baijnath 11 00
01 PC 16/11/2016 Munsyari 06 0
01 PC 16/11/2016 Didihat 06 0
01 PC 23/11/2016 Jaikuni 07 0
01 PC 23/11/2016 Bacham
Tok
Dhakuri
07 0
01 PC 23/11/2016
Sorag Tok
Dhoor 08 0
Public Consultation of Tourism GMVN Package 3 to 8
Public consultation has been regularly organised on the different locations of the sub project by the
NGO or by the social expert. During public consultations project information has been dispersed to the
community to make them aware about the project activities and benefits which they will get in near
future after the completion of the project when the tourist influx will be there.
Along with public consultations NGO CREDA organises different awareness activities with school
children, teachers, local community including FPIUs, contractors and labours in order to make them
aware about safety and security measures, employment opportunity, policy of equal payment for
similar work by male and female workers, law against engagement of child labor, and other similar
issues. One disclosure brochure of each district of Garhwal has been prepared by NGO in Hindi
language for distribution among the community to make the community aware about the project (The
brochures are attached here with the report). They are also conducting awareness activities among
community people and labours on health and hygiene, HIV/ AIDS and prepared & distributed IEC
material on the same. During this reporting period they have covered different sites of Chamoli in the
month of October 2016, Uttarkashi in November 2016 and Rudraprayag in the month of December
2016.
12. Grievance Redress Mechanism (GRM)
A robust and efficient GRM has been established to assist DPs/ community/stakeholders in resolving
their quarries and complaints at PMU level and a dedicated phone no for registering the grievances and
complaints from any stakeholders or individuals is also in operation. The dedicated no. is 0135-708376
and email-id is [email protected] . The DPs/ APs can also register complaints/inquiry/
grievances online through the web link: www.ukdisasterrecovery.co.in.
15
Photographs of Public Consultation at different sites
Didihat
Sorag tok Dhoor
Public Consultation at Gaurikund
Bacham Tok Dhakuri
Public Consultation and Gap Awareness at Gauchar Public Consultation at Uttarkashi
16
17
18
19